CN2229945Y - Cobble quick construction anchor pile - Google Patents
Cobble quick construction anchor pile Download PDFInfo
- Publication number
- CN2229945Y CN2229945Y CN 95226329 CN95226329U CN2229945Y CN 2229945 Y CN2229945 Y CN 2229945Y CN 95226329 CN95226329 CN 95226329 CN 95226329 U CN95226329 U CN 95226329U CN 2229945 Y CN2229945 Y CN 2229945Y
- Authority
- CN
- China
- Prior art keywords
- anchor pole
- hole
- drill bit
- cobble
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a cobble quick construction anchor rod which comprises a drill bit with ball teeth, an anchor rod, a connecting sleeve and a detachable connector, wherein, the drill bit is fixedly arranged on the anchor rod; an impactor which is fixedly connected with a main shaft of a driller is arranged on the tail end of the connector; the tail end of the anchor rod is welded with the connecting sleeve which is hinged with the connector. The utility model provides convenience for construction in disproportion soft and hard stratum, and can cancel the working procedure of beating and pulling casing pipes. A back impactor replaces a front impactor. Working efficiency is enhanced by 6 to 8 times, and construction cost is decreased by 50%.
Description
The utility model relates to and supports the anchor pole that side slope or foundation ditch use, especially with the cobble rapid construction anchor pole of a construction molding of drill bit.Be applicable to that railway, highway, reservoir moat slope reinforce pit shaft, the temporary lining of mine excavation supporting, house excavation of foundation pit.
Existing working anchor pole, mostly be indented bars or round steel, the sleeve pipe that the jumbolter utilization is repeatedly used repeatedly connects drill bit and preceding impactor at the sleeve pipe front end, the rotary impact power of impactor before utilizing, make sleeve pipe follow drill bit and progressively stretch into and treat strengthening stratum, arrive designated depth after, take out the drill bit and the preceding impactor that link together with drilling rod, put into anchor pole, after treating that anchor pole arrives assigned address, progressively extract sleeve pipe, cement injection mortar in the space between anchor pole and stratum.With the job practices more complicated that this anchor pole is used, pouring into an anchor pole need be through creeping into, places sleeve pipe and anchor pole is extracted sleeve pipe and drill bit, multiple working procedures such as preceding impactor, grouting, consumption manpower and time.When creep on construction stratum more rambunctious, for example run into ovum, the gravel stratum of soft or hard inequality, crooked, distortion that rotary drilling is easy to, place the sleeve pipe anchor pole like this, especially extracting drill bit and preceding impactor is to be difficult to take out in that distortion is crooked in creeping into, so just do not reach the purpose of repeatedly using drill bit and preceding impactor, and the price of preceding impactor is higher.
The purpose of this utility model is to propose a kind of pebble layer to use, rapid construction anchor pole that can a construction molding, at the anchor pole front end drill bit that is connected, be air-supply, dedusting and grouting channel in the anchor pole hollow tube, rear end and rig junction at anchor pole are provided with the back impactor, by this back impactor rotary drilling anchor pole, and take step-by-step movement mode construction molding grouted rock bolt.
Utility model is achieved in that a kind of cobble rapid construction anchor pole, comprise drill bit 2, anchor pole 3, adapter sleeve 6, it is characterized in that, the be connected tail end of drill bit 2 anchor poles 3 of dribbling tooth 1 of hollow bolt 3 front ends is welded to connect cover 6, the tube wall side face of the described adapter sleeve 6 moment of torsion pin-and-hole 7,71 that is crisscross arranged, the hinged dismountable connector 8 of the tail end of adapter sleeve, what the tail end setting of described connector 8 and back impactor were hinged is connected pin-and-hole 11.The circumferential surface of drill bit 2 is provided with and protrudes ball tooth 1, and the center is provided with the cooling that connects anchor pole and removes cinder hole 9, and evenly distributing along the drill bit periphery connects cooling slagging-off inclined hole 10.The anchor pole rear end is provided with the pulp retaining ring 4 and the slurry hole 5 of overflowing.The moment of torsion pin-and-hole 7,71 that is crisscross arranged on adapter sleeve 6 tube walls and can clogs.The front end of connector 8 is provided with moment of torsion pin-and-hole 81, and the rear end is provided with and connects pin-and-hole 11.
The utility model reduces working procedure, is the good tool of formation drilling of overcoming a difficulty, and reduces by 50% in single anchor pole operating expenses, and work efficiency improves 6~10 times.
Fig. 1 the utility model structural representation
Fig. 2 the utility model annexation schematic diagram
Fig. 3 drill bit structure schematic diagram
Now further narrate structure of the present utility model in conjunction with the accompanying drawings.
Referring to Fig. 1-Fig. 3, form the utility model by drill bit 2, anchor pole 3, adapter sleeve 6, connector 8.The front end of anchor pole 3 and button bit 2 weld, and the drill bit of the spherical tooth 1 of band carbide alloy is provided with central ventilation cooling hole 9, evenly distribute inclined hole 10 so that dust is crept in cooling and removal along the drill bit periphery.The end of drill bit 2 and anchor pole welding.Anchor pole 3 is the hollow circular metal tube, sets firmly the pulp retaining ring 4 and the slurry hole 6 of overflowing in the rear end of anchor pole, and the effect of pulp retaining ring 4 is that the slurry hole 5 of overflowing when creeping into is avoided stopping up when overflowing slurry on overflow slurry hole 5, the pulp retaining ring and left the opening 41 of being convenient to the cement grout diffusion.
Anchor pole tail end and adapter sleeve 6 welding are provided with moment of torsion pin-and-hole 7 at adapter sleeve 6 and anchor pole welding section tube wall, and the rear end tube wall of adapter sleeve 6 is provided with moment of torsion pin-and-hole 71, and this moment of torsion pin-and-hole 71 is hinged with the moment of torsion pin-and-hole 81 of connector 8 front ends.Connector 8 is T-shaped, is provided with in the rear end of connector 8 to connect pin-and-hole 11, and is hinged with the back impactor that is installed on the rig main shaft at described connection pin-and-hole 11 places.
The connector 8 of waiting to dismantle and connecting with pin, both connector 8 and adapter sleeve 6 were behind the connecting pin at moment of torsion pin-and-hole 71,81 places, connector 8 is separated with adapter sleeve 6, on adapter sleeve 6, be solded into second anchor pole 3, weld at moment of torsion pin-and-hole 7,71 places to strengthen weld strength.
The cementation pipe waits to remove connector 8, and with after the moment of torsion pin-and-hole on the adapter sleeve 67, the 71 welding filling, from the cavity of anchor pole, with pressure injection and it is overflowed at slurry 5 places, hole of overflowing.
Claims (5)
1, a kind of cobble rapid construction anchor pole, comprise drill bit (2), anchor pole (3), adapter sleeve (6), it is characterized in that, the be connected tail end of drill bit (2) anchor pole (3) of dribbling tooth (1) of hollow bolt (3) front end is welded to connect cover (6), the tube wall side face of described adapter sleeve (6) be crisscross arranged moment of torsion pin-and-hole (7), (71), the hinged dismountable connector of the tail end of adapter sleeve (8), what the tail end setting of described connector (8) and back impactor were hinged is connected pin-and-hole (11).
2, by the described cobble rapid construction of claim 1 anchor pole, it is characterized in that: the circumferential surface of drill bit (2) is provided with and protrudes ball tooth (1), the center is provided with the cooling that connects anchor pole and removes cinder hole (9), and evenly distributing along the drill bit periphery connects cooling slagging-off inclined hole (10).
3, by the described cobble rapid construction of claim 1 anchor pole, it is characterized in that: the anchor pole rear end is provided with the pulp retaining ring (4) and the slurry hole (5) of overflowing.
4, by claim 1 or 3 described cobble rapid construction anchor poles, it is characterized in that: the moment of torsion pin-and-hole (7), (71) that are crisscross arranged and clog on adapter sleeve (6) tube wall.
5, by the described cobble rapid construction of claim 1 anchor pole, it is characterized in that: the front end of connector (8) is provided with moment of torsion pin-and-hole (81), and the rear end is provided with and connects pin-and-hole (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 95226329 CN2229945Y (en) | 1995-11-22 | 1995-11-22 | Cobble quick construction anchor pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 95226329 CN2229945Y (en) | 1995-11-22 | 1995-11-22 | Cobble quick construction anchor pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2229945Y true CN2229945Y (en) | 1996-06-26 |
Family
ID=33872512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 95226329 Expired - Fee Related CN2229945Y (en) | 1995-11-22 | 1995-11-22 | Cobble quick construction anchor pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2229945Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967826A (en) * | 2010-10-14 | 2011-02-09 | 李式仁 | Vibrating bar-inserting long spiral air-cooled drilling rock-socketed pile forming method and equipment |
CN102155016A (en) * | 2011-05-10 | 2011-08-17 | 中铁二院工程集团有限责任公司 | Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method |
CN107642328A (en) * | 2017-10-31 | 2018-01-30 | 滨州学院 | A kind of high-pressure injection auto-oscillation type whole-length cohesive anchor bolt |
CN113216847A (en) * | 2021-05-21 | 2021-08-06 | 瑞腾基础工程技术(北京)股份有限公司 | Prestressed anchor cable pore-forming method suitable for rock-soil intersection complex stratum |
-
1995
- 1995-11-22 CN CN 95226329 patent/CN2229945Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967826A (en) * | 2010-10-14 | 2011-02-09 | 李式仁 | Vibrating bar-inserting long spiral air-cooled drilling rock-socketed pile forming method and equipment |
CN101967826B (en) * | 2010-10-14 | 2012-05-23 | 李式仁 | Vibrating bar-inserting long spiral air-cooled drilling rock-socketed pile forming method and equipment |
CN102155016A (en) * | 2011-05-10 | 2011-08-17 | 中铁二院工程集团有限责任公司 | Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method |
CN107642328A (en) * | 2017-10-31 | 2018-01-30 | 滨州学院 | A kind of high-pressure injection auto-oscillation type whole-length cohesive anchor bolt |
CN113216847A (en) * | 2021-05-21 | 2021-08-06 | 瑞腾基础工程技术(北京)股份有限公司 | Prestressed anchor cable pore-forming method suitable for rock-soil intersection complex stratum |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3824114B2 (en) | Whale bone method for large section tunnel | |
CN204959746U (en) | Expand integral type stock soon | |
JP3833403B2 (en) | Large-section tunnel sushi bone method | |
CN109595004A (en) | A kind of tunnel two expands four and digs method | |
CN109630151A (en) | Rectangular top pipe tunneling construction method | |
JP3927842B2 (en) | Construction method of double pipe digging small diameter pile | |
CN108914945A (en) | A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method | |
HRP980327A2 (en) | Process and device for boring holes | |
CN2229945Y (en) | Cobble quick construction anchor pile | |
CN203530988U (en) | One-time forming major-diameter anchor rod foundation pit supporting structure | |
CN101358529A (en) | Short tube and short tube sand consolidation agent strengthening construction process | |
JP3878104B2 (en) | Construction method of double pipe digging rock bolt using drilling rod | |
CN208151875U (en) | A kind of steel flanged beam cemented rock arch bridge side wall ruggedized construction | |
CN2297540Y (en) | Wriggle type self-propelled entry-driving machine for tunnel or gallery | |
CN215669558U (en) | Front-mounted inclined pile of foundation pit supporting system | |
CN110258553B (en) | Method for dismantling pull rod in soil and construction tool | |
CN210509213U (en) | Rock pillar reinforcement system in small clear distance tunnel | |
CN113605951A (en) | Shallow tunnel supporting structure and construction method thereof | |
CN112160322A (en) | Pile head softening treatment method for concrete cast-in-place pile | |
JP3851590B2 (en) | Preceding ground mountain consolidation method using self-drilling bolt and FRP bolt | |
CN217735499U (en) | A advance support structure, compound jet grouting pile for extremely soft rock tunnel face | |
JP2003184499A (en) | Large diameter lock bolt anchor for natural ground reinforcement | |
CN215332886U (en) | Tunnel arch prefabricated duct piece convenient for grouting | |
CN211368738U (en) | Novel steel bracing supporting construction | |
CN220621853U (en) | Advance support structure for small-section tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |