喷雾冷却塔 Download PDFInfo
- Publication number
- CN2227811Y CN2227811Y CN 95210274 CN95210274U CN2227811Y CN 2227811 Y CN2227811 Y CN 2227811Y CN 95210274 CN95210274 CN 95210274 CN 95210274 U CN95210274 U CN 95210274U CN 2227811 Y CN2227811 Y CN 2227811Y
- Authority
- CN
- China
- Prior art keywords
- tower body
- water
- tower
- air
- liquid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
一种适合于空分设备预冷系统中使用的喷雾冷却塔,其塔体采用圆柱立式结构,塔体内的上部设置有汇液斗,每个汇液斗上部均设置有雾化喷头,中部及下部设置有环流板及均液盘,其上也设置有雾化喷头,热空气可通过环流板及均液盘形成的水帘进入雾区与水进行热交换,由于采用雾化喷头,使得水与空气的接触更加充分,不但传质效果好,而且降低了水的消耗及压缩机的能耗,本实用新型不仅流通量大、阻力小、而且重量轻、体积小、成本较低。
Description
本实用新型涉及一种热交换设备,特别是一种适合于空分设备预冷系统中使用,空气与水逆流直接接触进行热交换的喷雾冷却塔。
通常,空分设备预冷系统中使用的空气冷却塔,大多为筛板式或填料式,其结构形式均为由上,下封头和壳体焊接而成的园柱立式塔体。筛板式空气冷却塔塔体内设置有多层不锈钢筛板,液体是通过每层筛板自上而下与自下而上的空气进行热交换,由于该冷却塔热交换效率高、通量大,以及结构改进的灵活性较大,所以目前筛板塔的应用在世界上占了很大的比例,但不足之处是结构复杂、阻力大、造价也较高,仅不锈钢筛板一项就需成本近五万元,填料式空气冷却塔分为乱堆填料塔或规则填料塔其结构是由设置在塔内的多层乱堆填料层或规则填料层构成,液体是通过填料层设定的通道流动,乱堆填料层中,流体的通道是随机的,即使是同型同尺寸的填料,亦因填料方法的不同而使流动通道的大小有所不同,因此,其流动分布的研究便成为一难题。规则填料塔中虽然流动通道有一定的规则,但液体并非完全沿着通道流动,大量液体因重力而呈垂直向下流动状态,所以规则填料塔也并不规则,无论哪种填料塔均存在有流动量小、阻力大、体积大,及填料拉西加环容易破碎和结垢的缺点。
本实用新型的目的在于提供一种喷雾冷却塔,它不但传质效果好,流通量大、阻力小、重量轻、体积小,而且能耗及成本较低。
其具体解决方案是:塔体采用园柱立式结构,塔体的下部设置有空气进口,顶部设置有空气出口,塔体内的顶部设置有丝网除雾器,上部设置有2—3层汇液斗,汇液斗的底部均布有孔,每个汇液斗上部均设置有雾化喷头,中部和下部设置有2—3层环流板及1—2层均液盘,环流板及均液盘交替设置,并且在其上部也设置有雾化喷头。环流板由支撑环以及设置在支撑环中心的中心环构成,并通过支撑环固定连接在塔体内壁上。均液盘通过支承肋连接在塔体内壁上。汇液斗可将吸附在塔壁上大量的水向中心聚集,通过底部的孔进行再分布,而环流板可使水从环流板中心通过形成一中间具有水雾,用边为水帘的水柱,均液盘可使水通过均液盘的周边形成一空心水帘,从而迫使空气强行通过水帘进入雾区进行热交换。
本实用新型由于采用雾化喷头,水粒小,使得水与空气的接触更加充分,不但传质效果好,而且降低了水的消耗,本实用新型与已有技术相比可节约钢材15—20%,阻力降低50%左右,它不仅流通量大,大大节约了空气压缩机的能耗,而且体积小、重量轻、成本较低。
下面通过实施例结合附图对本实用新型进行详细描述:
图1为本实用新型结构示意图。
图2为本实用新型图1I处放大图。
本实施例中,由上封头(2)、下封头(11)、裙座(12)焊接而成塔体,塔体下部设置有空气进口(9),顶部设置有空气出口(1),塔体内的顶部设置有丝网除雾器(3),塔体上部固定连接有两汇液斗(5),汇液斗(5)的底部均布有孔,两汇液斗(5)上部的塔体中心位置分别设置有3个及两个雾化喷头(6),三层环流板(7)与两层均液盘(8)交替设置在塔体内的中部及下部,环流板(7)与汇液斗(5)之间也设置有两雾化喷头(6),环流板(7)由固定连接在塔壁上的支撑环(7—2)、以及设置在支撑环中心并且上部高于支撑的中心环(7—1)构成,均液盘(8)通过两支撑肋(8—1)固定连接在塔体内壁上。为方便检修,塔体上设置有人孔(13),内部塔壁上设有安全梯(14)。
进行热交换时,热空气由空气进口(9)进入塔内,依次通过环流板(7)及均液盘(8),然后进入雾区与水进行热交换,热交换完毕的空气通过除雾器(3)除掉水雾由空气出口(1)排出。由雾化喷头雾化后的水与空气进行热交换时,由于水的壁流量很大,需将这部分水进行再分布,汇液斗(5)就是水的再分布器,水经再分布后与空气接触进行热质交换,并流入环流板,而流入环流板支承环(7—2)上的水不能通过而却通过中心环壁形成水帘,再经均液盘(8)周边通过,形成一空心水帘,依次通过后,经出水口(10)流出,环流板与均液盘起使空气强行通过水帘的作用。
Claims (3)
1、一种喷雾冷却塔,由上封头(2)、下封头(11)、裙座(12)构成塔体,塔体下部设置有空气进口(9),顶部设置有空气出口(1),其特征在于塔体内顶部设置有丝网除雾器(3),上部设置有2—3层汇液斗(5),每个汇液斗(5)的上部均设置有雾化喷头(6),中部及下部固定连接有2—3层环流板(7)及1—2层均液盘(8),其上也设置有雾化喷头(6)。
2、根据权利要求1所述的喷雾冷却塔,其特征在于汇液斗(5)的底部均布有孔。
3、根据权利要求1所述的喷雾冷却塔,其特征在于环流板(7)由固定连接在塔壁上的支撑环(7—2)以及设置在支撑环中心的中心环(7—1)构成,均液盘(8)通过两支撑肋(8—1)固定在塔体内壁上,并且环流板(7)及均液盘(8)交替设置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 95210274 CN2227811Y (zh) | 1995-05-04 | 1995-05-04 | 喷雾冷却塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 95210274 CN2227811Y (zh) | 1995-05-04 | 1995-05-04 | 喷雾冷却塔 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2227811Y true CN2227811Y (zh) | 1996-05-22 |
Family
ID=33861044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 95210274 Expired - Fee Related CN2227811Y (zh) | 1995-05-04 | 1995-05-04 | 喷雾冷却塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2227811Y (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7866179B2 (en) | 2005-02-23 | 2011-01-11 | I.D.E. Technologies Ltd. | Compact heat pump using water as refrigerant |
CN101147035B (zh) * | 2005-02-23 | 2012-01-11 | I.D.E.技术有限公司 | 用水作为制冷剂的紧凑式热泵 |
CN101852558B (zh) * | 2009-04-03 | 2012-12-19 | 贵阳铝镁设计研究院有限公司 | 一种气液冷却装置 |
CN104061797A (zh) * | 2014-06-28 | 2014-09-24 | 江苏江涛环境工程有限公司 | 一种卧式喷雾冷却器 |
CN105241181A (zh) * | 2015-09-28 | 2016-01-13 | 苏州制氧机股份有限公司 | 一种空气分离设备用下塔 |
-
1995
- 1995-05-04 CN CN 95210274 patent/CN2227811Y/zh not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7866179B2 (en) | 2005-02-23 | 2011-01-11 | I.D.E. Technologies Ltd. | Compact heat pump using water as refrigerant |
CN101147035B (zh) * | 2005-02-23 | 2012-01-11 | I.D.E.技术有限公司 | 用水作为制冷剂的紧凑式热泵 |
CN101852558B (zh) * | 2009-04-03 | 2012-12-19 | 贵阳铝镁设计研究院有限公司 | 一种气液冷却装置 |
CN104061797A (zh) * | 2014-06-28 | 2014-09-24 | 江苏江涛环境工程有限公司 | 一种卧式喷雾冷却器 |
CN104061797B (zh) * | 2014-06-28 | 2015-09-23 | 江苏江涛环境工程有限公司 | 一种卧式喷雾冷却器 |
CN105241181A (zh) * | 2015-09-28 | 2016-01-13 | 苏州制氧机股份有限公司 | 一种空气分离设备用下塔 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018103340A1 (zh) | 一种高效率脱除气溶胶的水洗装置 | |
CN86106645A (zh) | 颗粒的制备方法 | |
CN105727700A (zh) | 一种一体化超洁净脱硫除尘装置 | |
WO2006128351A1 (fr) | Colonne a garnissage reflechissante | |
CN2227811Y (zh) | 喷雾冷却塔 | |
CN1220179A (zh) | 汽液并流喷射接触无返混双层式塔板装置 | |
CN211425115U (zh) | 一种旋流喷射雾化式冷却塔 | |
CN211133461U (zh) | 一种应用于煤制油产物气固分离的过滤装置 | |
CN2184182Y (zh) | 分流式循环水逆流冷却塔 | |
CN210645660U (zh) | 喷淋净化塔 | |
CN217698596U (zh) | 一种氯化氢降膜吸收塔 | |
CN207850720U (zh) | 一种流化除雾器实验装置 | |
CN217068346U (zh) | 一种双液吸收反应器 | |
CN202066390U (zh) | 用于空分设备预冷系统的喷雾冷却塔 | |
CN201223761Y (zh) | 用于造粒塔的粉尘回收装置 | |
CN1184244A (zh) | 重力回水二次喷射喷雾推进通风冷却塔 | |
CN2520494Y (zh) | 空塔喷淋冷凝器 | |
CN208302453U (zh) | 一种废气处理喷淋塔 | |
CN2330404Y (zh) | 一种三聚氰胺尿素洗涤与气液分离联合装置 | |
CN208771100U (zh) | 一种高效流化除雾器 | |
CN1092857A (zh) | 二次引射风喷雾推进通风冷却塔 | |
CN218249425U (zh) | 一种氨气吸收塔 | |
CN111810899A (zh) | 一种防雾霾散热型太阳能路灯 | |
CN205700050U (zh) | 一种一体化超洁净脱硫除尘装置 | |
CN2149239Y (zh) | 圆环式喷雾降膜蒸发器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |