CN2615504Y - Integrated gas-producer and hot water boiler - Google Patents
Integrated gas-producer and hot water boiler Download PDFInfo
- Publication number
- CN2615504Y CN2615504Y CN 02295199 CN02295199U CN2615504Y CN 2615504 Y CN2615504 Y CN 2615504Y CN 02295199 CN02295199 CN 02295199 CN 02295199 U CN02295199 U CN 02295199U CN 2615504 Y CN2615504 Y CN 2615504Y
- Authority
- CN
- China
- Prior art keywords
- coal
- gas
- chamber
- boiler
- burning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Incineration Of Waste (AREA)
Abstract
An overall coal gasification hot water boiler that can gasify and burn the coal, and then fully burn the cinder after gasified to heat the boiler and feed water is a upright style and round boiler whose outer surface is added with a insulating layer decoration sheath wrap that mainly comprises a concrete groundwork portion (water-sealing area and an one-time air blowing area) boiler portion, (a boiler strip, a coal gas generating chamber, a sealing furnace door, a internally installed coal gas channel, a burning chamber beaming fire pipe, a dust-removing chamber and a chimney), the burning process is that: the wind crosses the furnace strip via the one-time wind chamber and enters the coal gas generating chamber and gasifies the coal, the gas passes through the internal installed pipe and enters the burning chamber and is burnt, the second-time wind helps burn, the beaming fire pipe and the dust-removing chamber discharges the water gas after collecting heat, the coke dust product after coal gasified passes through the dust-cleaning burning, heat and gas, the travelling course is unanimous, when the coke dust is burnt to the utmost the coal is placed, the furnace door is sealed, enters the next recycling passing, the two-time burning achieves the destination of clean burning and improves the utilizing efficient of the coal heat energy.
Description
Affiliated technical field
The utility model relates to, and pressure-bearing, normal pressure, series of heat homogeneous solution-type reactor combustion system especially change the direct combustion coal burning boiler into hot-water boiler that coal gasification is burnt.
Background technology
At present, the structure of known hot-water boiler is that coal directly burns, and the maximum NO of harm that discharges pollutants
xUnique can the reduction by combustion system, with gasification burner that coal gasification, conveying coal gas is too big to boiler, combustion apparatus investment, it is inconvenient to transport, store.
Summary of the invention
In order to overcome other hot-water boiler deficiency, the utility model provides an integral coal gasification hot-water boiler (pressure-bearing, normal pressure), this boiler vaporizes, enters the product after being lighted, burn, gasify in the combustion chamber with coal in generation chamber, physics sensible heat and calory burning, circulation heating is carried out in common heating boiler feedwater.
Integral coal gasification hot-water boiler of the present utility model, the overfiren air port that includes body of heater, combustion chamber and link to each other with the combustion chamber, wherein a gas generating chamber is arranged at the bottom, combustion chamber, and be connected by built-in channel between gas generating chamber and the combustion chamber, be provided with the water-stop chamber in the gas generating chamber bottom, have fire bars to be separated by between the two, primary air nozzle is communicated with closed chamber.
Above-mentioned integral coal gasification hot-water boiler, wherein built-in channel is arranged in the body of heater, and this built-in channel is by gas inlet, and gas passage and gas-fired mouth are formed, and are provided with outlet of secondary wind and coal gas ignition mouth above the gas-fired mouth.
The utility model beneficial effect is: with coal gasification, and combustion and the burning of gasification product cinder, combine, thereby reach the clean utilization coal resources, improve coal utilizaton rate, pollutant emission meets strict environmental standard, this boiler structure is simple, and is easy to operate, cost is low, the U.S. characteristics of moulding.The utility model is owing to take place coal gas to place in the same body of heater with burning, and it is big to have overcome the floor space that existing gas generator and gas furnace divide body running to bring, manufacturing cost height, unhandy defective.In body of heater, be provided with the coal gas built-in channel, the coal gas of bottom gas generating chamber generation is directly sent into the combustion chamber, top to burn, simplified furnace binding, and the heat that coal gas of high temperature can be carried absorbs directly by the water jacket in the body of heater, reduced thermal loss.
Description of drawings
Below in conjunction with drawings and Examples to this practical further specifying.
Fig. 1: be integral coal gasification water heater external structure schematic diagram
Fig. 2: the A-A cut-away view that is Fig. 1
Fig. 3: the vertical view that is Fig. 1
Fig. 4: the B-B cut-away view that is Fig. 1
Fig. 5 is the built-in channel front view
Fig. 6 is the built-in channel vertical view
Fig. 7 is the built-in channel left view
Fig. 8 is fire door external structure figure
Fig. 9 is the C-C cut-away view of Fig. 8
Figure 10 is the D-D cut-away view of Fig. 8
Among the figure 1, ground, 2, the water-stop chamber, 3, primary air nozzle, 4, fire bars, 5, gas generating chamber, 6, gas inlet, 7, built-in channel, 8, breast hole, 9, dog-house, 10, the combustion chamber, 11, the gas-fired mouth, 12, the coal gas ignition mouth, 13, sight glass, 14, overfiren air port, 15, the gravity explosion proof door, 16, cleaning door, 17, the boundling fire tube, 18, dirt pocket, 19, the dedusting mouth, 20, chimney, 21, thermometer, 22, layer, 23 are decorateed in the shell insulation, transport base, 24, water return outlet, 25, the maintenance ladder, 26, label, 27, delivery port, 28, sealing door, 29, the water level meter, 30, safety valve, 31, normal pressure hole 28-1, hinge rotating shaft cover, 28-2, door closure, the 28-3 refractory concrete, 28-4, conical pipe, 28-5, the sealing trim ring, 28-6, the keeper depression bar, 28-7, the trapezoidal thread axle sleeve, 28-8, rotary handle, 28-9, rotating shaft, 28-10, knocker
The specific embodiment
In embodiment illustrated in fig. 2, the boiler sealing that links to each other with ground, in ground 1, add water to potted line and form closed chamber 2, feed intake after the ignition of the boiler and with sealing door sealing, primary air nozzle 3 air blast enter gas generating chamber 5 from closed chamber through fire bars 4, the coal gas of generation rises to combustion chamber 10 from gas inlet 6, by the fire hole flame ignition, it is combustion-supporting to open secondary wind 14, by 17 heat absorptions of boundling fire tube, enters dirt pocket 18 and disappears that waste gas discharges from chimney 20 after the hot dedusting.
With reference to Fig. 5-7, coal gas rises to gas-fired mouth 11 from gas inlet 6 through built-in channel 7 and is lighted, opens secondary wind 14 by lighting-up tuyere 12 and carry out combustion-supportingly, and combustion process is implemented in sight glass monitoring.
With reference to Fig. 8-10, sealing door shown in the figure 28 is welded to door closure 28-2 by hinge rotating shaft cover 28-1, refractory concrete 28-3 adds full conical pipe 28-4, door closure side weld sealing trim ring 28-5, keeper depression bar 28-6 connects acme thread axle sleeve 28-7, and rotary handle 28-8 inserts in hole on rotating shaft 28-9, and knocker 28-10 is buckled in the preceding end slot of depression bar, rotary handle is implemented to unclamp, and closes effect.
In order to increase the furnace insulation effect, be provided with heat-insulation layer 22 at the body of heater shell.Transportation for convenience, in the body of heater arranged outside transport base 23.
A threeway is arranged on blast pipe, and two air outlets of this threeway link to each other with overfiren air port 14 with primary air nozzle 3 by valve respectively.
Claims (5)
1, a kind of integral coal gasification hot-water boiler, the overfiren air port (14) that includes body of heater, combustion chamber (10) and link to each other with the combustion chamber, it is characterized in that a gas generating chamber (5) is arranged at the bottom, combustion chamber, be connected by built-in channel (7) between gas generating chamber and combustion chamber (10), be provided with water-stop chamber (2) in gas generating chamber (5) bottom, have fire bars (4) to be separated by between the two, primary air nozzle (3) is connected with closed chamber (2).
2, according to the integral coal gasification hot-water boiler of claim 1, it is characterized in that described built-in channel (7) is arranged in the body of heater, this built-in channel is by gas inlet (6), gas passage and gas-fired mouth (11) are formed, and are provided with outlet of secondary wind and coal gas ignition mouth (12) in gas-fired mouth (11) top.
3, according to the integral coal gasification hot-water boiler of claim 1, it is characterized in that having on the blast pipe threeway, two air outlets of this threeway link to each other with overfiren air port (14) with primary air nozzle (3) by valve respectively.
4, according to claim 1,2 or 3 integral coal gasification hot-water boiler, it is characterized in that body of heater is provided with hermatic door (28).
5, according to claim 1,2 or 3 integral coal gasification hot-water boiler, it is characterized in that body of heater is provided with heat-insulation layer (22) and transport base (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02295199 CN2615504Y (en) | 2002-12-25 | 2002-12-25 | Integrated gas-producer and hot water boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02295199 CN2615504Y (en) | 2002-12-25 | 2002-12-25 | Integrated gas-producer and hot water boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2615504Y true CN2615504Y (en) | 2004-05-12 |
Family
ID=34238777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02295199 Expired - Fee Related CN2615504Y (en) | 2002-12-25 | 2002-12-25 | Integrated gas-producer and hot water boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2615504Y (en) |
-
2002
- 2002-12-25 CN CN 02295199 patent/CN2615504Y/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106958938A (en) | A kind of energy-saving, environmental protection boiler of thermal protection | |
CN101907292A (en) | Vertical environment-friendly boiler for triple dedusting burning wood and biological particle fuel in boiler | |
CN110068009B (en) | Water-cooling rotary grate straw bundle burning semi-gasification direct-combustion normal pressure hot water boiler | |
CN2908508Y (en) | Energy-saving high-efficient coal fired gasification furnace | |
CN2615504Y (en) | Integrated gas-producer and hot water boiler | |
CN104964269B (en) | A kind of pre- hot air boiler of two-stage for burning fin type water pipe furnace grate with being all-trans | |
CN202598487U (en) | Energy-saving environment-friendly coal gasification boiler | |
CN210345860U (en) | Steam-water dual-purpose split reciprocating flue type boiler | |
CN200940928Y (en) | Forward/reverse purifying burning boiler having coal gasifying 3 chambers | |
CN2619156Y (en) | Incinerator of combustable gas | |
CN206709083U (en) | A kind of garbage pyrolysis gasification incinerator | |
CN2559889Y (en) | Coal and gas integral clean combustion boiler | |
CN221036208U (en) | Biomass-fired hot blast stove | |
CN109404973A (en) | Second-time burning high efficient heating furnace | |
CN114738734B (en) | Energy-saving and environment-friendly heating equipment for crushing straw | |
CN201265947Y (en) | Multi-purpose gasification water heating boiler | |
CN2270197Y (en) | Domestic energy-saving constant pressure water heating boiler | |
CN102878564B (en) | Counter-burning wet combustion furnace | |
CN2596200Y (en) | Smokeless gasifying rotary boiler | |
CN2600716Y (en) | Coal gasification boiler | |
CN2594646Y (en) | Coal gasifying combustion boilers | |
CN2476738Y (en) | Machanical moving grate back blowing type coal gasification combustion environmental protection coal-fired boiler | |
CN209180997U (en) | Second-time burning high efficient heating furnace | |
CN2226731Y (en) | Verticle alternative combusion atmospheric boiler with hot water device | |
CN2869678Y (en) | Coal-burning back-burning boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |