CN2716338Y - Protection device for filling concrete in pile foundation construction - Google Patents

Protection device for filling concrete in pile foundation construction Download PDF

Info

Publication number
CN2716338Y
CN2716338Y CN 200420052905 CN200420052905U CN2716338Y CN 2716338 Y CN2716338 Y CN 2716338Y CN 200420052905 CN200420052905 CN 200420052905 CN 200420052905 U CN200420052905 U CN 200420052905U CN 2716338 Y CN2716338 Y CN 2716338Y
Authority
CN
China
Prior art keywords
pile foundation
concrete
utility
foundation construction
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420052905
Other languages
Chinese (zh)
Inventor
陈佳训
陈建业
王亦德
Original Assignee
陈佳训
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈佳训 filed Critical 陈佳训
Priority to CN 200420052905 priority Critical patent/CN2716338Y/en
Application granted granted Critical
Publication of CN2716338Y publication Critical patent/CN2716338Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a protection device for filling concrete in pile foundation construction, comprising a reinforced bar cage arranged on the inner of the pile hole concrete slurry. The utility model is characterized in that the outside of the reinforced bar cage is provided with a steel wire protection material net layer. When the underground has the geological condition that thicker flow plastic sludge (sand) layer exists, by using the device of the utility model, the construction method of filling pile of concrete pumping of auger boring can successfully be constructed. The utility model has the advantages that the protection device for filling concrete in pile foundation construction is economic and can reduce project duration and ensure engineering quality; the increased member-protection material metal net is easy to obtain on the building site, and processing and cost doesn't basically increase; the protection device for filling concrete in pile foundation construction has excellent cost performance and the building section is pleased to adopt; members are easy to make and can be understood easily.

Description

Pile foundation construction concrete spouting enclosure device
Technical field
The utility model belongs to Pile Foundations Design and construction technology category, relates in particular to a kind of pile foundation construction concrete spouting enclosure device.
Background technology
In Pile Foundations Design and the construction, in the pile foundation construction engineering of the soil layer of geological conditionss such as general clay and fill stratum, powder soil horizon, thin burning into sand soil layer and general non-deadweight fall loess formation, prior art preferentially adopts auger boring pumping of concrete bored cast-in-situ pile, promptly in the stake hole, pour into the concrete slurry that stirs, and insertion reinforcing cage, maintenance as usual, pile foundation construction is finished.
At the specific condition of geotechnical engineering geology, for example, underground have mud or a thicker layer of sand, and this mud or layer of sand are in that stream is moulded or during the half-flow plastic state; Or in pond backfill, coastal area, particularly carry out on one side under the situation of (building) structure construction in one side backfill, because the shortage self of banketing of upper strata backfill is fixed, there is mud (sand) layer that flows below again, new construction of structures is seated on the backfill, and the duration requires under the tight situation or the like, and construction is failure often.
The main cause of failure is that equipment is not good enough, and the reinforcing cage of prior art is to be made of main muscle+horizontal stirrup longitudinally, and the aperture of its side is often greater than the particle diameter of the coarse aggregate of perfusion concrete slurry; The stake hole poured into the concrete slurry or counter insert reinforcing cage after, the fluidised form concrete slurry that pours in the above stake of the absolute altitude hole at the bottom of the mud, because mud (sand) stressor layer that the pressure of deadweight is moulded greater than stream, the concrete stock losses occurs in mud (sand) layer of fluidised form, and absolute altitude with top the emptying aperture phenomenon appears at the bottom of the mud that flows in the stake hole; The used equipment of auger boring pumping of concrete bored cast-in-situ pile of prior art then, promptly traditional reinforcing cage is often not competent, directly influences construction quality.
The utility model content
Goal of the invention of the present utility model is to overcome above-mentioned defective, design a kind of pile foundation construction concrete spouting enclosure device, when the geological conditions of the thicker plastic flow mud of underground existence (sand) layer, use device of the present utility model, auger boring pumping of concrete filling pile construction method, but smooth construction still.
Goal of the invention of the present utility model is implemented by following technical solution:
Develop a kind of pile foundation construction concrete spouting enclosure device, comprise the reinforcing cage that is arranged in the hole concrete slurry, it is characterized in that: described reinforcing cage arranged outside steel wire is protected the material stratum reticulare.
Above-mentioned steel wire is protected the mesh aperture of material stratum reticulare, less than the particle diameter of the coarse aggregate in the concrete slurry that pours in the stake hole;
Above-mentioned steel wire is protected the material stratum reticulare height is set, greater than mud or layer of sand height in the stake hole, job site.
The utility model steel wire is protected the effect of material net, it is the coarse aggregate that pours in the restrained pile hole in the concrete slurry, mud (sand) layer is not produced pressure, prevent that coarse aggregate is lost in mud (sand) layer, and make the concrete grout in the concrete slurry flow to the outside that steel wire is protected the material net naturally, and form balancing of stresses with mud, reach the purpose that nature fills the hole, concrete stock quality to guarantee to pour in the stake hole guarantees workmanship.
The beneficial effects of the utility model are:
1. structure practicality, remarkably productive, when being particularly useful for the geological conditions of the thicker plastic flow mud of underground existence (sand) layer, use device of the present utility model, economy, reduction of erection time, guarantee workmanship;
2. the member of Zeng Jiaing---protect the material gauze wire cloth, the building site very easily obtains, and does not increase man-hour and cost substantially; Ratio of performance to price excellence, unit in charge of construction is glad to adopt;
3. structure manufacture is simple and easy, a religion will, be easy to promote, popularize.
Description of drawings
Fig. 1 is the local enlarged diagram in the utility model structure cross section;
Fig. 2 is the reinforcing cage structural representation of prior art;
Fig. 3 is " modified wire basket " of the present utility model structural formula intention;
Fig. 4 is a conventional apparatus enforcement state contrast schematic diagram at the construction field (site);
Fig. 5 is that the utility model device is implemented view at the construction field (site).
The specific embodiment
Show among the figure, the 1st, the main muscle of reinforcing cage; The 2nd, the stirrup of reinforcing cage; The 3rd, the steel wire of reinforcing cage arranged outside is protected the material stratum reticulare; The 4th, pour into the coarse aggregate in the concrete slurry in the hole; The 5th, the concrete slurry that pours in the hole; The 6th, a hole; The 7th, the nature terrace; The 8th, the plain fill layer; The 9th, mud matter farinose argillic horizon; The 10th, farinose argillic horizon; The 11st, middle roving layer; The 12nd, argillic horizon; The 13rd, " coarse aggregate " that the reinforcing cage of prior art runs off in the stake hole is deposited in the state signal in the mud matter farinose argillic horizon 9.
Make and require: after traditional reinforcing cage has been made, the height (mud or layer of sand height in greater than stake hole, job site) that needs in the reinforcing cage outside, finer wire net (being that steel wire is protected the material stratum reticulare) steel wire is set protects the mesh aperture of material stratum reticulare, less than the particle diameter of the coarse aggregate in the concrete slurry that pours in the stake hole; Steel wire is protected the material stratum reticulare can be provided with one deck.Its way is to select the gauze wire cloth of suitable mesh, and overlap joint is fixed in the reinforcing cage periphery.
The utility model using method: anti-inserting is pressed into reinforcing cage behind normal perfusion concrete slurry; like this in the stake hole in the layer depth absolute altitude scope of mud (sand) layer; just there is one deck finer wire protection stratum reticulare in the reinforcing cage outside; this layer gauze wire cloth constrains in the coarse aggregate in the fluidised form concrete slurry of cast in the catch net; do not produce pressure to mud (sand) layer; coarse aggregate just not can owing to the loss of pressure that self produces in mud (sand) layer; and the mud that the pressure of fines and concrete grout and stream are moulded (sand) stressor layer balance, reach protect material, pressurize makes the success of pile foundation perfusion concrete slurry.
On probation through the job site, even underground mud or thicker layer of sand arranged, this mud or layer of sand are in that stream is moulded or geological condition such as half-flow plastic state when bad, and construction can normally be carried out; Facts have proved that " coarse aggregate " in the construction in the concrete slurry do not run off, guaranteed construction speed and pile foundation engineering quality, reached the goal of the invention of expection satisfactorily.Society, remarkable in economical benefits.

Claims (3)

1. a pile foundation construction concrete spouting enclosure device comprises the reinforcing cage that is arranged in the hole concrete slurry, it is characterized in that: described reinforcing cage arranged outside steel wire is protected the material stratum reticulare.
2. according to the described pile foundation construction concrete spouting of claim 1 enclosure device, it is characterized in that the mesh aperture of described steel wire guarantor material stratum reticulare, less than the particle diameter of the coarse aggregate in the concrete slurry that pours in the stake hole.
3. according to the described pile foundation construction concrete spouting of claim 1 enclosure device, it is characterized in that described steel wire guarantor material stratum reticulare is provided with height, greater than mud in the construction site drilling or layer of sand height.
CN 200420052905 2004-08-05 2004-08-05 Protection device for filling concrete in pile foundation construction Expired - Fee Related CN2716338Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420052905 CN2716338Y (en) 2004-08-05 2004-08-05 Protection device for filling concrete in pile foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420052905 CN2716338Y (en) 2004-08-05 2004-08-05 Protection device for filling concrete in pile foundation construction

Publications (1)

Publication Number Publication Date
CN2716338Y true CN2716338Y (en) 2005-08-10

Family

ID=34872797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420052905 Expired - Fee Related CN2716338Y (en) 2004-08-05 2004-08-05 Protection device for filling concrete in pile foundation construction

Country Status (1)

Country Link
CN (1) CN2716338Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011131062A1 (en) * 2010-04-22 2011-10-27 斯君哲 Pouring pile structure without tension
CN103132507A (en) * 2013-03-01 2013-06-05 中天建设集团有限公司 Bored pile reinforcement cage
CN103132509A (en) * 2013-03-01 2013-06-05 中天建设集团有限公司 Bored pile construction process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011131062A1 (en) * 2010-04-22 2011-10-27 斯君哲 Pouring pile structure without tension
CN103132507A (en) * 2013-03-01 2013-06-05 中天建设集团有限公司 Bored pile reinforcement cage
CN103132509A (en) * 2013-03-01 2013-06-05 中天建设集团有限公司 Bored pile construction process

Similar Documents

Publication Publication Date Title
CN1837511A (en) Double-rowed cofferdam and method for manufacturing the same
CN105862721B (en) A kind of high building structure reinforcement and rectification that is applied to has the slip casting composite foundation and its construction method of adjustability embedded steel tube
CN109577365A (en) A kind of pile formula drainage anchor rod barrier wall structure and its construction method
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN110965595A (en) Raft foundation building lifting reinforcement structure and method under corrosive geological environment
CN107299650A (en) A kind of remote open caisson casting method for correcting error
CN111455973A (en) Composite foundation structure of prefabricated solid CFG pile and construction method thereof
CN215669631U (en) Deep overburden foundation structure
CN1127596C (en) Continuous wall foundation pit supporting method with short brad
CN2716338Y (en) Protection device for filling concrete in pile foundation construction
CN211898504U (en) Offshore wind power single pile-friction cone composite foundation
CN1196426A (en) Construction method for inversion underground continuous wall
CN1078282A (en) Pile shoe pouring process and special reinforcing steel cage thereof
CN207004431U (en) Soft soil foundation exciting drilling device
CN205062744U (en) Half gravity type two -stage view anti -flood wall on half cantilever
CN1137311C (en) Vibration compacted galet pile resisting pull-up and floatation, and its forming method
CN1306121C (en) Method for pile foundation construction of geologic structure with flow plastic half-flow plastic and its application apparatus
CN1461857A (en) Construction method and its use
CN203866821U (en) Lead hole implant cloth bag gravel grouting pile
CN209584855U (en) Bridge major diameter precast concrete tubular column basis
CN1243184A (en) Construction method of high-pressure rotary-jetting bottom-expanding pile
CN85108550A (en) Prestressed concrete foundation pile
CN203129163U (en) Reinforcing framework structure for dam foundation
CN217105203U (en) Anchor-pull combined type retaining structure
CN106854864A (en) Port engineering platoon formula prestressed reinforced concrete Big Pipe Pile new construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee