CN2394886Y - Three beam three small car hoist - Google Patents
Three beam three small car hoist Download PDFInfo
- Publication number
- CN2394886Y CN2394886Y CN 99247738 CN99247738U CN2394886Y CN 2394886 Y CN2394886 Y CN 2394886Y CN 99247738 CN99247738 CN 99247738 CN 99247738 U CN99247738 U CN 99247738U CN 2394886 Y CN2394886 Y CN 2394886Y
- Authority
- CN
- China
- Prior art keywords
- dolly
- main carriage
- girder
- girders
- auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
The utility model relates to a three beam three small car hoist, which comprises three segments of main beams which can be detachable and spliced, and one side surface of one main beam is provided with an auxiliary beam which can be spliced into two segments or three segments and are also detachable and spliced; the auxiliary beam and the adjacent main beam are respectively provided with an auxiliary small car track and an auxiliary small car, the bottom table-boards of the small cars are provided with safe movable doors, and an isolated operation and various composite synchronous operations of the three small cars can be controlled by an electrical box switch. Meanwhile, a support leg can be arranged between both ends of the second main beam and wheels of a big car, and a bridge and gantry type three beam three small car hoist with variable spans can be formed. Overlength pieces with heavy weights can be hoisted by the utility model. The utility model can be formed into various types after being dismantlement and splicing and is suitable for construction yards with various thicknesses and sizes.
Description
The utility model relates to the chassis of walking on crane span structure movably or the door frame or the hoisting crane of dolly.
In recent years, needs along with the Chinese national economy development, a collection of super-huge foundation work is successively started building, as: power station, the Yangtze River Gorges, Xiao Langdi power station, the Yellow River, Wan Jiazhai power station, the Yellow River, railway Nanning-Kunming line, railway Xikang line etc., compare with engineering in the past, these engineerings have following new feature:
1, these engineerings have been introduced many external large-scale construction equipments targetedly, and these construction machinery and equipment all need on-site hoisting, dismounting, and single hanging piece of these construction machinery and equipment be Heavy Weight not only, and overlength.Original homemade single-beam, twin beams bridge-type, transfer crane can only the handling heavy mails, and can not lifting super long spare, and it can't satisfy the Assembly ﹠Disassembly of super-huge heavy, the long equipment of users at home and abroad.
2, the construction of these engineerings all has certain stage, timeliness, local workyard varies, having widely has narrowly, in order to save cost of investment, requires lifting function transition to use, the needs that are fit to different width place, single-beam in the past, twin beams bridge-type, door machine hoisting crane though have detachablely, are permanent span, can not become span, can only on the place of certain width, use.
3, these engineerings all have underground power house, tunnel, tunnel facility, need construction hoist can satisfy the inside and outside needs in hole, need to select two kinds of dissimilar hoisting cranes for use inside and outside the hole in the past, can not accomplish dual-use.
4, be the maintenance that makes things convenient for the parts of monkey, therefore be provided with dodge gate on the dolly table top, dodge gate is closed at ordinary times, when needing, open dodge gate, and around dodge gate, add interim guardrail, not only inconvenience but also dangerous of guardrail is installed like this to guarantee maintainer's personal safety.
The purpose of this utility model is: design a kind of can handling extra heavy and overlength part, can accomplish three beams, the three dolly hoisting cranes of a tractor serves several purposes again.
In order to achieve the above object, the technical solution adopted in the utility model is:
It comprises respectively by two sections two girders that detachably are spliced, a main carriage track that is parallel to each other is arranged respectively on two girders, can be at two main carriages of two main carriage interorbitals rollings, the cart roller is equipped with at the two ends of two girders respectively, and the electric box of control dolly rolling.
It also also is equipped with an auxiliary girder that detachably is spliced by two sections in a side of a girder, detachable splicing is formed at the two ends of the two ends of auxiliary girder and a girder, a secondary trolley track that is parallel to girder two main carriage tracks is respectively arranged, a secondary dolly that can on two secondary trolley tracks, move on auxiliary girder and the adjacent girder thereof.
The electric box of control trolley travelling: comprise three phase frequency changing power three AC contactor in parallel of the mouth of three-phase voltage source frequency converter, connect main carriage operation motor, another main carriage operation motor, secondary trolley travelling motor respectively; The input termination three phase worker power of three-phase voltage source frequency converter and three AC contactor in parallel with three phase worker power connect main carriage electromotor brake, another main carriage electromotor brake, secondary vehicle motor drg respectively.
Below in conjunction with accompanying drawing, provide details of the present utility model by description to embodiment.
Description of drawings:
Fig. 1 is the front view of the variable span crane in bridge type of the utility model;
Fig. 2 is the lateral plan of the variable span crane in bridge type of the utility model;
Fig. 3 is the birds-eye view of the variable span crane in bridge type of the utility model;
Fig. 4 is the front view of the variable span transfer crane of the utility model;
Fig. 5 is the lateral plan of the variable span transfer crane of the utility model;
Fig. 6 is the front view of dolly base frame face movable door structure;
Fig. 7 is the birds-eye view of dolly base frame face movable door structure;
Fig. 8 is dolly base frame face dodge gate opening figure;
Fig. 9 is the schematic circuit diagram of control trolley travelling electric box.
As Fig. 1, Fig. 2, shown in Figure 3, an auxiliary girder 5 that detachably is spliced by two sections of d, f also is housed in a side of a girder 4 of former hoisting crane, detachable splicing is formed at one side two ends of auxiliary girder 5 and side two ends of a girder 4, two secondary trolley tracks 10,11 that are parallel to girder two main carriage tracks 8,9 are respectively arranged on auxiliary girder 5 and the adjacent girder 4 thereof, a secondary dolly 3 that can move on two secondary trolley tracks 10,11 forms crane in bridge type.
As Fig. 4, shown in Figure 5, if will be assembled into transfer crane, then between the two ends of two girders 4,7 and cart roller 6, supporting leg is housed respectively.
As shown in Figure 3, intersegmental at a, the c two of two girders 4,7, splicing has two main carriage tracks and a secondary trolley track detouchable b section respectively; D, f two at an auxiliary girder 5 are intersegmental, and splicing has a secondary trolley track detouchable e section respectively, forms three beams, three dolly bridge-types, the transfer crane of variable span.
As Fig. 6, shown in Figure 7, base frame face 19 at main carriage and secondary dolly is equipped with respectively by left-hand door 20 and right door 23 dodge gates of forming, and foot guard plate 17 is equipped with in the left side of its left-hand door 20, and railing 21 is equipped with on the right side, connecting rod 15 is equipped with in the bottom, and diagonal angle of left-hand door supports with connecting rod 16; Foot guard plate 13 is equipped with on right side of its right door 23, and the junction g of left side and right door 23 is equipped with pivotally attached railing 22, and the other end that blocks bar 22 is hinged with the junction h of railing 21 1 ends of left-hand door, and diagonal angle of right door is with connecting rod 14 supports.Pulling left-hand door handle 25 and right door handle technology 26, the left-hand door 20 of dodge gate and right door 23 are opened above the base frame face of dolly around left-hand door hinge 18 and right door hinge 24 respectively, as shown in Figure 8, just form a guardrail all around this moment naturally, so that guarantee maintainer's personal safety.
As shown in Figure 9, three phase frequency changing power AC contactor K1 in parallel, K2, the K3 that comprises the mouth of three-phase voltage source frequency converter B in electric box connects the operation motor M 1 of main carriage 1, the operation motor M 2 of main carriage 2, the operation motor M 3 of secondary dolly 3 respectively; The input termination three phase worker power of three-phase voltage source frequency converter B and AC contactor K4 in parallel with three phase worker power, K5, K6 meet the electromotor brake Y2 of main carriage 1 electromotor brake Y1, main carriage 2, the electromotor brake Y3 of secondary dolly 3 respectively, the low-voltage circuit breaker on QF1 among the figure~QF7 difference circuit.
Three beams, three dolly hoisting cranes adopt PLC as the control core, and big trolley body adopts frequency control, and lifting mechanism adopts the eddy-current brake speed governing.The lifting of these hoisting crane three dollies and translation can single movements, can link in twos, also can three interlocks together.During interlock, each dolly keeps synchronously, and when stopping even there being a dolly to hinder for some reason, other dollies also stop automatically at once.
Owing to used voltage source frequency converter, frequency converter output can drag multiple electric motors.Therefore 3 vehicle motors of native system translation frequency converter traction just have seven kinds of operating modes.The selection of operating mode realizes that by the change-over swith on the operator's station these seven kinds of operating modes are respectively: 1) No. 1 main carriage action; 2) No. 2 main carriage actions; 3) No. 3 secondary dolly actions; 4) No. 1, No. 2 main carriage interlocks; 5) No. 1 main carriage, No. 3 secondary dolly interlocks; 6) No. 2 main carriages, No. 3 secondary dolly interlocks; 7) No. 1, No. 2 main carriages, No. 3 secondary dollies link together.The principle of work of these seven kinds of operating modes is tiltedly stated as follows:
(1) No. 1 main carriage action
When the change-over swith on the operator's station was got to this operating mode, contactless switch K1 connected among Fig. 9, and K2, K3 disconnect.A frequency converter B output drive motor M1.
(2) No. 2 main carriage actions
When the change-over swith on the operator's station was got to this operating mode, contactless switch K2 connected among Fig. 9, and K1, K3 disconnect.A frequency converter B output drive motor M2.
(3) No. 3 secondary dolly actions
When the change-over swith on the operator's station was got to this operating mode, contactless switch K3 connected among Fig. 9, and K1, K2 disconnect.A frequency converter B output drive motor M3.
(4) No. 1, No. 2 main carriage interlocks
When the change-over swith on the operator's station was got to this operating mode, contactless switch K1, K2 connected among 9 figure, and K3 disconnects.Frequency converter B output drive motor M1 and M2.
(5) No. 1 main carriages, No. 3 secondary dolly interlocks
When the change-over swith on the operator's station was got to this operating mode, contactless switch K1, K3 connected among Fig. 9, and K2 disconnects.Frequency converter B output drive motor M1 and M3.
(6) No. 2 main carriages, No. 3 secondary dolly interlocks
When the change-over swith on the operator's station was got to this operating mode, contactless switch K2, K3 connected among Fig. 9, and K1 disconnects.Frequency converter B output drive motor M2 and M3.
(7) No. 1, No. 2 main carriages, No. 3 countermark dollies link together
When the change-over swith on the operator's station was got to this operating mode, contactless switch K1, K2, K3 all connected among Fig. 9.Frequency converter B output drive motor M1, M2 and M3.
Because the motor speed and the reduction ratio of three dollies are identical, take from same frequency conversion voltage source signal again, so keep synchronously during interlock.If in the coordinated operation process, there is a dolly to detect fault and stops, frequency converter B output is blocked at once so, and other dollies also stop at once.
The utility model is compared with background technology, and the useful effect that has is:
1) adopt two main carriages and secondary dolly with the change-over switch of electric box can with the separate unit trolley travelling or Many the heavy and overlength parts of the various composite sync operation of dolly hoisting weight;
2) adopt the detachable crane that splices span, can satisfy the requirement of construction site width and size;
3) crane of the detachable span of employing and leg is adapted at the inside and outside needs of constructing of Tunnel, both can Make the variable span bridge crane, can make again to become the span gantry crane and use, accomplish a tractor serves several purposes;
4) dodge gate of dolly base frame face is opened rear natural form guardrail all around, during maintenance trolley, guarantees Maintenance personal's personal safety.
Claims (4)
1. beam three dolly hoisting cranes, it comprises two girders [4], [7] that detachably are spliced by [a], [c] two sections respectively, main carriage track [8], [9] that are parallel to each other are arranged respectively on two girders [4], [7], two main carriages [1], [2] that can on two main carriage tracks, move, cart roller [6] is equipped with at the two ends of two girders respectively, and the electric box of control trolley travelling, it is characterized in that:
1) auxiliary girder [5] that detachably is spliced by [d], [f] two sections also is housed in a side of a girder [4], detachable splicing is formed at one side two ends of auxiliary girder [5] and side two ends of a girder [4], auxiliary girder [5] and adjacent girder [4] Shang Geshang have one to be parallel to girder two main carriage tracks [8], the secondary trolley track [10] of [9], [11], can go up a secondary dolly [3] of operation in two secondary trolley tracks [10], [11];
2) electric box of control trolley travelling: comprise the three phase frequency changing power AC contactor K1 in parallel of the mouth of three-phase voltage source frequency converter [B], the operation motor M 3 that K2, K3 connect the operation motor M 1 of main carriage [1], the operation motor M 2 of main carriage [2], secondary dolly [3] respectively; The input termination three phase worker power of three-phase voltage source frequency converter [B] and AC contactor K4, the K5 in parallel with three phase worker power, K6 meet the electromotor brake Y3 of the electromotor brake Y1 of main carriage [1], the electromotor brake Y2 of main carriage [2], secondary dolly [3] respectively.
2. a kind of three beams, three dolly hoisting cranes according to claim 1 is characterized in that: between the two ends of two girders [4], [7] and the cart wheel [6] supporting leg [12] is housed respectively.
3. a kind of three beams, three dolly hoisting cranes according to claim 1 and 2, it is characterized in that: [a], [c] two in two girders [4], [7] are intersegmental, and splicing has two main carriage tracks and a secondary trolley track detouchable [b] section respectively; [d], [f] two at an auxiliary girder [5] are intersegmental, and splicing has a secondary trolley track detouchable [e] section respectively.
4. a kind of three beams, three dolly hoisting cranes according to claim 1 and 2, it is characterized in that: the base frame face [19] at main carriage and secondary dolly is equipped with the dodge gate of being made up of left-hand door [20] He Youmen [23] respectively, foot guard plate [17] is equipped with in the left side of its left-hand door [20], railing [21] is equipped with on the right side, connecting rod [15] is equipped with in the bottom, and diagonal angle of left-hand door supports with connecting rod [16]; Foot guard plate [13] is equipped with on the right side of its right door [23], and the junction g of left side and right door [23] is equipped with pivotally attached railing [22], and the other end that blocks bar [22] is hinged with the junction h of railing [21] one ends of left-hand door, and diagonal angle of right door is with connecting rod [14] support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99247738 CN2394886Y (en) | 1999-11-19 | 1999-11-19 | Three beam three small car hoist |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99247738 CN2394886Y (en) | 1999-11-19 | 1999-11-19 | Three beam three small car hoist |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2394886Y true CN2394886Y (en) | 2000-09-06 |
Family
ID=34033108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 99247738 Expired - Fee Related CN2394886Y (en) | 1999-11-19 | 1999-11-19 | Three beam three small car hoist |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2394886Y (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100425521C (en) * | 2005-08-03 | 2008-10-15 | 上海永致机电设备有限公司 | Jacking type large gantry crane |
CN100460305C (en) * | 2003-08-27 | 2009-02-11 | 上海振华港口机械(集团)股份有限公司 | Roil type bitrolley gantry container hoister |
CN101962154A (en) * | 2010-09-27 | 2011-02-02 | 中国科学院国家天文台 | Adjustment locking mechanism for spatial attitude of suspended type large-scale member |
CN102491180A (en) * | 2011-11-25 | 2012-06-13 | 河南华东工控技术有限公司 | Group control hoisting multipoint positioning control system |
CN105110200A (en) * | 2015-09-23 | 2015-12-02 | 湖南中铁五新重工有限公司 | Three-beam double-trolley rail type container portal crane |
CN105984821A (en) * | 2015-03-02 | 2016-10-05 | 上海电气风电设备有限公司 | Hoisting device used according to needs and used in wind power unit cabin |
CN106744348A (en) * | 2016-12-13 | 2017-05-31 | 王志伟 | One kind carries asymmetry supporting leg Novel lightweight gantry crane |
CN107215783A (en) * | 2017-07-20 | 2017-09-29 | 无锡石油化工起重机有限公司 | The gantry crane of standby suspender is installed |
-
1999
- 1999-11-19 CN CN 99247738 patent/CN2394886Y/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100460305C (en) * | 2003-08-27 | 2009-02-11 | 上海振华港口机械(集团)股份有限公司 | Roil type bitrolley gantry container hoister |
CN100425521C (en) * | 2005-08-03 | 2008-10-15 | 上海永致机电设备有限公司 | Jacking type large gantry crane |
CN101962154A (en) * | 2010-09-27 | 2011-02-02 | 中国科学院国家天文台 | Adjustment locking mechanism for spatial attitude of suspended type large-scale member |
CN101962154B (en) * | 2010-09-27 | 2012-07-25 | 中国科学院国家天文台 | Adjustment locking mechanism for spatial attitude of suspended type large-scale member |
CN102491180A (en) * | 2011-11-25 | 2012-06-13 | 河南华东工控技术有限公司 | Group control hoisting multipoint positioning control system |
CN102491180B (en) * | 2011-11-25 | 2013-10-23 | 河南华东工控技术有限公司 | Group control hoisting multipoint positioning control system |
CN105984821A (en) * | 2015-03-02 | 2016-10-05 | 上海电气风电设备有限公司 | Hoisting device used according to needs and used in wind power unit cabin |
CN105110200A (en) * | 2015-09-23 | 2015-12-02 | 湖南中铁五新重工有限公司 | Three-beam double-trolley rail type container portal crane |
CN105110200B (en) * | 2015-09-23 | 2017-03-15 | 湖南中铁五新重工有限公司 | A kind of three beam double trolley rail-mounted gantry container cranes |
CN106744348A (en) * | 2016-12-13 | 2017-05-31 | 王志伟 | One kind carries asymmetry supporting leg Novel lightweight gantry crane |
CN107215783A (en) * | 2017-07-20 | 2017-09-29 | 无锡石油化工起重机有限公司 | The gantry crane of standby suspender is installed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108978484A (en) | A kind of curved bridge steel box-girder sliding method assembling and construction method | |
CN2394886Y (en) | Three beam three small car hoist | |
CN110137857B (en) | Vehicle-mounted rotatable stretching type electric power crossing frame | |
CN102051860A (en) | Bridge erecting and track laying machine for railway | |
CN201209083Y (en) | Folding gantry crane | |
CN111206784A (en) | Construction platform of unloading | |
CN2652990Y (en) | Bidirectional bridge girder erection machine | |
CN108842612B (en) | Bridge operation platform car | |
CN207877135U (en) | A kind of wheel-track type girder gantry crane | |
CN202337650U (en) | Dual-beam bridge type crane | |
CN110924310B (en) | Adjustable movable lifting device on girder transporting bridge and opposite-pulling portal tunnel crossing construction method | |
CN206255769U (en) | A kind of driving for overturning die cap | |
CN217388054U (en) | Bridge cable laying trolley | |
CN217072831U (en) | Self-positioning and walking template moving trolley for prefabricating hollow pier stud | |
CN114498445B (en) | Bridge cable laying trolley | |
CN114934449A (en) | Assembled bridge segment assembling continuous beam bridge erecting machine | |
CN201933411U (en) | Railway erecting-paving machine | |
CN211004232U (en) | Hanging beam crane with floor function | |
CN214141300U (en) | Special double-beam bridge crane for metallurgy | |
CN211524104U (en) | Novel bridge girder erection machine | |
CN210710412U (en) | Device is striden in driving | |
CN211420893U (en) | Rapid via hole bridge erecting machine | |
CN210066384U (en) | Urban rail scattered paving method mechanical construction equipment | |
CN206956696U (en) | A kind of light-duty mould bases support system of adjustable steel box-girder | |
CN201334310Y (en) | Superhigh large-span light gate-type crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |