CN201301179Y - Crawler crane self-dismounting device - Google Patents

Crawler crane self-dismounting device Download PDF

Info

Publication number
CN201301179Y
CN201301179Y CNU2008201395836U CN200820139583U CN201301179Y CN 201301179 Y CN201301179 Y CN 201301179Y CN U2008201395836 U CNU2008201395836 U CN U2008201395836U CN 200820139583 U CN200820139583 U CN 200820139583U CN 201301179 Y CN201301179 Y CN 201301179Y
Authority
CN
China
Prior art keywords
mast
pulley
self
crawler crane
disassembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201395836U
Other languages
Chinese (zh)
Inventor
史先信
孙丽
余钦伟
韩向芹
丁美莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Machinery Branch of XCMG
Original Assignee
Xuzhou Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Heavy Machinery Co Ltd filed Critical Xuzhou Heavy Machinery Co Ltd
Priority to CNU2008201395836U priority Critical patent/CN201301179Y/en
Application granted granted Critical
Publication of CN201301179Y publication Critical patent/CN201301179Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a crawler crane self-dismounting device, comprising a lambda-shaped bracket, a mast, a drop hanger, a pulley block, and an amplitude hoist and a lifting hoist which are provided with cable wires; wherein, the pulley block is composed of a pulley and a pulley bracket; the upper end part of the mast is provided with a mounting attached base, the pulley bracket of the pulley block is articulated with the mounting attached base; the cable wire of the lifting hoist is connected with the drop hanger by the pulley block; the cable wire of the amplitude hoist is connected with the mast by a pulley at the upper end of the lambda-shaped bracket. The crawler crane self-dismounting device utilizes the hoists and the drop hanger of the crawler crane for carrying out operation; the amplitude hoist is connected with the mast by the pulley at the upper end of the lambda-shaped bracket for controlling the posture of the mast, and the lifting hoist is connected with the drop hanger by the pulley block which is additionally arranged at the upper end part of the mast for carrying out swing conveying; the working range of self-dismounting is wide by virtue of the mast of the crawler crane, thereby being beneficial to disassembling and assembling each knock-down component and further improving the operating efficiency.

Description

履带起重机自拆装装置 Crawler crane self-disassembly device

技术领域 technical field

本实用新型涉及履带起重机,具体涉及履带起重机自拆装装置。The utility model relates to a crawler crane, in particular to a self-disassembling device for a crawler crane.

背景技术 Background technique

近年来,随着履带起重机的大型化发展,履带起重机各个主要部件(如桁架臂,履带梁,上车配重,下车配重等)的自重也越来越重,而履带起重机自身无法进行长距离行走转场,需要将各个部件拆解分别运输,到工地之后进行现场组装。由于具备完善的自拆装功能的履带起重机,既可以节省拆装时间,又能节约租赁辅助吊车的费用。因此,实现起重机转场时各主要部件的自行拆卸和组装已成为履带起重机的新课题。In recent years, with the large-scale development of crawler cranes, the weight of each main component of crawler cranes (such as truss arms, crawler beams, upper and lower counterweights, etc.) For long-distance walking and transition, each component needs to be disassembled and transported separately, and then assembled on site after arriving at the construction site. Because of the crawler crane with perfect self-disassembly function, it can not only save disassembly time, but also save the cost of renting auxiliary cranes. Therefore, it has become a new topic for crawler cranes to realize the self-disassembly and assembly of the main components when the crane is transferred.

目前,国内外履带起重机大多具有自行拆卸和组装的功能,大致分为两种实现方式,一是自拆装的实现借助于人字架来完成,一是自拆装的实现借助于桁架式吊臂底节来完成。二者的基本操作原理相似,进行自拆装作业时均需加装一个导向滑轮,该导向滑轮设置在人字架或底节臂的上端部,利用主机的卷扬、钢丝绳及吊钩作为自拆装作业的吊装工具,从而完成履带梁、上车配重、下车配重及桁架臂等部件的自行拆卸或装配作业。At present, most crawler cranes at home and abroad have the function of self-disassembly and assembly, which can be roughly divided into two ways. One is to realize self-disassembly and assembly by means of a gable frame, and the other is to realize self-disassembly and assembly by means of a truss-type crane. Bottom section to complete. The basic operating principles of the two are similar, and a guide pulley needs to be installed when performing self-disassembly and assembly operations. It is a lifting tool for disassembly and assembly operations, so as to complete the self-disassembly or assembly of track beams, on-board counterweights, alighting counterweights, and truss arms.

实际应用中,由于人字架和底节臂受自身结构尺寸的限制,因此在自拆装作业中工作幅度有限,影响自拆装的作业效率。In practical application, since the gable frame and the bottom section arm are limited by their own structural size, the working range in the self-disassembly operation is limited, which affects the efficiency of the self-disassembly operation.

实用新型内容Utility model content

针对上述缺陷,本实用新型解决的技术问题在于,提供一种具有较大工作幅度的履带起重机自拆装装置,以提高自行拆卸或组装作业的工作效率。In view of the above defects, the technical problem solved by the utility model is to provide a crawler crane self-disassembly device with a relatively large working range, so as to improve the work efficiency of self-disassembly or assembly operations.

本实用新型提供的履带起重机自拆装装置,包括:人字架、桅杆、吊钩、滑轮组及具有钢丝绳的变幅卷扬和起升卷扬,其中,所述滑轮组由滑轮和滑轮架组成;所述桅杆的上端部具有安装附座,所述滑轮组的滑轮架与所述安装附座铰接;所述起升卷扬的钢丝绳通过所述滑轮组与所述吊钩连接;所述变幅卷扬的钢丝绳通过人字架上端的滑轮与所述桅杆连接。The crawler crane self-disassembly device provided by the utility model includes: a herringbone frame, a mast, a hook, a pulley block, and a luffing hoist and a lifting hoist with a steel wire rope, wherein the pulley block is composed of a pulley and a pulley frame; The upper end of the mast has an attachment seat, and the pulley frame of the pulley block is hinged to the attachment seat; the wire rope of the hoisting winch is connected to the hook through the pulley block; the luffing winch The steel wire rope is connected with the mast through the pulley at the upper end of the gable.

优选地,桅杆前伸时,所述安装附座置于所述桅杆顶部的下侧表面。Preferably, when the mast is stretched forward, the attachment seat is placed on the underside surface of the top of the mast.

所述安装附座为两个,沿所述桅杆的纵向中心线对称设置。There are two mounting seats, which are arranged symmetrically along the longitudinal center line of the mast.

所述安装附座上具有通孔,且两个安装附座上的通孔同轴设置。There are through holes on the attachment base, and the through holes on the two attachment bases are arranged coaxially.

优选地,还包括铰接销轴,所述滑轮架的上端部具有铰接通孔,铰接销轴穿装在滑轮架的铰接通孔和所述安装附座的通孔内,实现滑轮架与安装附座之间的铰接。Preferably, it also includes a hinge pin shaft, the upper end of the pulley bracket has a hinge through hole, and the hinge pin shaft is installed in the hinge through hole of the pulley bracket and the through hole of the installation attachment seat, so as to realize the connection between the pulley bracket and the installation attachment. The hinge between the seats.

本实用新型所提供的履带起重机自拆装装置,利用履带起重机自身的卷扬和吊钩进行作业,其中,选用履带起重机上的吊钩,缠绕相应的倍率;变幅卷扬通过人字架上部的滑轮与桅杆连接,用于控制桅杆的姿态,起升卷扬通过桅杆上端部增设的滑轮组与吊钩连接,用于进行吊运,配合主机的回转即可进行其它主要部件的自拆装作业。The crawler crane self-disassembly and assembly device provided by the utility model uses the hoisting and hook of the crawler crane itself to carry out operations, wherein the hook on the crawler crane is selected to wind the corresponding magnification; the luffing winch passes through the upper part of the herringbone The pulley is connected to the mast to control the attitude of the mast. The hoisting hoist is connected to the hook through the pulley block added at the upper end of the mast for lifting. With the rotation of the main engine, other main components can be self-disassembled and assembled. .

与现有技术相比,本实用新型的技术方案借助履带起重机自带的桅杆来完成自拆装作业,其增设的滑轮组与桅杆的上端部铰接,无需改变现有桅杆的主结构和主功能,由于桅杆的长度相对较长,因此,相对于人字架和吊臂底节来说,借助履带起重机自带的桅杆进行自拆装作业的工作幅度较大,利于进行各分解部件的拆卸和装配,进而提高作业效率。Compared with the prior art, the technical solution of the utility model uses the mast of the crawler crane to complete the self-disassembly and assembly operation, and the additional pulley block is hinged with the upper end of the mast without changing the main structure and main function of the existing mast. Due to the relatively long length of the mast, compared with the gable frame and the bottom section of the boom, the self-disassembly and assembly operation with the help of the crawler crane's own mast is relatively large, which is beneficial to the disassembly and assembly of various disassembled parts , thereby improving work efficiency.

本实用新型所述履带起重机自拆装装置结构简单,操作简便易行,可用于履带梁、上车配重、下车配重、桁架臂等部件的自拆装作业,操作省力、安全可靠。The self-disassembly and assembly device of the crawler crane described in the utility model has a simple structure and is easy to operate, and can be used for self-disassembly and assembly of crawler beams, counterweights on the vehicle, counterweights on the vehicle, truss arms and other components, and the operation is labor-saving, safe and reliable.

本实用新型提供的履带起重机自拆装装置,可广泛应用于各种履带起重机。The crawler crane self-disassembly device provided by the utility model can be widely used in various crawler cranes.

附图说明 Description of drawings

图1是本实用新型所述履带起重机自拆装装置的使用状态示意图;Fig. 1 is a schematic diagram of the use state of the crawler crane self-disassembling device described in the utility model;

图2是图1的I部结构的A向视图;Fig. 2 is the A direction view of the I part structure of Fig. 1;

图3是使用本实用新型进行自拆装作业的示意图。其中:Fig. 3 is a schematic diagram of using the utility model to carry out self-disassembly and assembly operations. in:

图3a是履带梁的拆装示意图;Figure 3a is a schematic diagram of disassembly and assembly of the track beam;

图3b是下车配重的拆装示意图;Figure 3b is a schematic diagram of disassembly and assembly of the counterweight for getting off the car;

图3c和图3d是上车配重的拆装示意图;Figure 3c and Figure 3d are schematic diagrams of disassembly and assembly of the counterweight on the vehicle;

图3e是桁架臂的拆装示意图。Fig. 3e is a schematic diagram of disassembly and assembly of the truss arm.

图中:In the picture:

人字架1、人字架滑轮11、桅杆2、吊钩3、滑轮组4、滑轮41、滑轮架42、变幅卷扬5、变幅卷扬钢丝绳51、起升卷扬6、起升卷扬钢丝绳61、安装附座7、铰接销轴8、销轴卡板9、螺栓10;Herringbone frame 1, herringbone frame pulley 11, mast 2, hook 3, pulley block 4, pulley 41, pulley frame 42, luffing hoist 5, luffing hoist wire rope 51, hoisting hoist 6, hoisting coil Lifting steel wire rope 61, mounting base 7, hinge pin 8, pin clamping plate 9, bolt 10;

支腿油缸100、顶升油缸200、履带梁300、下车配重400、上车配重500、人字架油缸600、桁臂架700。Outrigger cylinder 100, jacking cylinder 200, crawler beam 300, getting off counterweight 400, getting on counterweight 500, herringbone cylinder 600, and truss arm frame 700.

具体实施方式 Detailed ways

本实用新型的核心思想在于,借助履带起重机的桅杆和增设的滑轮组实现大型履带起重机履带梁、上车配重、下车配重、桁架臂等部件的自拆装,以提高自拆装作业的效率。The core idea of the utility model is that, by means of the mast of the crawler crane and the additional pulley block, the self-disassembly and assembly of the large-scale crawler crane crawler beam, the counterweight of the upper vehicle, the counterweight of the lower vehicle, and the truss arm are realized to improve the efficiency of the self-disassembly operation. efficiency.

下面结合说明书附图具体说明本实施方式。The present embodiment will be described in detail below in conjunction with the accompanying drawings.

参见图1,该图是本实用新型所述履带起重机自拆装装置的使用状态示意图。Referring to Fig. 1, this figure is a schematic diagram of the use state of the crawler crane self-disassembly device described in the utility model.

如图1所示,所述自拆装装置包括:人字架1、桅杆2、吊钩3、滑轮组4及具有钢丝绳的变幅卷扬5和起升卷扬6。As shown in FIG. 1 , the self-disassembling device includes: a gable 1 , a mast 2 , a hook 3 , a pulley block 4 , and a luffing hoist 5 and a hoisting hoist 6 with wire ropes.

其中,所述人字架1、桅杆2、吊钩3和具有钢丝绳的变幅卷扬5、起升卷扬6均为履带起重机自带的功能部件,所述滑轮组4为增设的部件,它主要由由滑轮41和滑轮架42组成,待自拆装作业完成后,即可拆除。Wherein, the gable frame 1, the mast 2, the hook 3, the luffing hoist 5 with the wire rope, and the hoisting hoist 6 are all functional parts of the crawler crane, and the pulley block 4 is an added part, which Mainly be made up of pulley 41 and pulley frame 42, after treating that self-disassembling operation is finished, can dismantle.

所述桅杆2的上端部具有安装附座7,所述滑轮组4的滑轮架42与所述安装附座7铰接;所述变幅卷扬5的钢丝绳51通过人字架1上端的滑轮11与所述桅杆2连接,用于控制桅杆2的姿态;所述起升卷扬6的钢丝绳61通过所述滑轮组4与所述吊钩3连接,用于进行吊运待拆装部件,所述吊钩3选用履带起重机自带的吊钩,缠绕相应的倍率适应吊重的需要。The upper end of the mast 2 has a mounting base 7, and the pulley frame 42 of the pulley block 4 is hinged to the mounting base 7; The mast 2 is connected to control the attitude of the mast 2; the wire rope 61 of the hoisting winch 6 is connected to the hook 3 through the pulley block 4, and is used to lift parts to be disassembled. Hook 3 selects the hook that comes with the crawler crane, and the corresponding magnification of the winding is adapted to the needs of lifting.

如图1所示,桅杆2前伸时,所述安装附座7置于所述桅杆2顶部的下侧表面。实际上,所述安装附座7也可以设置在所述桅杆2顶部的端面上,可以理解的是,为使各承力部件获得较好的受力状态,所述安装附座7置于所述桅杆2顶部的下侧表面的布置方式,为最佳方案。As shown in FIG. 1 , when the mast 2 is stretched forward, the mounting base 7 is placed on the lower surface of the top of the mast 2 . In fact, the attachment seat 7 can also be arranged on the end surface of the top of the mast 2. It can be understood that, in order to obtain a better stress state for each load-bearing component, the attachment seat 7 is placed on the top of the mast 2. The arrangement of the underside surface of the top of the mast 2 is the best solution.

为了清楚地说明所述滑轮组4与桅杆2上端部的铰接关系,请参见图2,该图是图1的I部结构的A向视图。In order to clearly illustrate the hinge relationship between the pulley block 4 and the upper end of the mast 2 , please refer to FIG. 2 , which is an A-direction view of the I-part structure in FIG. 1 .

如图2所示,所述安装附座7为两个,沿所述桅杆2的纵向中心线对称设置。As shown in FIG. 2 , there are two mounting attachments 7 , which are arranged symmetrically along the longitudinal centerline of the mast 2 .

所述安装附座7上具有通孔,且两个安装附座7上的通孔同轴设置,以利于穿装销轴8。There are through holes on the said mounting base 7 , and the through holes on the two mounting bases 7 are arranged coaxially, so as to facilitate the pin shaft 8 to be worn.

所述滑轮架42的上端部具有铰接通孔,铰接销轴8穿装在滑轮架42的铰接通孔和所述安装附座7的通孔内,实现滑轮架42与安装附座7之间的铰接。The upper end of the pulley frame 42 has a hinged through hole, and the hinge pin 8 is worn in the hinged through hole of the pulley frame 42 and in the through hole of the attached seat 7 to realize the connection between the pulley frame 42 and the attached seat 7. the hinge.

其中,如图2所示,所述铰接销轴8的轴向定位采用销轴卡板9和螺栓10来实现,所述销轴卡板9置于在所述铰接销轴8的伸出端的卡槽内,并通过螺栓10将所述销轴卡板9与安装附座7固定连接。可以理解的是,所述铰接销轴8的轴向定位方式,不局限于图中所示的结构,也可以采用开口销等方式实现。Wherein, as shown in FIG. 2 , the axial positioning of the hinge pin 8 is realized by a pin clamp 9 and a bolt 10 , and the pin clamp 9 is placed on the protruding end of the hinge pin 8 . In the card slot, the pin shaft clamping plate 9 is fixedly connected with the mounting attachment seat 7 by bolts 10 . It can be understood that the axial positioning method of the hinge pin shaft 8 is not limited to the structure shown in the figure, and can also be realized by cotter pins or the like.

下面以整机的自拆装为例具体说明本实用新型所述履带起重机自拆装装置的工作过程。The working process of the self-disassembling device of the crawler crane described in the utility model is described in detail below by taking the self-disassembling of the complete machine as an example.

一、本实用新型所述履带起重机自拆装装置的组装。请参见图1。1. Assembly of the self-disassembling device of the crawler crane described in the utility model. See Figure 1.

首先,与车架铰接的四个支腿油缸100支撑并顶升主机脱离平板车;然后,将滑轮组4安装在桅杆2顶部,将起升卷扬钢丝绳61穿过滑轮组4,与选用的吊钩3连接;通过顶升油缸200顶升桅杆2摆向车前方,此时,变幅卷扬5放绳,使变幅钢丝绳51保持松弛状态;最后,当桅杆2摆至预定位置时,变幅卷扬5收绳,使变幅钢丝绳51处于张紧状态,顶升油缸200的两腔卸油。至此,完成自拆装作业的组装准备工作。自拆装装置的拆卸,操作过程相反。First, the four outrigger cylinders 100 hinged with the vehicle frame support and lift the main engine out of the flatbed; then, install the pulley block 4 on the top of the mast 2, pass the hoisting wire rope 61 through the pulley block 4, and connect it with the selected hook 3 Connect; lift the mast 2 through the jacking cylinder 200 and swing to the front of the car. At this time, the luffing winch 5 releases the rope to keep the luffing wire rope 51 in a relaxed state; finally, when the mast 2 swings to the predetermined position, the luffing coil Lift 5 and take in the rope, so that the luffing wire rope 51 is in a tensioned state, and the two cavities of the jacking oil cylinder 200 are unloaded. At this point, the assembly preparations for the self-disassembly operation are completed. The disassembly of the self-disassembly device is reversed.

二、履带梁的拆装。请参见图3a。Second, the disassembly and assembly of the track beam. See Figure 3a.

首先,将履带梁300吊起后,通过桅杆2的变幅使履带梁300离地;然后,通过主机的回转、桅杆2的变幅以及吊钩3的升降,使履带梁300到达安装位置并与车架装配。两履带梁300安装完毕后,将支腿油缸100收回,连接所有的液压电气接头,起重机即可自由行走。至此,完成履带梁300的安装作业。履带梁的拆卸作业,操作过程相反。Firstly, after the crawler beam 300 is hoisted, the crawler beam 300 is lifted off the ground through the luffing of the mast 2; then, through the rotation of the main engine, the luffing of the mast 2 and the lifting of the hook 3, the crawler beam 300 reaches the installation position and Assembled with frame. After the two crawler beams 300 are installed, the outrigger oil cylinder 100 is retracted, and all hydraulic and electrical connectors are connected, so that the crane can walk freely. So far, the installation work of the crawler beam 300 is completed. The disassembly operation of the track beam is reversed.

三、下车配重的拆装。请参见图3b。3. Disassembly and assembly of the counterweight when getting off the car. See Figure 3b.

首先,将下车配重400吊起,通过桅杆2的变幅使下车配重离地;然后,通过主机的回转、桅杆2的变幅以及吊钩3的升降,使下车配重400到达安装位置并与车架装配。主机回转180度,同样的方法将另一侧的下车配重400装好。至此,完成下车配重的安装作业。下车配重的拆卸作业,操作过程相反。Firstly, the alighting counterweight 400 is hoisted, and the alighting counterweight is lifted off the ground through the amplitude change of the mast 2; then, the alighting counterweight 400 Arrives at the installation location and assembles with the frame. The main engine turns 180 degrees, and the counterweight 400 on the other side is installed in the same way. So far, the installation work of getting off the counterweight is completed. The disassembly operation of the counterweight when getting off the car is reversed.

四、上车配重的拆装。请参见图3c和图3d。4. Disassembly and assembly of the counterweight on the vehicle. See Figure 3c and Figure 3d.

首先,通过主机的回转将上车配重500吊至车尾,按要求叠放完毕,如图3c所示。然后,调整起重机的位置,解除人字架1后侧杆上段和下段的直线状固定位置关系,后侧杆上段和下段之间铰接,利用人字架油缸600顶升上车配重500到规定位置,与主机连接,如图3d所示;最后,完成连接后,恢复人字架1后侧杆上段和下段的直线状固定位置关系。至此,完成上车配重500的安装作业。上车配重的拆卸作业,操作过程相反。First, lift the counterweight 500 on the vehicle to the rear of the vehicle through the rotation of the main engine, and complete the stacking as required, as shown in Figure 3c. Then, adjust the position of the crane, remove the linear fixed position relationship between the upper section and the lower section of the rear side bar of the herringbone frame 1, and hinge between the upper section and the lower section of the rear side bar, and use the herringbone oil cylinder 600 to jack up the counterweight 500 to the specified Position, connected with the host, as shown in Figure 3d; finally, after the connection is completed, restore the linear fixed position relationship between the upper and lower sections of the rear side bar of the herringbone frame 1. So far, the installation work of the boarding counterweight 500 is completed. The disassembly operation of the counterweight on the board is reversed.

五、桁架臂的拆装。请参见图3e。5. Disassembly and assembly of the truss arm. See Figure 3e.

首先,按工作要求组装桁臂架700的底节、标准节、顶节、防后倾杆等部件;然后,调整起重机位置,提升臂架根部到安装位置,与主机连接。至此,完成桁架臂600的安装作业。桁架臂的拆卸作业,操作过程相反。First, assemble the bottom section, standard section, top section, anti-roll bar and other components of the truss jib 700 according to the work requirements; then, adjust the position of the crane, lift the root of the jib to the installation position, and connect with the main machine. So far, the installation work of the lattice arm 600 is completed. The disassembly operation of the truss arm is reversed.

综上,本实用新型所述履带起重机自拆装装置结构简单,操作简便易行,可用于履带梁、上车配重、下车配重、桁架臂等部件的自拆装作业,操作省力、安全可靠,可广泛应用于各种履带起重机。In summary, the crawler crane self-disassembly device described in the utility model has a simple structure and is easy to operate, and can be used for self-disassembly and assembly operations of crawler beams, counterweights on the vehicle, counterweights on the vehicle, truss arms and other components, and the operation is labor-saving and convenient. It is safe and reliable, and can be widely used in various crawler cranes.

以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made, these improvements and Retouching should also be regarded as the scope of protection of the present utility model.

Claims (5)

1、履带起重机自拆装装置,包括人字架、桅杆、吊钩及具有钢丝绳的变幅卷扬和起升卷扬,其特征在于,还包括:1. The self-disassembly and assembly device of crawler cranes, including a gable frame, a mast, a hook, and a luffing winch and a lifting winch with wire ropes, is characterized in that it also includes: 滑轮组,由滑轮和滑轮架组成;The pulley block consists of a pulley and a pulley frame; 所述桅杆的上端部具有安装附座,所述滑轮组的滑轮架与安装附座铰接;The upper end of the mast has a mounting seat, and the pulley frame of the pulley block is hinged to the mounting seat; 所述起升卷扬的钢丝绳通过滑轮组与吊钩连接;The steel wire rope of the hoisting winch is connected with the hook through a block of pulleys; 所述变幅卷扬的钢丝绳通过人字架上端的滑轮与桅杆连接。The wire rope of the luffing winch is connected with the mast through the pulley at the upper end of the gable. 2、根据权利要求1所述的履带起重机自拆装装置,其特征在于,桅杆前伸时,所述安装附座置于所述桅杆顶部的下侧表面。2. The self-disassembling device for crawler crane according to claim 1, characterized in that, when the mast is stretched forward, the attachment seat is placed on the lower surface of the top of the mast. 3、根据权利要求2所述的履带式起重机自拆装装置,其特征在于,所述安装附座为两个,沿所述桅杆的纵向中心线对称设置。3. The crawler crane self-disassembly device according to claim 2, characterized in that there are two attachment seats, which are arranged symmetrically along the longitudinal centerline of the mast. 4、根据权利要求3所述的履带式起重机自拆装装置,其特征在于,所述安装附座上具有通孔,且两个安装附座上的通孔同轴设置。4. The self-disassembling device for crawler crane according to claim 3, characterized in that, the attachment base has a through hole, and the through holes on the two attachment bases are arranged coaxially. 5、根据权利要求4所述的履带式起重机自拆装装置,其特征在于,还包括铰接销轴,所述滑轮架的上端部具有铰接通孔,铰接销轴穿装在滑轮架的铰接通孔和所述安装附座的通孔内,实现滑轮架与安装附座之间的铰接。5. The crawler crane self-disassembly device according to claim 4, further comprising a hinge pin, the upper end of the pulley frame has a hinge hole, and the hinge pin is mounted on the hinge hole of the pulley frame. In the hole and the through hole of the attached seat, the hinge between the pulley frame and the attached seat is realized.
CNU2008201395836U 2008-10-23 2008-10-23 Crawler crane self-dismounting device Expired - Lifetime CN201301179Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201395836U CN201301179Y (en) 2008-10-23 2008-10-23 Crawler crane self-dismounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201395836U CN201301179Y (en) 2008-10-23 2008-10-23 Crawler crane self-dismounting device

Publications (1)

Publication Number Publication Date
CN201301179Y true CN201301179Y (en) 2009-09-02

Family

ID=41084798

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201395836U Expired - Lifetime CN201301179Y (en) 2008-10-23 2008-10-23 Crawler crane self-dismounting device

Country Status (1)

Country Link
CN (1) CN201301179Y (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101885450A (en) * 2010-07-26 2010-11-17 上海三一科技有限公司 Crawler crane main amplitude mast and cocked cylinder secondary pressure adjustment system and method thereof
CN102398865A (en) * 2011-12-27 2012-04-04 上海三一科技有限公司 Double-pulley-block balance structure and method and crane comprising structure
CN102730577A (en) * 2012-06-21 2012-10-17 无锡市协兴港口机械有限公司 Detachable propeller strut for crane
CN103010308A (en) * 2012-12-27 2013-04-03 徐州重型机械有限公司 Crane and split type frame structure thereof
CN103318774A (en) * 2013-06-04 2013-09-25 三一汽车起重机械有限公司 Self-assembly/self-disassembly hoisting device, crane and self-assembly/self-disassembly method of hoister
CN103420281A (en) * 2013-07-24 2013-12-04 三一汽车起重机械有限公司 Disassembly and assembly device, disassembly method and mounting method for crane and accessory structures thereof
CN104495637A (en) * 2014-12-16 2015-04-08 中联重科股份有限公司 Crane self-dismantling device, crane and self-dismantling method
CN106115500A (en) * 2016-08-16 2016-11-16 中昇建机(南京)重工有限公司 A kind of high-rise building is special to be hung and certainly tears method open from tearing formula roofing open
CN106219420A (en) * 2016-07-06 2016-12-14 徐州市久发工程机械有限责任公司 A kind of fast erecting traveling tower crane
CN110526138A (en) * 2019-07-31 2019-12-03 中铁九桥工程有限公司 A kind of amplitude variation type erecting crane
CN112554778A (en) * 2020-11-24 2021-03-26 北京三一智造科技有限公司 Counterweight self-disassembling method and counterweight self-assembling method of rotary drilling rig and rotary drilling rig
CN114044450A (en) * 2021-11-17 2022-02-15 郑州新大方重工科技有限公司 Integral quick-release device and method for supporting arm system and crane
CN115108477A (en) * 2022-06-24 2022-09-27 中国建筑第二工程局有限公司 Mast type crane
CN116605781A (en) * 2023-03-13 2023-08-18 中建安装集团南方建设有限公司 A vertical conveyor system for super high-rise building construction

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101885450B (en) * 2010-07-26 2012-05-30 昆山三一机械有限公司 Crawler crane main amplitude mast and cocked cylinder secondary pressure adjustment system and method thereof
CN101885450A (en) * 2010-07-26 2010-11-17 上海三一科技有限公司 Crawler crane main amplitude mast and cocked cylinder secondary pressure adjustment system and method thereof
CN102398865B (en) * 2011-12-27 2013-12-04 上海三一科技有限公司 Dual-pulley-block balance structure, method and crane comprising same
CN102398865A (en) * 2011-12-27 2012-04-04 上海三一科技有限公司 Double-pulley-block balance structure and method and crane comprising structure
CN102730577A (en) * 2012-06-21 2012-10-17 无锡市协兴港口机械有限公司 Detachable propeller strut for crane
CN102730577B (en) * 2012-06-21 2015-02-18 无锡市协兴港口机械有限公司 Detachable propeller strut for crane
CN103010308A (en) * 2012-12-27 2013-04-03 徐州重型机械有限公司 Crane and split type frame structure thereof
CN103318774B (en) * 2013-06-04 2015-05-13 三一汽车起重机械有限公司 Self-assembly/self-disassembly hoisting device, crane and self-assembly/self-disassembly method of hoister
CN103318774A (en) * 2013-06-04 2013-09-25 三一汽车起重机械有限公司 Self-assembly/self-disassembly hoisting device, crane and self-assembly/self-disassembly method of hoister
CN103420281A (en) * 2013-07-24 2013-12-04 三一汽车起重机械有限公司 Disassembly and assembly device, disassembly method and mounting method for crane and accessory structures thereof
CN103420281B (en) * 2013-07-24 2015-10-14 三一汽车起重机械有限公司 The attaching/detaching apparatus of hoisting crane and accessory structure thereof, method for dismounting and installation method
CN104495637A (en) * 2014-12-16 2015-04-08 中联重科股份有限公司 Crane self-dismantling device, crane and self-dismantling method
CN104495637B (en) * 2014-12-16 2016-10-05 中联重科股份有限公司 Crane self-dismantling device, crane and self-dismantling method
CN106219420A (en) * 2016-07-06 2016-12-14 徐州市久发工程机械有限责任公司 A kind of fast erecting traveling tower crane
CN106115500A (en) * 2016-08-16 2016-11-16 中昇建机(南京)重工有限公司 A kind of high-rise building is special to be hung and certainly tears method open from tearing formula roofing open
CN106115500B (en) * 2016-08-16 2017-12-08 中昇建机(南京)重工有限公司 A kind of high-rise building is special, and tearing formula roofing open hangs and tears open certainly method certainly
CN110526138A (en) * 2019-07-31 2019-12-03 中铁九桥工程有限公司 A kind of amplitude variation type erecting crane
CN112554778A (en) * 2020-11-24 2021-03-26 北京三一智造科技有限公司 Counterweight self-disassembling method and counterweight self-assembling method of rotary drilling rig and rotary drilling rig
CN114044450A (en) * 2021-11-17 2022-02-15 郑州新大方重工科技有限公司 Integral quick-release device and method for supporting arm system and crane
CN114044450B (en) * 2021-11-17 2024-01-19 郑州新大方重工科技有限公司 Integral quick-dismantling device and method for arm support system and crane
CN115108477A (en) * 2022-06-24 2022-09-27 中国建筑第二工程局有限公司 Mast type crane
CN115108477B (en) * 2022-06-24 2025-03-25 中建二局深圳南方建设投资有限公司 A mast crane
CN116605781A (en) * 2023-03-13 2023-08-18 中建安装集团南方建设有限公司 A vertical conveyor system for super high-rise building construction

Similar Documents

Publication Publication Date Title
CN103848360B (en) A kind of group tower tower crane being provided with packaged type balance weight system
CN101357739B (en) Column crane special for movable arm type group tower
CN101648690B (en) High-altitude operation engineering machinery and lifting arm support thereof
CN109231023B (en) Method for installing jib system of portal crane
CN113955654B (en) Method for laying down propeller strut of marine full-circle crane
CN216945934U (en) Double-rocker floor holding pole
CN103832933B (en) A kind of group tower tower crane with auxiliary
CN203728443U (en) Combined tower crane with main and auxiliary boom structure
CN201301180Y (en) Super-lifting gear for telescopic booms and telescopic boom crane
CN203173684U (en) Component for hoisting reinforcement cage
CN201214598Y (en) Column crane special for movable arm type tower erection
CN202658902U (en) Hoisting and distributing dual-purpose concrete placing machine
CN201809034U (en) Lifting appliance applied to adjusting posture of large member in air
CN203474321U (en) Tower crane used for constructing and erecting electric transmission line iron towers
CN201272674Y (en) Engineering machinery working aloft and its lifting jib
CN109534187B (en) Hoisting method suitable for hinged propeller strut on full-rotation floating crane ship
CN202785397U (en) crane
CN207108310U (en) Boom system and crane
CN2466127Y (en) Gin pole for track crane
CN205114897U (en) That climbs formula braced system in tower built -in is put has bad luck device certainly
CN204079306U (en) A kind of arm-folding crane
CN201686393U (en) Grill pole lifting tooling
CN111217254A (en) A light and easy-to-install tower crane
CN109941897A (en) A kind of tower crane jacking method
CN207209830U (en) For the hoisting tooling at Bridge Beam bottom and pier stud small space

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XCMG CONSTRUCTION MACHINERY CO., LTD.CONSTRUCTION

Free format text: FORMER OWNER: XUZHOU HEAVY MACHINERY CO., LTD.

Effective date: 20100608

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 221004 NO.165, TONGSHAN ROAD, XUZHOU CITY, JIANGSU PROVINCE TO: 221004 NO.19, TAOSHAN ROAD, ECONOMIC DEVELOPMENT ZONE, XUZHOU CITY, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20100608

Address after: 221004 No. 19 Peach Road, Xuzhou Economic Development Zone, Jiangsu, China

Patentee after: Building Machinery Co., Ltd., XCMG Construction Machinery Co., Ltd.

Address before: 221004 Xuzhou, Zhejiang Province, Jiangsu Road No. 165

Patentee before: Xuzhou Heavy Machinery Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20090902

CX01 Expiry of patent term