CN2514003Y - Drain pipe water cooling furnace lid for steel-smelting electric furnace - Google Patents

Drain pipe water cooling furnace lid for steel-smelting electric furnace Download PDF

Info

Publication number
CN2514003Y
CN2514003Y CN 01278847 CN01278847U CN2514003Y CN 2514003 Y CN2514003 Y CN 2514003Y CN 01278847 CN01278847 CN 01278847 CN 01278847 U CN01278847 U CN 01278847U CN 2514003 Y CN2514003 Y CN 2514003Y
Authority
CN
China
Prior art keywords
water
bell
furnace cover
pipe
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01278847
Other languages
Chinese (zh)
Inventor
孙立国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Guoye Metallurgical Water-Cooled Equipment Co., Ltd.
Original Assignee
YANTAI METALLURG WATER COOLING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANTAI METALLURG WATER COOLING filed Critical YANTAI METALLURG WATER COOLING
Priority to CN 01278847 priority Critical patent/CN2514003Y/en
Application granted granted Critical
Publication of CN2514003Y publication Critical patent/CN2514003Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A tubular water-cooling furnace cover for steel-making electric furnace; the furnace cover consists of a furnace cover frame, a water-cooling block and a small furnace cover which are assembled together; the water-cooling block is mounted on the hanger of the furnace cover frame; the small furnace cover is mounted on the furnace cover frame by a dowel pin on the inner ring of the furnace frame; the water-cooling block consists of bend pipes which are closely lined together, 180 degrees and 90 degrees pipe heads which are welded together. The utility model uses a water-cooling block and the circulation water in the small furnace cover water pipe to cool the furnace cover, so that the energy consumption can be reduced; during the normal use, the service life of the utility model is up to above 1500 heats, which is more than 200 times of that of the refractory brick structured furnace covers. Adopting the separate structure, the furnace cover is convenient to be replaced and maintained, and is easy to be installed.

Description

Steel-smelting electric furnace comb water cooled cover
The utility model relates to a kind of steel-smelting electric furnace bell, belongs to metallurgical equipment.
Adopt of the bell of existing steel-smelting electric furnace built firebrick structure by laying bricks or stones more, and the shortcoming of the bell of this structure is that brickwork joint is many, and overall performance is poor, and energy consumption is big, and work-ing life is short, keeps in repair consuming time many.
The purpose of this utility model is to provide a kind of calandria water cooled cover, and this bell energy consumption is few, long service life, and replacing, easy to maintenance.
The purpose of this utility model is achieved in that the water-cooled piece is installed in by bolt on the suspension bracket of bell framework, and little bell is contained in by the tommy on the bell framework inner ring and forms bell integral body on the bell framework.The water-cooled piece is welded by bend pipe and 180 ° of elbows and 90 ° of elbows of closely being arranged in together.
Little bell is welded by bend pipe and 180 ° of elbows and 90 ° of elbows of closely being arranged in together.The bell framework is welded by outer ring, water inlet pipe, return main, return water pipe and inner ring.The two ends of water inlet pipe, return main and return water pipe are welded on respectively on outer ring and the inner ring, are welded with suspension bracket on water inlet pipe, return main and the return water pipe, are welded with hanger and water inlet manifold flange on the outer ring, are welded with tommy on the inner ring.
The utility model steel-smelting electric furnace comb water cooled cover, utilize the recirculated water cooling bell in water-cooled piece and the port lid water pipe, energy consumption is few, under normal service condition, its life-span can reach 1500 more than the heat, is more than 200 times of life-span of firebrick structure form bell.Because adopting, this bell divides body structure, replacing and easy to maintenance, and be convenient to install.
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the utility model steel-smelting electric furnace comb water cooled cover front view;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is a water-cooled piece front view of the present utility model;
Fig. 4 is a port lid front view of the present utility model;
Fig. 5 is that Fig. 4 B is to stretch-out view;
Fig. 6 is the water-cooled piece front view that has feed port and exhaust smoke hole.
Steel-smelting electric furnace comb water cooled cover is assembled by bell framework, water-cooled piece and port cover split-type structure.The outer ring 1 that the bell framework is made by weldless steel tube, water inlet pipe 2, return main 21, return water pipe 25 and inner ring 3 are welded.The two ends of water inlet pipe 2, return main 21, return water pipe 25 are welded on respectively on outer ring 1 and the inner ring 3, be welded with the water inlet manifold flange 11 that communicates with it on the outer ring 1, on the water inlet manifold flange 11, can link to each other with water pump by flexible pipe, be welded with suspension bracket 6 on water inlet pipe 2, total return water pipe 21 and the return water pipe 25, be welded with hanger 10 on the outer ring 1, be welded with the return main 21 who communicates with it on the inner ring 3, be welded with return main's flange 12 on the return main 21, can pass through on return main's flange 12.Flexible pipe is introduced cooling water flow in pond with water coolant, and water-cooled piece 9 is welded together by the bend pipe of being made by weldless steel tube 14 and 180 ° elbow 17 and 90 ° the elbow 16 that closely are arranged in together, and elbow is communicated with bend pipe, forms cooling water path.The quantity and the caliber of bend pipe 14 are decided according to the size of steel-smelting electric furnace, the caliber of water-cooled piece bend pipe 14 is generally 60-90mm, quantity is about 17, be welded with compound plate 20 on the water-cooled piece 9, screw is arranged on it, water-cooled piece 9 couples together by the suspension bracket 6 on bolt and the bell framework, and water-in 18 and water return outlet 19 are arranged on the water-cooled piece 9, utilize metallic hose respectively with the bell framework on water inlet pipe 2 and return water pipe 25 couple together.Little bell is to be welded by the bend pipe of being made by weldless steel tube 13 and 180 ° of elbows 17 and 90 ° of elbows 16 of closely being arranged in together, and the effect of elbow is to be communicated with bend pipe, and water coolant is flowed in pipe, and caliber is generally 38mm, and quantity is about 17.The good port lid 4 of welding is contained in it on the tommy 22 on bell framework inner ring 3 by the pin-and-hole on the port cage 8.It is overall that bell framework, water-cooled piece and little bell are just formed a comb water cooled cover like this.Port lid 4 is cone, is convenient to bear the weight of steel-smelting electric furnace electrode.On the port lid 4 water inlet pipe 24 and return water pipe 23 are arranged, couple together with water inlet pipe 2 and return water pipe 25 respectively with metallic hose.
The comb water cooled cover is according to the needs of applying unit, can be made up of 3,4 or 6 water-cooled pieces, and the geometricdrawing of composition is circular.Be equipped with two water-ins 18 and two water return outlets 19 on the every water-cooled piece.According to the applying unit needs, wherein there is a water-cooled piece to be provided with exhaust smoke hole 1 the 4th hole 5 and charge cavity 1 the 5th hole 7.
When using this bell, earlier flange 15 is placed on the electric furnace, utilize then hanger 10 the bell integral hoisting on flange 15, can use.
Bell is cooled like this during steel-making: the water supply hose that is connected with water pump communicates with outer ring 1 by water inlet manifold flange 11, the water that water pump is released from the cooling basin enters outer ring 1 successively, water inlet pipe 2, water coolant is entered the water inlet pipe 24 of little bell by water inlet pipe 2, enter again in the bend pipe 13, enter in the bend pipe 14 of water-cooled piece by the water-in on the water-cooled piece 9 18 simultaneously, the water coolant of little bell flows into inner ring 3 by return water pipe 23, the water coolant of water-cooled piece 9 also flows into inner ring 3, flow back in the cooling water flow in pond by the return main on the inner ring 3 21 at last, so just, formed water-flow circuit, water is taken away heat in working cycle, the cooling bell.

Claims (3)

1, a kind of steel-smelting electric furnace comb water cooled cover, it is characterized in that: bell is assembled by bell framework, water-cooled piece and little bell, water-cooled piece (9) is installed on the suspension bracket (6) of bell framework by bolt, little bell (4) is contained on the bell framework by the tommy (22) on the bell framework inner ring (3), water-cooled piece (9) by closely be arranged in together bend pipe (14) and 180 ° elbow (17) and 90 ° of elbows (16) be welded.
2, steel-smelting electric furnace comb water cooled cover according to claim 1, it is characterized in that: the bell framework is to be welded by outer ring (1), water inlet pipe (2), return main (21), return water pipe (25) and inner ring (3), water inlet pipe (2), return main (21) and return water pipe (25) two ends are welded on respectively on outer ring (1) and the inner ring (3), be welded with suspension bracket (6) on water inlet pipe (2), return main (21) and the return water pipe (25), be welded with hanger (10) and water inlet manifold flange (11) on outer ring (1).
3, steel-smelting electric furnace comb water cooled cover according to claim 1 is characterized in that: little bell (4) is to be welded with 180 ° of elbows (17) and 90 ° of elbows (16) by the bend pipe (13) that closely is arranged in together.
CN 01278847 2001-12-21 2001-12-21 Drain pipe water cooling furnace lid for steel-smelting electric furnace Expired - Fee Related CN2514003Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01278847 CN2514003Y (en) 2001-12-21 2001-12-21 Drain pipe water cooling furnace lid for steel-smelting electric furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01278847 CN2514003Y (en) 2001-12-21 2001-12-21 Drain pipe water cooling furnace lid for steel-smelting electric furnace

Publications (1)

Publication Number Publication Date
CN2514003Y true CN2514003Y (en) 2002-10-02

Family

ID=33682256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01278847 Expired - Fee Related CN2514003Y (en) 2001-12-21 2001-12-21 Drain pipe water cooling furnace lid for steel-smelting electric furnace

Country Status (1)

Country Link
CN (1) CN2514003Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103459962A (en) * 2011-03-30 2013-12-18 现代制铁株式会社 Roof for ladle furnace
CN103459961A (en) * 2011-03-30 2013-12-18 现代制铁株式会社 Roof for electric furnace
CN103555887A (en) * 2013-11-08 2014-02-05 山东西王特钢有限公司 VD (vacuum degassing) water cooling furnace cover
CN110139937A (en) * 2016-12-02 2019-08-16 特诺恩股份公司 Metallurgical furnace is converted and including the modularization metallurgical equipment of the furnace for carrying out the production molten metal especially production process of steel or cast iron
CN113091463A (en) * 2021-04-29 2021-07-09 山东钢铁集团日照有限公司 LF refining water-cooling furnace cover modularization device and combined installation method thereof
CN113913586A (en) * 2021-09-27 2022-01-11 上海宝钢铸造有限公司 Split type cast iron vacuum furnace cover

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103459962A (en) * 2011-03-30 2013-12-18 现代制铁株式会社 Roof for ladle furnace
CN103459961A (en) * 2011-03-30 2013-12-18 现代制铁株式会社 Roof for electric furnace
CN103459961B (en) * 2011-03-30 2015-10-14 现代制铁株式会社 The top cover of electric furnace
CN103459962B (en) * 2011-03-30 2016-06-01 现代制铁株式会社 The top cover of ladle furnace
CN103555887A (en) * 2013-11-08 2014-02-05 山东西王特钢有限公司 VD (vacuum degassing) water cooling furnace cover
CN110139937A (en) * 2016-12-02 2019-08-16 特诺恩股份公司 Metallurgical furnace is converted and including the modularization metallurgical equipment of the furnace for carrying out the production molten metal especially production process of steel or cast iron
US11391515B2 (en) 2016-12-02 2022-07-19 Tenova S.P.A. Convertible metallurgical furnace and modular metallurgical plant comprising said furnace for conducting production processes for the production of metals in the molten state, in particular steel or cast iron
CN113091463A (en) * 2021-04-29 2021-07-09 山东钢铁集团日照有限公司 LF refining water-cooling furnace cover modularization device and combined installation method thereof
CN113913586A (en) * 2021-09-27 2022-01-11 上海宝钢铸造有限公司 Split type cast iron vacuum furnace cover

Similar Documents

Publication Publication Date Title
US8202476B2 (en) Heat exchanger system used in steel making
CN2514003Y (en) Drain pipe water cooling furnace lid for steel-smelting electric furnace
CN110306003A (en) Cast house totally enclosed type dust excluding hood before a kind of State of Blast Furnace
CN206677177U (en) A kind of waste heat comprehensive utilization system in aluminum casting workshop
CN2160872Y (en) Water-cooling calandria furnace lid for electric steel-smelting furnace
CN2852009Y (en) External heating and blowing non-lining water-cooled cupola
CN2514288Y (en) Refining furnace cover for smelting steel
CN209524751U (en) A kind of novel energy-saving environment-friendly aluminum melting equipment
CN215766394U (en) Cupola for desulfurization and dust and waste gas treatment
CN2171830Y (en) Water cooled cupola without furnace liner
CN218846838U (en) Cupola furnace capable of recycling hot air
CN218059063U (en) Water cooling structure of blast furnace
CN212620154U (en) Regulation and control type high-strength air cooling device for bottom of iron alloy electric furnace
CN210374584U (en) Smelting device of cast steel for high-temperature-resistant cast steel piece
CN215050600U (en) Molten pool smelting furnace slag notch protection device
CN209147742U (en) Ferronickel electric furnace furnace bottom water cooling plant
CN216245473U (en) Siphon mouth device of cupola
CN207439178U (en) A kind of energy-saving middle frequency furnace for melting iron
CN215724982U (en) Slag separator of cupola furnace
CN2884104Y (en) Integrated furnace for smelting and temp.-keeping
CN212701089U (en) Spraying device for preventing sticky dust from adhering to pipeline
CN216765021U (en) Novel hot-dip galvanizing furnace bottom structure utilizing flame tail heat
CN201196527Y (en) Reflection furnace
CN210826220U (en) Energy-saving and environment-friendly device for iron-making blast furnace coal
CN2128250Y (en) Furnace mouth water tank for converter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YANTAI GUOYE METALLURGY WATER-COOLED EQUIPMENT CO

Free format text: FORMER OWNER: YANTAI METALLURGICAL WATER COOLED PART FACTORY

Effective date: 20040820

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20040820

Address after: 265500, Nanshan Road, Fushan District, Shandong, Yantai

Patentee after: Yantai Guoye Metallurgical Water-Cooled Equipment Co., Ltd.

Address before: 265500, Nanshan Road, Fushan District, Shandong, Yantai

Patentee before: Yantai Metallurgical Water Cooled Part Factory

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20021002