CN2418163Y - Prestressed concrete triangular foundation pile - Google Patents
Prestressed concrete triangular foundation pile Download PDFInfo
- Publication number
- CN2418163Y CN2418163Y CN 00214249 CN00214249U CN2418163Y CN 2418163 Y CN2418163 Y CN 2418163Y CN 00214249 CN00214249 CN 00214249 CN 00214249 U CN00214249 U CN 00214249U CN 2418163 Y CN2418163 Y CN 2418163Y
- Authority
- CN
- China
- Prior art keywords
- pile body
- pile
- prestressed concrete
- foundation pile
- prestressed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a prestressed concrete triangular foundation pile, comprising a pile body with a pile toe at the lower part of the pile body, and the upper part of the pile body is provided with an opposition pile body connected with the pile body. The utility model solves the problem that the triangular foundation pile has the disadvantages of poor resistance ability, poor strength and difficult steel bar prestressing treatment, and is worthy to be popularized.
Description
The utility model relates to a kind of prestressed concrete triangle foundation pile.
At present, widely used foundation pile in China's construction work, its cross section mostly are square and circular.Building expert is thought: the bearing capacity of foundation pile and the size of its surface area have direct relation.As everyone knows, leg-of-mutton girth then is far longer than square and circular girth.To this, people just think and change existing square and circular foundation pile into triangle, but the problem that due to triangle foundation pile self shape, it exists in test, and the resistance ability is relatively poor, intensity is relatively poor, prestressed, reinforced processing is difficult has been brought many worries to every aspect for a long time.
The purpose of this utility model is for solving the technical deficiency problem, a kind of prestressed concrete triangle foundation pile is provided, and its resistance ability is stronger, and higher, the prestressed, reinforced processing of intensity is easier.
The utility model is achieved through the following technical solutions: it has the bottom to have the pile body of stake point, and coupled resistance pile body is arranged at the top of pile body.
For further realizing the purpose of this utility model, can also take following technical scheme: the cross section of pile body and resistance pile body is a triangle.The prestressed reinforcement that three distributions triangular in shape are arranged respectively in pile body and the resistance pile body.The stake pin is connected with the conical mount tip of being made up of reinforcing bar, and reinforcing bar is connected with prestressed reinforcement respectively.Stirrup twines shape in the shape of a spiral around prestressed reinforcement and reinforcing bar and connects.At least one row's steel mesh is arranged at the top of stirrup.
Advantage of the present utility model: one, reasonable in design, it is provided with the resistance pile body on the top of pile body, makes resistance ability of the present utility model improve greatly; It twines prestressed reinforcement with the stirrup spiral, makes it stressed quite even, so improved the intensity of foundation pile greatly; Link together again after conical mount and the prestressed reinforcement be made up of three reinforcing bars that it will have a pin made respectively, handled, make that in advance three main reinforcements to be carried out autofrettage very easy: two, simple in structure, easy making, with low cost, easy to use and reliable.Extensive use of the present utility model can produce good social, economic benefit.
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the B-B view of Fig. 1;
Fig. 4 is the C-C view of Fig. 1;
Fig. 5 is the D-D view of Fig. 1.
In conjunction with the embodiments the utility model is described in further detail with reference to the accompanying drawings.
Prestressed concrete triangle foundation pile of the present utility model, it has the bottom to have the pile body 4 of stake point, and coupled resistance pile body 3 is arranged at the top of pile body 4.The cross section of pile body 4 and resistance pile body 3 is a triangle.The prestressed reinforcement 5,10,11 that three distributions triangular in shape are arranged respectively in pile body and the resistance pile body.Stake pin 7 is connected with the conical mount tip of being made up of reinforcing bar 6,8,9, and reinforcing bar 6,8,9 is connected with prestressed reinforcement 5,11,10 respectively.Stirrup 2 twines shape in the shape of a spiral around prestressed reinforcement 5,10,11 and reinforcing bar 6,8,9 and connects.At least one row's steel mesh 1 is arranged at the top of stirrup 2.
During making, the stirrup of making in advance 2 is placed in the mould, prestressed reinforcement 5,11,10 is passed from stirrup 2, tensioned prestressing bar 5,11,10 then.After stretch-draw finished, the conical mount of being made up of 3 reinforcing bars 6,8,9 that will have a pin 7 placed in the mould, and was connected with presstressed reinforcing steel 5,11,10 respectively, on the top of stirrup 2 which floor steel mesh 1 was set again.After finishing above-mentioned operation, can in mould, pour into the concrete of different formulations, make bottom of the present utility model and top form pile body 4 and resistance pile body 3.
Claims (6)
1, prestressed concrete triangle foundation pile, it has the bottom to have the pile body (4) of stake point, and it is characterized in that: coupled resistance pile body (3) is arranged at the top of pile body (4).
2, prestressed concrete triangle foundation pile according to claim 1 is characterized in that: the cross section of pile body (4) and resistance pile body (3) is a triangle.
3, prestressed concrete triangle foundation pile according to claim 1 is characterized in that: prestressed reinforcement (5), (10), (11) that three distributions triangular in shape are arranged respectively in pile body (4) and the resistance pile body (3).
4, prestressed concrete triangle foundation pile according to claim 3, it is characterized in that: stake pin (7) is connected with the conical mount tip of being made up of reinforcing bar (6), (8), (9), and reinforcing bar (6), (8), (9) are connected with prestressed reinforcement (5), (11), (10) respectively.
5, according to claim 3 or 4 described prestressed concrete triangle foundation piles, it is characterized in that: stirrup (2) twines shape in the shape of a spiral and connects around prestressed reinforcement (5), (10), (11), and stirrup (12) twines shape in the shape of a spiral and connects around reinforcing bar (6), (8), (9).
6, prestressed concrete triangle foundation pile according to claim 5, it is characterized in that: at least one row's steel mesh (1) is arranged at the top of stirrup (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00214249 CN2418163Y (en) | 2000-04-19 | 2000-04-19 | Prestressed concrete triangular foundation pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00214249 CN2418163Y (en) | 2000-04-19 | 2000-04-19 | Prestressed concrete triangular foundation pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2418163Y true CN2418163Y (en) | 2001-02-07 |
Family
ID=33580384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 00214249 Expired - Fee Related CN2418163Y (en) | 2000-04-19 | 2000-04-19 | Prestressed concrete triangular foundation pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2418163Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101758556B (en) * | 2010-01-08 | 2011-06-15 | 福建省大地管桩有限公司 | Manufacturing method of concrete head-forging pipe pile with tapered pile tip |
CN102733382A (en) * | 2012-06-18 | 2012-10-17 | 上海中技桩业股份有限公司 | Post-grouting pre-tensioning method prestressed concrete hollow round-corner triangular pile |
CN102733373A (en) * | 2012-06-18 | 2012-10-17 | 上海中技桩业股份有限公司 | Post grouting concrete hollow circular corner triangular pile |
-
2000
- 2000-04-19 CN CN 00214249 patent/CN2418163Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101758556B (en) * | 2010-01-08 | 2011-06-15 | 福建省大地管桩有限公司 | Manufacturing method of concrete head-forging pipe pile with tapered pile tip |
CN102733382A (en) * | 2012-06-18 | 2012-10-17 | 上海中技桩业股份有限公司 | Post-grouting pre-tensioning method prestressed concrete hollow round-corner triangular pile |
CN102733373A (en) * | 2012-06-18 | 2012-10-17 | 上海中技桩业股份有限公司 | Post grouting concrete hollow circular corner triangular pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2876180Y (en) | Normal polygon prestressed hollow pile end plate | |
CN205999804U (en) | A kind of ruggedized construction of double curvature arched bridge | |
CN102966101A (en) | Prestressed concrete solid square pile and making method thereof | |
CN203547017U (en) | Long-span pre-stressing I-shaped steel reinforced concrete superposed beam | |
CN106626032A (en) | Integral type inner protrusion hollow uplift pile and preparation method thereof | |
CN2418163Y (en) | Prestressed concrete triangular foundation pile | |
CN205501843U (en) | Consolidate rigid framed arch bridge | |
CN110439026A (en) | A kind of assembled cantilever retaining wall and its earth-retaining construction method | |
CN203007936U (en) | Prestressed concrete solid square pile | |
CN208068511U (en) | A kind of production equipment of superimposed sheet and superimposed sheet | |
CN212129882U (en) | Prefabricated construction outrigger drawknot structure | |
CN207260375U (en) | A kind of steel plate concrete combined shear wall | |
CN206982069U (en) | A kind of steel reinforcement cage cage bar positions small fixture | |
CN209261049U (en) | Precast beam | |
CN209065269U (en) | A kind of roof purline modularization installation combined tools | |
CN102995629B (en) | Precast reinforced concrete square pile and manufacturing method thereof | |
CN209244093U (en) | Ultra-high performance concrete is without regular reinforcement Prestressed U type beam | |
CN206216889U (en) | A kind of hollow uplift pile of monoblock type internal projection | |
CN2285330Y (en) | Pre-fabricated concrete square pile tip | |
CN206815377U (en) | A kind of attachment structure of pipe gallery assembly | |
CN206408803U (en) | A kind of lift-on/lift-off type floor | |
CN206408834U (en) | Co-layer draining Beams with Large Openings | |
CN201058996Y (en) | Concrete prefabricated assembled multipurpose tower crane base counterweight | |
CN205875876U (en) | Triangle angle steel communication steel tower mast prevent wind fixing base | |
CN211572263U (en) | Simple large-thickness stirrup steel bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C57 | Notification of unclear or unknown address | ||
DD01 | Delivery of document by public notice |
Addressee: Yu Ling Document name: Notice of termination |
|
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |