CN2538839Y - Fastened steel coffer for pier foundation construction in water - Google Patents

Fastened steel coffer for pier foundation construction in water Download PDF

Info

Publication number
CN2538839Y
CN2538839Y CN 02223643 CN02223643U CN2538839Y CN 2538839 Y CN2538839 Y CN 2538839Y CN 02223643 CN02223643 CN 02223643 CN 02223643 U CN02223643 U CN 02223643U CN 2538839 Y CN2538839 Y CN 2538839Y
Authority
CN
China
Prior art keywords
steel
snap close
steel pipe
round steel
cofferdam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02223643
Other languages
Chinese (zh)
Inventor
熊建辉
孙建华
聂井华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02223643 priority Critical patent/CN2538839Y/en
Application granted granted Critical
Publication of CN2538839Y publication Critical patent/CN2538839Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a lock catch type steel cofferdam for construction of pier foundation under water, which is a split type assembly steel cofferdam. The utility model is formed by plugging and assembling a plurality of steel formworks at the job location by lock catch draw bails, wherein, the lock catch draw bail comprises a lock catch and a filling sealed tube. The lock catch is formed by covering a tapered end formed by connecting a supporting arm plate with a round steel tube into a fore shaft composed of a round steel tube slotted one side along length direction. The filling sealed tube comprises two notch structures which face to each other. The utility model has the advantages of short man-hour, low cost, convenient construction and good construction safety.

Description

Pier foundation construction bayonet type steel cofferdam in the water
Technical field:
The utility model relates to a kind of bridge construction facility, particularly Bridge Pier Construction steel cofferdam.
Background technology: the Bridge Pier Construction steel cofferdam of prior art adopts integral hoisting formula steel boxed cofferdam more, it is by steel plate, steel such as channel-section steel are welded into the casing steel cofferdam of an integral body, in the on-the-spot integral lifting of Bridge Pier Construction, sinking, need large-scale Lifting implements, equipment, therefore the construction period is long, cost is high, and poor stability.
Summary of the invention: the purpose of this utility model is to design a kind of with the monolithic steel cofferdam composition body structure steel cofferdam of assembly unit at the construction field (site) that breaks the whole up into parts, and in the hope of the reduction of erection time, reduces cost, increases working security.
Technical solution of the present utility model is a pier foundation construction bayonet type steel cofferdam in a kind of water, it is a kind of split type assembly unit steel cofferdam, it by some steel forms with the snap close draw bail at the construction field (site) the sleeve assembly unit connect and to constitute, the snap close draw bail comprises a snap close and a filling sealed tube.
Description of drawings:
Fig. 1 is the steel form elevation
Fig. 2 is the steel form vertical view
Fig. 3 is a steel form snap close draw bail cross section view, and notch configuration is a channel-section steel.
Fig. 4 is a steel form snap close draw bail cross section view, and notch configuration is an angle steel.
Fig. 5 is a steel form snap close draw bail cross section view, and notch configuration is half of pipe
Fig. 6 is a steel form snap close draw bail cross section view, and notch configuration is the steel plate billot
Figure seven is bayonet type steel cofferdam structural representation vertical views
Specific embodiment:
The bayonet type steel cofferdam use in pier foundation construction in a kind of water, and it is a kind of split type assembly unit steel cofferdam, by the snap close draw bail of some steel forms on the steel form at the construction field (site) sleeve assembly unit connection constitute.Steel form is referring to accompanying drawing 1,2, and it is by steel plate [1] and angle steel [2] and steel ribs [3] welding formation, and snap close draw bail [4] is arranged on the steel form edge.Complete is steel material.
Snap close draw bail [4] is on the commissural flange of the steel form of two adjacent connections, and referring to accompanying drawing 3, snap close draw bail [4] comprises a snap close [13] and a filling sealed tube [16]; Along the vertical assembly unit direction of steel form, two steel forms [18], [12] the edge-on rib limit [5] of a fourth type cross section is respectively arranged on the adjacent commissural flange, edge-on rib limit [5] is made of the welding of steel plate billot, the some stiffeners of edge-on rib limit [5] mat [17] connect with steel form, wherein mat stiffener [6] connection support arm plate [7] is gone up on the edge-on rib limit [5] of a steel form [18], support arm plate [7] connects tapered end round steel pipe [9], edge-on rib limit [11] the mat stiffener [8] of another piece steel form [12] connects fore shaft round steel pipe [10], fore shaft round steel pipe [10] is a round steel pipe that opening is arranged along pipe range direction sidewall, support arm plate [7] sleeve of tapered end round steel pipe [9] is gone in the opening of fore shaft round steel pipe [10], tapered end round steel pipe [9] sleeve is gone in the fore shaft round steel pipe [10], constitutes a snap close [13]; Along the vertical assembly unit direction of steel form, notch configuration [14], [15] that are welded into by channel-section steel or angle steel or half of steel pipe or steel plate bar are respectively arranged, on two adjacent steel templates [18], [12] commissural flange referring to accompanying drawing 3,4,5,6.Notch configuration [14] on two adjacent steel templates [18], [12], the recess of [15] are relative, constitute a filling sealed tube [16]].
During Bridge Pier Construction, be prefabricated into some steel forms earlier according to bridge pier shape, size, utilize original drilling platform waterborne of construction and steel casing location at the construction field (site), adopt on-the-spot split job practices, the lifting of monolithic steel form is sunk, the snap close draw bail sleeve of the steel form of adjacent connection above it is assembled into a whole steel cofferdam, injects packing matcrial sealing water blockoffs such as Guamishi concrete then in the filling sealed tube of connection place.
The advantage of fastened steel coffer for pier foundation construction is that it becomes several with the steel cofferdam split in the utility model water Independent steel form at the scene single lifting, sinking, sleeve is assembled into whole cofferdam, need not use large-scale lifting, sinking Thereby equipment can greatly reduce man-hour, can shorten half duration approximately, significantly reduce cost, and convenient construction, outstanding It increases working security.

Claims (2)

1, pier foundation construction bayonet type steel cofferdam in a kind of water, it is characterized in that it is a kind of split type assembly unit steel cofferdam, by some steel forms with the snap close draw bail at the construction field (site) the sleeve assembly unit connect and to constitute, the snap close draw bail comprises a snap close and a filling sealed tube.
2, the bayonet type steel cofferdam is used in pier foundation construction in the water according to claim 1, it is characterized in that its snap close draw bail is that the snap close draw bail comprises a snap close and a filling sealed tube on the commissural flange of the steel form of two adjacent connections; Along the vertical assembly unit direction of steel form, an edge-on rib limit is respectively arranged on two adjacent commissural flanges of steel form, wherein the edge-on rib limit mat stiffener of a template connects the support arm plate, the support arm plate connects the tapered end round steel pipe, the edge-on rib limit mat stiffener of another piece steel form connects the fore shaft round steel pipe, the fore shaft round steel pipe is a round steel pipe that opening is arranged along pipe range direction sidewall, the support wallboard sleeve of tapered end round steel pipe is gone in the opening of fore shaft round steel pipe, tapered end round steel pipe sleeve is gone in the fore shaft round steel pipe, constitutes a snap close; Along the vertical assembly unit direction of steel form, respectively there is one by channel-section steel on two adjacent steel template commissural flanges, or the notch configuration that is welded of angle steel or half of steel pipe or steel plate bar, the recess of the notch configuration on two adjacent steel templates is relative, constitutes a filling sealed tube.
CN 02223643 2002-03-22 2002-03-22 Fastened steel coffer for pier foundation construction in water Expired - Fee Related CN2538839Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02223643 CN2538839Y (en) 2002-03-22 2002-03-22 Fastened steel coffer for pier foundation construction in water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02223643 CN2538839Y (en) 2002-03-22 2002-03-22 Fastened steel coffer for pier foundation construction in water

Publications (1)

Publication Number Publication Date
CN2538839Y true CN2538839Y (en) 2003-03-05

Family

ID=33701272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02223643 Expired - Fee Related CN2538839Y (en) 2002-03-22 2002-03-22 Fastened steel coffer for pier foundation construction in water

Country Status (1)

Country Link
CN (1) CN2538839Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100489200C (en) * 2006-05-19 2009-05-20 中船第九设计研究院 Large-diameter circular steel-plate cofferdam and its construction method
CN100575618C (en) * 2007-07-30 2009-12-30 中铁十八局集团有限公司 Construction method of opening locked steel tube pilecofferdam
CN101936011A (en) * 2010-09-19 2011-01-05 路桥华南工程有限公司 Bayonet binding-type connection method of steel sleeve box blocks and construction method using same
CN101356317B (en) * 2006-07-10 2011-01-19 株式会社大宇建设 Method for constructing precast concrete pier segment having connecting structure using steel duct
CN102433888A (en) * 2011-08-25 2012-05-02 中交二航局第三工程有限公司 Assembled steel bushing box
CN102535487A (en) * 2012-02-10 2012-07-04 中铁第五勘察设计院集团有限公司 Diagonal-web-member-free fabricated steel cofferdam structure
CN103410309A (en) * 2013-08-31 2013-11-27 于光成 Concrete steel formwork
CN105401586A (en) * 2015-11-18 2016-03-16 中交第四公路工程局有限公司 Construction method for bottomless steel jacket box capable of stopping water simply

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100489200C (en) * 2006-05-19 2009-05-20 中船第九设计研究院 Large-diameter circular steel-plate cofferdam and its construction method
CN101356317B (en) * 2006-07-10 2011-01-19 株式会社大宇建设 Method for constructing precast concrete pier segment having connecting structure using steel duct
CN100575618C (en) * 2007-07-30 2009-12-30 中铁十八局集团有限公司 Construction method of opening locked steel tube pilecofferdam
CN101936011A (en) * 2010-09-19 2011-01-05 路桥华南工程有限公司 Bayonet binding-type connection method of steel sleeve box blocks and construction method using same
CN101936011B (en) * 2010-09-19 2012-08-29 路桥华南工程有限公司 Bayonet binding-type connection method of steel sleeve box blocks and construction method using same
CN102433888A (en) * 2011-08-25 2012-05-02 中交二航局第三工程有限公司 Assembled steel bushing box
CN102535487A (en) * 2012-02-10 2012-07-04 中铁第五勘察设计院集团有限公司 Diagonal-web-member-free fabricated steel cofferdam structure
CN102535487B (en) * 2012-02-10 2014-10-01 中铁第五勘察设计院集团有限公司 Diagonal-web-member-free fabricated steel cofferdam structure
CN103410309A (en) * 2013-08-31 2013-11-27 于光成 Concrete steel formwork
CN105401586A (en) * 2015-11-18 2016-03-16 中交第四公路工程局有限公司 Construction method for bottomless steel jacket box capable of stopping water simply

Similar Documents

Publication Publication Date Title
CN110130363A (en) Assembled is implanted into foundation pit enclosure stake and pile wall interaction structure and its construction method
CN201826325U (en) Foundation structure of tower crane
CN2538839Y (en) Fastened steel coffer for pier foundation construction in water
CN104988915A (en) Prefabrication and installation method of detachable steel protection tube device and underwater connection beam
CN110359476A (en) A kind of construction method of steel sheet-pile cofferdam inner support and drilled pile steel pile casting installation operation platform
CN205776157U (en) Assembled underground continuous wall
CN203334270U (en) Mountable buried type prefabricated hollow underground diaphragm wall
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN208545763U (en) A kind of steel pipe pile cofferdam for bridge deepwater foundation
CN205676882U (en) A kind of novel supporting construction
CN109930624A (en) A kind of embedding petrographic province blower foundation of offshore wind farm and construction method
CN108729457A (en) A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation
CN209923757U (en) H-shaped steel-D-shaped rubber combined pile structure
CN210117712U (en) Stirring grooving insertion type prefabricated combined box foundation structure
CN204780894U (en) Can dismantle steel protects wound packages and puts
CN213979273U (en) Two-in-one basement side wall and bottom plate joint waterproof structure
CN213328719U (en) New and old drainage box culvert connection structure
CN209293011U (en) A kind of Prefabricated composite box diaphram wall
CN114045819A (en) Construction method for steel pipe pile of threaded connection trestle
CN209723230U (en) The connecting node of steel plate combined shear wall and not equal higher baselines
CN202954578U (en) Structure for connecting tilted stair with rest platform of prefabricated assembled detachable type foundation pit ladder
CN206376251U (en) Steel plate concrete prefabricated parts and face forever and descend retaining design in combination
CN201908303U (en) Square frame-shaped steel cavity concrete cast-in-situ well sinking protecting wall
CN111395331A (en) Artificial-hole-digging rectangular-section anchoring pile assembled retaining wall and construction process thereof
CN110424408A (en) A kind of assembled PC plate stake of foundation pit enclosure structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee