CN1766288A - Combined safety evacuation platform made of fireproof composite material for subway tunnel - Google Patents

Combined safety evacuation platform made of fireproof composite material for subway tunnel Download PDF

Info

Publication number
CN1766288A
CN1766288A CN 200510101052 CN200510101052A CN1766288A CN 1766288 A CN1766288 A CN 1766288A CN 200510101052 CN200510101052 CN 200510101052 CN 200510101052 A CN200510101052 A CN 200510101052A CN 1766288 A CN1766288 A CN 1766288A
Authority
CN
China
Prior art keywords
platform
subway tunnel
bearing part
crosspiece
evacuation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510101052
Other languages
Chinese (zh)
Other versions
CN100412318C (en
Inventor
许家瑞
卢光霖
王虹
曾耀昌
莫庭斌
黄凤来
黄德亮
王建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING BOSENDA INDUSTRIAL TRADING Co Ltd
Sun Yat Sen University
Guangzhou Metro Corp
Original Assignee
BEIJING BOSENDA INDUSTRIAL TRADING Co Ltd
Sun Yat Sen University
Guangzhou Metro Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=36581194&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1766288(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by BEIJING BOSENDA INDUSTRIAL TRADING Co Ltd, Sun Yat Sen University, Guangzhou Metro Corp filed Critical BEIJING BOSENDA INDUSTRIAL TRADING Co Ltd
Priority to CNB2005101010529A priority Critical patent/CN100412318C/en
Priority to HK05111585A priority patent/HK1081063A2/en
Publication of CN1766288A publication Critical patent/CN1766288A/en
Application granted granted Critical
Publication of CN100412318C publication Critical patent/CN100412318C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a subway tunnel combination safe decentralization flatform of fireproof composite material, which consists of decentralization flatform plane and support rack, wherein the decentralization flatform plane displays grid-type flatform structure; the support rack is composed of transom, strut and loading part; the grid-type flatform structure is fixed on two or more transoms of support rack. The invention can be connected continual safe decentralization flatform tunnel with cable rack through the support rack, which realizes the integral of cable rack and decentralization flatform.

Description

Subway tunnel combined safety evacuation platform by the Flameproof composite material manufacturing
Technical field
The present invention relates to the combined safety evacuation platform that tunnel, a kind of urban subway is used by the Flameproof composite material manufacturing.
Background technology
Before the present invention makes, also there is not a kind of comparatively desirable safety evacuation platform in the existing subway tunnel.In the past, railcar was in operation and existed when meeting accident accident, if because machinery or electric equipment fault are parked in train can't travel in interval, generally adopt breakdown train that the fault train is dragged to station, the place ahead processing mode of " proteges of the powerful who stay with their benefactions like parasites " again.But, if train breaking out of fire owing to electrical equipment trouble incident, and can't continue to travel to station, the place ahead, then must in running tunnel, organize the passenger to evacuate as early as possible to the direction that helps most of passengers.Before the present invention makes, the general mode of leaving train and evacuating from train termination door that adopts of subway along the track centre.Because train termination gate-width degree is limited, add that again bridge equipment stops, the passenger that this evacuation mode can not guarantee the permutation car in official hour total evacuation to the safety zone.Therefore, must organize the passenger to leave train and evacuate to the direction that helps most of passengers, so that when meeting accident accident in the subway tunnel, the passenger can be dispersed into the safety zone quickly and easily by the platform that is installed on the tunnel-side from side door.
Summary of the invention
The purpose of this invention is to provide the combined safety evacuation platform that tunnel, a kind of urban subway is used by the Flameproof composite material manufacturing.
Subway tunnel combined safety evacuation platform of the present invention (being designated hereinafter simply as evacuation platform) constitutes with flat upper surface and platform bracing frame two parts by evacuating; Evacuation is fixed on the platform bracing frame with flat upper surface; Same with thermosetting compound material that described each parts are strengthened by the fireproof glass fiber or corrosion resistant metal (moulding or spray metal etc. as stainless steel, plating) are made.Described platform bracing frame can be mounted on the subway tunnel wall.
The platform bracing frame of described evacuation platform normally is made of crosspiece, diagonal brace and bearing part or last undersetting, and crosspiece one end is connected with bearing part top or upper bracket; Diagonal brace one end is connected with bearing part bottom or undersetting, and the other end is connected with the nearly outer end of crosspiece; Flat upper surface is fixedly installed on the crosspiece of two or more platform bracing frames.
Described bearing part also can have the cable bearer transverse arm, can make the evacuation platform that is constituted have the function of cable bearer concurrently like this, realizes the integrated of evacuation platform and cable bearer.
Described bearing part bottom or undersetting preferably have and can lock the latch-up structure that is connected with the cable bearer upper end; On this latch-up structure, can be connected with cable bearer.
The concrete installation connected mode of described evacuation platform is generally: crosspiece one end of platform bracing frame inserts the crosspiece mounting groove and the bonding connection of bearing part top or upper bracket; Diagonal brace one end is connected with the diagonal brace mounting groove of bearing part bottom or undersetting, and the other end inserts the nearly outer end of crosspiece and connects or be connected by the nearly outer end of stainless steel adapting piece and crosspiece; On bearing part or the last undersetting installing hole that can be mounted on the subway tunnel wall is arranged; Connection between the above-mentioned member all adopts stainless steel bolt fastening; Evacuation is mounted on the crosspiece of two or more platform bracing frames by stainless steel bolt with flat upper surface.
The evacuation of described evacuation platform is preferably grid-like slabbed construction with flat upper surface, and is made by same with thermosetting compound material or corrosion resistant metal that the fireproof glass fiber strengthens.
Described evacuation is made of T font or I shape drawing and extruding section bar, spacer ring and pultrusion connecting rod usually with flat upper surface; T font or I shape drawing and extruding section bar are spaced by spacer ring and are fixed into grid-like flat board by pultrusion connecting rod serial connection bonding; Two T fonts of the outer side edges of flat upper surface or I shape drawing and extruding section bar constitute double T font or duplexing font structure near together; Described each parts are made by the same with thermosetting compound material that the fireproof glass fiber strengthens.
The cross section of the same with thermosetting compound material pultrusion that the strut rail of the platform bracing frame of described evacuation platform and diagonal brace are normally strengthened by the fireproof glass fiber is rectangle or square section bar parts; Bearing part is preferably made by the same with thermosetting compound material that the fireproof glass fiber strengthens; Last undersetting can be with the same with thermosetting compound material of fireproof glass fiber enhancing or the profiled parts of corrosion resistant metal moulding.
The diagonal brace of the platform bracing frame of described evacuation platform preferably is connected by spherical connector or cylindric connector with the diagonal brace mounting groove of bearing part bottom or undersetting.
Usually, after described evacuation platform was installed on subway tunnel, described evacuation with respect to the horizontal plane had 1 °~10 ° outward side to upwarp with flat upper surface.
By a plurality of evacuation platforms of the present invention connection is installed and constitutes continuous subway tunnel safety evacuation platform passage.According to the evacuation platform of the invention described above, the profile that can be complementary according to subway tunnel (as circular tunnel, horse-shoe tunnel, the Rectangular Tunnel) design of different structure.Therefore, evacuation platform of the present invention is applicable to the subway tunnel of different structure.
That evacuation platform of the present invention has is good from heavy and light, compact conformation, adiabatic good insulating, fire line, LSZH, corrosion-resistant and structural strength is high, easy for installation, change advantages such as cable is easy.It is little to be specially adapted to installing space, underground constructions such as the tunnel that function of use is many, subway.
The present invention brings into play the good advantage of composite material designability, adopt the fireproof same with thermosetting compound material to substitute intrinsic steelwork of subway tunnel and cement product, can be with low-voltage distribution cable metal support, the composite element of the light fire-proof of high pressure cable metal support and integrating of reinforced concrete safety evacuation platform.Shortcomings such as this element structure intensity height, electrical insulation capability are good, fire prevention, long service life, and the easy corrosion of metallic support, the maintenance works amount that has overcome traditional use is big, application life is short.That this structural member is installed is simple and easy, lay and to change cable convenient, can reduce operator's labour intensity greatly, can accelerate the progress that subway engineering is built.Simultaneously,, need on shield structure ring wall, play the deep hole support and cause the damage of section of jurisdiction bigger, and it is few to adopt this structural member to punch on shield duct piece, and need not beat deep hole, can reduce damage the section of jurisdiction if adopt the reinforced concrete safety evacuation platform because self is heavy; On this basis, can also be further when the tunneling shield section of jurisdiction is installed, standard more on the engineering location also might utilize the existing bolt on the section of jurisdiction that integrated component is installed, reach the requirement of not punching basically, thereby help prolonging the application life in tunnel.
Because evacuation platform of the present invention mainly adopts the preparation of fireproof same with thermosetting compound material, therefore can require and ratio of performance to price analysis result according to mechanical calculation, processing technology, adopt mold pressing or pultrude process to be processed into intensity and all different some parts of rigidity respectively the each several part of this evacuation platform, be combined into a structural strength height, easy for installation, the easy integrated evacuation platform of replacing cable.
The parts of evacuation platform of the present invention can cut easily according to the site operation required size, boring, tapping screw, size adjustment and construction.
The present invention also is different with homogeneous traditional materials such as steel, aluminum alloy materials, and composite material has excellent designability.Fireproof composite product and goods can carry out performance design, structure design and select corresponding moulding process to make simultaneously according to concrete instructions for use.The present invention is fit to the necessary compactness of batch production requirements structure, shape is special, employing metal material manufacture difficulty is big, produce the high special-shaped component of cost in batches, especially suitable space-constrained underground construction member.
Below in conjunction with the drawings and specific embodiments the present invention is further described.
Description of drawings
Fig. 1-Figure 11 is the specific embodiment for the evacuation platform of the present invention of subway circular tunnel design.
Fig. 1 is a subway circular tunnel straightway cross section schematic diagram, the installation site of signal evacuation platform of the present invention.Wherein a is a tunneling shield section of jurisdiction wall, and b is a safety evacuation platform, and c is a handrail, and d is a underground railway track, and e is a track foundation.
Fig. 2 is that the platform bracing frame adopts the evacuation platform structural representation of the present invention of seat structure mode (abbreviating two point form as) up and down.
Fig. 3 is the evacuation platform structural representation of the present invention that does not have the cable bearer transverse arm on the bearing part of platform bracing frame.
Fig. 4 is the evacuation platform structural representation of the present invention that has the cable bearer transverse arm on the platform bracing frame.
Fig. 5 is a kind of structural representation of the flat upper surface of evacuation platform of the present invention, and wherein (5-1) is front view, (5-2) is left view, (5-3) is local A structure enlarged drawing.
Fig. 6 is a seat structure schematic diagram up and down, and wherein (6-1) is the structural representation of two kinds of different embodiments of upper bracket with (6-2), (6-2) is the structural representation of undersetting.
Fig. 7 is that diagonal brace passes through the structural representation that spherical connector is connected with undersetting, and wherein (7-1) is the syndeton schematic diagram, is respectively the front view and the vertical view of spherical connector (7-2) and (7-3).
Fig. 8 is that diagonal brace passes through the structural representation that cylindric connector is connected with undersetting, and wherein (8-1) is the syndeton schematic diagram, (8-2), (8-3) and (8-4) be respectively front view, vertical view and the left view of spherical connector.
Fig. 9 is the evacuation platform structural representation of the present invention that platform bracing frame bottom is connected with cable bearer.
Figure 10 is a kind of structural representation of the bearing part of platform bracing frame, wherein (10-1) is front view, be that the A of upper end installing hole 9 is to view (10-2), be that the B of crosspiece mounting groove 4a is to view (10-3), (10-4) be the I-I sectional drawing, the C that (10-5) is diagonal brace mounting groove 4b and bottom latch-up structure 7 is to view.
Figure 11 is a kind of structural representation of cable bearer, wherein (11-1) is front view, be that the A of upper end installing hole 83 is to view (11-2), (11-3) be the B-B sectional drawing of supporting body 81, be that the C of bottom installing hole 83 is to view (11-4), (11-5) being the D-D sectional drawing of supporting body 81, (11-6) is the E-E sectional drawing of transverse arm 82, and the F that (11-7) is transverse arm 82 is to view.
The specific embodiment
Example one. the platform bracing frame adopts the combined safety evacuation platform (with reference to Fig. 2, Fig. 5-Fig. 9 and Figure 11) of going up undersetting two point form structure
Tunnel, urban subway of the present invention constitutes by evacuating with flat upper surface 1 and platform bracing frame with combined safety evacuation platform.Evacuating with flat upper surface is to be made of T font (or I shape) drawing and extruding section bar 51, spacer ring 52 and pultrusion connecting rod 53.T font (or I shape) drawing and extruding section bar is spaced by spacer ring and is fixed into grid-like flat board by pultrusion connecting rod serial connection bonding; Two T fonts (or I shape) drawing and extruding section bar of the outer side edges of flat upper surface constitutes double T font (or duplexing font) structure 54 near together.This evacuation is installed on the crosspiece 2 of platform bracing frame by stainless steel fastener 10 usefulness stainless steel bolts 11 with flat upper surface.After this evacuation platform was installed on subway tunnel, its flat upper surface with respect to the horizontal plane had 1 °~10 ° upwarping laterally.
The platform bracing frame is made of crosspiece 2, diagonal brace 3, upper bracket 8a and undersetting 8b.Strut rail 2 and diagonal brace 3 are that the cross section of the same with thermosetting compound material pultrusion that strengthened by the fireproof glass fiber is rectangle or square section bar parts; Last undersetting 8a and 8b are the profiled parts (as shown in Figure 6) of the same with thermosetting compound material that strengthened by the fireproof glass fiber or corrosion resistant metal (moulding or spray metal etc. as stainless steel, plating) moulding.The installing hole 9 that can be mounted on the subway tunnel wall is arranged, available stainless steel plantation bolt or the fastening subway tunnel tube wall that is installed on of stainless steel expansion bolt on the last undersetting; Crosspiece 2 one ends insert crosspiece mounting groove 4a and the bonding connection of upper bracket 8a; The diagonal brace mounting groove 4b that diagonal brace 3 one ends insert undersetting 8b realizes connecting, and perhaps is connected (as Fig. 7, shown in Figure 8) with undersetting 8b by spherical connector 5a or cylindric connector 5b; The diagonal brace other end is connected by stainless steel adapting piece 6 with the nearly outer end of crosspiece, and the diagonal brace other end also can directly insert the nearly outer end of crosspiece and realize connecting; Connection between above-mentioned each parts all uses stainless steel bolt 11 fastening; Flat upper surface is mounted on the crosspiece of two or more platform bracing frames.
To be the two point form that can be divided into top and the bottom be fixed on profiled parts on the tunnel wall, its structure such as Fig. 2 and shown in Figure 6 to evacuation platform to last undersetting.Undersetting 8b can have latch-up structure 7 as required, and this latch-up structure is that the upper surface of the installing hole 9 of undersetting is made cancave cambered surface and constituted (as shown in Figure 2); The movable latch-up structure that this latch-up structure has cable bearer 8 upper ends of the same with thermosetting compound material moulding that strengthens with the fireproof glass fiber locks linkage function, reduces tunnel punching number and effect easy for installation to reach.
Example two. the platform bracing frame adopts the combined safety evacuation platform (with reference to Fig. 3, Fig. 4, Fig. 5, Fig. 7, Fig. 8, Figure 10 and Figure 11) of long strip type bearing part structure
This evacuation platform constitutes with flat upper surface and platform bracing frame two parts by evacuating.Evacuate with platform and constitute by I shape (or T font) drawing and extruding section bar 51, spacer ring 52 and pultrusion connecting rod 53 by flat upper surface 1.I shape (or T font) drawing and extruding section bar is spaced by spacer ring and is fixed into grid-like flat board by pultrusion connecting rod serial connection bonding; Two I shapes (or T font) of the outer side edges of flat upper surface squeeze the part section bar near together, constitute duplexing font (or T font) structure 54.This evacuation can be connected and installed in (as shown in Figure 2) on the platform bracing frame by stainless steel fastener 10 usefulness stainless steel bolts 11 with flat upper surface.After this evacuation platform was installed on subway tunnel, its evacuation with respect to the horizontal plane preferably had 1 °~10 ° upwarping laterally with flat upper surface.
The platform bracing frame is made of crosspiece 2, diagonal brace 3 and bearing part 4.Strut rail 2 and diagonal brace 3 are that the cross section of the same with thermosetting compound material pultrusion that strengthened by the fireproof glass fiber is rectangle or square long strip type section bar parts; Bearing part 4 is profiled parts of the same with thermosetting compound material compression molding of fireproof glass fiber enhancing.The concrete structure of bearing part 4 as shown in figure 10.The installing hole 9 that can be mounted on the subway tunnel wall is arranged, available stainless steel plantation bolt or the fastening subway tunnel tube wall that is installed on of stainless steel expansion bolt on the bearing part.Crosspiece 2 one ends are connected with the crosspiece mounting groove 4a on bearing part top; The diagonal brace mounting groove 4b that diagonal brace 3 one ends insert the bearing part bottom realizes connecting, and perhaps is connected (referring to Fig. 7 and Fig. 8) by spherical connector 5a or cylindric connector 5b with the diagonal brace mounting groove 4b of bearing part bottom; The diagonal brace other end inserts the nearly outer end of crosspiece and realizes connecting, and also can connect by stainless steel adapting piece 6 as shown in Figure 2.Connection between above-mentioned each member all uses stainless steel bolt 11 fastening.Flat upper surface is mounted on the crosspiece of two or more platform bracing frames.
Bearing part 4 can have cable bearer transverse arm 41 (as Fig. 4), also tape cable support transverse arm (as Fig. 3) not.Bearing part 4 bottoms can have latch-up structure 7, and this latch-up structure is the upper surface of the installing hole 9 of bearing part bottom is made cancave cambered surface and to constitute; The movable latch-up structure that this latch-up structure has cable bearer 8 upper ends of the same with thermosetting compound material compression molding that strengthens with the fireproof glass fiber locks linkage function, can realize both connection when being installed on the subway tunnel tube wall with bearing part (or undersetting) and cable bearer are fastening with stainless steel plantation bolt or stainless steel expansion bolt, reduce tunnel punch number and effect easy for installation to reach.
Example three, platform bracing frame bottom are connected with the integrated combined safety evacuation platform (with reference to Fig. 9, Figure 11 and Fig. 2, Fig. 3 and Fig. 4) of cable bearer
This evacuation platform can be connected with cable bearer 8 in the bottom of platform bracing frame.The undersetting 8b of the upper end of cable bearer 8 and platform bracing frame (or bearing part 4 bottoms) links together by latch-up structure 7.
Cable bearer 8 is made of the supporting body 81 that fuses and some transverse arms 82, and the installing hole 83 that can be mounted on the subway tunnel wall is arranged on the supporting body; Cable bearer is the profiled parts by the same with thermosetting compound material moulding of fireproof glass fiber enhancing.The concrete structure of cable bearer as shown in figure 11.

Claims (10)

1. a subway tunnel combined safety evacuation platform is characterized in that this evacuation platform constitutes by evacuating with flat upper surface (1) and platform bracing frame two parts; Evacuate and be fixed on the platform bracing frame with flat upper surface (1); Described each parts are made by same with thermosetting compound material or corrosion resistant metal that the fireproof glass fiber strengthens.
2. according to the described subway tunnel combined safety evacuation platform of claim 1, it is characterized in that, described platform bracing frame is by crosspiece (2), diagonal brace (3) and bearing part (4) or goes up undersetting (8a, 8b) formation that crosspiece (2) one ends are connected with bearing part (4) top or upper bracket (8a); Diagonal brace (3) one ends are connected with bearing part (4) bottom or undersetting (8b), and the other end is connected with the nearly outer end of crosspiece (2); Flat upper surface (1) is fixedly installed on the crosspiece of two or more platform bracing frames.
3. according to the described subway tunnel combined safety evacuation platform of claim 2, it is characterized in that described bearing part (4) has cable bearer transverse arm (41).
4. according to the described subway tunnel combined safety evacuation platform of claim 2, it is characterized in that, described bearing part (4) bottom or undersetting (8b) have and can lock the latch-up structure (7) that is connected with the cable bearer upper end, are connected with cable bearer (8) on the latch-up structure (7).
5. according to the described subway tunnel combined safety evacuation platform of claim 2, it is characterized in that crosspiece (2) the one end Inserted of described platform bracing frame go into the crosspiece mounting groove (4a) and the bonding connection of bearing part (4) top or upper bracket (8a); Diagonal brace (3) one ends are connected with the diagonal brace mounting groove (4b) of bearing part (4) bottom or undersetting (8b), and the other end inserts the nearly outer end of crosspiece and connects or be connected with the nearly outer end of crosspiece by stainless steel adapting piece (6); On bearing part (4) or the last undersetting (8a, 8b) installing hole (9) that can be mounted on the subway tunnel wall is arranged; Connection between the above-mentioned member all adopts stainless steel bolt (11) fastening; Flat upper surface (1) is mounted on the crosspiece of two or more platform bracing frames by stainless steel bolt (11).
6. according to the described subway tunnel combined safety evacuation platform of claim 1, it is characterized in that described evacuation is grid-like slabbed construction with flat upper surface (1), and make by same with thermosetting compound material or corrosion resistant metal that the fireproof glass fiber strengthens.
7. according to claim 1 or 6 described subway tunnel combined safety evacuation platforms, it is characterized in that described evacuation is to be made of T font or I shape drawing and extruding section bar (51), spacer ring (52) and pultrusion connecting rod (53) with flat upper surface (1); T font or I shape drawing and extruding section bar are spaced by spacer ring and are fixed into grid-like flat board by pultrusion connecting rod serial connection bonding; Two T fonts of the outer side edges of flat upper surface or I shape drawing and extruding section bar constitute double T font or duplexing font structure (54) near together; Described each parts are made by the same with thermosetting compound material that the fireproof glass fiber strengthens.
8. according to claim 2 or 5 described subway tunnel combined safety evacuation platforms, it is characterized in that strut rail of described platform bracing frame (2) and diagonal brace (3) are that the cross section of the same with thermosetting compound material pultrusion that strengthened by the fireproof glass fiber is rectangle or square section bar parts; Bearing part (4) is to be made by the same with thermosetting compound material that the fireproof glass fiber strengthens; Last undersetting (8a, 8b) is with the same with thermosetting compound material of fireproof glass fiber enhancing or the profiled parts of corrosion resistant metal moulding.
9. according to claim 2 or 5 described subway tunnel combined safety evacuation platforms, it is characterized in that described diagonal brace (3) is connected by spherical connector (5a) or cylindric connector (5b) with the diagonal brace mounting groove (4b) of bearing part bottom or undersetting (8b).
10. according to the described subway tunnel combined safety evacuation platform of claim 1, it is characterized in that described evacuation with respect to the horizontal plane had 1 °~10 ° outward side to upwarp with flat upper surface after this evacuation platform was installed on subway tunnel.
CNB2005101010529A 2005-11-14 2005-11-14 Combined safety evacuation platform made of fireproof composite material for subway tunnel Expired - Fee Related CN100412318C (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CNB2005101010529A CN100412318C (en) 2005-11-14 2005-11-14 Combined safety evacuation platform made of fireproof composite material for subway tunnel
HK05111585A HK1081063A2 (en) 2005-11-14 2005-12-15 Demountable safety evacuation platform for underground railway tunnels made of fireproof composite material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005101010529A CN100412318C (en) 2005-11-14 2005-11-14 Combined safety evacuation platform made of fireproof composite material for subway tunnel

Publications (2)

Publication Number Publication Date
CN1766288A true CN1766288A (en) 2006-05-03
CN100412318C CN100412318C (en) 2008-08-20

Family

ID=36581194

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005101010529A Expired - Fee Related CN100412318C (en) 2005-11-14 2005-11-14 Combined safety evacuation platform made of fireproof composite material for subway tunnel

Country Status (2)

Country Link
CN (1) CN100412318C (en)
HK (1) HK1081063A2 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003207A (en) * 2010-12-31 2011-04-06 上海市隧道工程轨道交通设计研究院 Escape platform and security channel structure for single-hole dual-line magnetic suspension tunnel
CN102080359A (en) * 2010-12-31 2011-06-01 上海市隧道工程轨道交通设计研究院 Platform and safe passage structure for single-hole double-line magnetic levitation tunnel
CN102704994A (en) * 2012-06-04 2012-10-03 江苏华威线路设备集团有限公司 Evacuation platform for tunnel
CN103321674A (en) * 2013-07-11 2013-09-25 南通美固复合材料有限公司 Composite evacuation platform
CN107435556A (en) * 2017-09-11 2017-12-05 中国安全生产科学研究院 A kind of dropproof subway dispersing platform
CN109057858A (en) * 2018-09-21 2018-12-21 山西晋投玄武岩开发有限公司 Lightweight basalt composite fiber plate and its subway dispersing platform of production
CN110374670A (en) * 2019-07-05 2019-10-25 洛阳双瑞橡塑科技有限公司 A kind of tunnel composite material evacuation platform
CN110397471A (en) * 2019-07-05 2019-11-01 洛阳双瑞橡塑科技有限公司 A kind of subway tunnel composite material evacuation platform
CN110593944A (en) * 2019-04-15 2019-12-20 洛阳双瑞橡塑科技有限公司 Evacuation platform capable of fixing cable support
CN110593943A (en) * 2019-01-31 2019-12-20 洛阳双瑞橡塑科技有限公司 Evacuation platform for tunnel
CN112879081A (en) * 2021-01-29 2021-06-01 南通德瑞森复合材料有限公司 Integrated composite evacuation platform
CN113847084A (en) * 2021-10-15 2021-12-28 楚雄佑琳生科技有限公司 Novel UHPC subway evacuation platform
CN115465325A (en) * 2022-09-20 2022-12-13 山东大学 Integral type cold-bending and edge-curling asymmetric Z-shaped bracket evacuation platform support

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1587220A1 (en) * 1988-02-23 1990-08-23 Всесоюзный Научно-Исследовательский Институт Безопасности Труда В Горнорудной Промышленности Emergency resscue arrangement for lifting people in unequipped ascending workings
CN2758489Y (en) * 2004-12-07 2006-02-15 张国志 Subway dispersing platform
CN2878679Y (en) * 2005-11-16 2007-03-14 广州市地下铁道总公司 Substation used fireproof composite combination type safety escape platform

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003207A (en) * 2010-12-31 2011-04-06 上海市隧道工程轨道交通设计研究院 Escape platform and security channel structure for single-hole dual-line magnetic suspension tunnel
CN102080359A (en) * 2010-12-31 2011-06-01 上海市隧道工程轨道交通设计研究院 Platform and safe passage structure for single-hole double-line magnetic levitation tunnel
CN102003207B (en) * 2010-12-31 2012-08-29 上海市隧道工程轨道交通设计研究院 Escape platform and security channel structure for single-hole dual-line magnetic suspension tunnel
CN102704994A (en) * 2012-06-04 2012-10-03 江苏华威线路设备集团有限公司 Evacuation platform for tunnel
CN103321674A (en) * 2013-07-11 2013-09-25 南通美固复合材料有限公司 Composite evacuation platform
CN107435556A (en) * 2017-09-11 2017-12-05 中国安全生产科学研究院 A kind of dropproof subway dispersing platform
CN109057858A (en) * 2018-09-21 2018-12-21 山西晋投玄武岩开发有限公司 Lightweight basalt composite fiber plate and its subway dispersing platform of production
CN110593943A (en) * 2019-01-31 2019-12-20 洛阳双瑞橡塑科技有限公司 Evacuation platform for tunnel
CN110593944A (en) * 2019-04-15 2019-12-20 洛阳双瑞橡塑科技有限公司 Evacuation platform capable of fixing cable support
CN110374670A (en) * 2019-07-05 2019-10-25 洛阳双瑞橡塑科技有限公司 A kind of tunnel composite material evacuation platform
CN110397471A (en) * 2019-07-05 2019-11-01 洛阳双瑞橡塑科技有限公司 A kind of subway tunnel composite material evacuation platform
CN112879081A (en) * 2021-01-29 2021-06-01 南通德瑞森复合材料有限公司 Integrated composite evacuation platform
CN113847084A (en) * 2021-10-15 2021-12-28 楚雄佑琳生科技有限公司 Novel UHPC subway evacuation platform
CN115465325A (en) * 2022-09-20 2022-12-13 山东大学 Integral type cold-bending and edge-curling asymmetric Z-shaped bracket evacuation platform support
CN115465325B (en) * 2022-09-20 2024-09-06 山东大学 Integral cold-bending hemming asymmetric Z-shaped bracket arm evacuation platform bracket

Also Published As

Publication number Publication date
HK1081063A2 (en) 2006-05-04
CN100412318C (en) 2008-08-20

Similar Documents

Publication Publication Date Title
CN1766288A (en) Combined safety evacuation platform made of fireproof composite material for subway tunnel
CN2878679Y (en) Substation used fireproof composite combination type safety escape platform
CN201433790Y (en) Evacuation platform made of fireproof composite material
CN2808849Y (en) Combined frame hoistway
CN2818654Y (en) Self-walking straight-arm overhead operating platform
CN214326849U (en) Steel structure well connecting piece convenient to install and fix
CN2659732Y (en) Conductor rail support frame
CN100347479C (en) High molecular composite material cable rack for city rail traffic
CN200949905Y (en) Up-down type air-conditioning support
CN214733649U (en) Pin-connected panel steel constructs elevator well
CN200982042Y (en) All-unit transverse curtain wall system structure
CN2718121Y (en) Assembling stairway with universal double-beam structure
CN212740317U (en) Statically indeterminate shaft structure with elevator additionally installed in existing building and elevator system
CN220148940U (en) Guide rail bracket for elevator
CN2612729Y (en) Arched well cover
CN220353183U (en) Dry-hanging structure of concave stone curtain wall based on steel skeleton
CN2721711Y (en) Multifunctional windscreen device
CN215803132U (en) Scaffold board for building
CN212176209U (en) Big glass cable curtain wall of vestibule
CN215407826U (en) Rail guard for construction
CN220950750U (en) Novel no computer lab elevator sedan-chair frame goes up roof beam device
CN218990440U (en) Combined steel structure convenient to connect
CN219792348U (en) Adjustable electromechanical multi-pipeline prefabricated mounting bracket
CN207813123U (en) A kind of cellular building with corner fittings device
CN221855161U (en) Assembled track structure assembly for magnetic levitation train

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C35 Partial or whole invalidation of patent or utility model
IP01 Partial invalidation of patent right

Commission number: 4W100991

Conclusion of examination: On the basis of the revised claim 1-5 submitted on 2011, 08, the patent holder continued to maintain the validity of the patent in 04.

Decision date of declaring invalidation: 20111202

Decision number of declaring invalidation: 17635

Denomination of invention: Substation used fireproof composite combination type safety escape platform

Granted publication date: 20080820

Patentee: SUN YAT-SEN University|GUANGZHOU METRO Corp.|Beijing Posenda Industry Trade Co.,Ltd.

IP01 Partial invalidation of patent right
IP01 Partial invalidation of patent right

Commission number: 4W105037

Conclusion of examination: Declare that claims 1 and 3-5 filed by the patentee on August 04, 2011 in the invention patent 200510101052.9 are null and void, and maintain the patent validity on the basis of claim 2 filed by the patentee on August 04, 2011.

Decision date of declaring invalidation: 20170223

Decision number of declaring invalidation: 31440

Denomination of invention: Substation used fireproof composite combination type safety escape platform

Granted publication date: 20080820

Patentee: SUN YAT-SEN University|GUANGZHOU METRO Corp.|Beijing Posenda Industry Trade Co.,Ltd.

IP01 Partial invalidation of patent right
IP01 Partial invalidation of patent right

Commission number: 4W104857

Conclusion of examination: It is declared that claims 1, 3-5 submitted by the patentee on August 4, 2011 in the patent for invention No. 200510101052.9 are invalid, and the patent will remain valid on the basis of claim 2 submitted by the patentee on August 4, 2011.

Decision date of declaring invalidation: 20170223

Decision number of declaring invalidation: 31440

Denomination of invention: Substation used fireproof composite combination type safety escape platform

Granted publication date: 20080820

Patentee: SUN YAT-SEN University|GUANGZHOU METRO Corp.|BEIJING POSENDA INDUSTRY TRADE Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080820