CN2364077Y CN 99237266 CN99237266U CN2364077Y CN 2364077 Y CN2364077 Y CN 2364077Y CN 99237266 CN99237266 CN 99237266 CN 99237266 U CN99237266 U CN 99237266U CN 2364077 Y CN2364077 Y CN 2364077Y
Authority
CN
China
Prior art keywords
girder
nose
utility
model
nose girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 99237266
Other languages
Chinese (zh)
Inventor
郭文魁
张志华
刘学斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU DAFANG INDUSTRY Co Ltd
Original Assignee
ZHENGZHOU DAFANG INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU DAFANG INDUSTRY Co Ltd filed Critical ZHENGZHOU DAFANG INDUSTRY Co Ltd
Priority to CN 99237266 priority Critical patent/CN2364077Y/en
Application granted granted Critical
Publication of CN2364077Y publication Critical patent/CN2364077Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridging machine, comprising a main girder (1), a lifting trolley (3) positioned above the main girder, a front, a middle and a rear supporting legs (7) (8) (9) with running gears and arranged under the main girder and a transition idler roller (4). The inner of the abdominal cavity of the main beam (1) is provided with a nose girder (5) with a front supporting leg (6) and a nose girder draw gear (2) for driving the nose girder (5) to do front and rear displacement. The utility model has the advantages of short main girder, low cost and convenience for installation and disassembly, is suitable for building bending (oblique) bridges, and provides facility for lateral displacement at the time of erecting bridges.

Description

A kind of bridge formation machine
The utility model relates to a kind of bridge formation machine that is used to set up concrete prefabricated beam class bridge.
Existing bridge formation machine mainly comprises girder, is positioned at the lifting dolly of girder top, and be arranged on the girder below have running gear before, during and after supporting leg.The course of work of its unloaded reach is as follows: at first pack up front leg strut (this moment, the girder front end was in full cantilever position), in the utilization, the rear support leg running gear drives the reach of whole bridge formation machine, till moving on the bent cap of striding bridge pier before front leg strut can be placed on, can carry out setting up of next Kong Liang afterwards.Because being the whole displacement by girder, the zero load of above-mentioned bridge formation machine reach realizes, at the long enough (girder length generally is about 2.2 times of bridge span) that just certainly will make that the girder of bridge formation machine is made, to satisfy the needs of displacement balance, in the increase that also just must cause the whole cost of bridge formation machine, also strengthened the workload of installation, transportation, dismounting simultaneously.
The purpose of this utility model provides a kind of structure more scientific and reasonable bridge formation machine with regard to being to overcome above-mentioned weak point of the prior art.
The purpose of this utility model can take following measure to realize:
The purpose of this utility model bridge formation machine comprises girder, be positioned at the lifting dolly of girder top, and be arranged on girder below have running gear before, during and after supporting leg and transition carrying roller, the intraperitoneal of girder be provided with one have before a nose girder that moves back, and be used to drive the nose girder draw-gear that nose girder is done forward and backward displacement.
Girder short (be about bridge span 1.4 times), cost are low except that having compared to existing technology for the utility model, the advantage of installation, transportation, convenient disassembly, also have and be applicable to and build curved (tiltedly) bridge, and the facilitate advantage of condition of the lateral displacement during for bridge formation.
Accompanying drawing is a front view of the present utility model.
The utility model is done with detailed description below with reference to embodiment (accompanying drawing):
Bridge formation machine of the present utility model comprises girder (1), what be positioned at girder top is used to lift by crane concrete prefabricated beam lifting dolly (3), and be arranged on girder below have running gear before, during and after supporting leg (7) (8) (9) and transition carrying roller (4), be provided with one at the intraperitoneal of girder (1) and move back the nose girder (5) of (6) before having, and be used to drive nose girder (5) is done forward and backward displacement along the guiding mechanism of girder (1) intraperitoneal setting nose girder draw-gear (2).
Bridge formation machine unloaded operation process of the present utility model is as follows:
During bridge formation machine zero load reach, at first driving nose girder by the nose girder draw-gear moves forward with cantilever position, after moving on the bent cap of striding bridge pier before front leg strut can be placed on, with nose girder supporting leg and the bent cap anchoring of before striding on the bridge pier, rely on support and the guide slide of nose girder afterwards as girder, in girder, under the driving of rear support leg running gear, move forward, move to the work of to set a roof beam in place after (surpassing the bent cap center line) on the bent cap of striding bridge pier before the girder front leg strut can be placed on.

Claims (1)

1, a kind of bridge formation machine, it comprises girder (1), be positioned at the lifting dolly (3) of girder top, and be arranged on girder below have running gear before, during and after supporting leg (7) (8) (9) and transition carrying roller (4), it is characterized in that: be provided with one at the intraperitoneal of girder (1) and move back the nose girder (5) of (6) before having, and be used to drive the nose girder draw-gear (2) that nose girder (5) is done forward and backward displacement.
CN 99237266 1999-03-03 1999-03-03 Bridging machine Expired - Fee Related CN2364077Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99237266 CN2364077Y (en) 1999-03-03 1999-03-03 Bridging machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99237266 CN2364077Y (en) 1999-03-03 1999-03-03 Bridging machine

Publications (1)

Publication Number Publication Date
CN2364077Y true CN2364077Y (en) 2000-02-16

Family

ID=34024944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99237266 Expired - Fee Related CN2364077Y (en) 1999-03-03 1999-03-03 Bridging machine

Country Status (1)

Country Link
CN (1) CN2364077Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886369A (en) * 2010-07-06 2010-11-17 中建八局基础设施建设有限公司 Beam erecting method
CN104631334A (en) * 2014-12-23 2015-05-20 郑州新大方重工科技有限公司 Novel middle supporting device of large-tonnage bridge girder erection machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886369A (en) * 2010-07-06 2010-11-17 中建八局基础设施建设有限公司 Beam erecting method
CN101886369B (en) * 2010-07-06 2012-11-07 中建八局基础设施建设有限公司 Beam erecting method
CN104631334A (en) * 2014-12-23 2015-05-20 郑州新大方重工科技有限公司 Novel middle supporting device of large-tonnage bridge girder erection machine

Similar Documents

Publication Publication Date Title
CN108330842A (en) A kind of Bridge Erector and construction method of large span steel reinforced concrete combination beam erection construction
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN208996741U (en) A kind of included track laying device of tunnel lining trolley
CN110820602A (en) Single-segment box girder bridge girder erection machine and operation method thereof
CN101929126B (en) Self-help hoisting mechanism of low-position cantilever walking type bridge erection machine
CN201786002U (en) Sliding jig for construction of large-span steel structure
CN2364077Y (en) Bridging machine
CN111894278A (en) Material lifting device for building construction
CN207714163U (en) A kind of combined type Hanging Basket
CN210766431U (en) Steel arch rib pushing system
CN201526014U (en) Internal cable-stayed bailey cradle
CN202415024U (en) Crane capable of climbing over beam-arch, climbing up slope and climbing down slope
CN201351052Y (en) Centralized drive-type caldron-vehicle ferry push vehicle
CN109930496A (en) The segment Cantilever Construction Method of Wavelike steel webplate prestressed concrete combined box beam bridge
CN2291401Y (en) Single-rail gantry crane
CN214516739U (en) Steel bar paying-off guide device for cold-rolled steel bar
CN2253370Y (en) Electric form-lifting construction equipment for chimney
CN209477152U (en) A kind of construction site steel bar bending apparatus
CN203546622U (en) Folding-turning retractable type cantilever beam system of lower guide beam walking type bridge girder erection machine
CN209100047U (en) A kind of multifunctional tunnel construction platform frame
CN217924744U (en) Rail type construction frame body suitable for multi-storey building structure
CN215801072U (en) Trackless walking hanging basket
CN201614550U (en) 3000DWT bridge-erecting machine for full-span erection of steel truss bridge used for both double-layer four-track highway and railway
CN211446609U (en) Steel-concrete beam bridge erecting machine
CN212388374U (en) Cast-in-place box girder steel reinforcement framework integral installation equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee