CN2583542Y - Air conditioner - Google Patents

Air conditioner Download PDF

Info

Publication number
CN2583542Y
CN2583542Y CN02285192U CN02285192U CN2583542Y CN 2583542 Y CN2583542 Y CN 2583542Y CN 02285192 U CN02285192 U CN 02285192U CN 02285192 U CN02285192 U CN 02285192U CN 2583542 Y CN2583542 Y CN 2583542Y
Authority
CN
China
Prior art keywords
installing plate
air conditioner
plate
framework
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN02285192U
Other languages
Chinese (zh)
Inventor
栂村富康
西川和宏
太田雅也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co Ltd filed Critical Matsushita Electric Industrial Co Ltd
Application granted granted Critical
Publication of CN2583542Y publication Critical patent/CN2583542Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)

Abstract

The utility model provides an air conditioner, which has a firm mounting structure, realizes the lightness of a body and is particularly arranged on an indoor wall corner. A mounting plate which is provided with an air conditioner body is composed of a left mounting plate (39) and a right mounting plate (40) which are arranged on both faces of a wall surface, and a front mounting plate (41) which is connected with the left mounting plate and the right mounting plate (40). The air conditioner body (1) which is fixed with a frame (5), a front grid (6), etc., is arranged on the front mounting plate (41).

Description

Air conditioner
Technical field
The utility model relate to a kind of be arranged on indoor corner freeze, make warm air conditioner.
Background technology
The formation of the existing air conditioner that is arranged on indoor corner such as Figure 16~shown in Figure 19.Figure 16 separates air conditioner body and erecting device under the state that air conditioner body 101 is arranged on the corner metope of room, the stereogram of looking up from the below, (a) expression air conditioner body, (b) expression erecting device.Figure 17 is the plane of seeing from ceiling one side under the state that is provided with of Figure 16, and Figure 18 similarly represents the plane of pipe arrangement connection status, and Figure 19 similarly represents the plane of the bending state of scupper hose.
Air conditioner body 101, the corner of being connected airtight the metope of the ceiling that is installed in the room and two directions, below have the grid 102 of suction, and circular arc portion has exhaust outlet 103.Air conditioner body 101 forms its end face and two sides by the framework 104 of steel plate system.Cross flow one fan, heat exchanger, drip pan etc. are not shown among the figure but are being supported to be arranged on the inside of framework 104 respectively.On framework 104, be provided with the mounting part 105 that forms in the outside, the two sides of framework, connecting the auxiliary pipe arrangement 106 of deriving and be connected scupper hose 107 on the drip pan by the heat exchanger that is arranged on 104 1 sides of framework.
And, be configured for to pair of right and left air conditioner body 101 is supported in installing plate 108 on the metope, and have that each body bears portion 109 and a plurality of ceiling is laid portion 110, and pipe arrangement hole notch 111.
Installing plate 108 is laid on the metope of two directions that portion 110 ground are installed in adjacency symmetrically connecting each ceiling on the ceiling face.At pipe arrangement hole notch 111 places, the situation corresponding to the installation position after installing plate 108 is fixed on the metope is provided with pipe arrangement through hole 112, from outdoor insertion connecting pipings 113.And, have as the end face cover plate 114 of the top cover plate of air conditioner body 101 and make by steel plate, connect the framework 104 and the installing plate 108 of air conditioner body 101.
The air conditioner of Gou Chenging like this, the body that makes the mounting part 105 of air conditioner body 101 in combination air conditioner body 101 is arranged on installing plate 108 from top bears in the portion 109, end face cover plate 114 is set then, and, implement the connection and the bending of being connected of auxiliary pipe arrangement 106 and connecting pipings 113, scupper hose 107.
But, in above-mentioned existing formation, so, must adopt steel plate to form the framework 104 of air conditioner body basic structure because support air conditioner body 101 two intensity of rigidity that just are necessary to strengthen air conditioner body 101 about the installing plate on the metope 108 has only to guarantee to install.
Therefore the weight of air conditioner body becomes heavy, goes wrong on operability, application property.So and owing to make the body of installing plate about 108 bear portion 109 and the mounting part 105 of air conditioner body about 101 directly to combine the installation influence that 108 alignment error directly is subjected to air conditioner body 101 is installed, on installation accuracy, have problems.
And, similarly because only with rigid body air conditioner body 101 is installed about installing plate, so the problem that has the margin of being provided with to diminish for the error of the angle between the metope of two directions.
And, because auxiliary pipe arrangement 106 is formed at a side of framework 104, when auxiliary pipe arrangement 106 1 sides were provided with pipe arrangement through hole 112, the bending process of connecting pipings 113 is had any problem so must bend auxiliary pipe arrangement 113 as shown in figure 18 when being connected with connecting pipings 113 had problem on the operability.
And, form one because make the ceiling of installing plate 108 lay portion 110 with installing plate 108, not only can not select the setting height(from bottom) of air conditioner body 101, and because ceiling lay portion 110 and protrude upward from installing plate 108, so the size of the packing during the goods packing itself becomes big, also have ceiling to lay the problem that portion 110 is subjected to the external force easy deformation.
And, when being installed in air conditioner body 101 on the installing plate 108, if about support air conditioner body 101, because and do not have the space between metope and difficulty be installed, near just must the exhaust outlet 103 of support body central authorities or the part of framework 104, therefore there be restriction at the position to fastening body.
And, so because end face cover plate 114 is not only Heavy Weights of steel plate system, and just like above-mentioned ceiling lay portion 110 like that the Package size of goods become big, so because have end face edge have for the problems such as contact need protection of electric wire etc.
And when connecting auxiliary pipe arrangement 106 and connecting pipings 113, if pipe arrangement is heat insulation insufficient, the dew of pipe arrangement might drop onto the problem in the room from the peristome that sucks grid 102 in addition.
And scupper hose 107 bends to pipe arrangement through hole 112 from drip pan (not shown) as shown in Figure 19, because of horizontal range length can cause fold, also might cause the problem of the impeded drainage of condensed water.
The utility model content
In order to address the above problem, air conditioner of the present utility model, be to have framework at least, front grid, exhaust outlet, suck grid, heat exchanger, the air conditioner body of auxiliary pipe arrangement is installed to the air conditioner on the metope of two directions of room corner, when the upper rear portion of framework has the body mounting part, lower backside has anti-shedding part, also possess and be used for the air conditioner body is installed to left installing plate on the metope, right installing plate and connect the front mounting plate of left installing plate and right installing plate, top at front mounting plate, be provided with in conjunction with the air conditioner support sector that is formed at the body mounting part of framework upper rear portion, in the bottom of front mounting plate, be provided with in conjunction with the air conditioner fixed part that is formed at the anti-shedding part of framework lower backside.
Be made of above-mentioned, installing plate can form the firm mounting structure of the triangular prism shape of 3 connections, when the rigidity of air conditioner body can be reduced, so be the influence that the high accuracy bonding state is not subjected to alignment error because of front mounting plate and air conditioner body.
In addition, can provide a kind of installation, pipe arrangement operability, packing property, the gripping property that is arranged on the air conditioner on the metope of corner, room, erecting device of managing raisings such as drainage of making.
Description of drawings
Fig. 1 represents that the air conditioner of the utility model embodiment of seeing from the below is arranged on the stereogram of the state in indoor corner.
Fig. 2 represents that the air conditioner of the utility model embodiment of seeing from the top is arranged on the stereogram of the state in indoor corner.
Fig. 3 is the exploded perspective view of the air conditioner of the utility model embodiment.
Fig. 4 is the stereogram of seeing from the air conditioner body frame back side of the utility model embodiment.
Fig. 5 is the A-A profile of framework and auxiliary frame Fig. 3 of being stationary state.
Fig. 6 is with framework, auxiliary frame, front grid and decorates the B-B profile of the Fig. 3 under the fixing state of lattice.
Fig. 7 represents that left installing plate and ceiling lay the portion that wants of the installation of portion's parts and amplify exploded perspective view.
Fig. 8 represents the stereogram of mounting plates structure.
Fig. 9 represents the stereogram of base arrangement.
Figure 10 represent with scupper hose backward base plate fixing want portion's stereogram.
Figure 11 represents the stereogram of the cross-section structure of end face cover plate.
Figure 12 represents the integrally-built stereogram of end face cover plate.
Figure 13 represents the plane of the connection status of auxiliary pipe arrangement.
Figure 14 represents the plane corresponding to the installment state of the installing plate of metope angle.
Figure 15 represents to adjust the concrete front view of fixed position of installing plate fixing hole installment state, that adjust front mounting plate of Figure 14.
The existing air conditioner that Figure 16 (a) expression is seen from the below is arranged on the air conditioner body stereogram of indoor corner state.
The existing air conditioner that Figure 16 (b) expression is seen from the below is arranged on the installation site stereogram of indoor corner state.
Figure 17 is the plane of the state that is provided with of Figure 16 of seeing from ceiling one side.
Figure 18 represents the plane of pipe arrangement connection status in the existing air conditioner.
Figure 19 represents the plane of the bending state of scupper hose in the existing air conditioner.
The specific embodiment
Below, with reference to description of drawings embodiment of the present utility model.
Fig. 1 represents that the air conditioner of the utility model embodiment of seeing from the below is set at the state stereogram in indoor corner, and Fig. 2 is the stereogram of similarly seeing from the top.And Fig. 3 is the exploded perspective view of the air conditioner of Fig. 1, Fig. 2, and Fig. 4~Figure 15 represents the detailed construction of each component parts.
The formation of air conditioner body at first, is described with reference to Fig. 1, Fig. 2.Air conditioner body 1 is installed in the ceiling a that closes in the room and the metope b of two directions, the corner of c.It is fan-shaped that the horizontal profile of this air conditioner body 1 roughly is, and there is suction inlet 2,3 in the place ahead on the front reaches, and there is exhaust outlet 4 positive below.By framework 5 and front grid 6, form suction inlet 2 suction grid 7, be arranged on the decoration lattice 8 that sucks about grid, go up lower wind door 9, base plate 10, end face cover plate 11 that front and back are divided into two parts constitute.But base plate 10 and end face cover plate 11 are in the erecting bed mounted component.
As shown in Figures 3 and 4, framework 5 is by plastic firm rectangle, when making positive major part form ventilation circuit (not shown), the a plurality of bodies mounting part 12 that combines with the support sector 60 of the air conditioner of front mounting plate 41 is formed at the top of side overleaf, a plurality of anti-shedding parts 13 that combine with the fixed part 65 of the air conditioner of front mounting plate 41 in bottom formation.And, though do not illustrate in the ventilation circuit of framework 5, be provided with cross flow one fan (not shown), be provided with heat exchanger 14 with covering the cross flow one fan.Derive the rear side that the auxiliary pipe arrangement 15 that off-premises station is connected with cooling tube is housed in initial framework 5 from heat exchanger 14.And,, be provided with to the below of connection heat exchanger 14 and the ventilation circuit of framework 5 air discharge grille 16 in downside the place ahead of framework 5.And, be provided with the electric control part (Electricity dress portion) 17 of the running of this air conditioner body 1 of control on the right side of framework 5.And the outside about framework 5 is respectively equipped with the auxiliary frame 18,19 of symmetric shape.
Auxiliary frame 18,19 is made by synthetic resin, and is identical with the height of framework 5.Fig. 5 is illustrated in the A-A profile of Fig. 3 of the state that auxiliary frame 18 has been installed on the framework 5.As shown in the figure, see that from top auxiliary frame 19 is the roughly triangular shape ground that enlarges previously and forms, framework contact-making surface 20 is connecting each side of framework 5, be provided with the front portion that anti-shedding part 21 is covering the side of framework 5 in the front of framework contact-making surface 20, and with the side of a plurality of standing finish 22 clamping frames 5 that insert from medial surface and fix with the bolt crimping.On the one hand, metope contact-making surface 23 is tabular, forms the form of adjacency with metope b or c, be located at the anti-shedding part 21 and front grid 6 overlap joints of framework contact-making surface 20 ends, the handle portion 25 that is located at auxiliary frame 18,19 is for embedding the structure in the handle openings portion 24 that is located at front grid 6 places.
Fig. 6 represents auxiliary frame 19, framework 5, front grid 6, and decorates near the B-B profile of auxiliary frame 19 among state Fig. 3 down that lattice 8 combines.
Front grid 6, see that from top front end is circular-arc, the rear end is linearly, its side is and metope applying shape, form above-mentioned suction inlet 3 by horizontal a plurality of suction grid plates 26 in the above, form suction inlet 2 in the front by sucking grid 7, contiguous above-mentioned air discharge grille 16 forms exhaust outlet 4 in oblique front lower place.And, its upper end is connected with the top of framework 5, the lower end is connected with framework 5 with air discharge grille 16, and combines fixing about it with auxiliary frame 18,19.
Be provided with the handle slot part 27 that forms the box-shaped space in front about the front of grid 6, on the metope in the outside, side, form as illustrated in fig. 6 and decorate lattice mount hole 28, on inboard metope, form and decorate lattice fixed claw 29, form opening 30 in central authorities, decorating the vertical handle flange 31 of formation between lattice fixed claw 29 and the opening 30, connecting and decorate lattice fixed claw 29 and handle flange 31 formation auxiliary frame contact-making surfaces 32.When the handle portion 25 of handle slot part 27 and above-mentioned auxiliary frame 18,19 was embedded into, handle flange 31 and handle portion 25 are adherence state ground was fixed front grid 6 by auxiliary frame 18,19.And the handle openings portion 24 by opening 30 auxiliary frames 19 is in the face of form.Then,, other finger is stretched into from opening 30, keeping handle portion 25 ground to insert so in order to keep the air conditioner body thumb is close to handle flange 31 because decoration lattice 8 is the state of non-set with respect to front grid 6 when mounted.
As shown in Figure 3, positive suction grid 7, the circular arc place that roughly is connected on front grid 6 makes and forms same circular-arcly and certain highly substantially, is provided with the suction inlet 2 that is the shutter shape.And sucking grid 7 places, be provided with the lever trailing arm 33,34 of pair of right and left, bearing portion 35 by lever trailing arm 33,34 and a pair of axial region (not shown) that is formed at front grid 6 places rotatably combine to make and suck grid 7 and can open and close up and down, make the maintenance of dirt catcher 36 become easy.And, as shown in Figure 6, suck decoration lattice 8a, the 8b of grid about 7, be designed to and suck grid 7 much the same shape ground, vertical section and covering handle slot part 27.That is, in the inside of decorating lattice 8a, 8b, form front grid and articulate sheet 37 and front grid fixing hole 38, make front grid articulate sheet 37 and combine with decorating lattice mount hole 28, front grid fixing hole 38 is fixed in combination with decoration lattice fixed claw 29.Decorating lattice 8a, 8b, much less, is symmetrical shape.
Secondly, illustrate that with Fig. 3 and Fig. 8 installation constitutes.Installing plate is by left installing plate 39 and right installing plate 40, and front mounting plate 41 constitutes.The corner of the ceiling a in left side installing plate 39 and right installing plate 40 and the room and b, the c of two directions is in abutting connection with setting.Be that left installing plate 39 is arranged on the metope b, right installing plate 40 is arranged on the metope c, and front mounting plate 41 connects the left end of left installing plate 39 and right-hand member ground pro being installed with to the room of right installing plate 40.Left side installing plate 39 is by the metope installation portion 43 of the connection metope b with a plurality of installing holes 42, with its top to the inside flatly the bending top kink 44, to the left kink 45 of front bending with its underpart kink 46 before the bottom of bending flatly to the inside, kink 47 is used to be provided with and the bottom bending part is cut off and pipe arrangement hole notch 49 and its right-hand member of bending of the pipe arrangement through hole 48 of configuration make metope contact site 50 formations that contact with metope C behind the bottom with its left end.On top kink 44, near left kink 45, form in the installing plate mount hole 52, as shown in Figure 7, certain a plurality of seams hole 51 that is interval with is separated by.At each seam 51 places, hole, make L shaped ceiling and lay parts 53 and insert the bolt 54 that is fixed from the top vertical direction and be fixed on the bolt block 55 that metope installation portion 43 upper process form.Lay on the parts 53 at ceiling, the slotted hole 56 that forms longitudinal direction can suitably be adjusted the level altitude that ceiling is laid parts 53.
And, as Fig. 3 and shown in Figure 8, on left kink 45, be provided with a plurality of installing plate combined holes 57, at its back side welded nut (not shown).And, near the pipe arrangement hole of bottom kink 46 notch 49, be provided with base plate with hole under the bolt 58.And, above-mentioned right installing plate 40, just different with respect to left installing plate 39 with the upper-lower position at the metope junction surface 50 of metope b contact, so and other shape is recorded and narrated because constitute to omit with left installing plate left and right symmetrically.
And, front mounting plate 41 is by the installing plate body 59 that its 4 limit is formed to the metope lateral buckling, the air conditioner support sector 60 of a plurality of L shaped sections that flatly are provided with is dug on the one side on its top, the installing plate that is provided with bendingly downwards at the two ends on the top of installing plate body 59 articulates pawl 61, a plurality of installing plate fixing holes 62 of the slotted hole shape of the formation level that is provided with at the two ends, the left and right sides of installing plate body 59, the auxiliary pipe arrangement that is provided with in the bottom center of installing plate body 59 connects slotted hole 63, the scupper hose through hole 64 that two ends, the left and right sides are provided with below installing plate body 59 Yi Bian make the air conditioner fixed part 65 of its a plurality of L shaped sections that are fixed constitute below installing plate body 59 with stretching out forward.And the height of front mounting plate 41 roughly is sustained height with left installing plate 39 and right installing plate 40.Promptly, the top kink 44 of the one side on installing plate body 59 tops of front mounting plate 41 and left installing plate 39, right installing plate 40 roughly is horizontal plane, and one side of the bottom of installing plate body 59 and the same bottom kink 46,47 similarly roughly are horizontal plane.Installing plate about front mounting plate 41 articulates each installing plate mount hole 52 combinations of pawl 61 and left installing plate 39, right installing plate 40, is arranged to make installing plate fixing hole 62 and installing plate combined hole 57 to coincide.
And, as Fig. 8 and shown in Figure 9, above-mentioned base plate 10 is covering the downside of the generally horizontal plane figure that the bottom kink 46,47 by one side of the bottom of the installing plate body 59 of front mounting plate 41 and left installing plate 39, right installing plate 40 forms, is arranged to consistent with the height below the front grid 6 in the metope side of above-mentioned front grid 6.That is, base plate 10 is configured to see roughly triangular in shapely from top that the downside of grid 6 is in front covering the space between front grid 6 and metope.And for convenience of accommodating of part, with front grid 6 sides noseplate 66 formations, the metope side will be divided into 2 with will interconnecting a part of coincidence of part and will partly constitute with back base plate 67 formations.On the base plate 67 of back, be provided with the erecting of upper ledge of outer rim along 68, and, be provided with installing plate mounting part 69 in the vicinity in its corner, rear portion.And be provided with in its front portion and surround pipe arrangement crop portion 70 and erecting on every side thereof along flange 71.Pipe arrangement crop portion 70 make connecting pipings shown in Figure 13 83 from below be provided with seam hole (not shown) in cut part along its periphery under the situation of turning back it be cut off easily.And the front side at back base plate 67 is provided with the installing plate fixedly fixing hole 73 and the scupper hose fixed part 74 of slotted hole 72, noseplate.Scupper hose fixed part 74, as shown in figure 10, from the planar section that overlaps of noseplate 66 of back base plate 67, with metope b, c opening abreast, and have on top opening the subtend setting hyoplastron 75 below be provided with hole 76.The interval of hyoplastron 75 is unanimous on the whole with the profile of scupper hose 77, and the profile of aperture efficiency scupper hose 77 that forms its top is a little bit smaller slightly.Scupper hose 77 is arranged to sandwich with hyoplastron 75, and its maintenance is connected airtight on the base plate 67 of back.Then, after back base plate 67 is provided in the bottom of left installing plate 39, right installing plate 40 kink 47 places in conjunction with installing plate mounting part 69, by with installing plate fixedly slotted hole 72 be fixed by bolts to base plate with in the hole under the bolt 58.
And, on noseplate 66, similarly being provided with erecting of projection along 68 on the top of outer rim, its rear side is provided with a plurality of base plate fixed projections 78, and the front side is provided with a plurality of base plate fixed claws 79.Noseplate 66 is configured to make base plate fixed projection 78 to insert the noseplate fixing hole 73 that is articulated to back base plate 67 from the below, and base plate fixed claw 79 is fixed in combination with the below of the installation body 59 of front mounting plate 41.
And, as shown in Figure 8, above-mentioned end face cover plate 80 is covering the generally horizontal plane that the top kink 44 by the one side on installing plate body 59 tops of front mounting plate 41 and left installing plate 39, right installing plate 40 forms, and is arranged to make the height of metope one side of framework 5 and framework 5 unanimous on the whole.That is, end face cover plate 80 is seen roughly triangular in shapely from top, be designed to cover as far as possible the space that framework 5 and metope form.End face cover plate 80 forms tabular by synthetic resin, is provided with a lot of hollow bulbs 81 side by side at its section part fore-and-aft direction, and half from top to section made grooving with the front and back separated into two parts as illustrated in fig. 11.Can form bending as shown in figure 12.And side is provided with two sides adhesive plaster 82 within it, with end face cover plate 80, is bonded on one side, top or top kink 44 that body 59 is installed.
Secondly, the erection sequence of the erecting device of this air conditioner is described.
At first, the ceiling of left installing plate 39 and right installing plate 40 being laid parts 53 adjusts to and the corresponding only length of the situation of installation position and fixing with set bolt 54.In this case, also can omit adjustment process, use ceiling to lay the foot of the slotted hole 56 of parts 53, the height that makes ceiling lay parts 53 is that maximum also can.Then, left installing plate 39 is put near the corner of metope b, c of ceiling a and two directions, on metope b, make ceiling lay parts 53 and contact, make metope contact site 50 to contact with metope c with ceiling a, with a plurality of bolts left installing plate 39 is fixed in the installing hole 42 of metope installation portion 43.And, similarly, right installing plate 40 is fixed on the metope c.Certainly, the erection sequence of left installing plate 39, right installing plate 40 can be changed.Then, left installing plate 39, right installing plate 40 any the metope b of the most suitable position of pipe arrangement hole notch 49 or metope c on open pipe arrangement through hole 48.This pipe arrangement through hole 48 should select to avoid the barriers such as inclined strut of installation position.Then, in the installing plate mount hole 52 of the top kink 44 of being located at left installing plate 39 and right installing plate 40, the installing plate that inserts the both upper ends thereof of front mounting plate 41 articulates pawl 61, articulate front mounting plate 41, make the installing plate combined hole 57 of left installing plate 39 and right installing plate 40 and the installing plate fixing hole 62 identical bolting front mounting plates 41 of using again at the two ends, the left and right sides of front mounting plate 41.Like this, 3 of installing plate places, corner that under the state that connects, are fixed on ceiling a and metope b, c.
Then, air conditioner body 1 is carried on the front mounting plate 41.Under the state of decoration lattice 8a, the 8b of the machine body 1 that do not install an air-conditioner, utilize the handle slot part 27 of front grid 6 this moment, hand is stretched into right-hand man's shank 25 of auxiliary frame 18,19, clamp handle portion 25 and front grid 6 handle flanges 31 lift air conditioner body 1, the body mounting part 12 at the back side of framework 5 is articulated in the air conditioner support sector 60 of front mounting plate, and anti-shedding part 13 is fixed on air conditioner body 1 on the front mounting plate 41 towards air conditioner fixed part 65.After air conditioner body 1 is fixing, make the decoration lattice mount hole 28 of front grid 6 and decorate lattice fixed claw 29, articulate with the front grid of decorating lattice 8a, 8b that sheet 37 and front grid fixing hole 38 combine and decoration lattice 8a, 8b about installing.
Then, be that cooling tube connects the connection of electric wire and scupper hose.The connection of cooling tube, be will be contained in the auxiliary pipe arrangement through hole 63 of auxiliary pipe arrangement 15 by the bottom center of front mounting plate 41 at the back side of framework 5 to the metope lateral buckling, implement to be connected with the cooling tube that inserts from pipe arrangement through hole 48 from outdoor introducing.The pipe arrangement of auxiliary pipe arrangement 15 because by disc spring (not shown) even shelter can not cause the flat etc. of pipe arrangement with bending yet.The connection of electric wire is an electric control part 17 of electric wire being gone back to framework 5 by the scupper hose through hole 64 of the bottom right of front mounting plate 41.And, the connection of scupper hose 77, be that scupper hose 77 is implemented bending corresponding to the position of pipe arrangement through hole 48 by the left side or the scupper hose through hole on the right 64 of front mounting plate 41, the middle part of scupper hose 77 is fixed on the scupper hose fixed part 74 of the back base plate of installing thereafter 67.
At last, be the installation of end face cover plate 80 and base plate 10.End face cover plate 80, the shape of bending is launched into tabular after, towards the top of 3 the installing plate of installing, with following two-sided tape 82 bonding being installed on one side, top or top kink 44 that body 59 is installed.And the order of later base plate 67, noseplate 66 is installed base plate 10.Back base plate 67, with the installing plate mounting part 69 of kink 47 behind the bottom of left installing plate 39, right installing plate 40 towards back base plate 67, by installing plate fixedly slotted hole 72 be installed to before the bottom of left installing plate 39, right installing plate 40 on the kink 46.With such state scupper hose 77 is remained in the scupper hose fixed part 74 of back base plate 67.Then, the installation of noseplate 66 is the base plate fixed projections 78 that insert noseplate 66 in the noseplate fixing hole 73 of back base plate 67, the base plate fixed claw 79 of noseplate 66 is fixed on the implementing of installing plate body 59 of front mounting plate 41 followingly.
As mentioned above,, and front mounting plate 41 is set, thereby constitutes the triangular prism shape, only promptly can form firm installation constitution, can reduce the rigidity of air conditioner with installing plate by 3 of installing plate because the left installing plate 39 of installing plate, right installing plate 40 connected.
Promptly can reach the synthetic resinization of the framework 5 of air conditioner body 1.Therefore thereby can make air conditioner body 1 lightness improve quick detachable property, easy installation property.
And form air conditioner support sector 60, air conditioner fixed part 65 at front mounting plate 40 places, similarly be provided with body mounting part 12 and anti-shedding part 13 at the back side of the framework 5 of air conditioner body, because the framework 5 of front mounting plate 41 and air conditioner body 1 directly is mounted in combination, so can guarantee and the irrelevant front mounting plate 41 of the alignment error of installing plate and the stable installation constitution of air conditioner body 1.
And, because be located at the installing plate fixing hole 62 at the two ends, the left and right sides of front mounting plate 41, form the slotted hole shape of level, even not being right angle but other angle, the angle between metope b and the metope c can not be suitable for yet.Promptly, left side installing plate 39, right installing plate 40, front mounting plate 41 are when the metope angle is big, formation is shape shown in Figure 14 solid line, and the metope angle hour, form shape shown in dotted line, in the bolting position at installing plate fixing hole 62 places of front mounting plate 41 as shown in figure 15 with d or e is corresponding like that changes.
And, articulate pawl 61 because in installing plate mount hole 52, insert installing plate, even before using bolt, front mounting plate 41 can not fall yet and can implement safe operation.Installing plate mount hole 52 and installing plate articulate pawl 61, for can be corresponding with the angle of metope will about leave the space.
And, lay parts 53 and metope contact site 50 because on left installing plate 39, right installing plate 40, be provided with ceiling, implement high-precision construction so can be easy to determine the position of installing plate.And left installing plate 39, right installing plate 40, front mounting plate 41 are bending or the shape of through-body so be easy to processing, thus its roughly outer rim form bending enough intensity arranged.And the ceiling of left installing plate 39, right installing plate 40 is laid parts 53 and can be moved up and down, thus as in the goods packings, can implement the Package size miniaturization to dwindle form ground, and be subjected to external force to produce the situation of distortion when not transporting.And, when using at the scene, can adjust to necessary height and make the setting height(from bottom) of air conditioner become optimum height.And, lay parts 53 because be provided with seam hole 51 at top kink 44 places of left installing plate 39, right installing plate 40 to insert ceiling, so it is stable that ceiling is laid the action that moves up and down of parts 53, so and because be provided with the back side that the front end of bolt block 55 bolts of projection also can not reach installing plate at metope installation portion 43 places.
And, be configured in the auxiliary pipe arrangement 15 at air conditioner body 1 back side, when carrying air conditioner body 1 on the front mounting plate 41, because be housed in the back side of framework 5 same as before, so carry easily, and, if connecting slotted hole 63, the auxiliary pipe arrangement of the lower central by front mounting plate 41 will assist pipe arrangement 15 to be folded into metope one side, then the position of auxiliary pipe arrangement 15 is in the substantial middle portion of 3 angular shapes that formed by installing plate, left installing plate 39 is located in the position of pipe arrangement through hole 48, arbitrary place of right installing plate 40 can both make the bending of connecting pipings 83 become easily, and the operability of bending process is improved.And at this, the bending of auxiliary pipe arrangement 15 is after the front mounting plate 41 that carries air conditioner body 1, but bending should also have same effect before lift-launch.
That is, reach the structure of metope side from the central portion of air conditioner body 1, can both guarantee the simplicity of installing for the position of any one pipe arrangement through hole by assisting pipe arrangement 15.
And, when being installed to air conditioner body 1 on the front mounting plate 41, handle slot part 27 by front grid 6, because with hand from the left and right sides handle 25 of auxiliary frame 18,19 stretch in case stably arrest air conditioner body 1 about, not only can install simply with the range-independence ground of metope, and because grip the handle portion 25 of auxiliary frame 18,19 and the handle flange 31 of front grid 6, so can implement firmer more stable installation exercise with clamping.And, so because the auxiliary frame contact-making surface of the handle portion 25 of auxiliary frame 18,19 and front grid 6 31 closely contacts the rigidity that can improve air conditioner body 1.
And, so not only can improve aesthetic property because decorate the handle slot part 27 that lattice 8 covering front grid 6, and because be not with bolt but simply in conjunction with fixing, be easy to so remove and install also.
And, because covering the side of air conditioner body 1, auxiliary frame 18,19 not only improves aesthetic property, and auxiliary frame 18,19 by the front side anti-shedding part 21 and clamp framework 5 from the standing finish 22 that medial surface inserts and be fixed, so can be firmly fixing.And, also can make framework 5 and auxiliary frame 18,19 integrated, even it is still identical to implement the effect of the structure of integrated handle and side cover plate, by being set, also can use on the framework of other kinds (as wall hanging) episome, so can save the mould investment.
And, because left installing plate 39, right installing plate 40, front mounting plate 41 forms sustained heights, on top and the bottom horizontal plane that is roughly is set, so the installation of end face cover plate 80, base plate 10 becomes easy.And, because end face cover plate 80 is made by flat synthetic resin, can put into grooving can form bendingly, so not only can lightness, so and end face is not that the edge does not need end face to handle, and so flat city dealer product material is cut off the mould that processing does not need high price yet, the Package size of goods also can dwindle.And, so can guarantee intensity because grooving is located at when top is the use of tabular ground.So it is and also easy because can engage fixing its installation exercise with two-sided tape 82.
And, because the periphery top of base plate 10 is provided with erecting along 68 of projection, and be provided with and surround the erecting along the intensity that also can guarantee base plate 10 after so even flange 71 cuts pipe arrangement hole crop portion 70 of pipe arrangement hole crop portion 70, so and erect along 68 and erect along flange 71 and surround the dew that base plate 10 can keep pipe arrangement, prevent dripping of water droplet.And, base plate 10 is overlapped by back base plate 67 and noseplate 66 and is constituted, because so an end is provided with and clamps the centre of scupper hose fixed part 74 scupper hoses 77 that forms the scupper hose 77 of one with back base plate 67 and do not have fold on overlapping base plate 10, can prevent impeded drainage, also not need remaining part.And the installation of scupper hose 77 also only is to insert from top to get final product, so construction is also simple.And, because the bottom in the hole 76 of scupper hose fixed part 74 downsides by noseplate 66 shelters with also 76 dews that spill not from the hole.And, so because scupper hose fixed part 74 can be selected use corresponding to the position of pipe arrangement through hole 48 about setting up separately.

Claims (8)

1. air conditioner, its air conditioner body that utilizes installing plate will have framework, front grid, exhaust outlet, suction grid, heat exchanger, auxiliary pipe arrangement at least is installed on the metope of room corner two directions, it is characterized in that,
Described framework is when top has the body mounting part overleaf, and the bottom has anti-shedding part overleaf,
Described installing plate is by being used for that described air conditioner body is installed to left installing plate and right installing plate on the described metope, and the front mounting plate that is connected and fixed described left installing plate and described right installing plate constitutes,
Top at described front mounting plate, be provided with the air conditioner support sector that is formed at described framework upper rear portion in conjunction with described body mounting part, in the bottom of described front mounting plate, be provided with the air conditioner fixed part that is formed at described framework lower backside in conjunction with described anti-shedding part.
2. air conditioner as claimed in claim 1 is characterized in that, is provided with the installing plate fixing hole of the slotted hole shape of a plurality of levels at the two ends, the left and right sides of front mounting plate, by this installing plate fixing hole described front mounting plate and left installing plate, right installing plate is connected and fixed.
3. air conditioner as claimed in claim 1, it is characterized in that, when the positive bottom center place of front mounting plate is provided with auxiliary pipe arrangement perforation slotted hole, make the auxiliary pipe arrangement that is housed in the framework back side connect the inboard that slotted hole export to front mounting plate by described auxiliary pipe arrangement.
4. air conditioner as claimed in claim 1, it is characterized in that, the top kink that on left installing plate and right installing plate, is provided with the metope installation portion that is abutted against metope and top is flatly bent to the inside, on described metope installation portion, be provided with a plurality of bolt blocks, and the kink place is provided with a plurality of seams hole on described top, described bolt block and described seam hole are formed on the same vertical line, to lay parts at the ceiling that has slotted hole on the longitudinal direction, can lay described ceiling the parts easy on and off and be fixed by bolts on the described bolt block with regulating in the slotting logical described seam hole from top.
5. air conditioner as claimed in claim 1, it is characterized in that, left and right sides at framework, auxiliary frame is set, this auxiliary frame has the framework contact-making surface of fixing described framework and the flat wall contact-making surface along metope inclined with this framework contact-making surface, and be provided with to covering the front grid that described auxiliary frame constitutes at both ends, the left and right sides, when either party in described auxiliary frame or described front grid or both sides formed handle arrangement, the situation that is provided with handle at described front grid place had the decoration lattice that covers handle groove.
6. air conditioner as claimed in claim 1, it is characterized in that, same approximately height is arranged in each installing plate top of left installing plate, right installing plate and front mounting plate with forming generally horizontal plane, also is provided with the flat plastic end face cover plate that its top can bend.
7. air conditioner as claimed in claim 1, it is characterized in that, make the bottom of each installation portion of left installing plate, right installing plate and front mounting plate be arranged to same approximately height with forming generally horizontal plane, be provided with the base plate that covers its underpart, be provided with periphery at base plate at this base plate place to the edge that erects of upper ledge, and surround the erecting of pipe arrangement hole grooving portion along flange.
8. air conditioner as claimed in claim 7 is characterized in that, the back base plate and the noseplate of base plate constituted with overlapping, and an end is provided with the scupper hose fixed part that forms one with base plate on overlapping base plate.
CN02285192U 2001-11-12 2002-11-11 Air conditioner Expired - Fee Related CN2583542Y (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2001345611A JP3690336B2 (en) 2001-11-12 2001-11-12 Air conditioner
JP2001345611 2001-11-12

Publications (1)

Publication Number Publication Date
CN2583542Y true CN2583542Y (en) 2003-10-29

Family

ID=19158922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN02285192U Expired - Fee Related CN2583542Y (en) 2001-11-12 2002-11-11 Air conditioner

Country Status (2)

Country Link
JP (1) JP3690336B2 (en)
CN (1) CN2583542Y (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100838014B1 (en) * 2006-12-29 2008-06-12 캐리어 주식회사 Air conditioner bracket at corner

Also Published As

Publication number Publication date
JP3690336B2 (en) 2005-08-31
JP2003148797A (en) 2003-05-21

Similar Documents

Publication Publication Date Title
CN1081316C (en) Room air conditioner
US20140326687A1 (en) Solar module integration system
CN103608629B (en) Built-in air-conditioning system
CN202170602U (en) Siphoning type roof drainage system
WO2019128242A1 (en) Fabricated toilet and mounting method therefor
CN2583542Y (en) Air conditioner
CN1884927A (en) Air conditioner
CN2400742Y (en) Mounting member and structure of air-conditioning machine
JP4871688B2 (en) Vertical air supply / exhaust system
CN2875898Y (en) Locomotive air conditioner having new type outdoor lateral drain mechanism
CN1641132A (en) Heat colleting roof of house with solar system
CN216641103U (en) Light steel building type slope roof structure
CN209855089U (en) Canopy of first floor self-remaining courtyard of house
CN220203134U (en) Archaize stacked roof hidden drainage structure
CN218763158U (en) Corrugated lamp capable of avoiding accumulated water and dust
CN219386903U (en) Ventilating skylight with micro-resistance S-shaped channel
CN1755229A (en) Central airflow guiding plate of integral air conditioner
CN2229626Y (en) Wooden tiltable louvre ventilation device
CN215859289U (en) A installation component for sunshade
CN2266011Y (en) Easy-to-assemble and disassemble PVC ceiling device
US20220393635A1 (en) Systems and methods for solar panel mounting
JP4648064B2 (en) Roof equipment for air conditioners
JPH04113138A (en) Underground buried type outdoor apparatus
JPH0886471A (en) Outdoor machine of air conditioner
CN112695962A (en) Water diversion device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20031029

Termination date: 20091211