CN202280144U - Building drainage energy-dissipation plastic inspection well - Google Patents

Building drainage energy-dissipation plastic inspection well Download PDF

Info

Publication number
CN202280144U
CN202280144U CN2011202493999U CN201120249399U CN202280144U CN 202280144 U CN202280144 U CN 202280144U CN 2011202493999 U CN2011202493999 U CN 2011202493999U CN 201120249399 U CN201120249399 U CN 201120249399U CN 202280144 U CN202280144 U CN 202280144U
Authority
CN
China
Prior art keywords
inspection well
plastic inspection
drainage
building
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202493999U
Other languages
Chinese (zh)
Inventor
郝鹏
杨琦
王学良
梁葆春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Architectural Design and Research Institute Co Ltd
Original Assignee
East China Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Architectural Design and Research Institute Co Ltd filed Critical East China Architectural Design and Research Institute Co Ltd
Priority to CN2011202493999U priority Critical patent/CN202280144U/en
Application granted granted Critical
Publication of CN202280144U publication Critical patent/CN202280144U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model belongs to a building drainage energy-dissipation plastic inspection well in the technical field of drainage of building water supply and drainage. The building drainage energy-dissipation plastic inspection well comprises a plastic inspection well body, an inspection well water inlet pipe, an inspection well water outlet pipe and an indoor pressure drainage outlet pipe for the building, wherein the inspection well water inlet pipe and the inspection well water outlet pipe are connected with the lower part of the plastic inspection well body; the indoor pressure drainage outlet pipe for the building is connected with the upper part of the plastic inspection well body; an energy dissipation plate is inserted into the plastic inspection well body and is fixed; and the installation height of the energy dissipation plate can satisfy the condition that discharged water of the indoor pressure drainage outlet pipe for the building directly impacts onto the energy dissipation plate after the discharged water enters the plastic inspection well body. According to the building drainage energy-dissipation plastic inspection well provided by the utility model, building pressure drainage kinetic energy is eliminated from the inside of the inspection well, and the technical requirement of a whole drainage system is satisfied.

Description

A kind of construction drainage energy dissipating plastic inspection well
Technical field
The utility model belongs to the water discharge technology field of building plumbing system, particularly a kind of construction drainage plastic inspection well.
Background technology
The water drainage plastics manhole obtains promoting the use progressively in China.The water drainage plastics manhole has the material of saving, saves soil, advantages of saving energy and reducing emission.It combines to form drainage system with overall gutter, can prevent that sewage from permeating the ground to the pollution of environment, can prevent that rainwater from getting into drainage system and increasing the burden of Wastewater Treatment Plant.But; In the water drainage plastics manhole is used in architectural complex; Because of the brick drainage inspection well that the size of its manhole is conventional much smaller; After the pressure drainage of building got into plastic inspection well, that aqueous vapor is separated was obstructed, hydraulic pressure to manhole to wash away influence bigger, need carry out certain energy dissipating to the pressure drainage of building and handle.
The utility model content
The utility model technical problem to be solved has provided a kind of construction drainage energy dissipating plastic inspection well, eliminates the kinetic energy of building pressure drainage from manhole self inside, satisfies the technical requirements of overall drainage system.The utility model can be used for groundwater pressure gutter, siphonic roof storm system gutter etc. and inserts outdoor first the overall drainage inspection well of building.
For solving the problems of the technologies described above, the technical scheme of the utility model is:
A kind of construction drainage energy dissipating plastic inspection well; Comprise the plastic inspection well main body; The manhole water inlet pipe and the manhole outlet pipe that are connected with said plastic inspection well lower body part; The architecture indoor pressure drainage that is connected with said plastic inspection well main body top goes out the family pipe; The energy dissipating plate inserts in the said plastic inspection well main body and fixes, and after the satisfied draining that can make said architecture indoor pressure drainage go out the family pipe of the setting height(from bottom) of said energy dissipating plate gets into said plastic inspection well main body, directly impacts on the said energy dissipating plate.
After current get into the plastic inspection well main body through architecture indoor pressure drainage pipe; Again through behind the energy dissipating plate resistance retaining; The turbulent condition that forms draining reduces energy; And carry out the shunting of gas and water body effectively, draining gravity drops into the bottom of plastic inspection well main body then, comes draining through the manhole outlet pipe.
The installation of energy dissipating plate in the plastic inspection well main body can be adopted and move the plug-in type installation, also can adopt the form with the plastic inspection well global formation.The fixed installation mode can adopt any way of the prior art.
Based on technique scheme, the energy dissipating plate is the plastic plate or the metal sheet of random arrangement porous.
The beneficial effect of the utility model is: solve the problem that the building pressure drainage is impacted manhole and overall drainage system.The utility model simple installation, be easy to transformation, be easy to be extended and applied material-saving, energy-saving and environmental protection existing plastic inspection well.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is done further to describe.
Fig. 1 is the plan view of the utility model, the water (flow) direction that is designated as the manhole Inlet and outlet water of horizontal arrow among Fig. 1.
Fig. 2 is the sectional drawing of the utility model, the water (flow) direction that is designated as the manhole Inlet and outlet water of horizontal arrow among Fig. 2.
Fig. 3 is the open-cellular form of the energy dissipating plate of the utility model, and hole becomes honeycomb shape.
Fig. 4 is the open-cellular form of the energy dissipating plate of the utility model, and hole is circular.
Fig. 5 is the open-cellular form of the energy dissipating plate of the utility model, and hole is " silk cocoon " shape.
Fig. 6 is the open-cellular form of the energy dissipating plate of the utility model, and hole is a triangle.
The specific embodiment
In existing plastic inspection well main body, increase the technical measures of energy dissipating plate, the draining that the architecture indoor pressure drainage is gone out the family pipe directly impacts on the energy dissipating plate.As depicted in figs. 1 and 2: a kind of construction drainage energy dissipating plastic inspection well; Comprise plastic inspection well main body 2, the manhole water inlet pipe 3 and the manhole outlet pipe 6 that are connected with said plastic inspection well main body 2 bottoms, the architecture indoor pressure drainage that is connected with said plastic inspection well main body top goes out family pipe 4; It is interior also fixing that energy dissipating plate 1 inserts the inwall slot of said plastic inspection well main body 2; Certainly, also can adopt any fixed form of the prior art, Fig. 1 and Fig. 2 are merely a kind of signal.After the setting height(from bottom) of energy dissipating plate 1 should satisfy draining that the architecture indoor pressure drainage goes out family pipe 4 and gets into said plastic inspection well main body, directly impact on the energy dissipating plate 1.
Fig. 3 to Fig. 6 is the various forms of energy dissipating plate, can adopt multi-form energy dissipating plate according to different draining (as: rainwater, sewage, waste water etc.) water quality, thereby can prevent the obstruction in energy dissipating hole, the effect of energy dissipation of raising current.
More than scheme that the utility model embodiment is provided introduce in detail, for one of ordinary skill in the art, according to the thought of the utility model embodiment, part all can change on the specific embodiment and range of application.In sum, this description should not be construed as the restriction to the utility model, and all any changes of being made according to the utility model design philosophy are all within the protection domain of the utility model.

Claims (2)

1. construction drainage energy dissipating plastic inspection well; Comprise plastic inspection well main body (2); The manhole water inlet pipe (3) and the manhole outlet pipe (6) that are connected with said plastic inspection well main body (2) bottom; The architecture indoor pressure drainage that is connected with said plastic inspection well main body (2) top goes out family pipe (4); It is characterized in that: energy dissipating plate (1) inserts in the said plastic inspection well main body (2) and fixes, and after the satisfied draining that can make said architecture indoor pressure drainage go out family pipe (4) of the setting height(from bottom) of said energy dissipating plate (1) gets into said plastic inspection well main body (2), directly impacts on the said energy dissipating plate (1).
2. a kind of construction drainage energy dissipating plastic inspection well according to claim 1, it is characterized in that: said energy dissipating plate (1) is the plastic plate or the metal sheet of random arrangement porous.
CN2011202493999U 2011-07-15 2011-07-15 Building drainage energy-dissipation plastic inspection well Expired - Fee Related CN202280144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202493999U CN202280144U (en) 2011-07-15 2011-07-15 Building drainage energy-dissipation plastic inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202493999U CN202280144U (en) 2011-07-15 2011-07-15 Building drainage energy-dissipation plastic inspection well

Publications (1)

Publication Number Publication Date
CN202280144U true CN202280144U (en) 2012-06-20

Family

ID=46226318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202493999U Expired - Fee Related CN202280144U (en) 2011-07-15 2011-07-15 Building drainage energy-dissipation plastic inspection well

Country Status (1)

Country Link
CN (1) CN202280144U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322096A (en) * 2011-07-15 2012-01-18 华东建筑设计研究院有限公司 Building drainage energy dissipating plastic manhole
CN105040795A (en) * 2015-08-06 2015-11-11 成都迅德科技有限公司 Drop well having scouring alleviation function
CN106836449A (en) * 2017-01-10 2017-06-13 中国核电工程有限公司 A kind of gully energy dissipator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322096A (en) * 2011-07-15 2012-01-18 华东建筑设计研究院有限公司 Building drainage energy dissipating plastic manhole
CN105040795A (en) * 2015-08-06 2015-11-11 成都迅德科技有限公司 Drop well having scouring alleviation function
CN106836449A (en) * 2017-01-10 2017-06-13 中国核电工程有限公司 A kind of gully energy dissipator

Similar Documents

Publication Publication Date Title
CN201972229U (en) Residential rainwater comprehensive utilization system device
CN202280144U (en) Building drainage energy-dissipation plastic inspection well
CN102322096A (en) Building drainage energy dissipating plastic manhole
CN202380655U (en) House rainwater collecting device
CN203741704U (en) Rainwater collecting and recycling system for overpass
CN201981576U (en) Rainwater collection and utilization system for multi-floor building
CN103741766A (en) Rainwater abandoning device
CN205153098U (en) Siphon rain water discharging tube energy dissipation inspection shaft
CN201080651Y (en) Road drainage port
CN102359142A (en) Rainwater recycling system
CN204590224U (en) Integration filter purification type cuts dirty inlet for stom water
CN209323643U (en) A kind of sponge-type rain penetration discharge structure
CN202936683U (en) Environment-friendly floor tile
CN204529608U (en) Ecological wastewater processing pond
CN105113621A (en) Vertical fence mesh well lid
CN204370554U (en) A kind of greenbelt is from process formula storm detention tank
CN201924280U (en) Drainage system
CN203654439U (en) Integrated-type rainwater discarding system
CN203795512U (en) Rainwater recycling device
CN202730644U (en) Bridge with sealed water-drainage system
CN203383317U (en) Vertical rainwater pipeline with easiness of settling silt on outer side
CN203145172U (en) Anti-blocking rain sewage draining and treatment pipe
CN203498967U (en) Vacuum mobile toilet
CN207863222U (en) A kind of squelch type rainwater-collecting light-duty wooden interior wall
CN203546887U (en) Subway construction site rainwater recycling and comprehensive utilization system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120620

Termination date: 20170715

CF01 Termination of patent right due to non-payment of annual fee