CN2333108Y - Large span cable bridge rack - Google Patents

Large span cable bridge rack Download PDF

Info

Publication number
CN2333108Y
CN2333108Y CN 97233118 CN97233118U CN2333108Y CN 2333108 Y CN2333108 Y CN 2333108Y CN 97233118 CN97233118 CN 97233118 CN 97233118 U CN97233118 U CN 97233118U CN 2333108 Y CN2333108 Y CN 2333108Y
Authority
CN
China
Prior art keywords
cable
large span
pull bar
drag
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 97233118
Other languages
Chinese (zh)
Inventor
冀延君
单翔年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97233118 priority Critical patent/CN2333108Y/en
Application granted granted Critical
Publication of CN2333108Y publication Critical patent/CN2333108Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a technical proposal of a large span cable bridge rack which can enlarge the hoisting span of cables. The utility model is characterized in that the utility model has two upright posts, one or two drag rope or draw rod is arranged between the two upright posts, the drag rope or the draw rod is provided with a plurality of slings or supporting rods which are respectively connected with respective hanging frames which are passed through by a bridge rack used for loading cables.

Description

The large span cable testing bridge
The utility model relates to a kind of cable hanging apparatus, especially for increasing the device that cable lifts a kind of large span cable testing bridge of span.
At present, the lifting of cable all is by upright supports, and mostly the cable lifting for needing large span is to adopt the method that increases column.So, the applicant has applied for patent No. 97206245.9 to Patent Office of the People's Republic of China, this patent is exactly a kind of technical scheme that increases cable lifting span, what adopt is the structure of approximate wire bridge, though this structure can improve the lifting span of cable greatly, there is certain difficulty in the construction at the scene.
The purpose of this utility model is exactly at existing difficulty in the prior art, and a kind of cable lifting span that increases is provided, by the large span cable testing bridge technical scheme of being convenient to construct.
For clearly demonstrating the technical characterstic of this programme, now by specific embodiment, and in conjunction with its accompanying drawing, the technical characterictic of this programme is described in detail.
Description of drawings;
Fig. 1 is a kind of example structure schematic diagram of using drag-line and hoist cable on crane span structure of the utility model;
Fig. 2 is a kind of example structure schematic diagram of using epirelief pull bar and hoist cable on crane span structure of the utility model;
Fig. 3 is a kind of example structure schematic diagram of using epirelief pull bar and pole under crane span structure of the utility model;
Fig. 4 be the utility model a kind of under crane span structure with the example structure schematic diagram of recessed pull bar and pole;
Fig. 5 is that Figure 1A-A is to analysing and observe the schematic diagram that adopts a drag-line;
Fig. 6 is that Figure 1A-A is to analysing and observe the schematic diagram that adopts two drag-lines;
Fig. 7 is that Fig. 3 B-B is to analysing and observe the schematic diagram that adopts a pull bar;
Fig. 8 is that Fig. 3 B-B is to analysing and observe the schematic diagram that adopts two pull bars.
As can be seen from Figure, this large span cable testing bridge has two columns 5, one to two drag-line or pull bar 3 are arranged between two columns 5, then have a plurality of hoist cables or pole 4 connecting separately hanging box 2 respectively on drag-line or pull bar 3, the crane span structure 1 that is used to load cable just passes in hanging box 2.As shown in Figure 1 be a kind of on crane span structure 1, with drag-line 3 in 5 connections of two columns, 3 one-tenth suspension cable shapes of drag-line, tight knot 7 is equipped with in order to adjust sag in two ends, the hoist cable 4 of several band tight knots 7 is housed on drag-line 3, and the lower end of hoist cable 4 is connected with hanging box 2, is lifting crane span structure 1 in the hanging box 2.Drag-line 3 can be one as shown in Figure 5, also can be two as shown in Figure 6.Fig. 2 then is on crane span structure 1, the pull bar 3 of making epirelief with steel pipe or channel-section steel connects between two columns 5, and the hoist cable 4 of several band tight knots 7 is housed on pull bar 3, and the lower end of hoist cable 4 is connected with hanging box 2, lifting crane span structure 1 in the hanging box 2, this pull bar 3 also can be with one or two.Fig. 3 represent below crane span structure 1, the pull bar 3 of making epirelief with steel pipe or channel-section steel connects between two columns 5, and several poles 4 are housed on pull bar 3, the last top of pole 4 is connected with hanging box 2, lifting crane span structure 1 in the hanging box 2, this pull bar 3 also can with one as Fig. 7, or two as Fig. 8.Fig. 4 represent then below crane span structure 1, make recessed pull bar 3 with steel pipe or channel-section steel and be connected between two columns 5, several poles 4 are housed on pull bar 3, the last top of pole 4 is connected with hanging box 2, lifting crane span structure 1 in the hanging box 2, this pull bar 3 also can be with one or two.In above-mentioned various forms of drag-lines or pull bar 3, the distance between described two hanging boxes 2 is less than or equals 6 meters.In addition, assisted suspension cable 6 also is housed, on every heel post 5, can adorns one to four assisted suspension cable 6, and on every assisted suspension cable 6 tight knot 7 is housed all at crane span structure 1 and 5 on column.
By such scheme as can be seen, between two columns, be connected with the drag-line or the pull bar of recessed or epirelief, hoist cable or pole are housed on drag-line or pull bar, hoist cable or pole lift or prop up and adorning hanging box, the crane span structure that cable is housed is just supported by hanging box, this just can add large span as suspension bridge and Gong Qiao, so realize the crane cable of large span.When installing at the scene,, can reduce a large amount of adjustment work, on-the-spot just the installation more easily gone owing to be mostly prefabricated component.This shows that the utility model has substantive distinguishing features and progress than prior art, its effect also is conspicuous.

Claims (4)

1. large span cable testing bridge, it is characterized in that having two columns [5], one to two drag-line or pull bar [3] are arranged between two columns [5], then have a plurality of hoist cables or pole [4] connecting separately hanging box [2] respectively on drag-line or pull bar [3], the crane span structure [1] that is used to load cable just passes in hanging box [2].
2. large span cable testing bridge according to claim 1 is characterized in that between crane span structure [1] and column [5] assisted suspension cable [6] being housed also.
3. large span cable testing bridge according to claim 2 is characterized in that all being equipped with tight knot [7] on assisted suspension cable [6].
4. large span cable testing bridge according to claim 1 is characterized in that distance between described two hanging boxes [2] is less than or equals 6 meters.
CN 97233118 1997-05-25 1997-05-25 Large span cable bridge rack Expired - Fee Related CN2333108Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97233118 CN2333108Y (en) 1997-05-25 1997-05-25 Large span cable bridge rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97233118 CN2333108Y (en) 1997-05-25 1997-05-25 Large span cable bridge rack

Publications (1)

Publication Number Publication Date
CN2333108Y true CN2333108Y (en) 1999-08-11

Family

ID=33944773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97233118 Expired - Fee Related CN2333108Y (en) 1997-05-25 1997-05-25 Large span cable bridge rack

Country Status (1)

Country Link
CN (1) CN2333108Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101227067A (en) * 2007-11-20 2008-07-23 袁义青 Extra-high voltage electric power transmission method
CN102174969A (en) * 2011-03-04 2011-09-07 中建一局华江建设有限公司 Steel wire hanging frame and construction method thereof
CN103628729A (en) * 2013-12-04 2014-03-12 国家电网公司 Road crossing strut for power grid construction
CN106786311A (en) * 2016-11-15 2017-05-31 于光成 The accessible supply lines construction system in track field
CN112962664A (en) * 2021-01-29 2021-06-15 中冶东方工程技术有限公司 Overhead cable corridor with steel pipe truss structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101227067A (en) * 2007-11-20 2008-07-23 袁义青 Extra-high voltage electric power transmission method
CN102174969A (en) * 2011-03-04 2011-09-07 中建一局华江建设有限公司 Steel wire hanging frame and construction method thereof
CN103628729A (en) * 2013-12-04 2014-03-12 国家电网公司 Road crossing strut for power grid construction
CN103628729B (en) * 2013-12-04 2015-10-28 国家电网公司 Power grid construction highway crossing support
CN106786311A (en) * 2016-11-15 2017-05-31 于光成 The accessible supply lines construction system in track field
CN112962664A (en) * 2021-01-29 2021-06-15 中冶东方工程技术有限公司 Overhead cable corridor with steel pipe truss structure

Similar Documents

Publication Publication Date Title
CN105621280B (en) The apparatus and method for mounting and dismounting crane arm
CN104631810A (en) High-altitude movable hanging basket system and construction method thereof
CN2333108Y (en) Large span cable bridge rack
CN103236656B (en) Column suspension type crossing structure and operating method thereof
CN201190443Y (en) Embraced Bar special for tower set
CN108505623A (en) A kind of overhead cable construction method suitable for flexible double rope net system
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN214575056U (en) Pull rod supporting ceiling conversion layer structure
CN202094562U (en) Suspension type synchronous hoisting system for pipe type bus
CN210139389U (en) Steel pipe stacking device
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN112554076A (en) Continuous small-stroke hanging basket bottom basket lowering device and construction method
CN204980945U (en) Supplementary tower crane dismounting device
CN214573363U (en) Cable hanging system of single-column type steel cable tower cable-stayed bridge
CN213596814U (en) Movable three-dimensional crossing type multipurpose suspension bridge construction platform
CN210184028U (en) Dragon fruit planting frame column
CN210693256U (en) Simple crossing frame
CN209872171U (en) Gantry crane with novel structure
CN202970094U (en) Guyed tower applied to transmission line project
CN219993300U (en) Large-span cable line overhead structure device
CN215669028U (en) Combined support for steel strand
CN202901531U (en) Overhead device of cables
CN2261449Y (en) Testing apparatus for static load of pile foundation
CN220704330U (en) Cable body lifting device for steel strand inhaul cable construction
CN213755925U (en) Double-stay-wire dragon fruit support frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee