CN2599046Y - Industrial washing machine - Google Patents
Industrial washing machine Download PDFInfo
- Publication number
- CN2599046Y CN2599046Y CNU022954082U CN02295408U CN2599046Y CN 2599046 Y CN2599046 Y CN 2599046Y CN U022954082 U CNU022954082 U CN U022954082U CN 02295408 U CN02295408 U CN 02295408U CN 2599046 Y CN2599046 Y CN 2599046Y
- Authority
- CN
- China
- Prior art keywords
- water
- water tank
- combustion chamber
- hot
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
An industrial washing machine consists of a washing main body and a hot water supply device, wherein, the washing main body is provided with a control panel; a hot water supply pipe is connected between the washing main body and the hot water supply device. The utility model is characterized in that: the hot water supply device comprises a frame, a water tank, a combustion chamber with a water containing interlayer, a spiral coil pipe, a fuel oil burner and a chimney, wherein, the water tank is arranged at the upper part of the frame and is provided with a cold water inlet pipe and a hot water outlet pipe; the combustion chamber is arranged at the lower part of the frame and is provided with a fire inlet and a smoke outlet; the water containing interlayer is communicated with the circulating water inlet of the water tank through a pipe; the spiral coil pipe is arranged inside the combustion chamber and has the water outlet end communicated with the water containing interlayer and the water inlet end communicated with the circulating water outlet of the water tank through a pipe; the fuel oil burner is arranged at the fire inlet of the combustion chamber; in addition, the chimney is arranged at the smoke outlet of the combustion chamber. The utility model has simple structure, small volume and safe use and can be extensively used under various washing conditions, particularly under field operation environment.
Description
Technical field
The utility model relates to a kind of industry washer.
Background technology
The general industrial washing machine is made up of laundry main body and hot-water supply two parts, and hot-water supply often adopts the mode of Electric heating or Boiler Steam heating, but under the situation of operation in the open air, all there are some problems in these the two kinds modes that add hot water: if 1 employing Electric heating, its power consumption is big, general vehicle-mounted controller switching equipment is often not enough, needs to be specially the bigger controller switching equipment of its configuration, and this is unrealistic.If 2 adopt the mode of Boiler Steam heating, just need to be equipped with boiler, not only equipment volume is big for it, but also needs the working pressure container, and safety is a big problem, and therefore above dual mode all is not suitable for field work.
Summary of the invention
At the problems referred to above, the purpose of this utility model provides a kind of being suitable for and uses in the lowered in field environment, and the industry washer of safe ready.
For achieving the above object, the utility model is taked following technical scheme: a kind of industry washer, it is made up of laundry main body and hot-water supply two parts, described laundry main body is provided with control panel, be connected with the heat supply water pipe between described laundry main body and the hot-water supply, it is characterized in that described hot-water supply comprises: a frame; One water tank, it is arranged on described upper rack, and described water tank is provided with cold water inlet, hot water outlet pipe; One has the combustion chamber that holds water interlayer, and it is arranged on described frame lower, and it is provided with into burner and outlet flue, and described appearance water interlayer is communicated with the circulating water intake of described water tank by pipeline; One spiral coil, it is arranged in the described combustion chamber, and the water side of described spiral coil is communicated with described appearance water interlayer, and the water inlet end of described spiral coil is communicated with the circulating water outlet of described water tank by pipeline; One oil burner, it is arranged on the burner that advances of described combustion chamber; One chimney, it is arranged on the outlet flue of described combustion chamber.
For making full use of the heat of chimney, described chimney can pass described water tank.
Be to accelerate the heat cycles speed of water, be connected the water circulating pump of to connect on the pipeline between described water tank and the described appearance water interlayer.
For to higher position heat supply water, the heat supply water pump of can connecting on the hot water outlet pipe of described water tank.
Described each pipeline all is arranged on a side of described support, and in this side one maintenance wicket is set.
The utility model is owing to take above design, it has the following advantages: 1, the utility model is owing to adopt oil burner as the thermal source that adds hot water in hot-water supply, when it uses in the open air, fuel is easy to get, the distribution problem that neither has a large amount of power consumptions has also been avoided the safety problem with boiler generation steam.2, the utility model is owing to become one to have the structure of holding water interlayer Combustion chamber design, one spiral coil is set in the combustion chamber, and with spiral coil respectively with hold water interlayer and water tank and be communicated with, therefore when the flame that sprays when burner is in the combustion chamber internal combustion, can directly heat the water in spiral coil and the appearance water interlayer, make hot water advance to hold water interlayer through spiral coil, get back to spiral coil through water tank again, form a Rapid Heating Cyclic system, series connection one water circulating pump on the pipeline that holds between water interlayer and the water tank particularly, it is quite high to make it add hot water efficient.3, therefore the utility model can utilize the chimney waste heat better because chimney is passed water tank, improves the heat energy utilization rate.The utility model is simple in structure, and volume is little, and is safe in utilization, and it can be widely used in various laundry occasions, and the environment that is particularly suitable for operation in the open air uses down.
Description of drawings
Fig. 1 is the utility model structural representation
Fig. 2 is the utility model hot-water supply schematic diagram
Fig. 3 is the schematic side view of Fig. 1
The specific embodiment
As shown in Figure 1, industry washer of the present utility model mainly comprises laundry main body A 1 and hot-water supply A2 two parts, connect by the heat supply water lines between two parts, the cabinet of laundry main body A 1 is provided with control panel, and control section can adopt individual Programmable Logic Controller.Laundry main body A 1 is basic identical with prior art, and the utility model difference from prior art is mainly reflected in to the laundry main body and provides on the hot-water supply A2 of hot water.
As Fig. 2, shown in Figure 3, hot-water supply A2 of the present utility model comprises a frame 1, and the top of frame 1 is a water tank 2, and water tank 2 is provided with cold water inlet 3 and hot water outlet pipe 4.Frame 1 bottom is a combustion chamber 5, and an oil burner 6 is installed in advancing of combustion chamber 5 on the burner, connect a chimney 7 on the outlet flue of combustion chamber 5, and chimney 7 can pass water tank 2, to utilize heat more.Be provided with a spiral coil 8 in the combustion chamber 5, the wall of combustion chamber 5 is an appearance water interlayer 9, and the water side of spiral coil 8 is communicated with and holds water interlayer 9, and the water inlet end of spiral coil 8 is by the circulating water outlet of pipeline 10 joining water box 2.Hold the circulating water intake of water interlayer 9, a water circulating pump 12 can be set on pipeline 11, to accelerate the heat cycles speed of water by pipeline 11 joining water box 2.Cold water inlet 3 on the water tank 2 connects the water source, and the hot water outlet pipe 4 of water tank 2 connects the water inlet of hot water on the laundry main body A 1.
In the foregoing description, in order on the hot water outlet pipe 4 at water tank 2 a heat supply water pump 13 to be set, with more promptly to laundry main body A 1 heat supply water to the higher position hot-water supply.For blowdown, can also blow-off pipe 14,15 etc. be set in addition in the bottom of water tank 2 and the bottom of appearance water interlayer 9.
In the foregoing description, should be provided with also on water tank 2 that water level shows and control device, and temperature shows and control device etc., the button of these control device all can be unified to be arranged on the control panel of doing washing on the main body A 1, with handled easily.
In the various embodiments described above, can be with each connecting line 10,11, hot and cold water pipe 3,4 etc. can be arranged on a side of frame 1, and in this side one maintenance wicket 16 is set, and opens maintenance wicket 16 and just can overhaul easily.
When laundry main body A 1 needs to use hot water, at first as required, by operating button on the individual Programmable Logic Controller heating-up temperature of hot-water supply A2 is set, pass through cold water inlet 3 water filling in water tank 2 of water tank 2 then, and open appearance water interlayer 9 and the spiral coil 8 that each pipe valve moves the water to flow into combustion chamber 5, after being filled to water tank 2 and reaching predetermined water level, light oil burner 6, the flame of burner 6 ejections directly heats spiral coil 8 and holds water interlayer 9 inwalls, water in the spiral coil 8 heads into appearance water interlayer 9 after adding thermal expansion, 10 enter water tank 2 by the road, the water of water tank 2 expands and flows back to appearance water interlayer 9 by pipeline 11, return spiral coil 8, so repeatedly the water in the cyclic heating water tank 2.When having connected water circulating pump 12 on the pipeline 10,, make the speed of heat exchange faster with accelerating the circulation rate of this water.When water temperature reaches temperature required (generally about 60 ℃), can close burner 5, open the valve on the hot water feeding pipe 4 of water tank 2, beginning is laundry main body A 1 heat supply water.On opening hot water feeding pipe 4 series connection heat supply water pump 13 time, can send into hot water the hot water inlet of the laundry main body A 1 of higher position, and make current faster.
Claims (7)
1, a kind of industry washer, it is made up of laundry main body and hot-water supply two parts, and described laundry main body is provided with control panel, is connected with the heat supply water pipe between described laundry main body and the hot-water supply, it is characterized in that described hot-water supply comprises:
One frame;
One water tank, it is arranged on described upper rack, and described water tank is provided with cold water inlet, hot water outlet pipe;
One has the combustion chamber that holds water interlayer, and it is arranged on described frame lower, and it is provided with into burner and outlet flue, and described appearance water interlayer is communicated with the circulating water intake of described water tank by pipeline;
One spiral coil, it is arranged in the described combustion chamber, and the water side of described spiral coil is communicated with described appearance water interlayer, and the water inlet end of described spiral coil is communicated with the circulating water outlet of described water tank by pipeline;
One oil burner, it is arranged on the burner that advances of described combustion chamber;
One chimney, it is arranged on the outlet flue of described combustion chamber.
2, industry washer as claimed in claim 1 is characterized in that: described chimney passes described water tank.
3, industry washer as claimed in claim 1 is characterized in that: be connected on the pipeline between described water tank and the described appearance water interlayer and be in series with a water circulating pump.
4, industry washer as claimed in claim 2 is characterized in that: be connected on the pipeline between described water tank and the described appearance water interlayer and be in series with a water circulating pump.
5, as claim 1 or 2 or 3 or 4 described industry washers, it is characterized in that: the hot water outlet pipe of described water tank goes up series connection one heat supply water pump.
6, as claim 1 or 2 or 3 or 4 described industry washers, it is characterized in that: described each connecting line all is arranged on a side of described water tank, and a maintenance wicket is set on the frame of this side.
7, industry washer as claimed in claim 5 is characterized in that: described each connecting line all is arranged on a side of described water tank, and a maintenance wicket is set on the frame of this side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU022954082U CN2599046Y (en) | 2002-12-31 | 2002-12-31 | Industrial washing machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU022954082U CN2599046Y (en) | 2002-12-31 | 2002-12-31 | Industrial washing machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2599046Y true CN2599046Y (en) | 2004-01-14 |
Family
ID=34152141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU022954082U Expired - Fee Related CN2599046Y (en) | 2002-12-31 | 2002-12-31 | Industrial washing machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2599046Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101749856A (en) * | 2009-12-11 | 2010-06-23 | 江苏海狮机械集团有限公司 | Fuel water heater used on field laundry cart |
CN101845736A (en) * | 2010-03-25 | 2010-09-29 | 管仲池 | Full-automatic professional washing machine and washing method thereof |
CN106637838A (en) * | 2017-01-13 | 2017-05-10 | 无锡小天鹅股份有限公司 | Heating water circulation device for washing machine and washing machine |
CN106757957A (en) * | 2017-01-13 | 2017-05-31 | 无锡小天鹅股份有限公司 | Washing machine |
-
2002
- 2002-12-31 CN CNU022954082U patent/CN2599046Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101749856A (en) * | 2009-12-11 | 2010-06-23 | 江苏海狮机械集团有限公司 | Fuel water heater used on field laundry cart |
CN101845736A (en) * | 2010-03-25 | 2010-09-29 | 管仲池 | Full-automatic professional washing machine and washing method thereof |
CN101845736B (en) * | 2010-03-25 | 2011-12-28 | 武汉万福兴科技有限公司 | Full-automatic professional washing machine and washing method thereof |
CN106637838A (en) * | 2017-01-13 | 2017-05-10 | 无锡小天鹅股份有限公司 | Heating water circulation device for washing machine and washing machine |
CN106757957A (en) * | 2017-01-13 | 2017-05-31 | 无锡小天鹅股份有限公司 | Washing machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2599046Y (en) | Industrial washing machine | |
CN102519274A (en) | Intelligent waste heat recovery and utilization system for boiler | |
CN2898715Y (en) | Optical electromechanical integrated heater | |
CN2599472Y (en) | Hot water supply device | |
CN201335363Y (en) | Fuel gas steam engine | |
CN103416264A (en) | Wind power and fuel complementary type greenhouse heating device and control method | |
CN209026776U (en) | A kind of biogas steam generator | |
CN206861857U (en) | A kind of high efficiency burnt gas heating furnace | |
CN203177294U (en) | Light panel solar energy and fuel gas combined type heat supply system | |
CN205137404U (en) | Energy -efficient full -automatic gas vapor generation stove | |
CN201575446U (en) | Energy-saving environmental-protection steam generator | |
CN204478463U (en) | Energy-conservation easy to clean divided boiler | |
CN217978977U (en) | Solar photo-thermal and biomass fuel stove combined energy supply system | |
CN2694170Y (en) | Combined water heater | |
CN2489263Y (en) | Domestic automatic gas water heater | |
CN2304853Y (en) | Computer controlling direct flow hot water and steam generator | |
CN220958618U (en) | Boiler flue gas waste heat circulation heating device | |
CN104034026A (en) | Stand type water supplying and heat supplying conversion boiler | |
CN2708160Y (en) | Direct-exchanging type water heater | |
CN2567513Y (en) | Water heater using fuel oil and gas | |
CN211177431U (en) | Novel energy-saving environment-friendly hydrothermal liquid hot water oil furnace | |
CN1046997C (en) | Water circulation system of heating boiler with steam generator | |
CN217356845U (en) | Energy-saving steam-water general boiler | |
CN218781441U (en) | Fast-heating energy-saving boiler | |
CN2187256Y (en) | Enclosed high-temp. condensate transfer apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |