CN102826459A - Device and method for hoisting underwater structural part of ocean platform - Google Patents

Device and method for hoisting underwater structural part of ocean platform Download PDF

Info

Publication number
CN102826459A
CN102826459A CN2012103353805A CN201210335380A CN102826459A CN 102826459 A CN102826459 A CN 102826459A CN 2012103353805 A CN2012103353805 A CN 2012103353805A CN 201210335380 A CN201210335380 A CN 201210335380A CN 102826459 A CN102826459 A CN 102826459A
Authority
CN
China
Prior art keywords
coaster
underwater structure
structural part
structure spare
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103353805A
Other languages
Chinese (zh)
Other versions
CN102826459B (en
Inventor
王继耕
邓堡
蔡永桥
郑松林
闫肃
黄建虾
李冬翌
沈国华
朱多平
朱晓义
季富财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Energy Technology and Services Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Energy Technology and Services Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Energy Technology and Services Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201210335380.5A priority Critical patent/CN102826459B/en
Publication of CN102826459A publication Critical patent/CN102826459A/en
Application granted granted Critical
Publication of CN102826459B publication Critical patent/CN102826459B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a device and a method for hoisting an underwater structural part of an ocean platform. The method comprises the following steps of: installing two sliding rails on the structure of the ocean platform, installing a traveling trolley on the sliding rails and hanging a chain block on the traveling trolley; connecting the underwater structural part on a working support boat with the chain block through rigging; operating the traveling trolley and the chain block to lift up the underwater structural part and move the underwater structural part to a position above the surface of water at an installation position; according to the instruction of a diver, operating the chain block to slowly lower down the underwater structural part to a horizontal line at the height of the installation position; and operating the traveling trolley to horizontally move and adjusting the horizontal position of the underwater structural part till the underwater structural part is hoisted in place. The device and the method for hoisting the underwater structural part of the ocean platform have the advantages that the original complex structure is simplified, the goal of hoisting the underwater structural part in place can be realized through the horizontal movement of the traveling trolley and the vertical lifting of the chain block by using only simple machines and tools such as the traveling trolley and the chain block, the construction method is simple, the construction accuracy is high, the cost is low, the safety risk is low, and the device is environmental-friendly, economic and highly universal; the hoisting and the installation can be completed in one step, the working efficiency is improved, and the device and the method can be widely popularized and used.

Description

A kind of underwater structure spare hanging apparatus and hanging method that is used for platform
Technical field
The present invention relates to a kind of device and method of under-water operation, specifically, relate to a kind of device and method that is used for lifting under water.
Background technology
The lifting of platform underwater structure spare is the work that high risk and higher technical risk are arranged always, and traditional underwater structure spare hanging method mainly contains platform crane lifting, winch lifting and three kinds of methods of crane barge lifting.
Utilizing the platform crane lifting is the mode that the most conveniently lifts, can be faster the framing member lifting is put in place, but in the practical project construction, a lot of construction locations are in the platform crane can't region covered, can't utilize crane directly to lift.
Utilize the winch lifting to need to make interim lifting frame; The welding hanger articulates assembly pulley and steel rope etc. on lifting frame; Also need carry out accurate addressing to the winch installation site, remove structures such as original platform wind break wall, guardrail, hanging device installation, dismounting and location work capacity are bigger; This method is bigger to the space requirement of construction area, and a lot of construction area exactly can't be installed winch owing to limit by site space.In addition, the vertical orientation that winch lifting only can the control structure thing, horizontal position adjustment difficulty.
The crane barge lifting can faster put the framing member lifting in place; But its construction cost is high, needs to flow to the location of casting anchor according to routing diagram and seawater, and the security risk in cast anchor location and the hoisting process is higher; And it is bigger influenced by weather and sea situation, is difficult to the accuracy control construction precision.
Simultaneously, the lifting of platform underwater structure spare requires high-precision adjustment is carried out in its position usually, to reach installation requirement.Utilize facility such as winch, crane barge all can be difficult to carried out the adjustment of high-precision position by hoisting structure spare because of various condition restriction or influence; Need the diver to adjust in place through leading instruments such as chain under water; Construction precision is lower, and is long in time limit, also has higher security risk.
Summary of the invention
What the present invention will solve is above-mentioned technical matters of the prior art, and a kind of underwater structure spare hanging apparatus and hanging method that is used for platform is provided, and easy and simple to handle, with low cost, construction safety is efficient.
In order to solve the problems of the technologies described above, the present invention is achieved through following technical scheme:
A kind of underwater structure spare hanging apparatus that is used for platform is equipped with two slide rails on the offshore platform structure, on the said slide rail coaster is installed, and is mounted with jack on the said coaster.
Be connected with brace between said slide rail and the said offshore platform structure.
Said coaster is motor block or manual coaster.
A kind of underwater structure spare hanging method that is used for platform comprises the steps:
A. according to waiting that the weight and the size that lift underwater structure spare carry out design calculation, slide rail and offshore platform structure that slide rail is installed are carried out Force Calculation and strength check, and select to meet slide rail, coaster and the jack of force request;
B., two slide rails are installed on the offshore platform structure above the construction area side by side, on the said slide rail coaster are installed, articulate jack on the coaster;
C. utilize the platform crane will wait to lift the work of lifting of underwater structure spare and support on the ship that work supports that ship is in place to construction area;
D. underwater structure spare is connected with said jack through rigging;
E. operate said coaster and said jack and support ship to sling from work underwater structure spare, and move to the water surface sky of installation site;
F. according to diver's instruction, operate said jack and slowly transfer underwater structure spare, on height level's line of transferring to the place, installation site;
G. according to diver's instruction, operate said coaster parallel motion, the level attitude of underwater structure spare is adjusted, until hoisted in position.
The invention has the beneficial effects as follows:
Hanging apparatus of the present invention and hanging method are abbreviatied, and only need utilize simple facility such as coaster and jack, can realize that through the horizontal displacement of coaster and the vertical lift of jack the lifting of underwater structure spare puts in place.The present invention compares with hanging method with traditional hanging apparatus, and following remarkable advantage is arranged:
(1) construction precision is high, can carry out three-dimensional localization to underwater structure, and level and vertical direction position are adjusted easily;
(2) input equipment facility are simple, and construction cost is cheap;
(3) construction method is simple, and security risk is low;
(4) need not take the original place of platform resource, can not impact during construction platform production;
(5) carry out hanging device and design for scheme flexibly according to the platform actual conditions, can confirm lifting and mount scheme fast and effectively, thereby solve the difficult problem of underwater structure lifting;
(6) equipment is installed and construction required time weak point, and lifting and erection work can settle at one go, have improved work efficiency greatly;
(7) reduce the consumption of the required fuel of platform electric power or boats and ships construction greatly, i.e. environmental protection is economical again;
(8) compare with crane barge, can not cause construction loss or great security risk because of the weather reason.
(9) highly versatile, can extensively be popularized and applied to platform such the construction in go, wide application prospect is arranged.
Under equal work capacity situation, compare with tradition construction pattern, utilize the each construction of the present invention can save about 200,000 yuan of construction cost, have remarkable economic efficiency.
Description of drawings
Fig. 1 is the structural representation of hanging apparatus provided by the present invention;
Fig. 2 is the scheme of installation of slide rail provided by the present invention on offshore platform structure;
Fig. 3 works in the hanging method provided by the present invention to support ship at construction area work progress scheme drawing in place;
Fig. 4 is the work progress scheme drawing that underwater structure spare moves to the installation site in the hanging method provided by the present invention;
Fig. 5 is the work progress scheme drawing of underwater structure spare hoisted in position in the hanging method provided by the present invention.
Among the figure: 1, offshore platform structure; 2, brace; 3, slide rail; 4, coaster; 5, jack; 6, underwater structure spare; 7, ship is supported in work.
The specific embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, the following examples of giving an example now, and conjunction with figs. specifies as follows:
As depicted in figs. 1 and 2; Present embodiment discloses a kind of underwater structure spare hanging apparatus that is used for platform; Utilize newly-increased structure of platform or the old structure of platform; Two slide rails 3 that have I-beam section to process are installed on offshore platform structure 1, and the part of slide rail 3 adopts two-sided full weld to be fixed on the offshore platform structure 1, and a part is stretched out offshore platform structure 1 outer end.In order to guarantee the stressed in the strength range of lifting defined of slide rail 3, between slide rail 3 and offshore platform structure 1, be connected with brace 2 usually.
On two slide rails 3, be separately installed with a coaster 4, coaster 4 can be motor block or manual coaster.
Be mounted with jack 5 on the coaster 3, jack 5 is used for being connected with the underwater structure spare 6 that is lifted.
The workmen can be respectively operate coaster 4 and jack 5, utilizes the vertical lift of horizontal slip and the jack 5 of coaster 4 that underwater structure spare 6 positions are adjusted until lifting and puts in place.
Present embodiment discloses the underwater structure spare hanging method that utilizes above-mentioned hanging apparatus simultaneously, and concrete steps are following:
At first carry out design calculation according to the weight and the size of underwater structure spare 6 to be lifted; Design and produce special-purpose hanging apparatus; Offshore platform structure 1 to slide rail on the hanging apparatus 3 and installation slide rail 3 carries out Force Calculation and strength check; Secondly select customization suitable manual or motor block 4 and jack 5, and correct the installation connects.
Utilize underwater structure spare 6 work that is lifted in advance that the platform crane will be to be lifted to support ship 7 afterbodys before the construction, work supports ship 7 to specifying construction area in place, as shown in Figure 2.Hang up properly rigging on the framing member 6 under water, jack 5 is moved to the outer end by offshore platform structure 1 the inner, rigging that hangs up properly on the underwater structure spare 6 and jack 5 are connected firmly, prepare to begin lifting through operation coaster 4.
Utilize jack 5 to support ship 7 afterbodys to sling from work underwater structure spare 6 earlier, and make jack 5 that the water surface that underwater structure spare 6 moves to the installation site is overhead through coaster 4 slips.According to diver's instruction, operation jack 5 is slowly transferred underwater structure spare 6, transfers to height level's line at place, installation site until underwater structure spare 6 again.According to diver's instruction, operation coaster 4 parallel motions are adjusted the level attitude of underwater structure spare 6, until hoisted in position.
Although combine accompanying drawing that the preferred embodiments of the present invention are described above; But the present invention is not limited to the above-mentioned specific embodiment, and the above-mentioned specific embodiment only is schematically, is not restrictive; Those of ordinary skill in the art is under enlightenment of the present invention; Not breaking away under the scope situation that aim of the present invention and claim protect, can also make the concrete conversion of a lot of forms, these all belong within protection scope of the present invention.

Claims (4)

1. a underwater structure spare hanging apparatus that is used for platform is characterized in that, two slide rails are installed on the offshore platform structure, on the said slide rail coaster is installed, and is mounted with jack on the said coaster.
2. a kind of underwater structure spare hanging apparatus that is used for platform according to claim 1 is characterized in that, is connected with brace between said slide rail and the said offshore platform structure.
3. a kind of underwater structure spare hanging apparatus that is used for platform according to claim 1 is characterized in that, said coaster is motor block or manual coaster.
4. a underwater structure spare hanging method that is used for platform is characterized in that, comprises the steps:
A. according to waiting that the weight and the size that lift underwater structure spare carry out design calculation, slide rail and offshore platform structure that slide rail is installed are carried out Force Calculation and strength check, and select to meet slide rail, coaster and the jack of force request;
B., two slide rails are installed on the offshore platform structure above the construction area side by side, on the said slide rail coaster are installed, articulate jack on the coaster;
C. utilize the platform crane will wait to lift the work of lifting of underwater structure spare and support on the ship that work supports that ship is in place to construction area;
D. underwater structure spare is connected with said jack through rigging;
E. operate said coaster and said jack and support ship to sling from work underwater structure spare, and move to the water surface sky of installation site;
F. according to diver's instruction, operate said jack and slowly transfer underwater structure spare, on height level's line of transferring to the place, installation site;
G. according to diver's instruction, operate said coaster parallel motion, the level attitude of underwater structure spare is adjusted, until hoisted in position.
CN201210335380.5A 2012-09-11 2012-09-11 Method for hoisting underwater structural part of ocean platform Expired - Fee Related CN102826459B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210335380.5A CN102826459B (en) 2012-09-11 2012-09-11 Method for hoisting underwater structural part of ocean platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210335380.5A CN102826459B (en) 2012-09-11 2012-09-11 Method for hoisting underwater structural part of ocean platform

Publications (2)

Publication Number Publication Date
CN102826459A true CN102826459A (en) 2012-12-19
CN102826459B CN102826459B (en) 2014-03-19

Family

ID=47329811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210335380.5A Expired - Fee Related CN102826459B (en) 2012-09-11 2012-09-11 Method for hoisting underwater structural part of ocean platform

Country Status (1)

Country Link
CN (1) CN102826459B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103288002A (en) * 2013-06-22 2013-09-11 中铁十八局集团第二工程有限公司 Simple combination portal upper-air heavy-article hoisting device
CN104692247A (en) * 2014-12-09 2015-06-10 中国海洋石油总公司 Twisting-resisting installation method of deepwater underwater structure
CN105221112A (en) * 2015-11-11 2016-01-06 太重(天津)滨海重型机械有限公司 Rotating mechanism
CN110092292A (en) * 2018-01-30 2019-08-06 岭东核电有限公司 Base station is launched in underwater equipment installation
CN113374935A (en) * 2021-06-09 2021-09-10 安徽鲁班建设投资集团有限公司 Construction method for underwater installation of water intake head of water plant by using ship-borne method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201074165Y (en) * 2007-07-25 2008-06-18 渤海船舶重工有限责任公司 Cantilever supported welding supplying apparatus
CN201980882U (en) * 2010-12-31 2011-09-21 山东海盛海洋工程集团有限公司工程公司 Simple electric hoist on offshore platform
CN202865848U (en) * 2012-09-11 2013-04-10 中国海洋石油总公司 Underwater structural component lifting device for ocean platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201074165Y (en) * 2007-07-25 2008-06-18 渤海船舶重工有限责任公司 Cantilever supported welding supplying apparatus
CN201980882U (en) * 2010-12-31 2011-09-21 山东海盛海洋工程集团有限公司工程公司 Simple electric hoist on offshore platform
CN202865848U (en) * 2012-09-11 2013-04-10 中国海洋石油总公司 Underwater structural component lifting device for ocean platform

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103288002A (en) * 2013-06-22 2013-09-11 中铁十八局集团第二工程有限公司 Simple combination portal upper-air heavy-article hoisting device
CN103288002B (en) * 2013-06-22 2015-12-02 中铁十八局集团第二工程有限公司 Simple combination door frame high-altitude weight hanging apparatus
CN104692247A (en) * 2014-12-09 2015-06-10 中国海洋石油总公司 Twisting-resisting installation method of deepwater underwater structure
CN105221112A (en) * 2015-11-11 2016-01-06 太重(天津)滨海重型机械有限公司 Rotating mechanism
CN110092292A (en) * 2018-01-30 2019-08-06 岭东核电有限公司 Base station is launched in underwater equipment installation
CN110092292B (en) * 2018-01-30 2024-05-14 岭东核电有限公司 Base station is put in installation of underwater equipment
CN113374935A (en) * 2021-06-09 2021-09-10 安徽鲁班建设投资集团有限公司 Construction method for underwater installation of water intake head of water plant by using ship-borne method

Also Published As

Publication number Publication date
CN102826459B (en) 2014-03-19

Similar Documents

Publication Publication Date Title
CN101492140B (en) Aluminum alloy catamaran whole-boat afloat process
CN102826459B (en) Method for hoisting underwater structural part of ocean platform
CN102852147B (en) Method for righting jacket by using single cantilever gin pole and double hooks
CN101475046B (en) Large-sized thruster underwater installing process based on L type floating platform
EP3022381A2 (en) Drilling rig arrangement
WO2016173238A1 (en) Floating crane and multifunctional suspension hook and multifunctional suspension hook group thereof
CN101804849A (en) Construction program of semi-submersible platform for offshore oil and gas development
CN103910041A (en) High-precision offshore wind turbine hoisting and mounting ship
CN102852095B (en) Prefabricated bridge abutment multifunctional lifting system and construction procedure thereof
CN110185057B (en) Tool and construction method for lifting and erecting steel pipe piles of offshore wind power single pile foundation
CN102213085A (en) Installation method of vertical pipe of guide pipe rack
CN2615042Y (en) Special crane ship for transporting & erecting bridges on sea
CN103171976A (en) Hoisting method for shipyard gantry crane
CN108018778B (en) Catwalk cable erection traction system and catwalk cable rapid erection method for non-navigable water area
CN202865848U (en) Underwater structural component lifting device for ocean platform
CN201686393U (en) Derrick mast hoisting tool
CN104627326A (en) Special lifting and vibration-driving ship for integrated driving of cell type steel sheet pile large cylinders and vice cells
CN105648996A (en) Lifting ballasting barge applicable to installation of simple wellhead platform and mounting method thereof
CN107487724A (en) A kind of the large-scale floating crane arm support erecting device and installation method of non-loop wheel machine auxiliary
CN203976242U (en) A kind of generator unit stator associating hanging apparatus
CN209023076U (en) Jacket handling integrated ship
CN210971453U (en) Large heavy workpiece transporting and lifting ship
CN112112764A (en) Offshore wind turbine complete machine installation tower with rotation and motion compensation capabilities
CN202194363U (en) Movable steel pipe scaffold operation platform for over-water construction
CN111470430A (en) Ship-linked crane structure and overwater bridge construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140319

Termination date: 20160911

CF01 Termination of patent right due to non-payment of annual fee