CN2575195Y - Prefabricated combined septic tank - Google Patents
Prefabricated combined septic tank Download PDFInfo
- Publication number
- CN2575195Y CN2575195Y CN 03235278 CN03235278U CN2575195Y CN 2575195 Y CN2575195 Y CN 2575195Y CN 03235278 CN03235278 CN 03235278 CN 03235278 U CN03235278 U CN 03235278U CN 2575195 Y CN2575195 Y CN 2575195Y
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- handle
- hanging
- filth
- septic tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a hanging basket for intercepting filth, which belongs to the technical field of the auxiliary supply of drainage structures. The hanging basket is provided with a hanging piece connected with a well wall of rain water, the wall part of the hanging basket, or the wall part and the bottom of the hanging basket are provided with an effusion hole, and the hole diameter of the effusion hole is not larger than 3 mm. The inner side of the upper part of the hanging basket is provided with a handle and a handle frame, and the bottom of the hanging basket is padded and provided with a spongy body for sucking filth. The utility model can effectively intercept filth and can bring convenience to clean filth.
Description
Technical field
The utility model belongs to drainage structures appurtenance technical field, particularly a kind of Prefabricated combined septic tank that is placed in town road rainwater water inlet interception bulk footpath dirt.
Background technology
The town road storm-water drainage causes urban traffic and resident's work and life closes importantly, and discharging freely will directly not influence people's work and daily life.Section dirty device of existing town road rainwater water inlet 500 * 300mm or the 750 * 500mm standard iron grates of adopting more, go into tank and be generally 200 * 25mm or 100 * 25mm size at the single no end of this iron grate, it is oversize that this goes into tank, no matter the rainwater phase also is the non-rainwater phase, various foreign material less than this size are all gone into tank by this easily and are entered the rainwater water inlet, enter rainwater inspection shaft and Sewage pollution collecting hanging basket through rain drop erosion.The dirt of post precipitation can make the pipe culvert runoff area reduce, design water pouring ability drop.Can cause Sewage pollution collecting hanging basket to stop up when serious, even cause indivedual highway sections large tracts of land ponding.The dirt that is mingled in the rainwater not only has a strong impact on rainwater water quality, strengthens rainwater comprehensive utilization cost, but also can increase the number of times of removing contamination, the workload of removing contamination and the cost of removing contamination.The stink that dirt gave out that clears causes severe contamination to urban air again.
The utility model content
The utility model purpose is to provide a kind of Prefabricated combined septic tank that can effectively cut dirt and conveniently remove contamination.
For reaching above-mentioned purpose, the utility model adopts following technical scheme: a kind of Prefabricated combined septic tank, Hanging Basket are provided with the hanging part that is connected with the rainwater borehole wall, and Hanging Basket wall portion is provided with the cascading water hole.
The Hanging Basket bottom is provided with the cascading water hole.
Aperture, cascading water hole is not more than 3mm.
The Hanging Basket upper edge forms the draw-in groove that goes in ring along outer folding, and the Hanging Basket upper inner is provided with handle and handle frame, and Hanging Basket bottom pad is established and inhaled dirty cavernous body.
The utility model proposes and a kind ofly at town road rainwater water inlet the new approaches of Hanging Basket are set, adopt the design that the cascading water hole is set in Hanging Basket wall portion and bottom, make the dirt that enters Hanging Basket with rainwater be retained down, rainwater then goes out by the cascading water orifice flow.Thereby both effectively cascading waters can effectively cut dirt again, avoid dirt to enter storm sewer and result in blockage, and guarantee that road traffic is unimpeded.Aperture, cascading water hole is not more than 3mm, and feasible dirt greater than the 3mm particle diameter is trapped and falls to the Hanging Basket bottom.Folding forms the draw-in groove that goes in ring outside Hanging Basket upper edge edge, is used for Hanging Basket is placed in the set loop bracket of rainwater water inlet; Hanging Basket upper inner both sides are provided with handle in order to extract Hanging Basket when removing contamination; Handle frame is set in order at carriage handle at ordinary times along the Hanging Basket inwall, avoids handle to drop down onto at the bottom of the basket; The suction dirt cavernous body that Hanging Basket bottom pad is established can stop that tiny dirt enters storm sewer, plays and effectively cuts dirty effect.Mention the Hanging Basket handle and can propose Hanging Basket removing dirt, remove contamination conveniently.
Description of drawings
Fig. 1 is the utility model structural representation.
The specific embodiment
Embodiment, a kind of Prefabricated combined septic tank, the Hanging Basket upper edge forms the draw-in groove 1 that goes in ring along outer folding, and the Hanging Basket upper inner is provided with handle 2, and handle 2 lies low when putting down on the handle frame 3 that is provided with along the Hanging Basket inwall.Hanging Basket wall portion and bottom are respectively equipped with cascading water hole 4,5, cascading water hole aperture 3mm.Hanging Basket bottom pad is established and is inhaled dirty cavernous body 6.
Claims (5)
1, a kind of Prefabricated combined septic tank is characterized in that, Hanging Basket is provided with the hanging part that is connected with the rainwater borehole wall, and Hanging Basket wall portion is provided with the cascading water hole.
2, Hanging Basket as claimed in claim 1 is characterized in that, the Hanging Basket bottom is provided with the cascading water hole.
3, Hanging Basket as claimed in claim 1 or 2 is characterized in that, aperture, cascading water hole is not more than 3mm.
4, Hanging Basket as claimed in claim 1 or 2 is characterized in that, the Hanging Basket upper edge forms the draw-in groove that goes in ring along outer folding, and the Hanging Basket upper inner is provided with handle and handle frame, and Hanging Basket bottom pad is established and inhaled dirty cavernous body.
5, Hanging Basket as claimed in claim 3 is characterized in that, the Hanging Basket upper edge forms the draw-in groove that goes in ring along outer folding, and the Hanging Basket upper inner is provided with handle and handle frame, and Hanging Basket bottom pad is established and inhaled dirty cavernous body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03235278 CN2575195Y (en) | 2003-01-17 | 2003-01-17 | Prefabricated combined septic tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03235278 CN2575195Y (en) | 2003-01-17 | 2003-01-17 | Prefabricated combined septic tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2575195Y true CN2575195Y (en) | 2003-09-24 |
Family
ID=33758150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03235278 Expired - Fee Related CN2575195Y (en) | 2003-01-17 | 2003-01-17 | Prefabricated combined septic tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2575195Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102989729A (en) * | 2012-10-17 | 2013-03-27 | 刘安民 | Underwater dust collection pad |
CN104895178A (en) * | 2015-06-18 | 2015-09-09 | 浙江天井塑业有限公司 | Rainwater collection well |
CN107882164A (en) * | 2017-12-21 | 2018-04-06 | 鸿灌环境技术有限公司 | A kind of rainwater-collecting recovery system Prefabricated combined septic tank |
CN109469192A (en) * | 2018-12-12 | 2019-03-15 | 北京市水科学技术研究院 | A kind of universal Prefabricated combined septic tank and installation method |
-
2003
- 2003-01-17 CN CN 03235278 patent/CN2575195Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102989729A (en) * | 2012-10-17 | 2013-03-27 | 刘安民 | Underwater dust collection pad |
CN104895178A (en) * | 2015-06-18 | 2015-09-09 | 浙江天井塑业有限公司 | Rainwater collection well |
CN104895178B (en) * | 2015-06-18 | 2017-02-15 | 浙江天井塑业有限公司 | Rainwater collection well |
CN107882164A (en) * | 2017-12-21 | 2018-04-06 | 鸿灌环境技术有限公司 | A kind of rainwater-collecting recovery system Prefabricated combined septic tank |
CN109469192A (en) * | 2018-12-12 | 2019-03-15 | 北京市水科学技术研究院 | A kind of universal Prefabricated combined septic tank and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108104247B (en) | Mixed flow non-concave biological detention pool with initial rainwater discarding function | |
CN209723179U (en) | A kind of rainwater utilization system for sponge city | |
CN102392487A (en) | Pollutant separation device of rainwater and sewage pipeline | |
CN207277485U (en) | Sponge city flood drainage system | |
CN2575195Y (en) | Prefabricated combined septic tank | |
CN213174118U (en) | Filterable rainwater collecting device in town road area | |
CN206385597U (en) | A kind of rainwater-collecting processing unit | |
CN208293713U (en) | A kind of roadside greening leukorrhagia seeps purification and the utilization system of rainwater | |
CN208870147U (en) | A kind of recessed greenbelt receipts water purifier of town road | |
CN208981464U (en) | A kind of commercial street sponge urban structure | |
CN204456413U (en) | Unpowered rain water drainage pollution cutting device | |
CN106746349A (en) | Contaminative early-stage rainwater treatment facility | |
CN206570904U (en) | Early-stage rainwater Prefabricated combined septic tank stage purifying device | |
CN206396858U (en) | A kind of city shunt sewage discharge apparatus | |
CN202280144U (en) | Building drainage energy-dissipation plastic inspection well | |
CN205759936U (en) | A kind of rain water on roof vertical filter unit | |
CN211228818U (en) | Concave greenbelt of town road receives water purifier | |
CN209260815U (en) | A kind of rain collector for building | |
CN209907149U (en) | Town road drainage structures | |
CN201265196Y (en) | Anti-clogging water grate | |
CN202689127U (en) | Water seal deodorization floor drain | |
CN2575194Y (en) | Sewage cleaning bag | |
CN214497803U (en) | Municipal water utilization rainwater pipe net mouth structure | |
CN219343447U (en) | Municipal works are with having filtration's inlet for stom water | |
CN212534402U (en) | Drainage structures of town road |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |