CN2292856Y - Multifunctional scaffold with form - Google Patents

Multifunctional scaffold with form Download PDF

Info

Publication number
CN2292856Y
CN2292856Y CN 96209366 CN96209366U CN2292856Y CN 2292856 Y CN2292856 Y CN 2292856Y CN 96209366 CN96209366 CN 96209366 CN 96209366 U CN96209366 U CN 96209366U CN 2292856 Y CN2292856 Y CN 2292856Y
Authority
CN
China
Prior art keywords
scaffold
moulding
utility
template
carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 96209366
Other languages
Chinese (zh)
Inventor
姜德辉
姜德明
郭良俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinese Building No3 Engrg Bureau
Original Assignee
Chinese Building No3 Engrg Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinese Building No3 Engrg Bureau filed Critical Chinese Building No3 Engrg Bureau
Priority to CN 96209366 priority Critical patent/CN2292856Y/en
Application granted granted Critical
Publication of CN2292856Y publication Critical patent/CN2292856Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a multifunctional scaffold with moulding boards. The utility model comprises a scaffold, an electric elevator, a bearing beam, a heavy frame and a safety net, wherein a row of brackets which are composed of transverse levers, and inclined struts are fixedly connected to the scaffold, the moulding boards are vertically supported on the brackets, and the four corners of each of the moulding boards are connected with the scaffold by telescopic joints and can rise or descend along with the scaffold integrally and synchronously. The moulding boards do not need disassembling and assembling layer by layer, and the vertical transport of the moulding boards are reduced; therefore, the utility model has the advantages of labor saving, hoisting frequency reduction of a tower crane, avoidance of difficult moulding board disassembly and assembly, obvious acceleration of construction progress, accurate moulding board positioning, guarantee to construction quality, repeated use enhancement of the moulding boards and turnover material saving. The scaffold of the utility model can be integrally lifted.

Description

The multifunction scaffold of band template
The utility model belongs to the integral hoisting scaffold that a kind of building operations is used.
Existing integral hoisting scaffold comprises steel pipe scaffold, electric hoist equipment, load supporting system, safety net.Utilize the electric lifting device scaffold that four floors are high to carry out integral body or segmentation lifting, successively finish the major project structure construction.Each layer construction all will be transported to work plane with template with tower crane, after being in place, and the ability concreting; During form removal, also to tower crane template be transported again; The transhipment of template has influenced the progress of construction; The dismounting location of template has increased the difficulty of construction.
The purpose of this utility model provides a kind of multifunction scaffold with template, reduces the transportation of template and the difficulty of dismounting location, accelerating construction progress.
The technical solution of the utility model is:
The multifunction scaffold of band template comprises scaffold, motor hoist, bearing beam, heavy frame, safety net, it is characterized in that: fixedly connected row's carriage of forming by cross bar and diagonal brace on scaffold, template vertically is bearing on the carriage, and four jiaos of templates are connected with scaffold with scalable connector.
The cross bar of above-mentioned carriage is connected with the vertical steel pipe of scaffold, and diagonal brace one end of carriage is connected with the cross bar of carriage, and the other end is connected with scaffold.
Above-mentioned scalable connector is screw mandrel or hydraulic mandril, contraction latch.
Above-mentioned template can be steel, bamboo and wood, veneer, plastics, Steel-wood forming board.
In when construction, the scaffold with Senior Three layer or four layers links together by load supporting system and building, and dead load and dynamic load on the scaffold are delivered on the building by load supporting system.Adopt electric hoist equipment (electric block, low speed winch etc.) that scaffold is promoted together with template synchronous integral body or segmentation and slicing.After lifting puts in place,, advance template accurately in place with scalable connector turn, and the beginning concreting, wait to build and finish, after concrete reaches demoulding strength, again with scalable connector turn, and drive the template return, and prepare to rise in company with scaffold, build the last layer concrete.
The utility model has the advantages that: template is dismounting successively, reduces the vertical transport of template, and labor savings and tower crane lift number of times, has avoided the difficulty of template dismounting, can adopt large formwork construction, and construction speed is significantly accelerated; Template Location is accurate, has guaranteed construction quality; And can increase the access times of template, save circulation material.Be applicable to integral hoisting scaffold.
Below in conjunction with drawings and Examples the utility model is described in detail:
Fig. 1 is a structural representation of the present utility model.
As shown in the figure, the multifunction scaffold of this band template, comprise scaffold 1, motor hoist 9, bearing beam 7, heavy frame 8, safety net 4, fixedly connected row's carriage of forming by cross bar 6 and diagonal brace 5 on scaffold 1, interval between the carriage is 0.8~1.2 meter approximately, the cross bar 6 of carriage is connected with the vertical steel pipe of scaffold 1, and diagonal brace 5 one ends of carriage are connected with cross bar 6, and the other end is connected with scaffold 1.Template 2 vertically is bearing on the carriage, the back cord that template is 2 four jiaos is connected with scaffold 1 with scalable connector 3, and scalable connector 3 preferably adopts screw mandrel, also available hydraulic push rod or contraction latch, even can adopt general connector, the position of personnel selection wage adjustment mould preparation plate.Template 2 can adopt steel, bamboo and wood, veneer, plastics, Steel-wood forming board.

Claims (4)

1, a kind of multifunction scaffold with template, comprise scaffold, motor hoist, bearing beam, heavy frame, safety net, it is characterized in that: fixedly connected row's carriage of forming by cross bar and diagonal brace on scaffold, template vertically is bearing on the carriage, and four jiaos of templates are connected with scaffold with scalable connector.
2, the multifunction scaffold of band template according to claim 1 is characterized in that: the cross bar of described carriage is connected with the vertical steel pipe of scaffold, and diagonal brace one end of carriage is connected with the cross bar of carriage, and the other end is connected with scaffold.
3, the multifunction scaffold of band template according to claim 1 is characterized in that: described scalable connector is screw mandrel or hydraulic mandril, contraction latch.
4, the multifunction scaffold of band template according to claim 1 is characterized in that: described template can be steel, bamboo and wood, veneer, plastics, Steel-wood forming board.
CN 96209366 1996-05-16 1996-05-16 Multifunctional scaffold with form Expired - Fee Related CN2292856Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96209366 CN2292856Y (en) 1996-05-16 1996-05-16 Multifunctional scaffold with form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96209366 CN2292856Y (en) 1996-05-16 1996-05-16 Multifunctional scaffold with form

Publications (1)

Publication Number Publication Date
CN2292856Y true CN2292856Y (en) 1998-09-30

Family

ID=33893030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96209366 Expired - Fee Related CN2292856Y (en) 1996-05-16 1996-05-16 Multifunctional scaffold with form

Country Status (1)

Country Link
CN (1) CN2292856Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100351482C (en) * 2005-12-14 2007-11-28 姚康华 Protective frame special for construction of building main body
CN100365237C (en) * 2005-12-28 2008-01-30 上海市第一建筑有限公司 Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
CN102051977A (en) * 2010-11-29 2011-05-11 南通四建集团有限公司 Exterior wall scaffold and template integrated construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100351482C (en) * 2005-12-14 2007-11-28 姚康华 Protective frame special for construction of building main body
CN100365237C (en) * 2005-12-28 2008-01-30 上海市第一建筑有限公司 Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
CN102051977A (en) * 2010-11-29 2011-05-11 南通四建集团有限公司 Exterior wall scaffold and template integrated construction method

Similar Documents

Publication Publication Date Title
CN206110656U (en) Scalable foldable integrally lift up tube formwork of elevartor shaft
CN111535579A (en) Construction method for support-free mold hanging tool for horizontal post-pouring belt
CN106703403A (en) Pouring formwork and wall pouring equipment
CN116101875B (en) Automatic lifting and installing equipment for self-climbing building component
CN217175692U (en) Intelligent hydraulic lifting formwork system for super high-rise core tube construction
CN2292856Y (en) Multifunctional scaffold with form
CN108483190B (en) Intelligent aluminum alloy template material conveying device and operation method thereof
CN211313311U (en) Assembled concrete structure regularization stair protection platform
CN210308361U (en) Self-contraction type inner formwork structure for caisson prefabrication
CN111115461B (en) Reinforcing steel bar and mould transportation and automatic assembling equipment
CN112239187A (en) Demolish lift hydraulic locomotive
CN215564159U (en) Existing building unit-installment installs finished well of elevator additional
CN2256418Y (en) Creeping formwork lifting frame for lift shaft
CN111074800A (en) Drainage box culvert pouring supporting structure
CN215519871U (en) Combined elevator shaft operating frame
CN214885625U (en) Multi-point prefabricated part mounting platform
CN219826107U (en) Quick easy-to-install and-remove elevator shaft operation frame and template
CN219946704U (en) Reverse-beating pouring tool for assembled small-sized concrete precast slabs
CN112627509B (en) Assembly type wedge-shaped inner support device for shaft-shaped steel-clad concrete wall and construction method thereof
CN217840874U (en) Outer wall constructional column formwork tool
CN216042607U (en) Screw demoulding device for creeping formwork
CN210850742U (en) Precast concrete component production system with movable support
CN213595748U (en) Material elevator
CN219807750U (en) Aluminum template lifting device for building
CN218230629U (en) Multifunctional elevator for ALC board transportation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee