CN2713318Y - Arch roof of gasification furnace - Google Patents

Arch roof of gasification furnace Download PDF

Info

Publication number
CN2713318Y
CN2713318Y CN 03262693 CN03262693U CN2713318Y CN 2713318 Y CN2713318 Y CN 2713318Y CN 03262693 CN03262693 CN 03262693 CN 03262693 U CN03262693 U CN 03262693U CN 2713318 Y CN2713318 Y CN 2713318Y
Authority
CN
China
Prior art keywords
gasification furnace
layer
vault
brick
mullite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 03262693
Other languages
Chinese (zh)
Inventor
郭文元
蒋自平
徐积源
亢万忠
郑泉杰
李晓黎
李磊
王明锋
邹杰
章晨辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Ningbo Engineering Co Ltd
Original Assignee
LANZHOU DESIGN INST SINOPEC
China Petrochemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LANZHOU DESIGN INST SINOPEC, China Petrochemical Corp filed Critical LANZHOU DESIGN INST SINOPEC
Priority to CN 03262693 priority Critical patent/CN2713318Y/en
Application granted granted Critical
Publication of CN2713318Y publication Critical patent/CN2713318Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The utility model mainly relates to an arch roof structure of a gasification furnace, in particular to a refractory lining structure of the arch roof of the gasification furnace. The arch roof of the gasification furnace comprises a steel casing of the arch roof of the gasification furnace, and a mouth of the furnace; a refractory insulating layer of the arch roof of the gasification furnace comprises a facing pavior layer. A back lining layer comprises a lightweight highstrength mullite insulating layer.The utility model is characterized in that a ceramic fiber blanket layer is arranged between the highpurity corundum brick facing pavior layer and the mullite insulating layer; a ceramic fiber blanket insulating layer is arranged between the mullite insulating layer and the inner wall of the steel casing of the arch roof. The refractory lining structure of the arch roof of the gasification furnace.of the utility model has obvious refractory insulating effect. After the material is changed from the heavy feed stock such as the residual oil into the lightweight material such as the natural gas,the temperature of the outer wall of the metal of the arch roof of the gasification furnace is reduced by 8-12 C; therefore, the normal operation of the gasification furnace is ensured.

Description

The gasification furnace vault
Technical field:
The utility model relates generally to the gasification furnace vault construction, relates in particular to the structure of gasification furnace vault refractory liner.
Background technology:
6.0MPa residual oil and natural gas gasifying stove are the technologies that English lotus shell global company (Shell Globe SolutionInternational) developed and dropped into industrialized a kind of non-catalytic partial oxidation method preparing synthetic gas, being widely used in residual oil, light oil, natural gas is that raw material generates in the device of synthetic ammonia.The raw material lighting is a raw material when adopting natural gas or refinery exhaust, moves on the high temperature hot-zone in the gasification furnace and flame shortens, and does not almost have the black area and causes that gasification furnace vault heat flow density strengthens, and the vault radiation is strengthened and the gasification furnace vault outer wall overtemperature that causes.Its fire door is because temperature overheating, and unreasonable structure, and easy scaling loss have a strong impact on the normal cycle safety and stability operation of gasification furnace.
From the update search result, domestic to solving gasification furnace vault overtemperature problem, mainly concentrate on residual oil gasifier and the coal slurry gasifier, pertinent literature has " coal slurry gasifier vault overtemperature exploration of reasons and precautionary measures (Coal Chemical Industry .2001; (2)-55-57) ", " improvement of Texaco's residual oil gasifier refractory liner (chemical fertilizer industry .2000; 27 (5) .-45-47) ", " prolong residual oil gasifier refractory liner life-span countermeasure (Xinjiang chemical industry .1992; (2) .-46-51) ", " gasification furnace furnace shell overtemperature and transformation (Chemical Engineering Design .2001,011 (004) .-43-44) ".
On engineering, prior art is in order to reduce the gasification furnace dome temperature, taked the method that adds water-cooling jacket or furnace roof refractory heat-insulating lining is thickeied 360mm at vault, and the vault insulated lining of thickening is generally 3 layers.
Prior art comes with some shortcomings: the firstth, add water-cooling jacket at the gasification furnace vault, and not only need the weld zone is heat-treated, and the cooling water pressure temperature controlling is very crucial.Because the dew-point temperature of gasification furnace is about 186 ℃, cooling water must be higher than this temperature.Like this, for the investment for trnasforming urban land height of gasification furnace, and increased a jacket water pressure and temp control system.The secondth, set up cooling water jecket, make heat loss increase the also corresponding increase of consumption of raw materials.
To 360mm, in order to keep the stability of vault, straight tube place tangent line moves down, and vault weight is increased, and investment increases for thickening vault refractory heat-insulating lining.
Summary of the invention:
The purpose of this utility model is to avoid the deficiencies in the prior art part and a kind of gasification furnace vault is provided.Structure setting by optimizing vault refractory liner, refractory insulating layer and optimize backing layer high-strength light mullite insulating layer structure solves because raw material changes gasification furnace vault overtemperature problem behind the natural gas into by residual oil.Another purpose is that gasification furnace vault and fire door and gasification burner tip are complementary.
The purpose of this utility model can be by realizing by the following technical solutions: a kind of gasification furnace vault includes gasification furnace vault steel body case (9), and fire door (6), gasification furnace vault refractory insulating layer include sees fiery face brick layer (1); Back sheet includes high-strength light mullite thermal insulation layer (3), and its main feature is that the high-purity corundum brick is seen and is provided with the fine blanket layer (2) of making pottery between fiery face brick layer (1) and the mullite thermal insulation layer (3); Be provided with the fine blanket heat insulation layer (4) of making pottery between mullite thermal insulation layer (3) and vault steel body case (9) inwall.
Described gasification furnace vault also includes between vault steel body case (9) and the heat insulation layer (4) and is provided with nano heat insulating layer (7).Nanoscale heat insulating material is guaranteed to obtain lower vault outside wall temperature, and the effect that the operating flexibility of gasifier temperature is increased is more obvious.
The groove (18) that fire door extension brick (5) is provided with is embedded on the boss (11) of its back sheet brick (10) setting.The change acquisition of fire door structure and the reasonable coupling of gasification burner tip so that form best flow field and temperature field in gasification furnace, guarantee that the available gas composition is greater than 95.5%.
The described high-purity corundum brick (12) of seeing fiery face brick layer (1) is being met with it on each adjacent face of fire, is provided with groove (13) and projection (14) one to one; Join with mortise and tenon between two high-purity corundum bricks (12).
The mullite brick (15) that described mullite thermal insulation layer (3) is adopted interlaces for integral body, is respectively equipped with recessed (16), convex surface (17) on its corresponding, between two mullite bricks (13) with the concave, convex misconnection.The concavo-convex misconnection structure of high-strength light mullite brick is avoided because the gasification furnace vault metal outer wall temperature control that brickwork joint is collaborated and caused.
The utility model gross thickness is controlled at 300-340mm, make residual oil change natural gas after the vault outside wall temperature be limited in 300 ℃.
The beneficial effects of the utility model are:
Adopt gasification furnace vault refractory heat-insulating of the present utility model to have remarkable result.At first be raw material is changed into lightweight materials such as natural gas by heavy charges such as residual oil after, move on the high temperature hot-zone in the gasification furnace and flame shortens, almost do not have the black area and cause that gasification furnace vault heat flow density strengthens, the vault radiation is strengthened, gasification furnace vault metal outer wall temperature does not only raise, descend 8~12 ℃ on the contrary, guaranteed the normal running of gasification furnace.Next is that the reasonable Arrangement of vault and fire door structure makes it to have obtained best flow field and temperature field coupling and reached best gasification result with the natural gas gasifying burner.Therefore, the utility model both had been applicable in the gasification furnace transformation or newly-built gasified boiler system after the raw material lighting, also can be used for raw material between heavy charge and lightweight material switching or mix with arbitrary proportion in the gasified boiler system of burning, thereby can shorten greatly and transform the duration, reduce investment outlay.Satisfy the long period of gasification installation, oepration at full load requirement, the economic benefit of raising device.
Description of drawings:
Fig. 1 be the utility model embodiment gasification furnace vault master cutaway view;
Fig. 2 is the enlarged diagram of Fig. 1 vault local I;
Fig. 3 is the enlarged diagram of Fig. 1 vault local I I;
Fig. 4 is the utility model high-purity corundum brick (12) schematic perspective view;
Fig. 5 is the utility model mullite brick (15) schematic perspective view;
The specific embodiment:
Be described in further detail below in conjunction with the most preferred embodiment shown in the accompanying drawing, but the utility model is not limited to embodiment.
Embodiment:
See Fig. 1, gasification furnace vault steel body case 9, fire door 6, fire pot 8 gasification furnace vault refractory insulating layers include sees fiery face brick layer 1.Back sheet includes high-strength light mullite thermal insulation layer 3, sees at the high-purity corundum brick to be provided with the fine blanket layer 2 of making pottery between fiery face brick layer 1 and the mullite thermal insulation layer 3; Be provided with the fine blanket heat insulation layer 4 of making pottery between mullite thermal insulation layer 3 and vault steel body case 9 inwalls, nano heat insulating layer 7.The groove 18 that fire door extension brick 5 is provided with is embedded on the boss 11 of its back sheet brick 10 settings.The high-purity corundum brick 12 of meeting fiery face brick layer 1 is provided with groove 13 and projection 14 one to one meeting with it on adjacent each of fire; Join with mortise and tenon between two high-purity corundum bricks 12.The mullite brick 15 that mullite thermal insulation layer 3 is adopted interlaces for integral body, is being respectively equipped with on its corresponding between recessed 16, convex surface 17, two mullite bricks 13 with the concave, convex misconnection.Vault refractory heat-insulating backing layer gross thickness is 310mm; Each layer refractory heat-insulating backing layer thickness is respectively 1. corundum brick: 141mm, 2. make pottery fine blanket: 10mm, 3. high-strength light mullite brick: 147mm, 4. make pottery fine blanket: 5mm and 9mm, 7. nanoscale heat insulating material: 3mm and 7mm, make residual oil change 265 ℃ of the outside wall temperature average out to of gasification furnace vault metal reality behind the natural gas like this, be up to 285 ℃.

Claims (5)

1. a gasification furnace vault includes gasification furnace vault steel body case (9), fire door (6), and gasification furnace vault refractory insulating layer includes the face brick layer (1) that warms oneself in front of a fire; Back sheet includes high-strength light mullite thermal insulation layer (3), it is characterized in that the high-purity corundum brick warms oneself in front of a fire to be provided with the fine blanket layer (2) of making pottery between face brick layer (1) and the mullite thermal insulation layer (3); Be provided with the fine blanket heat insulation layer (4) of making pottery between mullite thermal insulation layer (3) and vault steel body case (9) inwall.
2. gasification furnace vault as claimed in claim 1 is characterized in that also including between vault steel body case (9) and the heat insulation layer (4) and is provided with nano heat insulating layer (7).
3. gasification furnace vault as claimed in claim 1 or 2 is characterized in that the groove (18) that fire door extension brick (5) is provided with is embedded on the boss (11) of its back sheet brick (10) setting.
4. gasification furnace vault as claimed in claim 3 is characterized in that seeing that the high-purity corundum brick (12) of fiery face brick layer (1) is being met with it on each adjacent face of fire, is provided with groove (13) and projection (14) one to one; Join with mortise and tenon between two high-purity corundum bricks (12).
5. gasification furnace vault as claimed in claim 4, it is characterized in that the mullite brick (15) that mullite thermal insulation layer (3) is adopted interlaces for integral body, on its corresponding, be respectively equipped with recessed (16), convex surface (17), between two mullite bricks (13) with the concave, convex misconnection.
CN 03262693 2003-08-08 2003-08-08 Arch roof of gasification furnace Expired - Lifetime CN2713318Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03262693 CN2713318Y (en) 2003-08-08 2003-08-08 Arch roof of gasification furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03262693 CN2713318Y (en) 2003-08-08 2003-08-08 Arch roof of gasification furnace

Publications (1)

Publication Number Publication Date
CN2713318Y true CN2713318Y (en) 2005-07-27

Family

ID=34866288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03262693 Expired - Lifetime CN2713318Y (en) 2003-08-08 2003-08-08 Arch roof of gasification furnace

Country Status (1)

Country Link
CN (1) CN2713318Y (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102041098A (en) * 2010-12-30 2011-05-04 云南煤化工集团有限公司 Fixed bed slag gasification furnace
CN102206516A (en) * 2010-03-29 2011-10-05 通用电气公司 Flame shield and gasification device and method
CN102295936A (en) * 2011-07-18 2011-12-28 宜兴市诺明高温耐火材料有限公司 Pre-assembly processing method for dry quenching chamber outlet arch used in coke dry quenching process
CN101701162B (en) * 2009-10-14 2012-02-01 兖矿国泰化工有限公司 Water-coal-slurry gasifier vault
CN103307875A (en) * 2013-05-22 2013-09-18 江阴长源机械制造有限公司 Assistant arched crown of high-temperature-region kiln body of pushed slab kiln in nitrogen protective atmosphere
CN103881762A (en) * 2014-04-15 2014-06-25 华东理工大学 Refractory liner of gasification furnace
CN103937555A (en) * 2014-04-30 2014-07-23 华东理工大学 Single-nozzle water-coal-slurry entrained-flow bed gasifier and gasification method of same
CN105087076A (en) * 2015-09-22 2015-11-25 华东理工大学 Fire-resistant lining for gasification furnace vault of entrained-flow bed
CN105779019A (en) * 2010-03-29 2016-07-20 通用电气公司 Fireproof wall and gasification device and method
CN107543175A (en) * 2017-09-06 2018-01-05 光大环境科技(中国)有限公司 A kind of plasma dangerous waste ash melting device
CN110030833A (en) * 2019-04-23 2019-07-19 无锡市亿洲耐火材料有限公司 A kind of sulfur recovery unit combustion furnace head lining structure
CN111979428A (en) * 2020-09-16 2020-11-24 金川集团股份有限公司 Horizontal converter fire door zone inside lining double-arch masonry structure
CN113881463A (en) * 2021-11-05 2022-01-04 赣州市怡辰宏焰能源科技有限公司 Composite heat preservation type furnace top of gasification furnace

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101701162B (en) * 2009-10-14 2012-02-01 兖矿国泰化工有限公司 Water-coal-slurry gasifier vault
CN105779019A (en) * 2010-03-29 2016-07-20 通用电气公司 Fireproof wall and gasification device and method
CN102206516A (en) * 2010-03-29 2011-10-05 通用电气公司 Flame shield and gasification device and method
US9702628B2 (en) 2010-03-29 2017-07-11 General Electric Company Refractory walls, and gasification devices and methods
CN102041098B (en) * 2010-12-30 2013-01-23 云南煤化工集团有限公司 Fixed bed slag gasification furnace
CN102041098A (en) * 2010-12-30 2011-05-04 云南煤化工集团有限公司 Fixed bed slag gasification furnace
CN102295936B (en) * 2011-07-18 2013-09-18 江苏诺明高温材料股份有限公司 Pre-assembly processing method for dry quenching chamber outlet arch used in coke dry quenching process
CN102295936A (en) * 2011-07-18 2011-12-28 宜兴市诺明高温耐火材料有限公司 Pre-assembly processing method for dry quenching chamber outlet arch used in coke dry quenching process
CN103307875A (en) * 2013-05-22 2013-09-18 江阴长源机械制造有限公司 Assistant arched crown of high-temperature-region kiln body of pushed slab kiln in nitrogen protective atmosphere
CN103881762B (en) * 2014-04-15 2016-01-20 华东理工大学 A kind of vapourizing furnace refractory liner
CN103881762A (en) * 2014-04-15 2014-06-25 华东理工大学 Refractory liner of gasification furnace
CN103937555A (en) * 2014-04-30 2014-07-23 华东理工大学 Single-nozzle water-coal-slurry entrained-flow bed gasifier and gasification method of same
CN103937555B (en) * 2014-04-30 2015-09-23 华东理工大学 Single nozzle coal water slurry entrained flow bed gasification stove and gasification process thereof
CN105087076A (en) * 2015-09-22 2015-11-25 华东理工大学 Fire-resistant lining for gasification furnace vault of entrained-flow bed
CN107543175A (en) * 2017-09-06 2018-01-05 光大环境科技(中国)有限公司 A kind of plasma dangerous waste ash melting device
CN110030833A (en) * 2019-04-23 2019-07-19 无锡市亿洲耐火材料有限公司 A kind of sulfur recovery unit combustion furnace head lining structure
CN111979428A (en) * 2020-09-16 2020-11-24 金川集团股份有限公司 Horizontal converter fire door zone inside lining double-arch masonry structure
CN113881463A (en) * 2021-11-05 2022-01-04 赣州市怡辰宏焰能源科技有限公司 Composite heat preservation type furnace top of gasification furnace

Similar Documents

Publication Publication Date Title
CN2713318Y (en) Arch roof of gasification furnace
CN201232068Y (en) Blast furnace air supply branch pipe with three layers of fire resistant inner lining
CN201093868Y (en) Gas phase fluidization roasting furnace composite boiler wall
CN202945214U (en) Novel gasifier arch apex structure
CN103387325B (en) Insulation apparatus for glass tank furnace
CN105087076A (en) Fire-resistant lining for gasification furnace vault of entrained-flow bed
CN200955908Y (en) Holding furnace body
CN204718409U (en) A kind of can the anode furnace of hot replacing redox mouth brick
CN212102719U (en) Gasification furnace vault inside lining structure and gasification furnace
CN2075198U (en) Improved structure of carbon black furnace body
CN208898825U (en) A kind of coal water slurry pressurized gasifier vault refractory lining
CN205061999U (en) Entrained flow gasifica tion furnace arch top refractory liner
CN203687610U (en) Toward-fire face brick building structure of gasification furnace
CN203307367U (en) Masonry structure of 120-ton converter lining
CN202105466U (en) Cooling unit assembled settling tank for flash furnace
CN2400458Y (en) Vertical magnesium-smelting reduction furnace
CN101852550A (en) Tubular industrial heating furnace
CN210772204U (en) Wear-resisting corrosion-resistant pouring lining structure of garbage incinerator
CN201170572Y (en) Multifunctional fireproof brick for firing space inner wall
CN201152541Y (en) Multifunctional fireproof brick seat
RU2282112C1 (en) Water heating boiler
CN204770448U (en) Energy -conserving anti -corrosion room form forge furnace
CN204555684U (en) A kind of siccative oven inner liner
CN210141589U (en) Air-cooled furnace wall structure of household garbage incinerator
CN206420319U (en) A kind of chamber structure of heating furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SINOPEC NINGBO ENGINEERING COMPANY LIMITED

Free format text: FORMER OWNER: CHINA PETROCHEMICAL GROUP CORPORATION

Effective date: 20121122

Free format text: FORMER OWNER: LANZHOU DESIGN INST, SINOPEC

Effective date: 20121122

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100029 CHAOYANG, BEIJING TO: 315103 NINGBO, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20121122

Address after: 315103 Ningbo high tech Zone, Zhejiang, academician Road, No. 660

Patentee after: SINOPEC Ningbo Engineering Company Limited

Address before: 100029 Beijing City, Chaoyang District Hui Street No. 6

Patentee before: China Petrochemical Group Corp.

Patentee before: Lanzhou Design Inst, SINOPEC

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20130808

Granted publication date: 20050727