CN2249787Y - Construction wholly shifting arrangement - Google Patents
Construction wholly shifting arrangement Download PDFInfo
- Publication number
- CN2249787Y CN2249787Y CN 95231438 CN95231438U CN2249787Y CN 2249787 Y CN2249787 Y CN 2249787Y CN 95231438 CN95231438 CN 95231438 CN 95231438 U CN95231438 U CN 95231438U CN 2249787 Y CN2249787 Y CN 2249787Y
- Authority
- CN
- China
- Prior art keywords
- channel
- steel
- round steel
- section steel
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model construction wholly shifting device. The utility model is characterized in that a base of the utility model is provided with a lower track which is composed of channel steel and steel plates, and the channel steel is filled with concrete; the track is provided with a rolling rod whose interior is provided with infilling; an upper track, which is composed of a plurality of segments of channel steel with inlets, infilling, connecting rings and connecting pins, is arranged above the rolling rod; the segments of channel steel are connected by the cooperation of the connecting rings and the connecting pins; a traction round steel bar goes through circular holes of the connecting rings, one end of the round steel bar is provided with a draw ring, the other end of the round steel bar is provided with a thread and sheathed with a vertical shim plate and a cross beam from the inside to the outside of the round steel bar, and a nut is screwed on the end with the thread of the round steel bar. The utility model is suitable for the integral translation project of buildings with different structures and has the advantages that most of the parts can be utilized repeatedly for times; the cost is low; the work efficiency is high.
Description
The utility model relates to the equipment that a kind of building is moved usefulness.
At present, in the engineering of widening the road that China town and country are remodeled and expand, the building integrated translation technology has obtained applying.Though the employed equipment of integral translation in the past is safe, reliable and effective, also exist certain shortcoming, promptly there is quite a few parts repeatedly not recycle in the device, availability is low; The parts that have are monolithic reinforced concrete structures, and long construction period causes work efficiency low, and equipment manufacturing cost is very high and technology is comparatively complicated.
The purpose of this utility model provides a kind of above-mentioned deficiency that remedied, to realize the device of the efficient integral translation of building.
The utility model is achieved in that the lower railway 2 that is made of channel-section steel and steel plate is set on the pedestal 1, fill concrete in the channel-section steel, install tubulose rolling bar 3 on the lower railway 2, it in the pipe obturator 4, the top of rolling bar 3 is to get on the right track 5, get on the right track and 5 comprise number joint channel-section steels 6, obturator 7 in the channel-section steel, connecting ring 8, Connection Card 9 compositions such as grade, charging hole 10 is all offered in channel-section steel 6 both sides, connecting ring 8 is fixed in the two ends of every joint channel-section steel 6, two of every sides, adjacent two joint channel-section steels utilize connecting ring 8 and Connection Card 9 to connect, and draw-gear is by traction round steel 11, vertical backing plate 13, compositions such as crossbeam 14 and nut 15; Traction round steel 11 passes the circular hole of connecting ring 8, and one of round steel 11 is tow lug 12, and the other end is threaded, is with vertical backing plate 13 and crossbeam 14 from inside to outside, and it is fixing that end is rotary with nut 15.Lower railway 2 and get on the right track 5 channel-section steel 6 usefulness standard components or non-standard component all can.
The utility model is the improvement of inventor on its original patent application technology (" the parallel moving apparatus of building " 95231206.9) basis, be applicable to the integral translation engineering of different structure building, this apparatus structure is simple, concrete construction technology is easy to grasp, overwhelming majority member can repeatedly reuse, cost reduces a lot relatively, and short construction period, the work efficiency height.
Describe in detail below in conjunction with accompanying drawing:
Fig. 1 is a lateral view of the present utility model
Fig. 2 is an A-A view of the present utility model
Among the figure, 1 pedestal, 2 lower railway, 3 rolling bars, 4,7 obturators, 5 get on the right track, 6 channel-section steels, 8 connecting rings, 9 Connection Cards, 10 charging holes, 11 traction round steel, 12 tow lugs, 13 vertical backing plates, 14 crossbeams, 15 nuts; Square B represents building foundation, and square C represents fabric structure.
In the concrete construction, at first the load-carrying members segmentation with the building direction of travel cuts out an opening, and the height of opening is determined by this height of devices; Incision utilize fine-stone concrete or cement mortar with the pedestal fixed in position on basic B, pedestal is made of steel bar concrete or steel plate, it is fixed that joint number is come by building length or width; The lower railway that is welded or all be welded by steel plate by channel-section steel and steel plate is set on the pedestal, fills concrete in the channel-section steel; Rolling bar is a thick-walled seamless steel pipes, is placed on the lower railway, and obturator is high-strength little moulding material in the pipe; Lay on the rolling bar and get on the right track,, as obturator channel-section steel and original building structure C are linked together with Materials with High Strength, packing material can also can inject from channel-section steel both sides charging aperture from channel-section steel injection suitable for reading, has so just finished first section cutting installation work.After treating that first section fixing body is fixed fully, finish second section cutting installation work with identical method again, till whole cuttings install.A upper and lower track of joint and a pedestal only installed in one section of every cutting, finishes a translation required joint number of constructing and come surely by the length of building or width, and the adjacent two joint channel-section steels that get on the right track must utilize connecting ring and Connection Card to link up securely.Treat whole cuttings, installation and be connected finish after, draw-gear is installed is about to draw the circular hole that round steel passes each connecting ring from inside to outside, pass the crossbeam circular hole again, a vertical backing plate is installed between crossbeam and building structure, contact area is increased, screw nut then and fix.After extraneous hauling power device and tow lug couple together, can promote building integrated translation.After putting in place, each parts all detachably gets off in the said apparatus, and the arrangement back is reusable.
Claims (3)
1. building integrated translation device, it is characterized in that: pedestal (1) is gone up the lower railway (2) that is made of channel-section steel and steel plate is set, fill concrete in the channel-section steel, install tubulose rolling bar (3) on the lower railway (2), in the pipe obturator (4), the top of rolling bar (3) is get on the right track (5), get on the right track (5) comprise number joint channel-section steels (6), obturator (7) in the channel-section steel, connecting ring (8), Connection Card compositions such as (9), charging hole (10) is all offered in channel-section steel (6) both sides, connecting ring (8) is fixed in the two ends of every joint channel-section steel (6), two of every sides, adjacent two joint channel-section steels utilize connecting ring (8) and Connection Card (9) to connect; Draw-gear is made up of traction round steel (11), vertical backing plate (13), crossbeam (14) and nut (15) etc., traction round steel (11) passes the circular hole of connecting ring (8), one of round steel (11) is tow lug (12), the other end is threaded, be with vertical backing plate (13) and crossbeam (14) from inside to outside, it is fixing that end is rotary with nut (15).
2. a kind of building integrated translation device according to claim 1 is characterized in that: the channel-section steel (6) of lower railway (2) and get on the right track (5) all can with standard component or non-standard component.
3. according to claim 1,2 described a kind of building integrated translation devices, it is characterized in that: the obturator (4) in rolling bar (3) pipe is high-strength little moulding material; The obturator (7) of (5) of getting on the right track is high-strength packing material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 95231438 CN2249787Y (en) | 1995-06-16 | 1995-06-16 | Construction wholly shifting arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 95231438 CN2249787Y (en) | 1995-06-16 | 1995-06-16 | Construction wholly shifting arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2249787Y true CN2249787Y (en) | 1997-03-19 |
Family
ID=33876039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 95231438 Expired - Fee Related CN2249787Y (en) | 1995-06-16 | 1995-06-16 | Construction wholly shifting arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2249787Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102720373A (en) * | 2012-06-13 | 2012-10-10 | 山东建筑大学 | Building displacement turning method |
CN104499728A (en) * | 2014-12-25 | 2015-04-08 | 北京国电龙源环保工程有限公司 | Absorbing tower horizontal moving device and construction method thereof |
CN105089292A (en) * | 2015-08-21 | 2015-11-25 | 顾雍舟 | Monolithic movement construction method for house with soil foundation |
CN106368446A (en) * | 2016-10-21 | 2017-02-01 | 天津大学 | Method for rapidly removing vertical support |
-
1995
- 1995-06-16 CN CN 95231438 patent/CN2249787Y/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102720373A (en) * | 2012-06-13 | 2012-10-10 | 山东建筑大学 | Building displacement turning method |
CN102720373B (en) * | 2012-06-13 | 2014-08-06 | 山东建筑大学 | Building displacement turning method |
CN104499728A (en) * | 2014-12-25 | 2015-04-08 | 北京国电龙源环保工程有限公司 | Absorbing tower horizontal moving device and construction method thereof |
CN104499728B (en) * | 2014-12-25 | 2016-05-11 | 北京国电龙源环保工程有限公司 | Absorption tower translating device and construction method thereof |
CN105089292A (en) * | 2015-08-21 | 2015-11-25 | 顾雍舟 | Monolithic movement construction method for house with soil foundation |
CN106368446A (en) * | 2016-10-21 | 2017-02-01 | 天津大学 | Method for rapidly removing vertical support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AT517958B1 (en) | Foundation for a wind turbine | |
EP3516121B1 (en) | Foundation for a wind turbine | |
AT517959B1 (en) | Foundation for a wind turbine | |
CN101152949A (en) | Parallel move method for ultra-high ultra-large large-weight running well frame type hoisting tool and device thereof | |
EP3592640B1 (en) | Autonomously buoyant heavyweight foundation for connection to a buoyant offshore plant | |
CN105735141A (en) | Gliding device with box beam side template and construction method thereof | |
DE69933552T2 (en) | Carrier structure for an increased guideway for a rail vehicle | |
US6564516B1 (en) | Support structure for elevated railed-vehicle guideway | |
DE202015009285U1 (en) | battery mold | |
CN109355983B (en) | Trackless construction method for urban rail | |
CN2249787Y (en) | Construction wholly shifting arrangement | |
CN205636503U (en) | Case beam side displacement device | |
CN109629350B (en) | Prestressed seamless connection concrete track beam for empty iron and construction method thereof | |
EP1371781B1 (en) | Modular station platform system | |
CN109555268A (en) | Prefabricated support column and its construction method based on H profile steel | |
CN208965580U (en) | A kind of non-console mode tower crane | |
CN108221508B (en) | Integrated monorail beam end pre-buried device | |
CN207619988U (en) | The cast-in-place concrete of bar shaped foundation pit is to supportting the connection structure with prefabricated linking beam | |
DE2140797A1 (en) | IN-HOUSE ASSEMBLY DEVICE | |
CN111236049A (en) | External prestress steering structure | |
DE102019126587A1 (en) | Foundation for a wind turbine | |
JPH0469244B2 (en) | ||
CN219527204U (en) | Reinforcing device for train track | |
CN109826059B (en) | Construction method for installing hoisting equipment on station main body and assembling track panel in cooperation with hoisting equipment | |
CN220849680U (en) | Tunnel excavation trolley height adjusting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |