CN2642831Y - 插板堤坝 - Google Patents

插板堤坝 Download PDF

Info

Publication number
CN2642831Y
CN2642831Y CNU032714785U CN03271478U CN2642831Y CN 2642831 Y CN2642831 Y CN 2642831Y CN U032714785 U CNU032714785 U CN U032714785U CN 03271478 U CN03271478 U CN 03271478U CN 2642831 Y CN2642831 Y CN 2642831Y
Authority
CN
China
Prior art keywords
plate
dam
dams
dykes
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU032714785U
Other languages
English (en)
Inventor
何富荣
唐光裕
应华素
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HEHAI HYDRAULIC FLAPPER ENGINEERING CO LTD
Shandong Hongxu Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU032714785U priority Critical patent/CN2642831Y/zh
Application granted granted Critical
Publication of CN2642831Y publication Critical patent/CN2642831Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开了一种插板堤坝,包括插板桩、坝面板、堤坝板、防浪墙、坝面,其插板桩(1)互相联接插入地下形成排桩(6),排桩(6)的顶部直接安置形成桥的坝面板(2),排桩(6)的迎水面插入互相联接的堤坝板(3),堤坝板(3)的迎水面并垂直于堤坝插入防冲丁坝(7),所述排桩(6)在无堤坝板(3)的一端插入外侧较宽的边桩板(14)。坝体内充填泥土(16)可形成重力坝。本实用新型的水力插板堤坝整体性能好,承载能力大。这项技术可广泛应用于淤泥质海岸地区的潮间带建防潮大坝,用于围海养殖、围海造地、沿海交通大道、港口码头的各种工程建设中。

Description

插板堤坝
一、技术领域:
本实用新型涉及围堤,涉及一种水力插板堤坝。
二、背景技术:
众所周知,在沙泥质和淤泥质海岸的潮间带和浅海水域中建设堤坝,目前普遍采用的办法有抛石充填爆炸挤淤,沙膜袋充填以及依靠打桩与抛石相结合的办法,这些结构的堤坝存在着根基浅、建设周期长、施工难度大、工程造价高等问题,从而使这种堤坝的建造受到很大的限制。
三、发明内容:
本实用新型要解决的技术问题是提供一种插板堤坝,它既可以克服上述现有技术中存在的问题,又具有桩基承载能力大,抗水毁能力强、整体性能好、建设周期短、造价低、特别适应沿海地区及浅海水域中建设围海堤坝及港堤工程。
本实用新型解决问题的技术方案是包括插板桩、边桩板、坝面板、丁坝、坝面和防浪墙的插板堤坝。所述插板桩互相连接插入地下形成排桩,该排桩顶部直接吊装形成桥的坝面板,该排桩的迎水面插入堤坝板,堤坝板的迎水面与堤坝板相垂直插入丁坝。所述排桩无堤坝板的一面插入外侧较宽的边桩。
其中所述插板桩为预制的平板、框架T型板、槽型板、框架槽型板、T型板、边桩板、圆筒桩结构,其顶端预留纵向钢筋。
其中所述堤坝板为平板、T型板、槽型板结构,顶端预留纵向钢筋。
其中所述插板桩、堤坝、坝面板顶端设置的预留钢筋,相互绑扎连接成整体,现浇钢筋砼层作为坝面,其堤坝板上方现浇防浪墙与坝面形成整体。
根据上述原理在边桩板的一面插入堤坝板和丁坝,即可形成封闭式堤坝。
根据上述原理在边桩板的一面插入堤坝板和丁坝的封闭式堤坝内充填泥土形成重力堤坝。
本实用新型与现有技术相比较还具有以下的优点和有益效果:
1、插板桩插入地层深度大,形成堤坝之后安全稳定性能好。
2、插板桩承载力大。本实用新型公开的插板堤坝,消耗相同数量钢筋砼的情况下,它的承载力高于传统工艺建设的灌注桩和摩擦桩。因异型插板桩与地层接触的面积大,同时插板桩入地部分通过注浆固缝、注浆固板措施与地层之间固结,加大摩擦力,因此承载能力较大。
3、整体连接稳定性能好。组成插板堤坝的各个构件,包括桩的顶部、坝面板上部、堤坝板上部在预制钢筋砼件时均预留有钢筋,它们在上部统一绑扎,现浇钢筋砼层和防浪墙后可形成一个宽大的整体结构,从而具有很强的抗风浪、水流和冰凌冲击的能力。
4、整体密封性能好,单块的桩板进入地层之后通过独创的注浆固缝技术处理之后,桩板之间结合部的连接强度和密封性能均可达到预制钢筋砼桩板本体的各项指标,这是目前传统的灌注桩和摩擦桩无法做到的。
5、建设周期短,施工速度快,可比传统建坝周期缩短1/2以上。
6、节约建设资金,在浅海水域中建设同一标准的堤坝可降低工程造价1/3以上。
四、附图说明:
图1为本实用新型的结构主视图
图2为图1的俯视图
图3为本实用新型的封闭堤坝示意图
图4为本实用新型的重力坝示意图
图5为平板的主视图
图6为图5的俯视图
图7为框架T型板的主视图
图8为图7所示A-A剖面示意图
图9为图7所示B-B剖面示意图
图10槽型板的主视图
图11为图10的俯视图
图12为框架槽型板的主视图
图13为图12所示A-A剖面示意图
图14为图12所示B-B剖面示意图
图15为T型板的主视图
图16为图15的俯视图
图17为空心圆筒桩的主视图
图18为图17的俯视图
图19为边桩板的主视图
图20为图19的俯视图
五、具体实施方式:
参看图1至图20,一种插板堤坝,它包括插板桩1、坝面板2、堤坝板3、丁坝7、边桩板14、及坝面4、防浪墙5。将插板桩1按坝面4的宽度相互连接插入地下形成排桩6,排桩顶部直接安装形成桥的坝面板2。在排桩6的迎水面插入相互连接的堤坝板3,再垂直堤坝板3插入丁坝7,在排桩6无堤坝板3的一端插入外侧较宽的边桩板14。将排桩6、堤坝板3和坝面板2上部的钢筋8相互连接绑扎现浇坝面4,并在堤坝板3上方现浇防浪墙5,使整个工程形成牢固的钢筋混凝土整体结构,如图1、图2,这种坝型适合建造围海堤坝。
插板桩1也可以是各种异型板结构,根据工程用途和地质状况选择板型,预制桩上部较宽,能直接吊装坝面板2,下部较宽承载力大,如框架T型板、槽型板、框架槽型板、圆筒桩。
插板桩1、堤坝板3之间的间缝用水泥浆固缝连接。排桩6、堤坝板3与地层之间的水扰动间隙也可用水泥浆固结,增加插桩与地层之间的侧摩面积和端承面积,增加桩的承载力,因而具有较强的抗风浪冲击破坏的能力。
在围堤另一侧再插入堤坝板3或丁坝7,既形成全封闭式堤坝,如图3;也可在坝内充填泥土形成重力坝,如图4。它广泛应用于沙或淤泥质海岸及浅海水域中建设围海堤坝及港堤工程。

Claims (6)

1、一种插板堤坝,包括插板桩、边桩板、坝面板、丁坝、坝面和防浪墙,其特征在于所述插板桩(1)互相连接插入地下形成排桩(6),该排桩(6)顶部直接吊装形成桥的坝面板(2),该排桩(6)迎水面插入堤坝板(3),堤坝板(3)的迎水面垂直于堤坝板(3)插入丁坝(7),所述排桩(6)无堤坝板(3)的一端插入外侧较宽的边桩板(14)。
2、根据权利要求1所述的插板堤坝,其特征在于所述插板桩(1)为预制的平板(9)、框架T型板(10)、槽型板(11)、框架槽型板(12)、T型板(13)、边桩板(14)或空心圆筒桩板(15)的结构,顶端预留纵向钢筋(8)。
3、根据权利要求1所述的插板堤坝,其特征在于所述堤坝板(3)为平板(9)、槽型板(11)或T型板(13)的结构,顶端预留纵向钢筋(8)。
4、根据权利要求1或2或3所述的插板堤坝,其特征在于所述坝面(4)和防浪墙(5)由插板桩(1)、坝面板(2)和堤坝板(3)顶端的预留钢筋(8)相互绑扎后现浇钢筋混凝土制成的。
5、根据权利要求1所述的插板堤坝,其特征在于还可在边桩板(14)的一面插入堤坝板(3)和丁坝(7)形成封闭堤坝。
6、根据权利要求1所述的插板堤坝,其特征在于还可在封闭堤坝内充填泥土(16),形成封闭式重力堤坝。
CNU032714785U 2003-08-18 2003-08-18 插板堤坝 Expired - Lifetime CN2642831Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU032714785U CN2642831Y (zh) 2003-08-18 2003-08-18 插板堤坝

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU032714785U CN2642831Y (zh) 2003-08-18 2003-08-18 插板堤坝

Publications (1)

Publication Number Publication Date
CN2642831Y true CN2642831Y (zh) 2004-09-22

Family

ID=34300763

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU032714785U Expired - Lifetime CN2642831Y (zh) 2003-08-18 2003-08-18 插板堤坝

Country Status (1)

Country Link
CN (1) CN2642831Y (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100387785C (zh) * 2006-11-24 2008-05-14 何富荣 水力插板及使用方法
CN102296564A (zh) * 2011-06-13 2011-12-28 张康德 一种治理沙洲飘移的方法
CN104264627A (zh) * 2014-09-03 2015-01-07 成都绿迪科技有限公司 堤坝结构
CN104652357A (zh) * 2013-11-20 2015-05-27 上海勘测设计研究院 筒桩加插板护岸结构
CN109338986A (zh) * 2018-11-21 2019-02-15 交通运输部天津水运工程科学研究所 十字板桩生态型丁坝
CN115217070A (zh) * 2021-04-19 2022-10-21 河南正合建筑科技有限公司 一种采用网模构件加固的大堤及其施工方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100387785C (zh) * 2006-11-24 2008-05-14 何富荣 水力插板及使用方法
CN102296564A (zh) * 2011-06-13 2011-12-28 张康德 一种治理沙洲飘移的方法
CN104652357A (zh) * 2013-11-20 2015-05-27 上海勘测设计研究院 筒桩加插板护岸结构
CN104264627A (zh) * 2014-09-03 2015-01-07 成都绿迪科技有限公司 堤坝结构
CN104264627B (zh) * 2014-09-03 2016-02-24 张鹏 堤坝结构
CN109338986A (zh) * 2018-11-21 2019-02-15 交通运输部天津水运工程科学研究所 十字板桩生态型丁坝
CN115217070A (zh) * 2021-04-19 2022-10-21 河南正合建筑科技有限公司 一种采用网模构件加固的大堤及其施工方法

Similar Documents

Publication Publication Date Title
CN1837511B (zh) 一种双排围堰及其制作方法
CN200978411Y (zh) 弧面格型结构的防波堤
CN111851427A (zh) 一种水电站新型截流及围堰坝体以及坝体施工方法
CN2848942Y (zh) 一种挡水围堰结构
CN103243678B (zh) 防波堤
CN2642831Y (zh) 插板堤坝
CN111622179A (zh) 一种海堤生态改造的栅栏板护坡结构及其施工方法
CN108018854A (zh) 一种生态型混凝土支护桩
CN207794060U (zh) 一种生态型混凝土支护桩
CN114382048B (zh) 一种贝藻礁型生态海堤结构
CN1876968A (zh) 一种挡水围堰结构及其施工方法
CN2861272Y (zh) 水力插板航道拦沙堤坝
CN1380469A (zh) 组合插板堤坝及建筑工艺
CN213328885U (zh) 一种透空式防波堤
CN215629710U (zh) 一种适用于深厚泥炭质土软基的板桩接岸式高桩码头结构
CN214993537U (zh) 一种采用网模构件加固的大堤
CN214401845U (zh) 一种适用于岩基陡坡的装配式围堰
CN200996149Y (zh) 一种水利工程构件
CN2642833Y (zh) 插板航道
CN203256680U (zh) 防波堤
CN2646035Y (zh) 插板码头
CN2412925Y (zh) 水利围堤筑坝构件
CN113585168A (zh) 一种适用于深厚泥炭质土软基的板桩接岸式高桩码头结构及施工方法
CN201339196Y (zh) 浅海围海造陆用沉箱
CN1837510A (zh) 一种钢管桩围堰及其制作方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: TANG GUANGYU YING HUASU

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 257000 44-1, WEST ZONE 1, DONGYING DISTRICT, DONGYING CITY, SHANDONG PROVINCE TO: 44-1, XIUYUAN RESIDENTIAL QUATER, XICHENG, DONGYING DISTRICT, DONGYING CITY, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20100903

Address after: West District of Dongying District of Shandong province Xiu Yuan 44-1 in Dongying City

Patentee after: He Furong

Address before: 257000 West District 44-1, Dongying District, Shandong, Dongying

Co-patentee before: Tang Guangyu

Patentee before: He Furong

Co-patentee before: Ying Huasu

ASS Succession or assignment of patent right

Owner name: SHANDONG HONGXU CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: SHANDONG HEHAI HYDRAULIC FLASHBOARD ENGINEERING CO., LTD.

Effective date: 20130312

Owner name: SHANDONG HEHAI HYDRAULIC FLASHBOARD ENGINEERING CO

Free format text: FORMER OWNER: HE FURONG

Effective date: 20130312

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130312

Address after: Shandong Province, Dongying District 257000 West Xiu Yuan District of Dongying city 44-1

Patentee after: SHANDONG HONGXU CONSTRUCTION Co.,Ltd.

Address before: Shandong Province, Dongying District 257000 West Xiu Yuan District of Dongying city 44-1

Patentee before: Shandong Hehai Hydraulic Flapper Engineering Co.,Ltd.

Effective date of registration: 20130312

Address after: Shandong Province, Dongying District 257000 West Xiu Yuan District of Dongying city 44-1

Patentee after: SHANDONG HEHAI HYDRAULIC FLAPPER ENGINEERING Co.,Ltd.

Address before: Shandong Province, Dongying District 257000 West Xiu Yuan District of Dongying city 44-1

Patentee before: He Furong

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20130818

Granted publication date: 20040922