CN2739233Y - 水力插板套筒桩 - Google Patents

水力插板套筒桩 Download PDF

Info

Publication number
CN2739233Y
CN2739233Y CN 200420051943 CN200420051943U CN2739233Y CN 2739233 Y CN2739233 Y CN 2739233Y CN 200420051943 CN200420051943 CN 200420051943 CN 200420051943 U CN200420051943 U CN 200420051943U CN 2739233 Y CN2739233 Y CN 2739233Y
Authority
CN
China
Prior art keywords
stake
pile
sleeve
outer sleeve
hydraulic sheeting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420051943
Other languages
English (en)
Inventor
何富荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HEHAI HYDRAULIC FLAPPER ENGINEERING CO LTD
Shandong Hongxu Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200420051943 priority Critical patent/CN2739233Y/zh
Application granted granted Critical
Publication of CN2739233Y publication Critical patent/CN2739233Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

一种水力插板套筒桩,包括外套筒桩和内套筒桩及外套筒桩上安设的钢筋、滑道、滑板、喷射管和中心管。所述内套筒桩安设于外套筒桩内下部,插入地层,内套筒桩和外套筒桩连接成一个整体结构的长桩体,其内腔为封固的水泥浆,桩体外用水泥浆与地层固结。本实用新型具有插入施工快、建设周期短、造价低,桩体不受损坏、桩基入地深度大、不需大型吊机等优点。特别能适应河流、湖泊、浅海水域等大型工程的建设。

Description

水力插板套筒桩
一、技术领域:
本实用新型涉及堤坝、桥梁、码头等的桩基,尤其涉及一种水力插板套筒桩。
二、背景技术:
目前,各种建筑的桩基工程施工中,一般采用钻孔形成的灌注桩或者打入施工的摩檫桩。这两种桩基工程普遍存在着施工速度慢、建造周期长、工程造价高、施工难度大,特别是地面环境复杂的海域或地层持力层较深时,施工难度更大的缺点或不足,使这种堤坝、桥梁等大型桩基工程的建造受到一定的限制。
三、发明内容:
本实用新型要解决的技术问题是提供一种改进的水力插板套筒桩,它可以有效地克服或避免上述现有技术中存在的施工速度慢、建造周期长、工程造价高、施工难度大,特别是地面环境复杂的海域或地层持力层较深时,施工难度更大的缺点或不足。
本实用新型解决问题的技术方案是一种水力插板套筒桩,包括外套筒桩和内套筒桩及外套筒桩上安设的钢筋、滑道、滑板、喷射管、中心管,所述内套筒桩安设于外套筒桩内下部,插入地层,内套筒桩和外套筒桩连接成一个整体结构的长桩体,其内腔和桩体外部为封固的水泥浆。
其中,所述外套筒桩的外部为圆形、方形或多边形,内部为圆形,顶部设置预留钢筋和现浇的盖板或承台,其上对称设置的中心管为两根或多根结构。所述内套筒桩为单根或多根的圆形的水泥管或钢管,其顶部安设反扣接头。所述内套筒桩和外套筒桩的下部设置的喷射管为单排或多排结构,由中心管与顶部安设的连接头相连通。
本实用新型与现有技术相比较具有以下的优点和有益效果:
1、本实用新型将原来长桩变为分段预制的短桩,小形设备即可施工,可降低工程造价。
2、与灌注桩或者打入施工的摩檫桩相比,施工速度快、降低了工程造价。
3、插入施工不损坏桩体,适应各种环境施工。
4、工艺技术可靠,桩体内外充填水泥浆固结,安全稳定性好,承载能力大。
四、附图说明:
图1为本实用新型外套筒桩结构示意图
图2为图1所示结构俯视示意图
图3为本实用新型内套筒桩结构示意图
图4为图3所示的结构俯视示意图
图5为本实用新型结构示意图
五、具体实施方式:
参看图1至图5,一种水力插板套筒桩,包括外套筒桩1和内套筒桩2及外套筒桩上安设的钢筋3、滑道4、滑板5、喷射管6、中心管7,内套筒桩2的顶部安设反扣接头8,其套筒桩内腔和外部环形空间为封固的水泥浆9,顶部设置现浇的盖板或承台10。
外套筒桩1的外部为圆形、方形或多边形(图中表示为方形),内部为圆形,其上对称设置的中心管7为单根或多根结构(图中表示为两根)。内套筒桩2为圆形的水泥管或钢管(图中表示为水泥管),根据工程桩长,内套筒桩2可以设置单根或多根(图中表示为一根)。内套筒桩和外套筒桩的下部设置的喷射管6为单排或多排结构(图中表示为单排),由中心管7与顶部安设的连接头8相连通。
施工时,可根据工程实际需要,分段预制为不同直径的空心外套筒桩1和内套筒桩2,采用水力插板技术插入地层,先插入外套筒桩,然后依次插入内套筒桩,内、外套筒桩部分重叠,连接成一个整体结构的长桩体,达到预定深度后,用水泥浆把内、外套筒桩内腔和重叠部位充填封固,现浇盖板或承台10形成一个牢固的整体桩。

Claims (7)

1、一种水力插板套筒桩,包括外套筒桩和内套筒桩及外套筒桩上安设的钢筋、滑道、滑板、喷射管和中心管,其特征在于所述内套筒桩安设于外套筒桩内下部,插入地层,内套筒桩和外套筒桩连接成一个整体结构的长桩体,其内腔和桩体外部为封固的水泥浆。
2、根据权利要求1所述的水力插板套筒桩,其特征在于所述外套筒桩的外部为圆形、方形或多边形,内部为圆形。
3、根据权利要求1所述的水力插板套筒桩,其特征在于所述外套筒桩顶部设置有预留钢筋和现浇的盖板或承台。
4、根据权利要求1所述的水力插板套筒桩,其特征在于所述外套筒桩上对称设置的中心管为两根或多根结构。
5、根据权利要求1所述的水力插板套筒桩,其特征在于所述内套筒桩为圆形的水泥管或钢管,其下部设置喷射管,由中心管与顶部安设的连接头相连通。
6、根据权利要求1或5所述的水力插板套筒桩,其特征在于所述内套筒桩顶部安设的连接头为反扣接头。
7、根据权利要求1所述的水力插板套筒桩,其特征在于所述内套筒桩和外套筒桩的下部设置的喷射管为单排或多排结构。
CN 200420051943 2004-06-30 2004-06-30 水力插板套筒桩 Expired - Lifetime CN2739233Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420051943 CN2739233Y (zh) 2004-06-30 2004-06-30 水力插板套筒桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420051943 CN2739233Y (zh) 2004-06-30 2004-06-30 水力插板套筒桩

Publications (1)

Publication Number Publication Date
CN2739233Y true CN2739233Y (zh) 2005-11-09

Family

ID=35354299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420051943 Expired - Lifetime CN2739233Y (zh) 2004-06-30 2004-06-30 水力插板套筒桩

Country Status (1)

Country Link
CN (1) CN2739233Y (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113525A (zh) * 2015-08-26 2015-12-02 河南省第二建设集团有限公司 一种轻型井点用套管
CN109339078A (zh) * 2018-12-05 2019-02-15 昆明理工大学 一种矩形桩内接于圆桩的组合式抗滑桩

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113525A (zh) * 2015-08-26 2015-12-02 河南省第二建设集团有限公司 一种轻型井点用套管
CN105113525B (zh) * 2015-08-26 2017-01-25 河南省第二建设集团有限公司 一种轻型井点用套管
CN109339078A (zh) * 2018-12-05 2019-02-15 昆明理工大学 一种矩形桩内接于圆桩的组合式抗滑桩
CN109339078B (zh) * 2018-12-05 2020-11-20 昆明理工大学 一种矩形桩内接于圆桩的组合式抗滑桩

Similar Documents

Publication Publication Date Title
CN1837511B (zh) 一种双排围堰及其制作方法
CN1837512B (zh) 一种钢板桩和钢管桩组合围堰及其制作方法
CN200985498Y (zh) 连锁护坡砌块
CN200978412Y (zh) 防沉陷易调平易拆除的大型海上风电基础承台
CN201339195Y (zh) 一种围堰结构
CN110439022A (zh) 具有压密注浆加固地基的海上单桩基础
CN210658383U (zh) 一种淤泥深水大水流基坑组合支护
CA3177328C (en) Novel offshore wind power foundation suitable for shallow overburden layer and construction method thereof
CN204780990U (zh) 一种复合式挡土墙结构
CN2739233Y (zh) 水力插板套筒桩
CN201962670U (zh) 一种复合桩及其组合
CN2509232Y (zh) 长芯水泥土组合桩
CN201746812U (zh) 一种湿地岸边树木生态驳岸加固结构
CN206956747U (zh) 弧形双排钢管桩围堰
CN214737800U (zh) 一种水利工程用便于拆装的护坡网
CN212077786U (zh) 一种码头构件及其码头结构
CN103981858A (zh) 一种网格状水泥土连续墙防护的抗倾斜管桩及其工法
CN209011082U (zh) 一种装配式桩板结合护岸
CN209779617U (zh) 一种高压旋喷桩兼做边坡支护桩的桩基结构
CN202298627U (zh) 一种基坑支护结构
CN206655221U (zh) 一种适用于深厚软土地基的双排板桩墙驳岸结构
CN2323018Y (zh) 一种新法人工挖孔桩
CN105908773A (zh) 海上风电场浅覆盖层地基两级嵌岩桩风机基础及施工方法
CN214614091U (zh) 一种适用于风积沙地层的深基坑开挖组合支护结构
CN206815279U (zh) 一种装配式高桩承台驳岸结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANDONG HEHAI HYDRAULIC FLAPPER ENGINEERING CO.,

Free format text: FORMER OWNER: HE FURONG

Effective date: 20130114

Owner name: SHANDONG HONGXU CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: SHANDONG HEHAI HYDRAULIC FLAPPER ENGINEERING CO., LTD.

Effective date: 20130114

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130114

Address after: 257000 Shandong province Dongying City West Road No. 433

Patentee after: SHANDONG HONGXU CONSTRUCTION Co.,Ltd.

Address before: 257000 Shandong province Dongying City West Road No. 433

Patentee before: Shandong Hehai Hydraulic Flapper Engineering Co.,Ltd.

Effective date of registration: 20130114

Address after: 257000 Shandong province Dongying City West Road No. 433

Patentee after: SHANDONG HEHAI HYDRAULIC FLAPPER ENGINEERING Co.,Ltd.

Address before: 257000 Shandong province Dongying City West Road No. 433

Patentee before: He Furong

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20140630

Granted publication date: 20051109