Construction engineering construction safety management rail
Technical Field
The utility model relates to the technical field of construction fences, in particular to a construction safety management fence for construction engineering.
Background
The construction is the production activity of the construction implementation stage, is the construction process of various buildings, and can be said to be the process of changing various lines on a design drawing into real objects at a designated place, and comprises the steps of foundation engineering construction, main structure construction, roof engineering construction, decoration engineering construction and the like.
Among the prior art, construction engineering rail is the facility that is used for separating job site and external world, consequently often need dismantle and install the rail, and at present rail is the in-process of installation, generally connects the location with a plurality of rail through the bolt mode, and the operation process is comparatively loaded down with trivial details, difficult installation and dismantlement have reduced the dismouting efficiency of rail.
Disclosure of utility model
This section is intended to outline some aspects of embodiments of the utility model and to briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section as well as in the description of the utility model and in the title of the utility model, which may not be used to limit the scope of the utility model.
The present utility model has been made in view of the above-mentioned and/or existing problems occurring in construction pens.
Therefore, the utility model aims to provide the construction engineering construction safety management fence, which can be assembled between fences conveniently and rapidly in the use process of the construction engineering construction fence, has simple operation process and improves the disassembly and assembly efficiency of the fence.
In order to solve the technical problems, according to one aspect of the present utility model, the following technical solutions are provided:
The utility model provides a construction engineering construction safety management rail, includes stand and first link, two the lateral wall of stand is connected with the rail frame, the inner wall of rail frame is provided with the rail board, first link sets up the lateral wall at the right-hand member stand, be provided with the through-hole on the first link, be provided with the locating lever in the through-hole, the one end of locating lever is provided with the pull ring, the bottom of pull ring is connected with the spring, the spring encircles the lateral wall at the locating lever, the one end and the top of first link of spring are connected, and the left end the lateral wall of stand is provided with the second link, the top of second link is provided with the locating hole corresponding with the locating lever.
As a preferable scheme of the construction engineering construction safety management fence, inclined struts are symmetrically arranged on the front side wall and the rear side wall of the fence board, screw holes are formed in the bottoms of the inclined struts, screw rods are connected with the screw holes in a threaded mode, knobs are arranged on the top ends of the screw rods, pressing plates are connected to the bottom ends of the screw rods in a rotating mode, and a plurality of barb rods are arranged on the bottoms of the pressing plates.
As a preferable scheme of the construction engineering construction safety management fence, bases are arranged at the bottoms of the two upright posts, and pulleys are arranged at the bottoms of the bases.
As an optimal scheme of the construction engineering construction safety management fence, the top of the fence frame is provided with a warning lamp.
As an optimal scheme of the construction engineering construction safety management fence, the first connecting frame and the second connecting frame are L-shaped connecting frames, and the first connecting frame and the second connecting frame are correspondingly arranged.
As a preferable scheme of the construction engineering construction safety management fence, the safety indication board is arranged on the front side wall of the fence board and is adhered with the front side wall of the fence board.
As a preferable scheme of the construction engineering construction safety management fence, the side wall of the pull ring is provided with anti-skid patterns.
Compared with the prior art, the rail fixing device has the advantages that 1. The rail fixing device is matched with the rail plate for use, people outside the rail are conveniently blocked from entering the rail, people are prevented from entering the rail during construction of construction engineering, the pull ring is used for conveniently operating the positioning rod to move upwards through the through hole, the bottom end of the positioning rod is contracted in the through hole, the first connecting frame is conveniently clamped with the corresponding second connecting frame, the first connecting frame is conveniently matched with the adjacent second connecting frame for connection, assembly between the rails is conveniently carried out, the pull ring is loosened, the positioning rod is driven to automatically downwards under the action of the spring, one end of the positioning rod is conveniently connected and positioned in the corresponding positioning hole, the first connecting frame is conveniently connected with the second connecting frame, therefore, the stability of the rail is improved, when the rail fixing device is disassembled, the pull ring is used for operating the positioning rod to separate from the positioning hole, then the first connecting frame and the second connecting frame are staggered, and accordingly the rail is conveniently assembled and quickly disassembled and installed in the process, the rail is conveniently and quickly disassembled and installed, the operation is simple, the efficiency of the rail is convenient to be assembled and the rail is easy to be disassembled and assembled through the screw rod is easy to be disassembled, and the screw rod is convenient to be easily rotated through the support side of the rail fixing device, and the side is convenient to be moved through the screw rod to be convenient to rotate.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the following detailed description of the embodiments of the present utility model will be given with reference to the accompanying drawings, which are to be understood as merely some embodiments of the present utility model, and from which other drawings can be obtained by those skilled in the art without inventive faculty. Wherein:
FIG. 1 is a schematic view of a construction safety management fence for construction engineering according to the present utility model;
FIG. 2 is an exploded view of a construction safety management fence for construction projects according to the present utility model;
FIG. 3 is a sectional view of a construction safety management fence for construction projects according to the present utility model;
Fig. 4 is a schematic diagram of a diagonal brace of a construction engineering construction safety management fence of the present utility model.
In the figure, the column is 100, the fence frame is 110, the fence board is 120, the first connecting frame is 200, the through hole is 210, the positioning rod is 220, the pull ring is 230, the spring is 240, the second connecting frame is 250, the positioning hole is 260, the diagonal bracing is 300, the screw hole is 310, the screw is 320, the knob is 330, the pressing plate is 340 and the barb rod is 350.
Detailed Description
In order that the above objects, features and advantages of the utility model will be readily understood, a more particular description of the utility model will be rendered by reference to the appended drawings.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, but the present utility model may be practiced in other ways other than those described herein, and persons skilled in the art will readily appreciate that the present utility model is not limited to the specific embodiments disclosed below.
Next, the present utility model will be described in detail with reference to the drawings, wherein the sectional view of the device structure is not partially enlarged to general scale for the convenience of description, and the drawings are only examples, which should not limit the scope of the present utility model. In addition, the three-dimensional dimensions of length, width and depth should be included in actual fabrication.
For the purpose of making the objects, technical solutions and advantages of the present utility model more apparent, embodiments of the present utility model will be described in further detail below with reference to the accompanying drawings.
The utility model provides a construction engineering construction safety management fence, referring to fig. 1-4, comprising upright posts 100 and first connecting frames 200, wherein the side walls of the two upright posts 100 are connected with fence frames 110, fence plates 120 are fixedly arranged on the inner walls of the fence frames 110, the first connecting frames 200 are fixedly arranged on the side walls of the right-end upright posts 100, through holes 210 are arranged on the first connecting frames 200, positioning rods 220 are slidably connected in the through holes 210, one ends of the positioning rods 220 are connected with pull rings 230, the bottoms of the pull rings 230 are connected with springs 240, the springs 240 encircle the side walls of the positioning rods 220, one ends of the springs 240 are fixedly connected with the tops of the first connecting frames 200, second connecting frames 250 are fixedly arranged on the side walls of the left-end upright posts 100, positioning holes 260 corresponding to the positioning rods 220 are formed in the tops of the second connecting frames 250, through the cooperation of rail frame 110 and rail board 120, be convenient for block that the people outside the rail enters into the rail, prevent that personnel from entering when construction engineering construction from entering, use pull ring 230 is convenient for operate locating lever 220 and upwards remove through-hole 210, make the bottom shrink of locating lever 220 in through-hole 210, be convenient for first link 200 and the mutual joint of corresponding second link 250, be convenient for through first link 200 and adjacent second link 250 cooperation connection, be convenient for assemble between the rail, loosen pull ring 230, under the effect of spring 240, drive locating lever 220 automatically downwards, make the one end grafting of locating lever 220 in corresponding locating hole 260, be convenient for be connected the location to first link 200 and second link 250, thereby to fixed mounting between the rail, improve the stability of rail.
The bottoms of the two upright posts 100 are provided with the base, the bottom of the base is provided with the pulley, and specifically, the pulley is convenient to connect through the base, and the rail is convenient to move to a construction site through the pulley, so that the operation is convenient.
The top of rail frame 110 is provided with the warning light, and specifically reaches the effect of warning through the warning light, and the personnel of being convenient for observe.
The first connecting frame 200 and the second connecting frame 250 are L-shaped connecting frames, the first connecting frame 200 and the second connecting frame 250 are correspondingly arranged, and specifically, the first connecting frame 200 and the second connecting frame 250 are convenient to match and clamp, and assembly is convenient.
The front side wall of the fence plate 120 is provided with a safety sign, the safety sign is adhered to the front side wall of the fence plate 120, and specifically, people can know the indication effect of the fence conveniently through the installation sign, so that the safety of building construction is improved.
The side wall of the pull ring 230 is provided with anti-slip patterns, specifically, the pull ring 230 is convenient to take through the anti-slip patterns, and the use is convenient.
In combination with fig. 1-4, a construction engineering construction safety management fence according to this embodiment is specifically used in the following steps, in the process of using the construction engineering construction fence, the pull ring 230 is used to operate the positioning rod 220 to move upwards through the through hole 210, the bottom end of the positioning rod 220 is contracted in the through hole 210, the first connecting frame 200 is matched and clamped with the second connecting frame 250 on the adjacent fence, the assembly operation is performed between the fences, the pull ring 230 is loosened, under the action of the spring 240, the positioning rod 220 is driven to automatically move downwards, one end of the positioning rod 220 is inserted into the corresponding positioning hole 260, the positioning rod 220 is connected with the positioning hole 260 in a matched manner, so that the first connecting frame 200 and the second connecting frame 250 are conveniently connected and positioned, the stability of the fence is improved, and in the same way, a long-length fence can be installed repeatedly, when the fence is detached, the pull ring 230 is used to operate the positioning rod 220 to separate from the positioning hole 260, then the first connecting frame 200 and the second connecting frame 250 are staggered, so that the fence is quickly detached, the fence is matched with the fence plate 120, and thus preventing people from entering the engineering construction fence when the fence 120 is blocked.
Fig. 3 to 4 are schematic structural views of a second embodiment of a construction safety management fence according to the present utility model, referring to fig. 3 to 4, unlike the above embodiment, in which diagonal braces 300 are symmetrically provided on the front and rear sidewalls of the fence plate 120, screw holes 310 are provided at the bottoms of the diagonal braces 300, screw rods 320 are connected to the screw holes 310, knobs 330 are provided at the top ends of the screw rods 320, a pressing plate 340 is rotatably connected to the bottom ends of the screw rods 320, a plurality of barb rods 350 are provided at the bottom of the pressing plate 340, specifically, the front and rear sides of the fence plate 120 are supported and positioned conveniently by the diagonal braces 300, thereby improving the support stability of the fence, the knob 330 is used to facilitate the rotation of the screw rods 320 through the screw holes 310, the pressing plate 340 is pushed conveniently by the screw rods 320, the barb rods 350 are inserted into the ground through the pressing plate 340, the fence is further fixed conveniently by the plurality of the barb rods 350, and the barb is not easy to shake, thereby improving the stability of the fence, and the fence is used in construction safety management.
Although the utility model has been described hereinabove with reference to embodiments, various modifications thereof may be made and equivalents may be substituted for elements thereof without departing from the scope of the utility model. In particular, the features of the disclosed embodiments may be combined with each other in any manner as long as there is no structural conflict, and the exhaustive description of these combinations is not given in this specification merely for the sake of omitting the descriptions and saving resources. Therefore, it is intended that the utility model not be limited to the particular embodiment disclosed, but that the utility model will include all embodiments falling within the scope of the appended claims.