CN2748467Y - Water-quenching slag-washing water treatment device for blast furnace slag - Google Patents

Water-quenching slag-washing water treatment device for blast furnace slag Download PDF

Info

Publication number
CN2748467Y
CN2748467Y CNU2004200808231U CN200420080823U CN2748467Y CN 2748467 Y CN2748467 Y CN 2748467Y CN U2004200808231 U CNU2004200808231 U CN U2004200808231U CN 200420080823 U CN200420080823 U CN 200420080823U CN 2748467 Y CN2748467 Y CN 2748467Y
Authority
CN
China
Prior art keywords
water
slag
blast furnace
flushing
settling tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2004200808231U
Other languages
Chinese (zh)
Inventor
周昌银
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan Iron and Steel Co Ltd
Original Assignee
Maanshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Iron and Steel Co Ltd filed Critical Maanshan Iron and Steel Co Ltd
Priority to CNU2004200808231U priority Critical patent/CN2748467Y/en
Application granted granted Critical
Publication of CN2748467Y publication Critical patent/CN2748467Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies

Abstract

The utility model belongs to the molten slag process, in particular to a water supply device for blast furnace slag process, which is a slag flushing water circulation circuit connected respectively by a punching box, a water slag gutter, a water slag slot, a communicating pipe, a dispenser buffer slot and a revolving drum filter. The auxiliary devices are cancelled such as cooling tower, air cooling device, etc. A settling tank and an impounding tank are provided beneath the revolving drum filter; the two tanks are connected by overflow holes arranged on the tank walls; a slag removing means is provided above the settling tank, and the impounding tank is directly connected with a nodulizer by pipelines, a valve and a slag flushing pump to comprise a water supply device combining the slag flushing, the recovery processing and the cyclic utilization into integration. Compared with the prior art, the auxiliary devices are cancelled such as cooling tower, air cooling device, etc. The configuration of the equipment and the facility is simplified and reasonable; the investment and the operation cost are low; the slag flushing water obtains the purifying, the equipment attrition is reduced, the pipeline blocking is avoided, and the inspection quantity is reduced; the equipment failure rate is low, and the punching rate of the water slag is high, which is in convenient for the smooth running and the stable production of the blast furnace; the slag flushing water and the furnace sewage are cyclically used to obtain the 'zero discharging of the sewage to save the water resource.

Description

Blast furnace cinder water quenching flushing cinder water treatment device
Technical field
Blast furnace cinder water quenching flushing cinder water treatment device belongs to and melts the slag processing, relates in particular to blast furnace slag and handles water supply installation.
Background technology
The blast furnace ironmaking stokehold is big with the water spot volume, and quantity of wastewater effluent is also big, and particularly blast furnace cinder water quenching processing consumption water is more, as not recycling, has wasted water resources, has polluted environment, even has influenced blast furnace production.INBA method Water Quenching water supply installation comprises grain slag Punched box, water slag groove, grain slag groove, communicating pipe, divider dashpot, drum filter, the funnel that catchments, hot tub, cooling tower and auxiliary facility, slag flushing pump such as air-cooled in the prior art, is in turn connected into the logical circuit of flushing cinder current.Flushing cinder muddy water under the drum filter filter flows into hot tub through the funnel that catchments, and delivers to cooling tower by cooling pump, to below 60 ℃, delivers to pelletizer by the slag flushing pump pressurization through air-cooled, uses for flushing cinder.This treatment unit is only handled water temperature, spends huge sums to set up cooling tower and auxiliary facility such as air-cooled.Research and practice show uses 90 ℃ of water temperatures and the water temperature of using below 60 ℃, the high-temperature slag that shrend is 1500 ℃, and its granulation effect is basic identical.This device is not but taked effective treatment measures to particulate grain slag contained in the flushing cinder muddy water, thereby has open defect, and equipment and facilities Allocation are unreasonable, numerous and jumbled, investment is big, and the working cost height does not have useful effect; Equipment and pipeline, valve serious wear, maintenance workload is big, and scarfing cinder labour intensity is big, consumes material, spare part expense height; The equipment failure rate height, grain slag system rate is low, and waste grain slag resource influences blast furnace production.
Summary of the invention
Have the irrational theory of flushing cinder water treatment and the defective of existence in order to overcome prior art, the purpose of this utility model is to provide a kind of equipment and facilities Allocation reasonable, reduced investment, and working cost is low; Particulate grain slag in the flushing cinder muddy water is few, and equipment failure rate is low; Blowing rate of slag height, granulation are effective, the water supply installation that the flushing cinder water cycle is used.
Blast furnace cinder water quenching flushing cinder water treatment device, water slag groove connects pelletizer and grain slag groove, grain slag groove bottom connects pipe, the divider dashpot that is connected with communicating pipe stretches in the drum filter, constitute the logical circuit of flushing cinder current, be characterized in cancelling cooling tower that water temperature handles and auxiliary facility such as air-cooled; Settling tank, water reservoir are set below drum filter; two ponds are communicated with by the overflow weir that is located on the pool wall, and slag removing mechanism is set on the settling tank, and water reservoir is by pipe connection valve, slag flushing pump; directly be connected, constitute the water supply installation of a collection flushing cinder, recycling, recycle with pelletizer.
During the punching out grain slag; blast furnace slag is by the slag ditch pelletizer of flowing through; pelletizer ejection constant voltage high speed water jet impact slag; slag water quenching is granulated into grain slag; slag and water enter the further broken granulation of grain slag groove along water slag groove; flow into drum filter by communicating pipe and divider dashpot and dewater, constitute the circulation circuit of flushing cinder flush slag.Then; having particulate grain slag muddy water filters in the settling tank; the sewage of stokehold also imports in the settling tank; the particulate grain slag and the foreign material that are deposited at the bottom of the pond are removed by slag removing mechanism; " purifying waste water " of post precipitation; flow into water reservoir by overflow weir, directly deliver to pelletizer by the slag flushing pump pressurization again, use for flushing cinder.
Compared with prior art, the utility model advantage is:
1, cancellation cooling tower and auxiliary facility such as air-cooled, appliance arrangement and facilities Allocation simplify, rationally, investment reduces significantly, working cost is low;
2, flushing cinder water is purified, and has alleviated equipment attrition, avoids line clogging, and service life of equipment prolongs, and the maintenance amount reduces, and saves lot of materials and labour cost, and scarfing cinder is convenient, reduces labor intensity;
3, breakdown rate is low, and blowing rate of slag reaches more than 99%, helps smooth operation of furnace, stable yields;
4, the flushing cinder water cycle is used, and has recycled stokehold sewage again, accomplishes sewage " zero " discharging, replenishes industrial water purification less, has protected environment, has saved water resources.
Description of drawings
In conjunction with the accompanying drawings the utility model is described in further detail.
1, Fig. 1 is a blast furnace cinder water quenching flushing cinder water treatment device connection diagram.
2, Fig. 2 is a blast furnace cinder water quenching flushing cinder water treatment device floor map.
3, Fig. 3 is a blast furnace cinder water quenching flushing cinder water treatment device slag removing mechanism connection diagram.
Embodiment
From accompanying drawing as can be seen the utility model embodiment connect to form successively by conveyor 7, transhipment conveyor 8, grab-crane 9, chute funnel 10, settling tank 11, water reservoir 12, electric liquid gate valve 13, slag flushing pump 14, relief valve 15, dried pit watering valve 16, flushing cinder gate valve 17, industrial water purifying valve 18, waterways, stokehold 19, dried pit backwater ditch 20 in pelletizer 1, water slag groove 2, grain slag groove 3, communicating pipe 4, divider dashpot 5, drum filter 6, the tube.Pelletizer is provided with water slag groove 21 time, connects pelletizer 1 and grain slag groove 3, and grain slag groove bottom connects pipe 4, and the divider dashpot 5 that is connected with communicating pipe 4 stretches in the drum filter 6, and conveyor 7 is connected mutually with transhipment conveyor 8 in the tube, is connected to finished bin; Drum filter is provided with settling tank 11 for 6 times, water reservoir 12 is communicated with by the overflow weir that is located on the pool wall; Settling tank 11 tops are provided with grab-crane 9, and are located at a chute funnel 10 of interior conveyor 7 tops and are connected mutually; Water reservoir 12 directly is connected with pelletizer 1 by pipe connection electricity liquid gate valve 13, slag flushing pump 14, flushing cinder gate valve 17, constitutes the water supply installation of a collection flushing cinder, recycling, recycle.
As seen from the figure, slag removing mechanism is made up of settling tank 11 and the grab-crane 9 established thereon, settling tank 11 is positioned at drum filter 6 belows and partly is arranged to slope, half inclined-plane, and the top is provided with grab-crane 9, is connected mutually with the chute funnel 10 of 7 tops of conveyor in the tube.After the flushing cinder muddy water fell, the particulate grain slag precipitated at the bottom of flowing into the pond along the slope, and grab-crane 9 cleaning in time is deposited in the particulate grain slag at the bottom of the pond, pour chute funnel 10 into, transported by conveyor in the tube 7, transhipment conveyor 8, production practice show that 2500 cubic metres of blast furnaces can clean out 40 tons of grain slags every day.Eliminate the particulate grain slag and piled up at the bottom of the pond, purified flushing cinder water, alleviated the wearing and tearing of pipeline, valve and equipment greatly." purifying waste water " of precipitating, overflow are to water reservoir 12, and " purifying waste water " that water reservoir is 12 li directly supplies with the flushing cinder water.Slag flushing pump 14 is loaded in the pump hole 21, and slag flushing pump 14 both sides are provided with electric liquid gate valve 13, low-tension side and water reservoir 12 pipe connection, and the flushing cinder water is supplied with, about about 90 ℃ of water temperature by flushing cinder gate valve 17 direct and pelletizer 1 pipe connection in the high-tension side.Slag flushing pump 14 high-tension sides also with relief valve 15, dried pit watering valve 16 pipe connection, in order to reduce the pressure and the flow of flushing cinder water, supply with dried slag watering water.Relief valve 15 side in addition is communicated with water reservoir 12.It is standby as accident water and additional water that other establishes industrial water purifying valve 18.Changed flushing cinder water treatment thinking, scarfing cinder is handled emphatically, has simplified flushing cinder water treating equipment and facility, reduces investment and working cost significantly, has lowered equipment failure rate.
As seen from Figure 3, the pond face absolute altitude of settling tank 11, water reservoir 12 is lower than the absolute altitude and the dried pit absolute altitude of stokehold terrace, waterways, stokehold 19, dried pit backwater ditch 20 all are connected with settling tank 11, furnace roof washing water, dried slag watering backwater, terrace wash-down water all import in the settling tank 11, recycled, accomplish sewage " zero " discharging, flushing cinder water replenishes less.Save water resources, protected environment.
The utility model adopts the spout hole quantity of regulating relief valve 15 and pelletizer 1, regulates the pressure and the flow of flushing cinder water, with the granularity and the quality of control grain slag finished product.

Claims (4)

1; blast furnace cinder water quenching flushing cinder water treatment device; water slag groove (2) connects pelletizer (1) and grain slag groove (3); grain slag groove bottom connects pipe (4); the divider dashpot (5) that is connected with communicating pipe (4) stretches in the drum filter (6); constitute the logical circuit of flushing cinder current; it is characterized in that settling tank (11) being set in drum filter (6) below; water reservoir (12); two ponds are communicated with by the overflow weir that is located on the pool wall; settling tank is provided with slag removing mechanism on (11), and water reservoir (12) is by connecting tube; valve; slag flushing pump (14) directly and pelletizer (1) connect and compose the collection flushing cinder; recycling; the water supply installation of recycle.
2, blast furnace cinder water quenching flushing cinder water treatment device according to claim 1, it is characterized in that settling tank (11) is positioned at drum filter (6) below part and is arranged to slope, half inclined-plane shape, settling tank (11) top is provided with band grab-crane (9), with the corresponding linking of chute funnel (10) of conveyor in the tube (7) top.
3, blast furnace cinder water quenching flushing cinder water treatment device according to claim 1; it is characterized in that slag flushing pump (14) both sides are provided with electric liquid gate valve (13); low-tension side and water reservoir (12) pipe connection; the high-tension side is direct and pelletizer (1) pipe connection by flushing cinder gate valve (17); the high-tension side also with dried pit watering valve (16), relief valve (15) pipe connection, relief valve (15) is side and water reservoir (12) pipe connection in addition.
4, blast furnace cinder water quenching flushing cinder water treatment device according to claim 1, the ground elevation that it is characterized in that settling tank (11), water reservoir (12) is lower than stokehold terrace absolute altitude, dried pit absolute altitude, blast furnace furnace roof washing pipe, dried pit return water pipe, waterways, stokehold are connected with settling tank (11).
CNU2004200808231U 2004-11-05 2004-11-05 Water-quenching slag-washing water treatment device for blast furnace slag Expired - Fee Related CN2748467Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2004200808231U CN2748467Y (en) 2004-11-05 2004-11-05 Water-quenching slag-washing water treatment device for blast furnace slag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2004200808231U CN2748467Y (en) 2004-11-05 2004-11-05 Water-quenching slag-washing water treatment device for blast furnace slag

Publications (1)

Publication Number Publication Date
CN2748467Y true CN2748467Y (en) 2005-12-28

Family

ID=35719959

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2004200808231U Expired - Fee Related CN2748467Y (en) 2004-11-05 2004-11-05 Water-quenching slag-washing water treatment device for blast furnace slag

Country Status (1)

Country Link
CN (1) CN2748467Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102166451A (en) * 2011-02-21 2011-08-31 安徽省华银茶油有限公司 Drum-type raw oil filter
CN102230037A (en) * 2011-06-13 2011-11-02 武汉钢铁(集团)公司 Method for controlling sand content of water body of blast furnace INBA circulating system and flow-limiting device thereof
CN102994668A (en) * 2012-12-06 2013-03-27 秦皇岛首秦金属材料有限公司 Utilization method for waste heat of blast furnace slag
CN103834754A (en) * 2014-01-13 2014-06-04 中冶南方工程技术有限公司 Waste-heat utilization triple generation system for blast furnace slag water employing minter process
CN103866058A (en) * 2014-01-13 2014-06-18 中冶南方工程技术有限公司 Triple-generation system for utilizing slag-washing water afterheat by using blast furnace drum method
CN104032054A (en) * 2014-01-13 2014-09-10 中冶南方工程技术有限公司 Triple co-supply system for utilization of waste heat of blast furnace bottom-filtration-method slag flushing water
CN112063836A (en) * 2020-10-27 2020-12-11 芜湖海创实业有限责任公司 Electroplating sludge treatment system and method
CN112481496A (en) * 2020-10-28 2021-03-12 芜湖海创环保科技有限责任公司 Electroplating sludge smelting system and method
CN114733233A (en) * 2022-03-03 2022-07-12 柳州钢铁股份有限公司 Efficient fine slag separation method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102166451A (en) * 2011-02-21 2011-08-31 安徽省华银茶油有限公司 Drum-type raw oil filter
CN102230037A (en) * 2011-06-13 2011-11-02 武汉钢铁(集团)公司 Method for controlling sand content of water body of blast furnace INBA circulating system and flow-limiting device thereof
CN102994668A (en) * 2012-12-06 2013-03-27 秦皇岛首秦金属材料有限公司 Utilization method for waste heat of blast furnace slag
CN103834754A (en) * 2014-01-13 2014-06-04 中冶南方工程技术有限公司 Waste-heat utilization triple generation system for blast furnace slag water employing minter process
CN103866058A (en) * 2014-01-13 2014-06-18 中冶南方工程技术有限公司 Triple-generation system for utilizing slag-washing water afterheat by using blast furnace drum method
CN104032054A (en) * 2014-01-13 2014-09-10 中冶南方工程技术有限公司 Triple co-supply system for utilization of waste heat of blast furnace bottom-filtration-method slag flushing water
CN103866058B (en) * 2014-01-13 2015-11-11 中冶南方工程技术有限公司 Blast furnace rotary drum method using exhaust heat of slag flushing water utilizes combined supply system
CN103834754B (en) * 2014-01-13 2015-11-18 中冶南方工程技术有限公司 Blast furnace Ming Tefa using exhaust heat of slag flushing water utilizes combined supply system
CN104032054B (en) * 2014-01-13 2015-12-30 中冶南方工程技术有限公司 Blast furnace bottom filter method using exhaust heat of slag flushing water utilizes combined supply system
CN112063836A (en) * 2020-10-27 2020-12-11 芜湖海创实业有限责任公司 Electroplating sludge treatment system and method
CN112481496A (en) * 2020-10-28 2021-03-12 芜湖海创环保科技有限责任公司 Electroplating sludge smelting system and method
CN114733233A (en) * 2022-03-03 2022-07-12 柳州钢铁股份有限公司 Efficient fine slag separation method
CN114733233B (en) * 2022-03-03 2023-11-14 柳州钢铁股份有限公司 High-efficiency separation method for fine slag

Similar Documents

Publication Publication Date Title
CN100343394C (en) Blast furnace cinder water quenching processing unit
CN101387119B (en) Rainwater gathering, processing and re-using system for large-sized workshop roof and method thereof
CN102311186B (en) Circulative reclamation processing system and processing technology of weaving jet wastewater
CN201848131U (en) Table-flap type multi-stage mud-discharge settling tank applied to sewage treatment
CN212017026U (en) Grain slag filtering device
CN2748467Y (en) Water-quenching slag-washing water treatment device for blast furnace slag
CN100352946C (en) Technique and equipment for processing blast furnace smelting slag
CN100453655C (en) Blastfurnace slag combined treating system
CN204841085U (en) Pot -type recoil eliminating dregs sewage treatment plant
CN211200624U (en) Urban park rainwater collection, purification and recycling system
WO2006005653A1 (en) Process and apparatus for granulating a melt
CN202729934U (en) Collecting and reusing system for glass edge polishing waste water
CN2743362Y (en) Water hardening treatment device of blast furnace fused slag
CN102659273B (en) Novel glass edging wastewater collection and reuse system
CN209442762U (en) A kind of circulation water recycling device
KR101535076B1 (en) Solid-liquid separation type wastewater treatment device
CN203429499U (en) Anti-blocking pulping waste water recycling system
CN112777801A (en) Integrated form sludge water processing system
CN212998577U (en) Novel stone material recycling water advanced treatment equipment
CN201271545Y (en) Device for recycling and separating sludge-flushing water in gas station
CN216891044U (en) Novel water quenching steel slag recovery system
CN219002454U (en) Closed stock ground spraying dust suppression water saving system of steel plant
CN212222661U (en) Desulfurization water recycling device for sintering workshop of iron and steel plant
CN219708239U (en) Adhesive tape cleaning and sewage recycling system
CN220426101U (en) Coarse grid grab bucket flushing water device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20051228

Termination date: 20121105