CN2160872Y - Water-cooling calandria furnace lid for electric steel-smelting furnace - Google Patents

Water-cooling calandria furnace lid for electric steel-smelting furnace Download PDF

Info

Publication number
CN2160872Y
CN2160872Y CN 93231460 CN93231460U CN2160872Y CN 2160872 Y CN2160872 Y CN 2160872Y CN 93231460 CN93231460 CN 93231460 CN 93231460 U CN93231460 U CN 93231460U CN 2160872 Y CN2160872 Y CN 2160872Y
Authority
CN
China
Prior art keywords
water
bell
furnace lid
welded
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93231460
Other languages
Chinese (zh)
Inventor
马恒文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANTAI PETROCHEMICAL PIPE FACTORY
Original Assignee
YANTAI PETROCHEMICAL PIPE FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANTAI PETROCHEMICAL PIPE FACTORY filed Critical YANTAI PETROCHEMICAL PIPE FACTORY
Priority to CN 93231460 priority Critical patent/CN2160872Y/en
Application granted granted Critical
Publication of CN2160872Y publication Critical patent/CN2160872Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a water-cooling calandria furnace lid for electric steel-smelting furnace. The furnace lid is composed of a furnace lid frame, a water-cooling block and a small furnace lid. The furnace lid frame is provided with a water inlet pipe, a water return pipe, a hanging rack and a hanging lug. Both the water-cooling block and the small furnace lid are welded and jointed by bending seamless steel pipes closely packed together, elbow pipes of 180 DEG and elbow pipes of 90 DEG. The utility model not only solves the problem that the marshalling refractory brick work furnace lid has poor integration performance, big energy consumption and short service life, but also has the advantages of convenient replacement, maintenance and transportation. The utility model has a service life which is more than 200 times of the refractory brick work furnace lid, which is an ideal furnace lid of the electric steel-smelting furnace.

Description

Water-cooling calandria furnace lid for electric steel-smelting furnace
The utility model relates to a kind of steel-smelting electric furnace bell, belongs to metallurgical equipment.
Adopt of the bell of existing steel-smelting electric furnace built firebrick structure by laying bricks or stones more, and the shortcoming of the bell of this structure is that brickwork joint is many, and overall performance is poor, and energy resource consumption is big, and service life is short, keeps in repair consuming time many.
The purpose of this utility model is to provide a kind of calandria water cooled cover, and this bell energy resource consumption is few, long service life, and replacing, easy to maintenance.
The purpose of this utility model is achieved in that the water-cooled piece is installed in by bolt on the suspension bracket of bell framework, and little bell is contained in by the shop bolt on the bell framework inner ring and forms bell integral body on the bell framework.The water-cooled piece is welded by bend pipe and 180 ° of elbows and 90 ° of elbows of closely being arranged in together.
Little bell is welded by bend pipe and 180 ° of elbows and 90 ° of elbows of closely being arranged in together.The bell framework is welded by outer ring, water inlet pipe, return main, return pipe and inner ring.The two ends of water inlet pipe, return main and return pipe are welded on respectively on outer ring and the inner ring, are welded with suspension bracket on water inlet pipe, return main and the return pipe, are welded with hanger and water inlet manifold flange on the outer ring, are welded with shop bolt on the inner ring.
The utility model steel-smelting electric furnace comb water cooled cover, utilize the recirculated water cooling bell in water-cooled piece and the port lid water pipe, energy resource consumption is few, under normal operating position, its life-span can reach 1500 more than the heat, be that more than 200 times of life-span of firebrick structure form bell divides body structure because this bell adopts, change and easy to maintenance and be convenient to transportation.
Description of drawings:
Fig. 1 is the utility model steel-smelting electric furnace comb water cooled cover front view;
Fig. 2 is the A-A cutaway view of Fig. 1;
Fig. 3 is a water-cooled piece front view of the present utility model;
Fig. 4 is a port lid front view of the present utility model;
Fig. 5 is that Fig. 4 B is to expanded view;
Fig. 6 is the water-cooled piece front view that has charging hole and exhaust smoke hole.
1, outer ring, 2, water inlet pipe, 3, inner ring, 4, little bell, the 5, the 4th hole, 6, suspension bracket, the 7, the 5th hole, 8, the port cage, 9, the water-cooled piece, 10, hanger, 11, the water inlet manifold flange, 12, return main's flange, 13, bend pipe, 14, bend pipe, 15, flange, 16,90 ° of elbows, 17,180 ° of elbows, 18, water inlet, 19, water return outlet, 20, compound plate, 21, the return main, 22, shop bolt, 23, return pipe, 24, water inlet pipe, 25, return pipe.
Below in conjunction with embodiment the utility model is further specified:
Steel-smelting electric furnace comb water cooled cover is assembled by bell framework, water-cooled piece and port cover split-type structure.The outer ring 1 that the bell framework is made by seamless steel pipe, water inlet pipe 2, return main 21, return pipe 25 and inner ring 3 are welded.The two ends of water inlet pipe 2, return main 21, return pipe 25 are welded on respectively on outer ring 1 and the inner ring 3, be welded with the water inlet manifold flange 11 that communicates with it on the outer ring 1, on the water inlet manifold flange 11, can connect flexible pipe links to each other with water pump, be welded with suspension bracket 6 on water inlet pipe 2, total return pipe 21 and the return pipe 25, be welded with hanger 10 on the outer ring 1, be welded with the return main 21 who communicates with it on the inner ring 3, be welded with return main's flange 12 on the return main 21, can connect flexible pipe on return main's flange 12 cooling water is introduced cooling water flow in pond.Water-cooled piece 9 is welded together by the bend pipe of being made by seamless steel pipe 14 and 180 ° elbow 17 and 90 ° the elbow 16 that closely are arranged in together, and elbow is communicated with bend pipe, forms cooling water path.The quantity and the caliber of bend pipe 14 are decided according to the size of steel-smelting electric furnace, and the caliber of water-cooled piece bend pipe 14 is generally 60-90mm, and quantity is about 17.Be welded with compound plate 20 on the water-cooled piece 9, screw is arranged on it, water-cooled piece 9 couples together by the suspension bracket 6 on bolt and the bell framework, and water inlet 18 and water return outlet 19 are arranged on the water-cooled piece 9, utilize metal hose respectively with the bell framework on water inlet pipe 2 and return pipe 25 couple together.Little bell is to be welded by the bend pipe of being made by seamless steel pipe 13 and 180 ° of elbows 17 and 90 ° of elbows 16 of closely being arranged in together, and the effect of elbow is to be communicated with bend pipe, and cooling water is flowed in pipe, and caliber is generally 38mm, and quantity is about 17.The good port lid 4 of welding is contained in it on the shop bolt 22 on bell framework inner ring 3 by the pin-and-hole on the port cage 8.It is overall that bell framework, water-cooled piece and little bell are just formed a comb water cooled cover like this.Port lid 4 is cone, is convenient to bear the weight of steel-smelting electric furnace electrode.On the port lid 4 water inlet pipe 24 and return pipe 23 are arranged, couple together with water inlet pipe 2 and return pipe 25 respectively with metal hose.
The comb water cooled cover is according to the needs of applying unit, can be made up of 3,4 or 6 water-cooled pieces, and the geometric figure of composition is circular.Be equipped with two water inlets 18 and two water return outlets 19 on the every water-cooled piece.According to the applying unit needs, wherein there is a water-cooled piece to be provided with exhaust smoke hole-Di four holes and charging aperture-Di five holes.
When using this bell, earlier flange 15 is placed on the electric furnace, utilize then hanger 10 the bell integral hoisting on flange 15, can use.
Bell is cooled like this during steel-making: the water supply hose that is connected with water pump communicates with outer ring 1 by water inlet manifold flange 11, the water that water pump is released from the cooling pond enters outer ring 1 successively, water inlet pipe 2, cooling water is entered the water inlet pipe 24 of little bell by water inlet pipe 2, enter again in the bend pipe 13, enter in the bend pipe 14 of water-cooled piece by the water inlet on the water-cooled piece 9 18 simultaneously, the cooling water of little bell flows into inner ring 3 by return pipe 23, the cooling water of water-cooled piece 9 also flows into inner ring 3, flow back in the cooling water flow in pond by the return main on the inner ring 3 21 at last, so just, formed water-flow circuit, water is taken away heat cooling bell in cyclic process.

Claims (3)

1, a kind of steel-smelting electric furnace comb water cooled cover, it is characterized in that: bell is assembled by bell framework, water-cooled piece and little bell, water-cooled piece (9) is installed on the suspension bracket (6) of bell framework by bolt, little bell (4) is contained on the bell framework by the shop bolt (22) on the bell framework inner ring (3), and water-cooled piece (9) is welded with 180 ° elbow (17) and 90 ° elbow (16) by the bend pipe (14) that closely is arranged in together.
2, steel-smelting electric furnace comb water cooled cover according to claim 1, it is characterized in that: the bell framework is to be welded by outer ring (1), water inlet pipe (2), return main (21), return pipe (25) and inner ring (3), water inlet pipe (2), return main (21) and return pipe (25) two ends are welded on respectively on outer ring (1) and the inner ring (3), be welded with suspension bracket (6) on water inlet pipe (2), return main (21) and the return pipe (25), be welded with hanger (10) and water inlet manifold flange (11) on outer ring (1).
3, steel-smelting electric furnace comb water cooled cover according to claim 1 is characterized in that: little bell (4) is to be welded with 180 ° of elbows (17) and 90 ° of elbows (16) by the bend pipe (13) that closely is arranged in together.
CN 93231460 1993-07-22 1993-07-22 Water-cooling calandria furnace lid for electric steel-smelting furnace Expired - Fee Related CN2160872Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93231460 CN2160872Y (en) 1993-07-22 1993-07-22 Water-cooling calandria furnace lid for electric steel-smelting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93231460 CN2160872Y (en) 1993-07-22 1993-07-22 Water-cooling calandria furnace lid for electric steel-smelting furnace

Publications (1)

Publication Number Publication Date
CN2160872Y true CN2160872Y (en) 1994-04-06

Family

ID=33807916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93231460 Expired - Fee Related CN2160872Y (en) 1993-07-22 1993-07-22 Water-cooling calandria furnace lid for electric steel-smelting furnace

Country Status (1)

Country Link
CN (1) CN2160872Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839628A (en) * 2010-05-31 2010-09-22 莱芜钢铁集团有限公司 Cooling device of small central furnace cover of electric arc furnace
CN101634524B (en) * 2009-05-31 2011-06-08 江苏联兴成套设备制造有限公司 Casting method of electric furnace water cooling cast steel furnace cover
CN103217011A (en) * 2013-05-14 2013-07-24 黑河阳光伟业硅材料有限公司 Energy-saving water-flow smoke hood of industrial silicon smelting furnace
CN103459962A (en) * 2011-03-30 2013-12-18 现代制铁株式会社 Roof for ladle furnace
CN108088237A (en) * 2017-11-27 2018-05-29 云南冶金新立钛业有限公司 For the furnace roof centerpiece component for the direct-current airtight electric arc furnace that titanium slag is smelted

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101634524B (en) * 2009-05-31 2011-06-08 江苏联兴成套设备制造有限公司 Casting method of electric furnace water cooling cast steel furnace cover
CN101839628A (en) * 2010-05-31 2010-09-22 莱芜钢铁集团有限公司 Cooling device of small central furnace cover of electric arc furnace
CN103459962A (en) * 2011-03-30 2013-12-18 现代制铁株式会社 Roof for ladle furnace
CN103459962B (en) * 2011-03-30 2016-06-01 现代制铁株式会社 The top cover of ladle furnace
CN103217011A (en) * 2013-05-14 2013-07-24 黑河阳光伟业硅材料有限公司 Energy-saving water-flow smoke hood of industrial silicon smelting furnace
CN108088237A (en) * 2017-11-27 2018-05-29 云南冶金新立钛业有限公司 For the furnace roof centerpiece component for the direct-current airtight electric arc furnace that titanium slag is smelted

Similar Documents

Publication Publication Date Title
CA2563035C (en) Heat exchanger system used in steel making
CN110306003A (en) Cast house totally enclosed type dust excluding hood before a kind of State of Blast Furnace
CN2160872Y (en) Water-cooling calandria furnace lid for electric steel-smelting furnace
CN2514003Y (en) Drain pipe water cooling furnace lid for steel-smelting electric furnace
CN2514288Y (en) Refining furnace cover for smelting steel
CN209524751U (en) A kind of novel energy-saving environment-friendly aluminum melting equipment
CN2217174Y (en) Fluidised bed cooling dross device
CN2148888Y (en) Streamlined coal-saving device
CN212692494U (en) Flash furnace concentrate charge door seat formula copper water jacket
CN2171830Y (en) Water cooled cupola without furnace liner
CN212701089U (en) Spraying device for preventing sticky dust from adhering to pipeline
CN2461934Y (en) Circular gap furnace base oxygen feeder for reblowing converter
CN216745497U (en) Exhaust pipeline and system of sintering kiln
CN213687818U (en) Gun body adjusting device for iron bath smelting reduction furnace
CN214065732U (en) Side-blown converter cast copper nozzle water jacket
CN2192118Y (en) Novel Conductive Electrode
CN219656582U (en) Side-blown furnace baking temperature rising and slag discharging operation sharing device
CN217210374U (en) Copper steel combination formula chute
CN210374585U (en) Alkaline smelting equipment for high alloy steel casting
CN216028045U (en) Hanging type continuous casting tundish working layer baking soaking device
CN219637244U (en) Converter mouth flue structure and converter device
CN215050600U (en) Molten pool smelting furnace slag notch protection device
CN213266643U (en) S-shaped aluminum melt furnace external online purification and filtration device
CN218120647U (en) Rotary anode furnace fire door water cooling device
CN216838040U (en) Tuyere small sleeve with embedded composite wear-resistant lining opening for blast furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee