CN2333687Y - Climbing mechanism for internal climbing tower crane - Google Patents
Climbing mechanism for internal climbing tower crane Download PDFInfo
- Publication number
- CN2333687Y CN2333687Y CN 98228957 CN98228957U CN2333687Y CN 2333687 Y CN2333687 Y CN 2333687Y CN 98228957 CN98228957 CN 98228957 CN 98228957 U CN98228957 U CN 98228957U CN 2333687 Y CN2333687 Y CN 2333687Y
- Authority
- CN
- China
- Prior art keywords
- climbing
- internal
- frame
- tower
- tower crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to a climbing mechanism for an internal climbing tower type crane, which is composed of an internal climbing jacket frame, a hydraulic pressure lifting mechanism, a cross rail and an internal climbing base, wherein the internal climbing jacket frame is in a frame type structure of which both sides are provided with climbing stairs. The whole body is sheathed on a tower body which is arranged in a lift well of a building. The utility model is characterized in that a climbing stair connecting plate is welded on two straight rails of the internal climbing jacket frame in a Y shape; the four corners of the internal climbing jacket frame are provided with guide wheels, the lower part is provided with an internal climbing guide frame, and the guide wheels and the internal climbing guide frame are connected into a frame body through angle steel; the four sides of the internal climbing jacket frame and the four sides of the internal climbing guide frame are separately provided with adjusting nuts and adjustable supporting rods. The lifting mechanism makes lifting stable for a tower crane, has good integral strength and improves the use efficiency and safety of an internal climbing tower crane.
Description
The utility model relates to the climbing device of tower crane auxiliary device, particularly a kind of internal-climbing tower crane.
Existing internal-climbing tower crane is divided into side jacking and two kinds of patterns of central jacking, adopt the tower machine of side jacking, climb in every once need successively upstairs to remove Hydraulic Station, hydraulic ram, in climb framework and bearing beam, not only labor strength is big, and the dismounting trouble, time-consuming.Need not move Hydraulic Station and hydraulic ram though adopt the tower machine of central jacking, but still climb framework, bearing beam and cat ladder in needing to remove in the dismounting, in order to climb framework and bearing beam in installing, often to do specific (special) requirements to the design and construction of elevator, both waste materials, increase cost again, so that have influence on promoting the use of of internal-climbing tower crane.
The applicant once proposed the patent application of a kind of " internal-climbing tower crane ", the patent No.: 96232555.4, this machine partly is made up of body of the tower, tower cap, crane arm, equilibrium arm and hydraulic lifting mechanism etc., feature is to be set with inner climbing jacket frame on body of the tower, the body of the tower bottom is an internal climbing foundation, is set with telescopic girder in the square tube straight beam of inner climbing jacket frame and base, and telescopic girder sets aside in the pre-buried can that is located at hoistway wall, cat ladder is established in the stock both sides, establishes in the body of the tower to promote the inner climbing jacket frame twin drum winch.
This internal-climbing tower crane has replaced with an inner climbing jacket frame climbing framework in three of routine techniques, with light and handy cheap pre-buried can, replaced heavy bearing beam, escalator need not special designs and special construction, in get over journey and all realize mechanization, automation, the practice effect is fine.But still find to have some problems, not proper as inner climbing jacket frame and cat ladder connection mode, internally climbing tower crane stability in the process of climbing is not enough, and skew etc. takes place in body of the tower easily, need further improve.
The purpose of this utility model is exactly on the basis of existing technology, problem at its existence, improve, develop a kind of new internal-climbing tower crane climbing device, the advantage in order to further bringing into play internally climbing tower crane makes it to be more widely used in high-building construction.
The purpose of this utility model is achieved through the following technical solutions:
A kind of internal-climbing tower crane climbing device, form by inner climbing jacket frame, hydraulic lifting mechanism, crossbeam, internal climbing foundation, inner climbing jacket frame is a tower structure, both sides are provided with cat ladder, integral assembling is on body of the tower, body of the tower places in the elevator of building, it is characterized in that: the cat ladder connecting panel adopts the Y type to be welded on two straight beams of inner climbing jacket frame, four jiaos track adjusting wheel is set at inner climbing jacket frame, in being provided with, the inner climbing jacket frame bottom climbs guide frame, in climb four jiaos of guide frame and be provided with track adjusting wheel, inner climbing jacket frame and in climb guide frame four limits be respectively equipped with setting nut and adjustable strut.
Inner climbing jacket frame with in climb guide frame and be linked to be support body by angle steel, make horizontal web member at the support body middle part with angle steel and connect.
On the standard knot web member of body of the tower both sides, the cat ladder guides is installed.
Be provided with guide rail at the cross sill two ends and climb pawl.
Be provided with setting nut and adjustable strut on four limits of internal climbing foundation.
Internal-climbing tower crane climbing device according to the utility model proposes has the following advantages:
The cat ladder connecting panel former with jump weld on two ring beams of inner climbing jacket frame, now change Y shape into and be welded on two straight beams, make the gravity when climbing in the tower machine be decomposed into 4 points, and the two ends of approaching straight beam, thereby improved the force-bearing situation of extending foot by 2.The track adjusting wheel that inner climbing jacket frame is four jiaos with in climb four jiaos of guide frames track adjusting wheel cooperate, rise along straight line when can the control tower machine climbing, make the jacking pressure of hydraulic efficiency pressure system keep stable.
Inner climbing jacket frame, in climb setting nut and adjustable strut be set on guide frame and the internal climbing foundation, when climbing with inner climbing jacket frame and in climb guide frame and be fastened in the elevator, make the unlikely skew in track adjusting wheel position, controlled the squareness that the tower machine climbs effectively.The tower machine climb put in place after, hold out against body of the tower with adjustable strut, can strengthen the stability of tower machine.
3. save original twin drum winch, Hydraulic Station, hydraulic ram are installed in 7~10 meters, body of the tower middle part, can make cat ladder length by original shortening to more than 20 meters in 13 meters,, cat ladder is returned at hydraulic pressure drag unlikely flexural deformation when promoting at the local cat ladder guides of installing of body of the tower.
With inner climbing jacket frame with in climb guide frame and cat ladder is linked to be support body by angle steel, increased intensity, help hydraulic pressure integral body and return to drag to promote in the complete set and climb mechanism.
5. at the cross sill two ends guide rail is set, cross sill is to the skew of body of the tower both sides, the squareness when having guaranteed the jacking of tower machine in the time of can preventing that hydraulic pressure from climbing.
Fig. 1 is a running condition scheme drawing of the present utility model;
Fig. 2 is a cat ladder coupled condition scheme drawing;
Fig. 3 climbs the lateral plan of guide frame in being;
Fig. 4 climbs the birds-eye view of guide frame in being;
Fig. 5 be inner climbing jacket frame with in climb the scheme drawing that guide frame is linked to be support body;
Fig. 6 is the front view of cross sill;
Fig. 7 is the birds-eye view of cross sill;
Fig. 8 is adjustable pole structure scheme drawing,
Fig. 9 is the structural representation of cat ladder guides;
Figure 10 is the internal climbing foundation structural representation.
Below in conjunction with accompanying drawing the utility model is further described:
As shown in Figure 1, the internal-climbing tower crane climbing device mainly by inner climbing jacket frame 1, hydraulic lifting mechanism 3, entablatrance 2, cross sill 4, in climb guide frame 5, internal climbing foundation 6 is formed, inner climbing jacket frame is a tower structure, both sides are provided with cat ladder 19, integral assembling is on body of the tower 23, body of the tower places in the elevator 24 of building, adopts hydraulic lifting mechanism 3 to carry out jacking, and Hydraulic Station, hydraulic ram are installed in 7~10 meters, body of the tower middle part.
Fig. 2, Fig. 3, shown in Figure 4, cat ladder connecting panel 10 adopts Y shape to be welded on two straight beams of inner climbing jacket frame 1, bottom four fillet welding of two straight beams have L shaped connecting panel 9, four jiaos track adjusting wheel 7 is set at inner climbing jacket frame, in being provided with, inner climbing jacket frame 1 bottom climbs guide frame 5, in climb four jiaos of guide frame and be provided with track adjusting wheel 12, guide frame two straight beam tops, four fillet welding have L shaped connecting panel 13, inner climbing jacket frame 1 and in climb guide frame 5 four limits be respectively equipped with setting nut 8,11.Inner climbing jacket frame with in climb on the L shaped connecting panel of guide frame, connects four angle steel 14, with inner climbing jacket frame, in climb guide frame and cat ladder 19 is linked to be support body, at the support body middle part with two groups respectively four angle steel 15 make horizontal web member, the intensity of reinforcement support body.
Fig. 6, Fig. 7 illustrate the structure situation of cross sill, be provided with guide rail 16 at cross sill 4 two ends and climb pawl 22, cross sill was to the skew of body of the tower both sides when guide rail can prevent that hydraulic pressure from climbing, and the squareness when guaranteeing the jacking of tower machine is climbed pawl and is used in jacking or returns tangling the cat ladder gusset when dragging.
Fig. 8 illustrates adjustable pole structure situation, and adjustable strut 17 is made of positive and negative screw thread strut and fastener 20.Its function 1 be inner climbing jacket frame 1 and in climb in the setting nut of guide frame 5 and load onto adjustable strut and fastener, with inner climbing jacket frame and in climb guide frame and be fastened in the elevator 24, make the unlikely skew in position of track adjusting wheel, thereby track adjusting wheel and the track adjusting wheel on the inner climbing jacket frame on the guide frame are remained on the perpendicular line, controlled the squareness when the tower machine climbs effectively.Its function 2 be when the tower machine climb put in place after, be installed between body of the tower main chord and the hoistway wall with 8 struts, to strengthen the stability of tower machine.
Fig. 9 illustrates the cat ladder guides, and cat ladder guides 18 is the cassette structure, adopts on a plurality of standard knot web members that are installed in body of the tower 23 both sides, and the center hole clipping of guides is stuck on the cat ladder 19, cat ladder is returned at hydraulic pressure drag unlikely flexural deformation when promoting.
Four limits that Figure 10 is illustrated in internal climbing foundation 6 are provided with setting nut 21, load onto adjustable strut 17, are used in after the jacking of tower machine puts in place internal climbing foundation and hoistway wall to be held out against, thereby strengthen the stability of internally climbing tower crane in work progress.
Claims (5)
1. internal-climbing tower crane climbing device, by inner climbing jacket frame, hydraulic lifting mechanism, crossbeam, internal climbing foundation is formed, inner climbing jacket frame is a tower structure, both sides are provided with cat ladder, integral assembling is on body of the tower, body of the tower places in the elevator of building, it is characterized in that: cat ladder connecting panel (10) adopts Y shape to be welded on two straight beams of inner climbing jacket frame (1), four jiaos of inner climbing jacket frames track adjusting wheel (7) is set, in being provided with, inner climbing jacket frame (1) bottom climbs guide frame (5), in climb four jiaos of guide frame and be provided with track adjusting wheel (12), inner climbing jacket frame (1) and in climb guide frame (5) four limits be respectively equipped with setting nut (8,11) and adjustable strut (17).
2. internal-climbing tower crane climbing device as claimed in claim 1, it is characterized in that inner climbing jacket frame (1) with in climb guide frame (5) and be linked to be support body by angle steel (14), do horizontal web member connection at the support body middle part with angle steel (15).
3. as claim 1,2 described internal-climbing tower crane climbing devices, it is characterized in that on the standard knot web member of body of the tower both sides, being equipped with cat ladder guides (18).
4. internal-climbing tower crane climbing device as claimed in claim 3 is characterized in that being provided with guide rail (16) and climbing pawl (22) at cross sill (4) two ends.
5. internal-climbing tower crane climbing device as claimed in claim 4 is characterized in that being provided with setting nut (21) and adjustable strut on four limits of internal climbing foundation (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98228957 CN2333687Y (en) | 1998-06-03 | 1998-06-03 | Climbing mechanism for internal climbing tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98228957 CN2333687Y (en) | 1998-06-03 | 1998-06-03 | Climbing mechanism for internal climbing tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2333687Y true CN2333687Y (en) | 1999-08-18 |
Family
ID=33978951
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 98228957 Expired - Fee Related CN2333687Y (en) | 1998-06-03 | 1998-06-03 | Climbing mechanism for internal climbing tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2333687Y (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012116537A1 (en) * | 2011-03-02 | 2012-09-07 | 长沙中联重工科技发展股份有限公司 | Lifting structure of tower crane, hydraulic system of lifting structure, and lifting method |
CN103274316A (en) * | 2013-06-18 | 2013-09-04 | 山东丰汇设备技术有限公司 | Climbing belt side hang type jacking device |
CN103303823A (en) * | 2013-06-13 | 2013-09-18 | 山东丰汇设备技术有限公司 | Supporting structure of internal climbing tower crane |
CN106542444A (en) * | 2016-11-10 | 2017-03-29 | 四川宇盛智创科技有限公司 | A kind of moment of flexure reduction structure set up in tower body revolution |
CN107043072A (en) * | 2017-02-07 | 2017-08-15 | 中建三局集团有限公司 | Exempt from the integration of falling beam inner climbing crane tower support meanss and implementation |
CN108775196A (en) * | 2018-08-14 | 2018-11-09 | 国网江苏省电力有限公司 | Lifting and self-climbing combined mechanism for erecting power transmission tower |
CN109179224A (en) * | 2018-10-14 | 2019-01-11 | 张家港市天运建筑机械有限公司 | A kind of secondary safety applied to derrick crane internal platform entrance |
CN110905188A (en) * | 2019-12-05 | 2020-03-24 | 荆门市佰思机械科技有限公司 | External-open internal-sliding type climbing formwork device lifted by tower crane body |
-
1998
- 1998-06-03 CN CN 98228957 patent/CN2333687Y/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012116537A1 (en) * | 2011-03-02 | 2012-09-07 | 长沙中联重工科技发展股份有限公司 | Lifting structure of tower crane, hydraulic system of lifting structure, and lifting method |
CN103303823A (en) * | 2013-06-13 | 2013-09-18 | 山东丰汇设备技术有限公司 | Supporting structure of internal climbing tower crane |
CN103274316A (en) * | 2013-06-18 | 2013-09-04 | 山东丰汇设备技术有限公司 | Climbing belt side hang type jacking device |
CN103274316B (en) * | 2013-06-18 | 2015-03-25 | 山东丰汇设备技术有限公司 | Climbing belt side hang type jacking device |
CN106542444A (en) * | 2016-11-10 | 2017-03-29 | 四川宇盛智创科技有限公司 | A kind of moment of flexure reduction structure set up in tower body revolution |
CN107043072A (en) * | 2017-02-07 | 2017-08-15 | 中建三局集团有限公司 | Exempt from the integration of falling beam inner climbing crane tower support meanss and implementation |
CN108775196A (en) * | 2018-08-14 | 2018-11-09 | 国网江苏省电力有限公司 | Lifting and self-climbing combined mechanism for erecting power transmission tower |
CN109179224A (en) * | 2018-10-14 | 2019-01-11 | 张家港市天运建筑机械有限公司 | A kind of secondary safety applied to derrick crane internal platform entrance |
CN109179224B (en) * | 2018-10-14 | 2023-12-01 | 张家港市天运建筑机械有限公司 | Be applied to auxiliary safety mechanism of tower crane inside platform access & exit |
CN110905188A (en) * | 2019-12-05 | 2020-03-24 | 荆门市佰思机械科技有限公司 | External-open internal-sliding type climbing formwork device lifted by tower crane body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2333687Y (en) | Climbing mechanism for internal climbing tower crane | |
CN2679123Y (en) | Internally creeping tower crane | |
CN110685227A (en) | Construction method of formwork support system of obstacle-crossing wide-width swivel bridge closure segment hanging bracket method | |
CN212669031U (en) | Novel split type jib loading boom of tower machine | |
CN211846934U (en) | Tower-free construction crane for arch bridge | |
CN217480772U (en) | Overhanging type dismounting and attaching type lifting scaffold construction device | |
CN212582675U (en) | Walking pile driver | |
CN115535846A (en) | Special-shaped shipbuilding bridge crane main beam | |
CN2466126Y (en) | Self-lifting internal creeping lifting-up system | |
CN219384698U (en) | Novel movable operation platform for bridge reinforcement and maintenance | |
CN215047861U (en) | Construction elevator sedan-chair frame assembly structure with adjustable width | |
CN207244453U (en) | A kind of suspension bridge light anchorage mast apparatus | |
CN223087459U (en) | A mobile maintenance platform for single-beam crane | |
CN219637681U (en) | Hanging platform type beam bottom overhauling device | |
CN214270008U (en) | Hand power hoist transmission shaft reinforcing system | |
CN213804901U (en) | Bent cap tensioning platform convenient to remove and operation | |
CN204551271U (en) | A kind of reinforcement type Hanging Basket | |
CN221989121U (en) | Operating platform for assisting bridge girder erection machine in installing steel box girder | |
CN215164722U (en) | A construction platform for steel landing stage superstructure installation | |
CN215801070U (en) | Open bridge hoist and mount track platform | |
CN218454347U (en) | Permanent maintenance platform of public road bridge roof beam support of transition mound | |
CN217974288U (en) | Ship lock chamber wall construction movable formwork with pedestrian passageway | |
CN220013417U (en) | Safe operation platform of cast-in-situ box Liang Xuantiao of continuous rigid frame hanging basket cantilever | |
CN218345010U (en) | Special-shaped shipbuilding bridge crane main beam | |
CN217975328U (en) | Climbing frame upper and lower hoisting point truss assembly capable of being provided with auxiliary vertical rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C57 | Notification of unclear or unknown address | ||
DD01 | Delivery of document by public notice |
Addressee: Hu Jianfeng Document name: Notification of Termination of Patent Right |
|
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |