CN2718121Y - Assembling stairway with universal double-beam structure - Google Patents

Assembling stairway with universal double-beam structure Download PDF

Info

Publication number
CN2718121Y
CN2718121Y CNU2004200459086U CN200420045908U CN2718121Y CN 2718121 Y CN2718121 Y CN 2718121Y CN U2004200459086 U CNU2004200459086 U CN U2004200459086U CN 200420045908 U CN200420045908 U CN 200420045908U CN 2718121 Y CN2718121 Y CN 2718121Y
Authority
CN
China
Prior art keywords
stair
support arm
generalization
stairway
twin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2004200459086U
Other languages
Chinese (zh)
Inventor
刘银盛
梁幸汉
罗建生
罗建中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGSHENGJIAN INDUSTRY DEVELOPMENT Co Ltd SHENZHEN CITY
Original Assignee
ZHONGSHENGJIAN INDUSTRY DEVELOPMENT Co Ltd SHENZHEN CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGSHENGJIAN INDUSTRY DEVELOPMENT Co Ltd SHENZHEN CITY filed Critical ZHONGSHENGJIAN INDUSTRY DEVELOPMENT Co Ltd SHENZHEN CITY
Priority to CNU2004200459086U priority Critical patent/CN2718121Y/en
Application granted granted Critical
Publication of CN2718121Y publication Critical patent/CN2718121Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/104Treads
    • E04F11/112Treads of metal or with an upper layer of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model relates to an assembled stairway with a generalized double-beam structure, which is used for building industry and decorating industry. The utility model aims to provide a generalized assembled stairway which has the advantage of strong adaptability and can be suitable for different layer heights and different opening sizes. Only after the generalization of unit assemblies is realized, necessary conditions can be provided to the realization of the mass production, the stability and the product quality improvement of the stairway. The utility model adopts the technical proposal that beams of the assembled stairway uses each step of the stairway as a resolvable member, and the generalization of unit assemblies is realized to the design. Two unit connecting structural parts form one stage of the stairway with supporting plates and steps, which are connected with the two unit connecting structural parts, and the stages are connected and assembled by screw bolts step by step. Each of the unit connecting structural parts has an integral structure.

Description

Generalization twin-spar construction assembling stair
Affiliated technical field
Generalization twin-spar construction assembling stair are used for building and adnornment industry.
Background technology
The beam of present twin beams stair, generally with the monoblock steel plate, process through boring etc., be connected with different modes with step plate, railing, handrail etc. by the associated fitting, also can constitute some stair simple for structure, as to have modern sense, but because the girder steel of old money twin beams steel stair is a single piece, can not organize production in enormous quantities, can only be customized for the client, the production cycle is long, and cost is higher relatively.Moreover the size of " single piece " beam is long, and the remote freight height of casing does not promptly satisfy the demand of big market (market expansion).
The content of invention
For the needs that satisfy client with adapt to market demand more widely, the purpose of this utility model provide a kind of compliance strong, can adapt to the generalization assembling stair that different floor heights and different dimensions of opening change.Have only the generalization that has realized unit block, can be for the batch process that realizes stair, stabilize and increase product quality necessary condition is provided.
Technical scheme
The technical solution adopted in the utility model is the beam of these assembling stair, is that to mark time be a resolving cell with each level of stair, to its design, realizes the generalization of unit block.Constitute the one-level stair by 2 unit connection structure spares and the supporting plate and the pedal that are attached thereto, every grade of stair assemble with bolt step by step.The as a whole structure of unit connection structure spare, it is made up of upper support arm 1 and lower support arm 8 and crossbeam 5, in the upper end of support arm up and down, respectively establish a fixed head 3,6 that direction is opposite, on support arm 1,8 up and down and fixed head 3,6, have and fixedly connected hole 2,4,7,9.The upper support arm of unit connection structure spare and the lower support arm of another unit connection structure spare by fixedly connected hole, connect with bolt, are linked and packed step by step with this.
On the fixed head 3,6 of the support arm up and down of 2 unit connection structure spares, connect supporting plate 12 with bolt, pedal 13 usefulness screws are installed on the supporting plate 12.
2 block construction spares of first order generalization twin-spar construction assembling stair are connected with ground built-in fitting 10, and the top of stair links to each other with upper connector 14.
The utility model has been realized the standardization of generalization and production technology, the on-the-spot simple installation that uses, and the production efficiency height, the scope of application is big, can organize batch process.
Description of drawings
Fig. 1 is a block construction spare schematic diagram;
Fig. 2 is the structural representation of twin-spar construction assembling stair;
Fig. 3 is a kind of assembled embodiment schematic diagram;
Fig. 4 is that pedal is installed in the embodiment schematic diagram on the generalization unit block.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is described in further detail:
Generalization twin-spar construction assembling stair shown in Figure 2 constitute the one-level stair by 2 unit connection structure spares and the supporting plate and the pedal that are attached thereto, and every grade of stair assemble with bolt step by step.The as a whole structure of unit connection structure spare shown in Figure 1, it is made up of upper support arm 1 and lower support arm 8 and crossbeam 5, in the upper end of support arm up and down, respectively establish a fixed head 3,6 that direction is opposite, on support arm 1,8 up and down and fixed head 3,6, have and fixedly connected hole 2,4,7,9.The upper support arm of unit connection structure spare 11 and the lower support arm of another unit connection structure spare by fixedly connected hole, connect with bolt, are linked and packed step by step with this.On the fixed head 3,6 of the support arm up and down of 2 unit connection structure spares, connect supporting plate 12 with bolt, pedal 13 is installed on the supporting plate 12.
2 block construction spares of first order generalization twin-spar construction assembling stair are connected with ground built-in fitting 10, and the top of stair links to each other with upper connector 14.
Fig. 3, Fig. 4 be two vertical ladders by with the embodiment of the different stair that turn to of the combined composition of different corner structures.The corner is by three kinds of forecast scheme configurations, because corner dimensions difference can be decided according to actual stair dimension of opening, it changes part and has only two, and all the other all adopt standard block spare to connect.
Railing post is fixed on the pedal.Handrail is fixed on and blocks on the bar column.Upper end and the combination that is complementary of different style railings and different handrail.Can be assembled into turn to multiple simple for structure, the generalization twin-spar construction assembling stair in outward appearance modern times.

Claims (4)

1, a kind of generalization twin-spar construction that is used to build with adnornment industry is assembled stair, it is by whole twin beams, pedal, the pedal support member is formed, this assembling stair that are characterised in that of the present utility model, constitute the one-level stair by 2 unit connection structure spares and the supporting plate and the pedal that are attached thereto, every grade of stair assemble with bolt step by step, the as a whole structure of unit connection structure spare, it is made up of upper support arm (1) and lower support arm (8) and crossbeam (5), in the upper end of support arm up and down, respectively establish a fixed head (3 that direction is opposite, 6), at following upper support arm (1,8) and fixed head (3,6) have fixedly connected hole (2 on, 4,7,9).
2, generalization twin-spar construction assembling stair according to claim 1 is characterized in that the upper support arm of unit connection structure and the lower support arm of another unit connection structure spare, by fixedly connected hole, connect with bolt.
3, generalization twin-spar construction assembling stair according to claim 1 is characterized in that connecting supporting plate (12) with bolt on the fixed head (3,6) of the support arm up and down of 2 unit connection structure spares, and pedal (13) is installed on the supporting plate (12).
4, generalization twin-spar construction assembling stair according to claim 1 is characterized in that 2 block construction spares of first order generalization twin-spar construction assembling stair are connected with ground built-in fitting (10), and the top of stair links to each other with upper connector (14).
CNU2004200459086U 2004-05-14 2004-05-14 Assembling stairway with universal double-beam structure Expired - Fee Related CN2718121Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2004200459086U CN2718121Y (en) 2004-05-14 2004-05-14 Assembling stairway with universal double-beam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2004200459086U CN2718121Y (en) 2004-05-14 2004-05-14 Assembling stairway with universal double-beam structure

Publications (1)

Publication Number Publication Date
CN2718121Y true CN2718121Y (en) 2005-08-17

Family

ID=34893231

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2004200459086U Expired - Fee Related CN2718121Y (en) 2004-05-14 2004-05-14 Assembling stairway with universal double-beam structure

Country Status (1)

Country Link
CN (1) CN2718121Y (en)

Similar Documents

Publication Publication Date Title
CN1766288A (en) Combined safety evacuation platform made of fireproof composite material for subway tunnel
CN205531085U (en) Combined assembled type stairway
CN205531082U (en) Assembled combination stair
CN107977540B (en) Corrugated steel plate arch bridge cross section design method based on optimal stress state
CN111779742A (en) Improved generation aluminum alloy building I-shaped aluminium connection structure
CN201031475Y (en) Prefabricated combined stairs
CN2718121Y (en) Assembling stairway with universal double-beam structure
CN110629913B (en) Curtain wall structure adopting red brick decoration panel and construction method thereof
CN2878679Y (en) Substation used fireproof composite combination type safety escape platform
CN2718120Y (en) Universal unit assembly type assembling stairway
CN200952114Y (en) Assembling road steel bridge
CN2908607Y (en) Hoop type guardrail bracket
CN212407227U (en) Improved generation aluminum alloy building I-shaped aluminium connection structure
CN200943261Y (en) Ultra-large movable building structure
CN200958214Y (en) Integrated stressed tower base of prefabricated concrete assembled
CN210238773U (en) Adopt beam column connected node of high strength bolt assembly
CN200949905Y (en) Up-down type air-conditioning support
CN2687214Y (en) Truss type assembled stairway
CN200964629Y (en) Building capable of moving
CN221663401U (en) Overpass aluminum alloy step structure
CN200982042Y (en) All-unit transverse curtain wall system structure
CN2571926Y (en) Cooling tower body structure adopting crisscross truss oblique support
CN201768743U (en) Stand of prestress rolling mill
CN112064838A (en) Center shaft supporting and mounting structure of corrugated aluminum plate decorative molding
CN2844309Y (en) Assembled warehouse

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee