CN2677612Y - Evaluation surveying device for delay well cementation analogue cenmentation quality - Google Patents

Evaluation surveying device for delay well cementation analogue cenmentation quality Download PDF

Info

Publication number
CN2677612Y
CN2677612Y CNU2003201220538U CN200320122053U CN2677612Y CN 2677612 Y CN2677612 Y CN 2677612Y CN U2003201220538 U CNU2003201220538 U CN U2003201220538U CN 200320122053 U CN200320122053 U CN 200320122053U CN 2677612 Y CN2677612 Y CN 2677612Y
Authority
CN
China
Prior art keywords
stratum
interlayer
well cementation
sleeve pipe
quality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2003201220538U
Other languages
Chinese (zh)
Inventor
陈晓楼
陈刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Petroleum Administration Bureau
Original Assignee
Daqing Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Petroleum Administration Bureau filed Critical Daqing Petroleum Administration Bureau
Priority to CNU2003201220538U priority Critical patent/CN2677612Y/en
Application granted granted Critical
Publication of CN2677612Y publication Critical patent/CN2677612Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)

Abstract

The utility model relates to an evaluation surveying device for delay well cementation analogue cementation quality, which solves the problem that the cementation quality of the cement ring under the condition of time delay can not be evaluated without the evaluation surveying device for well cementation. The utility model is characterized in that the upper end and the lower end of a casing tube (14) are respectively provided with pressurizing mouths (8, 1); furthermore, the inner wall of the casing tube is provided with a plurality of ultrasonic probes which are connected with a control system (A) and a test system (B). The outer margin of a stratum (17) is provided with a plurality of water inlets (4, 5) and water outlets (11, 13). The interlayer (12) of one side of the water inlet (4) is provided with a pressurizing mouth (15). The stratum (17) of the upper part of the interlayer (12) is provided with a capsule (6). The upper part of the interlayer (12) of which one side is provided with the water outlets (11, 13) is provided with a thermocouple (16). A rock core (3) and a cement ring (10) are arranged between the casing tube (14) and the stratum (17). The right side and the left side of the upper end of the cement ring (10) are provided with a cementing mouth (7) and a pressurizing mouth (9). The upper and the lower parts of the stratum (17) are respectively provided with an end cover of a kettle body (18). The utility model has the characteristic that the cement ring can evaluate the cementation quality for well cementation of the stratum and the casing tube.

Description

Time-delay well cementation simulation bonding quality evaluation experimental device
Technical field:
The utility model relates to the used indoor evaluation experimental device of field of oil drilling, belongs to time-delay well cementation simulation bonding quality evaluation experimental device.
Background technology:
It is three encryption adjusting stages of purpose that Daqing oil field has entered at present with the exploitation remaining oil, and the object that three encryptions are adjusted has characteristics such as oil reservoir is thin, poor properties based on the off-balancesheet reservoir, compares with superencipher, and the exploitation difficulty is big, and cementing quality more be cannot say for sure to demonstrate,prove.
Because long-term injecting water exploitation, the down-hole pressure system is very complicated, height is moisture, oil reservoir thin, interlayer is thin, these have brought great difficulty all for three encrypted adjustment well well cementation, though taked relative measures, encrypting pilot test for three times adjusts the well infrasonic sound of cementing the well and becomes the factor of merit and reached more than 70%, but test finds to adjust the passing in time of well cementing quality, tangible downward trend has appearred in cementing quality, greatly influence the Oilfield developing effect, can bring unnecessary loss to production simultaneously.
The utility model content:
Can estimate the deficiency of cement sheath bonding quality under the time delay condition in order to overcome the evaluation experimental device of not cementing the well, the utility model provides a kind of time-delay well cementation simulation bonding quality evaluation experimental device, and this experimental facilities has under time delay condition can carry out the characteristics of cement sheath to stratum and the evaluation of casing cementing bonding quality.
The technical solution of the utility model is: a kind of time-delay well cementation simulation bonding quality evaluation experimental device comprises sleeve pipe and stratum, sleeve pipe places in the stratum, sleeve pipe two ends up and down has the pressurization mouth, and be equipped with several ultrasonic probes that link to each other with control system and test macro on the inwall, the stratum outer rim has several water inlets and delivery port, have the pressurization mouth on the interlayer of water inlet one side, the stratum on its interlayer top is built-in with capsule, the interlayer top that has delivery port one side is equipped with thermocouple, be equipped with simulation rock core and cement sheath between sleeve pipe and the stratum, the left and right sides of cement sheath upper end has cementing mouth and pressurization mouth, and the stratum is equipped with the kettle end cap up and down respectively.
Above-mentioned ultrasonic probe is two.
The beneficial effect that the utlity model has is: owing to use this stratum, the sleeve pipe model equipment, on the stratum, have several inlet openings, weep hole and pressurization hole, between sleeve pipe and stratum, have the cement injection hole, carry out cement at this and inject the formation cement sheath, ultrasonic probe can carry out delay test within 15 days to the cement sheath cementing quality, adopt " time to peak method " to make an explanation the test result of ultrasonic probe by test macro and control system, under time delay condition, the influence factor of cement sheath bonding quality is to the influence of sealing quality, but visual interpretation interface agglutination quality, estimate the accuracy rate height of cement sheath bonding quality thus, can change by delay of feedback promptly and accurately.
Description of drawings:
Fig. 1 is a structural representation of the present utility model.
A-control system among Fig. 1, B-test macro, C-model, a-ultrasonic signal, b-flow, c-temperature, d-pressure, 1-are pressurizeed mouthful, the 2-ultrasonic probe, the 3-rock core, 4-water inlet, 5-water inlet, 6-capsule, 7-cement injection mouth, 8-pressurize mouthful, the 9-mouth that pressurize, 10-cement sheath, the 11-delivery port, 12-interlayer, 13-delivery port, 14-sleeve pipe, 15-pressurizes mouthful, 16-thermocouple, 17-stratum, 18-end cap.
The specific embodiment:
Below in conjunction with accompanying drawing will the utility model is described in further detail:
By shown in Figure 1, a kind of time-delay well cementation simulation bonding quality evaluation experimental device comprises sleeve pipe 14 and stratum 17, stratum 17 is a simulated formation, and sleeve pipe 14 places in the stratum 17, and sleeve pipe has pressurization mouth (8 in two ends about in the of 14,1), pressurizeed in stratum 17 by pressurization mouthful (1,8); And be equipped with several ultrasonic probes 2 that link to each other with control system A and test macro B on the inwall, stratum 17 outer rims have several water inlets (4,5) and delivery port (11,13), have pressurization mouth 15 on the interlayer 12 of water inlet 4 one sides, can record the permeability on stratum 17 by inlet opening (4,5) and weep hole (11,13); The stratum 17 on its interlayer 12 tops is built-in with capsule 6, and capsule 6 plays the effect of pressurization; Interlayer 12 tops that have delivery port (11, a 13) side are equipped with thermocouple 16, and thermocouple 16 plays the effect of heating; Be equipped with simulation rock core 3 and cement sheath 10 between sleeve pipe 14 and the stratum 17, simulation rock core 3 is attached on the steel wall, utilize screen cloth to form mud cake, but the permeability of rock core under the simulation well, the left and right sides of cement sheath 10 upper ends has cementing mouth 7 and pressurization mouth 9, stratum 17 is equipped with kettle end cap 18 up and down respectively, and kettle end cap 18 can play the effect of sealing pressurization.
This device is by MODEL C, test macro B and control system A constitute, MODEL C is to be used for simulating the situation of oil well cement in the down-hole, it is by sleeve pipe 14, simulated formation 17, kettle end cap 18, thermocouple 16 and cement sheath 10 are formed, sleeve pipe 14 is mainly based on simulation 139.7mm production string, simulated formation 17 adopts 224.4mm, the permeability of simulated formation 17 can be according to throw water hole (4 on sleeve pipe 14,5) and weep hole (11,13) realize, mud cake was obtained in the dehydration of 2MPa pressure reduction with mud by 325 orders+60 eye mesh screens in 2 hours, cement sheath 10 high 350mm, the temperature c of simulated formation 17, pressure d and flow b rely on temperature controller, pressure sensor and flow control valve are realized, test macro B mainly comprises ultrasonic probe 2 and interpretation software thereof, is mainly used to estimate the bonding quality of cement sheath 10.
And concrete test process is the situation of micro unit under the simulation well, the situation that the backward energy of dependence ultrasonic probe 2 and time are judged cement and interface agglutination, adopt " time to peak method " to make an explanation, the characteristic value of this method adopts peak-peak time corresponding in the echo, it is divided into several time periods with the ultrasonic echo time series, the defect type that each section correspondence is different, and the time period is not overlapping, does not lack; The velocity of sound difference of in different medium, propagating according to ultrasonic wave, cement is different with water interface position in the different sample defects types, the asynchronism(-nization) that causes the back wave of ultrasonic wave to take place at each interface, be that the position difference appears in peak value in the echo, the time to peak method is divided into several time periods with ultrasonic with the ripple time series, every section defect type that correspondence is different, the starting point of each time period obtains or theoretical calculation according to experiment, and the time that sample defects size and its peak-peak occur in each time period is linear, then can be positioned at which time period according to the time that peak value in the echo occurs, the defect type of final judgement sample.
Owing to use this device, can carry out the bonding quality evaluation of cement sheath 10 and stratum 17 and sleeve pipe 14, the truth that the down-hole can not be observed reflects on ground; The evaluation that can carry out cement paste detects, under time delay condition, can record of the influence variation of the influence factor of Cementation Quality to the sealing quality, but visual interpretation interface agglutination situation is estimated the accuracy rate height of cement sheath bonding quality thus, can change by delay of feedback promptly and accurately.

Claims (2)

1, a kind of time-delay well cementation simulation bonding quality evaluation experimental device, comprise sleeve pipe (14) and stratum (17), sleeve pipe (14) places in the stratum (17), it is characterized in that: sleeve pipe (14) two ends up and down has pressurization mouth (8,1), and be equipped with several ultrasonic probes (2) that link to each other with control system (A) and test macro (B) on the inwall, stratum (17) outer rim has several water inlets (4,5) and delivery port (11,13), have pressurization mouthful (15) on the interlayer (12) of water inlet (4) one sides, the stratum (17) on its interlayer (12) top is built-in with capsule (6), have delivery port (11,13) interlayer of a side (12) top is equipped with thermocouple (16), be equipped with rock core (3) and cement sheath (10) between sleeve pipe (14) and stratum (17), the left and right sides of cement sheath (10) upper end has cementing mouth (7) and pressurization mouthful (9), and stratum (17) are equipped with kettle end cap (18) up and down respectively.
2, time-delay well cementation simulation bonding quality evaluation experimental device according to claim 1, it is characterized in that: ultrasonic probe (2) is two.
CNU2003201220538U 2003-11-20 2003-11-20 Evaluation surveying device for delay well cementation analogue cenmentation quality Expired - Fee Related CN2677612Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2003201220538U CN2677612Y (en) 2003-11-20 2003-11-20 Evaluation surveying device for delay well cementation analogue cenmentation quality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2003201220538U CN2677612Y (en) 2003-11-20 2003-11-20 Evaluation surveying device for delay well cementation analogue cenmentation quality

Publications (1)

Publication Number Publication Date
CN2677612Y true CN2677612Y (en) 2005-02-09

Family

ID=34581150

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2003201220538U Expired - Fee Related CN2677612Y (en) 2003-11-20 2003-11-20 Evaluation surveying device for delay well cementation analogue cenmentation quality

Country Status (1)

Country Link
CN (1) CN2677612Y (en)

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102996116A (en) * 2012-12-06 2013-03-27 长江大学 Dynamic mud cake circulating device and using method thereof
CN103184866A (en) * 2013-03-15 2013-07-03 西安石油大学 Well cementation cement sheath integrity simulation and evaluation tester
CN101725345B (en) * 2009-11-10 2013-07-10 河北理工大学 Device for simulating casing-cement sheath damage indoor test under stratum action
CN103335888A (en) * 2013-05-31 2013-10-02 中国石油集团川庆钻探工程有限公司 Anti-gas-channeling simulation test apparatus in later stage of well cementation
CN104727805A (en) * 2013-12-24 2015-06-24 中国石油化工集团公司 Apparatus for evaluating cementing strength of cement sheath
CN104863541A (en) * 2015-04-22 2015-08-26 中国石油大学(华东) Experimental method of simulating cementing in well cementation process
CN105352670A (en) * 2014-08-22 2016-02-24 中国石油化工股份有限公司 Sealing evaluation system of cementing cement sheath of oil and gas well
CN105424331A (en) * 2014-09-18 2016-03-23 中国石油化工股份有限公司 Device and method for mechanical sealing evaluation of cement ring when large fracturing is performed
CN106499383A (en) * 2016-10-19 2017-03-15 中海石油(中国)有限公司 A kind of method of evaluating cementing barrier integrity
EP3039239A4 (en) * 2013-10-30 2017-04-19 Halliburton Energy Services, Inc. Modular sensed annular well apparatus for cement testing
CN107725030A (en) * 2017-11-20 2018-02-23 中国石油大学(华东) The lower well cementation second interface maintenance of stratum water disturbance and bonding quality evaluating apparatus and method
CN107807027A (en) * 2017-11-21 2018-03-16 淄博职业学院 High air-resistance type ceramic fibre gold mine slag prepares oil well antiseepage well cementation test block performance test
CN107860904A (en) * 2017-11-21 2018-03-30 淄博职业学院 Heat-resistance type ceramic fibre lead-zinc ore prepares oil well antiseepage well cementation test block performance test
CN107860897A (en) * 2017-11-21 2018-03-30 淄博职业学院 Anti-pressure polyester fiber firefly ore prepares the well cementation test block performance test of oil well water-impervious
CN107860903A (en) * 2017-11-21 2018-03-30 淄博职业学院 Enhanced glass fibre obsidian prepares the well cementation test block performance test of oil well water-impervious
CN107860901A (en) * 2017-11-21 2018-03-30 淄博职业学院 Intumescent polyester fiber aluminum ore prepares the well cementation test block performance test of oil well water-impervious
CN107860902A (en) * 2017-11-21 2018-03-30 淄博职业学院 Enhanced ceramic fibre iron ore prepares the well cementation test block performance test of oil well water-impervious
CN107860898A (en) * 2017-11-21 2018-03-30 淄博职业学院 Pleat-free ceramic fibre perlite prepares the well cementation test block performance test of oil well water-impervious
CN107884552A (en) * 2017-11-21 2018-04-06 淄博职业学院 Heat-resistance type glass fibre manganese ore prepares the well cementation test block performance test of oil well water-impervious
CN107907669A (en) * 2017-11-21 2018-04-13 淄博职业学院 Pleat-free glass fibre rock phosphate in powder prepares the well cementation test block performance test of oil well water-impervious
CN107941580A (en) * 2017-11-21 2018-04-20 淄博职业学院 Enhanced ceramic fibre cordierite prepares the well cementation test block performance test of oil well water-impervious
CN107991150A (en) * 2017-11-21 2018-05-04 淄博职业学院 Pleat-free polyester fiber kaolinite prepares the well cementation test block performance test of oil well water-impervious
CN108007743A (en) * 2017-11-21 2018-05-08 淄博职业学院 Intumescent glass fibre chrome ore prepares the well cementation test block performance test of oil well water-impervious
CN108007821A (en) * 2017-11-21 2018-05-08 淄博职业学院 Anti-pressure ceramic fibre gangue prepares the well cementation test block performance test of oil well water-impervious
CN109507103A (en) * 2018-11-28 2019-03-22 中国石油大学(华东) A kind of envelope alters physical simulation experiment device and effect evaluation method
CN111997589A (en) * 2020-09-10 2020-11-27 西南石油大学 Full-size cement sheath packing capacity and bonding strength testing device and testing method thereof

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725345B (en) * 2009-11-10 2013-07-10 河北理工大学 Device for simulating casing-cement sheath damage indoor test under stratum action
CN102996116A (en) * 2012-12-06 2013-03-27 长江大学 Dynamic mud cake circulating device and using method thereof
CN102996116B (en) * 2012-12-06 2015-04-15 长江大学 Dynamic mud cake circulating device and using method thereof
CN103184866B (en) * 2013-03-15 2015-07-22 西安石油大学 Well cementation cement sheath integrity simulation and evaluation tester
CN103184866A (en) * 2013-03-15 2013-07-03 西安石油大学 Well cementation cement sheath integrity simulation and evaluation tester
CN103335888B (en) * 2013-05-31 2015-11-25 中国石油集团川庆钻探工程有限公司 A kind of well cementation later stage anti-gas channeling simulation test device
CN103335888A (en) * 2013-05-31 2013-10-02 中国石油集团川庆钻探工程有限公司 Anti-gas-channeling simulation test apparatus in later stage of well cementation
EP3039239A4 (en) * 2013-10-30 2017-04-19 Halliburton Energy Services, Inc. Modular sensed annular well apparatus for cement testing
US9939419B2 (en) 2013-10-30 2018-04-10 Petrobras Modular sensed annular well apparatus for cement testing
CN104727805B (en) * 2013-12-24 2018-05-22 中石化石油工程技术服务有限公司 Cement sheath cementing strength evaluating apparatus
CN104727805A (en) * 2013-12-24 2015-06-24 中国石油化工集团公司 Apparatus for evaluating cementing strength of cement sheath
CN105352670A (en) * 2014-08-22 2016-02-24 中国石油化工股份有限公司 Sealing evaluation system of cementing cement sheath of oil and gas well
CN105352670B (en) * 2014-08-22 2019-01-01 中国石油化工股份有限公司 A kind of oil gas well cementing operation cement sheath leakproofness evaluation system
CN105424331B (en) * 2014-09-18 2019-07-05 中国石油化工股份有限公司 The device and method of the mechanical seal evaluation of cement sheath when for massive hydraulic fracturing
CN105424331A (en) * 2014-09-18 2016-03-23 中国石油化工股份有限公司 Device and method for mechanical sealing evaluation of cement ring when large fracturing is performed
CN104863541B (en) * 2015-04-22 2017-07-11 中国石油大学(华东) Cemented experimental method in one kind simulation well cementing process
CN104863541A (en) * 2015-04-22 2015-08-26 中国石油大学(华东) Experimental method of simulating cementing in well cementation process
CN106499383A (en) * 2016-10-19 2017-03-15 中海石油(中国)有限公司 A kind of method of evaluating cementing barrier integrity
CN107725030A (en) * 2017-11-20 2018-02-23 中国石油大学(华东) The lower well cementation second interface maintenance of stratum water disturbance and bonding quality evaluating apparatus and method
CN107860904A (en) * 2017-11-21 2018-03-30 淄博职业学院 Heat-resistance type ceramic fibre lead-zinc ore prepares oil well antiseepage well cementation test block performance test
CN107991150A (en) * 2017-11-21 2018-05-04 淄博职业学院 Pleat-free polyester fiber kaolinite prepares the well cementation test block performance test of oil well water-impervious
CN107860898A (en) * 2017-11-21 2018-03-30 淄博职业学院 Pleat-free ceramic fibre perlite prepares the well cementation test block performance test of oil well water-impervious
CN107884552A (en) * 2017-11-21 2018-04-06 淄博职业学院 Heat-resistance type glass fibre manganese ore prepares the well cementation test block performance test of oil well water-impervious
CN107860901A (en) * 2017-11-21 2018-03-30 淄博职业学院 Intumescent polyester fiber aluminum ore prepares the well cementation test block performance test of oil well water-impervious
CN107907669A (en) * 2017-11-21 2018-04-13 淄博职业学院 Pleat-free glass fibre rock phosphate in powder prepares the well cementation test block performance test of oil well water-impervious
CN107941580A (en) * 2017-11-21 2018-04-20 淄博职业学院 Enhanced ceramic fibre cordierite prepares the well cementation test block performance test of oil well water-impervious
CN107860902A (en) * 2017-11-21 2018-03-30 淄博职业学院 Enhanced ceramic fibre iron ore prepares the well cementation test block performance test of oil well water-impervious
CN108007743A (en) * 2017-11-21 2018-05-08 淄博职业学院 Intumescent glass fibre chrome ore prepares the well cementation test block performance test of oil well water-impervious
CN108007821A (en) * 2017-11-21 2018-05-08 淄博职业学院 Anti-pressure ceramic fibre gangue prepares the well cementation test block performance test of oil well water-impervious
CN107860903A (en) * 2017-11-21 2018-03-30 淄博职业学院 Enhanced glass fibre obsidian prepares the well cementation test block performance test of oil well water-impervious
CN107860897A (en) * 2017-11-21 2018-03-30 淄博职业学院 Anti-pressure polyester fiber firefly ore prepares the well cementation test block performance test of oil well water-impervious
CN107807027A (en) * 2017-11-21 2018-03-16 淄博职业学院 High air-resistance type ceramic fibre gold mine slag prepares oil well antiseepage well cementation test block performance test
CN109507103A (en) * 2018-11-28 2019-03-22 中国石油大学(华东) A kind of envelope alters physical simulation experiment device and effect evaluation method
CN111997589A (en) * 2020-09-10 2020-11-27 西南石油大学 Full-size cement sheath packing capacity and bonding strength testing device and testing method thereof

Similar Documents

Publication Publication Date Title
CN2677612Y (en) Evaluation surveying device for delay well cementation analogue cenmentation quality
CN104453802B (en) Coal bed gas pit shaft gas-liquid two-phase flow analogue means that many coal seams were adopted jointly
CN106761679A (en) The evaluating apparatus and method of a kind of the first interface agglutination quality of eccentric test well cementation
CN109975140B (en) Supercritical carbon dioxide pulse fracturing and permeability testing integrated experimental device and method
CN107367450B (en) Performance detection experimental device and evaluation method for expandable sieve tube
CN112903961B (en) Using method of device for simulating underground drilling fluid circulation to form mud cakes
CN105092798B (en) Recharge system and test method in one kind simulation varying head permeable ground diving stratum room
CN108222926B (en) Well killing simulation experiment device and method for relief well
CN106640062B (en) Cementing slurry water enchroachment (invasion) Simulation evaluation instrument and evaluation method
CN105781504B (en) A kind of segmentation reservoir pressure test method
CN108152186A (en) A kind of experimental provision for simulating the Fracture Networks two phase flow under coupling in complicated underground environment
CN111254912B (en) Anchoring and grouting engineering management system based on geological logging big data
CN106401577A (en) Visual testing device and method for simulating bottom water coning of bottom water gas reservoir gas well
CN106872651A (en) The experimental rig and analogy method of a kind of enhanced underground heat exploitation simulation
CN110206532A (en) The monitoring of horizontal well output and intelligent control integratedization completion tool and application method
CN106908354A (en) A kind of slippery water fracturing fluid friction drag testing device and its method of testing
CN110174342A (en) A kind of pit shaft ultrasonic wave-acidification composite blockage relieving imitative experimental appliance and method
CN105021513A (en) Full-size sand-prevention high-temperature and high-pressure steam simulation system
CN204024612U (en) A kind of multiple seam is closed the coal bed gas pit shaft biphase gas and liquid flow analogue means of adopting
CN112145163A (en) Experimental device and experimental method for simulating staged fracturing horizontal well foam discharging process
CN204831980U (en) Full -scale high temperature high pressure steam sand control analog system that takes in and send out
CN103993876B (en) A kind of method evaluating slow swollen granule oil reservoir conformability
CN206617162U (en) A kind of oil pipe of horizontal well memory storage formula test string
CN105259330B (en) A kind of indoor experimental apparatus and use the method that this device carries out profile control
CN106761690A (en) For the intelligent test well of gaslift processing simulation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050209

Termination date: 20101120