CN218842883U - Detachable floating type mobile operation platform on water - Google Patents

Detachable floating type mobile operation platform on water Download PDF

Info

Publication number
CN218842883U
CN218842883U CN202222537962.3U CN202222537962U CN218842883U CN 218842883 U CN218842883 U CN 218842883U CN 202222537962 U CN202222537962 U CN 202222537962U CN 218842883 U CN218842883 U CN 218842883U
Authority
CN
China
Prior art keywords
floating
water
connecting hole
upright
floating type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222537962.3U
Other languages
Chinese (zh)
Inventor
康天
王震
乔彬彬
冷正华
余敦华
毛事湘
陈东
董永波
黄明
郭强
邓丽珍
汤青春
廖建宇
张海英
于家维
张铖
张泽国
冷竹君
丁志辉
杨程宇
刘傲尘
黄研
余爱敏
白茹静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Group Co Ltd
Original Assignee
China Construction Third Bureau Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Construction Engineering Co Ltd filed Critical China Construction Third Bureau Construction Engineering Co Ltd
Priority to CN202222537962.3U priority Critical patent/CN218842883U/en
Application granted granted Critical
Publication of CN218842883U publication Critical patent/CN218842883U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field of bridge construction, in particular to a detachable floating type mobile operation platform on water, which comprises a bottom floating type foundation and an operation frame body, wherein the operation frame body is positioned above the bottom floating type foundation, and the bottom floating type foundation is formed by combining a sealing box body; the operation support body is by both sides edge stand, middle standing pillar, intermediate level horizon bar, operation layer horizon bar, operation platform, top support and bridging are constituteed, and operation platform comprises safety net, protection railing and scaffold board, the utility model discloses a stand base on the floating basis of bottom is connected with the pole setting bottom on the operation support body, adopts the bolt fastening, constitutes floating portable operation platform on water, for increasing platform stability, is provided with the mooring rope around the floating basis, can dismantle floating mobile operation platform's mode on water, has avoided the problem in the background art, and the platform can be dismantled and retrieve, reuse, the cost is low, and the equipment is quick, practices thrift construction cycle.

Description

Detachable floating type mobile operation platform on water
Technical Field
The utility model relates to a bridge construction technical field specifically is a can dismantle floating mobile operation platform on water.
Background
In the bridge construction process, the demand that a lot of aquatic set up the operation frame exists, for example when crossing the river course and building the bridge, there is the condition that wet seam needs formwork in the bridge panel, needs to set up the scaffold frame in aqueous. When the water depth is large and the water flow is urgent, an operation frame is directly erected on the riverbed, so that the implementation difficulty is high and the danger is high; if the cofferdam mode is adopted, the construction cost is greatly improved. How to solve the problem of erection of the operation frame body on the watercourse in a quick, safe and low-cost mode is very necessary.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can dismantle floating mobile operation platform on water to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a detachable floating type mobile operation platform on water comprises a bottom floating type foundation and an operation frame body, wherein the operation frame body is positioned above the bottom floating type foundation, and the bottom floating type foundation is formed by combining a sealed box body;
the operation support body comprises both sides edge stand, middle standing pillar, intermediate level pole, operation layer horizon pole, operation platform, top support and bridging, intermediate level horizon pole and operation layer horizon pole with edge stand and middle standing pillar are mutually perpendicular, operation layer horizon pole is located the top of intermediate level horizon pole, operation platform is located the top of operation layer horizon pole, operation platform comprises safety net, protection railing and scaffold board.
As the utility model discloses preferred scheme, sealed box top and bottom are connected with the connection otic placode, connect and seted up connect hole on the otic placode, the last fixedly connected with stand supporting seat of sealed box, the stand supporting seat comprises a support backing plate and stand sleeve, support backing plate bottom with sealed box is fixed mutually, stand sleeve bottom with the support backing plate is fixed mutually, connect hole has been seted up on the stand sleeve.
As the utility model discloses preferred scheme, bottom floating basis is formed through the assembly of connection otic placode by a plurality of sealed boxes, bottom floating basis bottom is connected with the mooring rope.
As the utility model discloses preferred scheme, upper portion connecting hole, middle part connecting hole and underpart connecting hole have all been seted up to edge stand upper portion, middle part and lower part, the upper portion connecting hole pass through the bolt with the protection railing is connected, the middle part connecting hole pass through the bolt with intermediate level horizon bar and operation layer horizon bar are connected, the underpart connecting hole pass through the bolt with the stand supporting seat is connected.
As the utility model discloses preferred scheme, upper portion connecting hole, middle part connecting hole and lower part connecting hole have been seted up to middle standing pillar's upper portion, middle part and lower part, the upper portion connecting hole is used for connecting the top and holds in the palm, the middle part connecting hole is used for connecting the intermediate level horizon bar, the lower part connecting hole is used for connecting the stand supporting seat.
As the utility model discloses preferred scheme, the top is held in the palm and is constituteed by a layer board and top support sleeve, the connecting hole has all been seted up at top layer board top all around, the connecting hole has been seted up to the top support sleeve, operation layer horizon bar is close to top layer board one end is located top layer board top is connected rather than through this bolt, the operation layer horizon bar other end is connected with the third connecting plate, the third connecting plate pass through the bolt with the edge standing pillar is connected.
As the utility model discloses preferred scheme, the first connection end plate of intermediate level horizon bar both ends fixedly connected with, it has the connecting hole, every to open from top to bottom first connection end plate through the connecting hole with the edge post is connected.
As the utility model discloses preferred scheme, guard rail both ends fixedly connected with second connection end plate, it has the connecting hole to open on the second connection end plate, the second connection end plate pass through the connecting hole with the edge post is connected.
As the utility model discloses preferred scheme, the bridging both ends have been bent and have been handled and have been bent and seted up the connecting hole on the section, the bridging both ends through the bolt with edge stand and middle stand are connected.
As the utility model discloses preferred scheme, scaffold board inside evenly is connected with the auto-lock pin, scaffold board is located the top of operation layer horizon bar, scaffold board through the auto-lock pin with operation layer horizon bar is fixed mutually.
Compared with the prior art, the beneficial effects of the utility model are that:
according to the problem in the background art, the utility model discloses a can dismantle floating removal work platform's mode on water, avoided the problem in the background art, and the platform can be dismantled and retrieve, reuse, the cost is low, and the equipment is quick, practices thrift construction cycle.
1. The utility model discloses a setting up and lengthening the sleeve, can according to high needs, lengthen the pole setting at will.
2. The utility model discloses a bottom floating foundation is a integrated configuration, can select the sealed box of suitable quantity to make up according to the needs of operation area, and the operation support body also can set up different specifications according to operation area's needs.
3. The utility model discloses an operation support body is a modular spatial structure, through simple concatenation, can carry out the support body on floating basis fast and set up, through being connected with the stand preparation, can increase the bulk rigidity of floating basis and operation support body.
4. The utility model relates to a repeatedly usable's integrated configuration, the structure equipment, dismantle the convenience, do benefit to the recovery.
5. The utility model relates to a structure of regularization, member, support, connecting hole etc. have the commonality, and the model of member, size can carry out the regularization preparation.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a side view of the present invention;
FIG. 3 is a schematic view of the connection between the middle upright post and the top support of the present invention;
fig. 4 is a schematic view of the self-locking pin of the present invention;
FIG. 5 is a schematic view of the extension sleeve of the present invention;
FIG. 6 is a front view of the sealing box of the present invention;
fig. 7 is a top view of the sealing box of the present invention.
In the figure: 1. a bottom floating foundation; 11. sealing the box body; 12. connecting the ear plates; 13. a stand column supporting seat; 14. a support base plate; 15. an upright post sleeve; 2. an operation frame body; 3. an edge post; 4. a middle upright post; 5. a middle layer horizontal rod; 51. a first connection end plate; 6. a working layer horizontal rod; 61. a third connecting plate; 7. an operating platform; 71. a safety net; 72. a guard rail; 721. a second connection end plate; 73. a scaffold board; 74. a self-locking pin; 8. jacking; 81. a top pallet; 82. jacking the sleeve; 9. a scissor support; 10. a mooring line.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the scope of the present invention based on the embodiments of the present invention.
In order to facilitate understanding of the present invention, the present invention will be described more fully hereinafter with reference to the accompanying drawings. Several embodiments of the present invention are presented. The invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Please refer to fig. 1-7, the utility model provides a technical solution: a detachable floating type mobile operation platform on water comprises a bottom floating type foundation 1 and an operation frame body 2, wherein the operation frame body 2 is positioned above the bottom floating type foundation 1, the bottom floating type foundation 1 is formed by combining a sealing box body 11, the top and the bottom of the sealing box body 11 are connected with connecting lug plates 12, the connecting lug plates 12 are provided with connecting through holes, the sealing box body 11 is fixedly connected with an upright post supporting seat 13, the upright post supporting seat 13 is composed of a supporting seat cushion plate 14 and an upright post sleeve 15, the bottom of the supporting seat cushion plate 14 is fixed with the sealing box body 11, the bottom of the upright post sleeve 15 is fixed with the supporting seat cushion plate 14, and the upright post sleeve 15 is provided with connecting through holes; the bottom floating foundation 1 is assembled by a plurality of sealed box bodies 11 through connecting lug plates 12, the bottom of the bottom floating foundation 1 is connected with a mooring rope 10, one section of the mooring rope 10 is connected with the bottom floating foundation 1, and the other end of the mooring rope is fixed with peripheral objects.
It should be noted that, in this embodiment, the bottom floating foundation 1 is formed by connecting the sealed box bodies 11, an appropriate number of sealed box bodies 11 are selected according to the area required by the working surface, the connecting ear plates 12 on the upper and lower surfaces of the adjacent sealed box bodies 11 are respectively fixed by using bolts and the like to form a whole, the sealed box bodies 11 can be spliced and combined by the connecting ear plates 12, users can increase or decrease the sealed box bodies 11 according to the use requirements, and the use is flexible;
furthermore, the edge upright posts 3 and the middle upright posts 4 can be inserted into the upright post sleeves 15, during installation, the lower ends of the edge upright posts 3 and the middle upright posts 4 are inserted into the upright post sleeves 15 of the upright post supporting seats 13 at proper positions, the connecting holes in the upright post sleeves 15 correspond to the connecting holes in the edge upright posts 3 and the middle upright posts 4, and bolts are inserted, screwed and fixed.
In the embodiment, referring to fig. 1, fig. 2 and fig. 3, the operation frame body 2 is composed of two side edge columns 3, a middle column 4, a middle layer horizontal rod 5, an operation layer horizontal rod 6, an operation platform 7, a top support 8 and a cross brace 9, the middle layer horizontal rod 5 and the operation layer horizontal rod 6 are perpendicular to the edge columns 3 and the middle column 4, the operation layer horizontal rod 6 is located above the middle layer horizontal rod 5, the operation platform 7 is located above the operation layer horizontal rod 6, and the operation platform 7 is composed of a safety net 71, a guard rail 72 and a scaffold plate 73; the upper part, the middle part and the lower part of the edge upright 3 are respectively provided with an upper connecting hole, a middle connecting hole and a lower connecting hole, the upper connecting holes are connected with the protective railing 72 through bolts, the middle connecting holes are connected with the middle layer horizontal rod 5 and the operation layer horizontal rod 6 through bolts, and the lower connecting holes are connected with the upright supporting seat 13 through bolts; the upper part, the middle part and the lower part of the middle upright post 4 are provided with an upper connecting hole, a middle connecting hole and a lower connecting hole, the upper connecting hole is used for connecting the jacking 8, the middle connecting hole is used for connecting the middle layer horizontal rod 5, and the lower connecting hole is used for connecting the upright post supporting seat 13; the two ends of the middle-layer horizontal rod 5 are fixedly connected with first connecting end plates 51, the upper and lower parts of each first connecting end plate 51 are provided with connecting holes, and each first connecting end plate 51 is connected with the edge upright column 3 through the connecting hole; the two ends of the guard rail 72 are fixedly connected with a second connecting end plate 721, the second connecting end plate 721 is provided with a connecting hole, and the second connecting end plate 721 is connected with the edge upright 3 through the connecting hole.
In this embodiment, during installation, the connection holes on the first connection end plate 51 correspond to the connection holes on the edge upright 3 or the middle upright 4, and bolts are inserted, screwed and fixed;
further, the connecting holes in the second connecting end plate 721 of the guard rail 72 are aligned with the connecting holes in the edge columns 3, bolts are inserted and screwed down for fixing, so that the guard rail 72 is fixedly connected with the edge columns 3, the upper part of the safety net 71 can be connected with the guard rail 72, the lower part can be connected with the horizontal rod 6 of the working layer, and the two sides can be connected with the edge columns 3.
In an embodiment, referring to fig. 1, fig. 3 and fig. 4, the top support 8 is composed of a top support plate 81 and a top support sleeve 82, the top of the periphery of the top support plate 81 is provided with connecting holes, the top support sleeve 82 is provided with connecting holes, one end of the operation layer horizontal rod 6 close to the top support plate 81 is positioned above the top support plate 81 and connected with the top support plate 81 through a bolt, the other end of the operation layer horizontal rod 6 is connected with a third connecting plate 61, and the third connecting plate 61 is connected with the edge upright 3 through a bolt; two ends of the scissor supports 9 are subjected to bending treatment, connecting holes are formed in the bending sections, and two ends of the scissor supports 9 are connected with the edge stand columns 3 and the middle stand column 4 through bolts; the inside auto-lock pin 74 that evenly is connected with of scaffold board 73, scaffold board 73 are located the top of operation level horizontal bar 6, and scaffold board 73 is fixed mutually with operation level horizontal bar 6 through auto-lock pin 74.
It should be noted that, in this embodiment, the jacking sleeve 82 has a connection hole, the upper portion of the jacking sleeve is fixed to the jacking plate 81, the middle column 4 can be inserted into the jacking sleeve 82, the connection hole on the jacking sleeve 82 and the middle column 4 is aligned, and a bolt is inserted and screwed tightly;
further, one end of the horizontal rod 6 of the operation layer is connected with the jacking 8 through a bolt, and the other end of the horizontal rod is correspondingly consistent with the connecting hole on the edge upright post 3 through a connecting through hole on the third connecting plate 61, and the bolt is inserted, screwed and fixed;
further, auto-lock pin 74 comprises pin and dwang, scaffold board 73 can realize being connected with operation layer horizontal rod 6 through the connecting hole, arrange scaffold board 73 in operation layer horizontal rod 6 upper portion, the dwang on the auto-lock pin 74 is changeed to unanimous with the pin direction earlier, take out auto-lock pin 74 from scaffold board 73, then aim at the connecting hole on operation layer horizontal rod 6 and the scaffold board 73, and the auto-lock pin 74 that will take out penetrates downtheholely, at last change the dwang to perpendicular with the pin direction, accomplish scaffold board 73 and operation layer horizontal rod 6's fixed promptly.
The utility model discloses work flow:
when in use, according to the area required by the working face, a proper number of sealed box bodies 11 are selected, the connecting lug plates 12 on the upper surface and the lower surface of the adjacent sealed box bodies 11 are respectively fixed by adopting the modes of bolts and the like to form a whole, a plurality of sealed box bodies 11 can be spliced and combined through the connecting lug plates 12, one section of the mooring rope 10 is connected with the bottom floating foundation 1, the other end of the mooring rope is fixed with peripheral objects, when in installation, the lower ends of the edge upright columns 3 and the middle upright columns 4 are inserted into upright column sleeves 15 of upright column supporting seats 13 at proper positions, the connecting holes on the upright column sleeves 15 are correspondingly consistent with the connecting holes on the edge upright columns 3 and the middle upright columns 4, bolts are inserted, screwed and fixed, the connecting holes on the first connecting end plate 51 are correspondingly consistent with the connecting holes on the edge upright columns 3 or the middle upright columns 4 in sequence, the bolts are inserted, screwed and fixed, the connecting hole on the second connecting end plate 721 of the guard rail 72 is aligned with the connecting hole on the edge upright 3, the bolt is inserted and screwed down for fixing, so that the connection and fixation of the guard rail 72 and the edge upright 3 can be realized, the upper part of the safety net 71 can be connected with the guard rail 72, the lower part can be connected with the operation layer horizontal rod 6, the two sides can be connected with the edge upright 3, one end of the operation layer horizontal rod 6 is connected with the top support 8 through the bolt, the other end is correspondingly aligned with the connecting hole on the edge upright 3 through the connecting through hole on the third connecting plate 61 of the operation layer horizontal rod 6, the bolt is inserted, screwed down and fixed, the scaffold plate 73 is arranged on the upper part of the operation layer horizontal rod 6, the rotating rod on the self-locking pin 74 is firstly rotated to be aligned with the direction of the pin, the self-locking pin 74 is taken out from the scaffold plate 73, then the connecting holes on the operation layer horizontal rod 6 and the scaffold plate 73 are aligned, and the taken out self-locking pin 74 is inserted into the hole, finally, the rotating rod is rotated to be vertical to the direction of the pin, namely, the scaffold board 73 and the horizontal rod 6 of the operation layer are fixed for use.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The floating type movable operation platform capable of being disassembled on water comprises a bottom floating type foundation (1) and an operation frame body (2), and is characterized in that the operation frame body (2) is positioned above the bottom floating type foundation (1), and the bottom floating type foundation (1) is formed by combining a sealing box body (11);
operation support body (2) comprises both sides edge stand (3), middle standing pillar (4), intermediate level horizon bar (5), operation layer horizon bar (6), operation platform (7), top support (8) and bridging (9), intermediate level horizon bar (5) and operation layer horizon bar (6) with edge stand (3) and middle standing pillar (4) are mutually perpendicular, operation layer horizon bar (6) are located the top of intermediate level horizon bar (5), operation platform (7) are located the top of operation layer horizon bar (6), operation platform (7) comprise safety net (71), guardrail bar (72) and scaffold board (73).
2. The floating type movable work platform capable of being disassembled on water as claimed in claim 1, wherein the top and bottom of the sealing box body (11) are connected with connecting ear plates (12), the connecting ear plates (12) are provided with connecting through holes, the sealing box body (11) is fixedly connected with upright supporting seats (13), the upright supporting seats (13) are composed of supporting seat cushion plates (14) and upright sleeve barrels (15), the bottoms of the supporting seat cushion plates (14) are fixed with the sealing box body (11), the bottoms of the upright sleeve barrels (15) are fixed with the supporting seat cushion plates (14), and the upright sleeve barrels (15) are provided with connecting through holes.
3. The floating mobile work platform that can be dismantled on water according to claim 1, characterized in that, the bottom floating foundation (1) is assembled by a plurality of sealed boxes (11) through connecting ear plates (12), and the bottom of the bottom floating foundation (1) is connected with mooring ropes (10).
4. The floating mobile work platform of claim 2, wherein the edge columns (3) are provided with upper connecting holes, middle connecting holes and lower connecting holes at the upper part, the middle part and the lower part, the upper connecting holes are connected with the guard rails (72) through bolts, the middle connecting holes are connected with the middle layer horizontal rods (5) and the work layer horizontal rods (6) through bolts, and the lower connecting holes are connected with the column supporting seats (13) through bolts.
5. The floating mobile work platform detachable from water on the claim 1, characterized in that the upper part, the middle part and the lower part of the middle upright post (4) are equipped with upper connecting hole, middle connecting hole and lower connecting hole, the upper connecting hole is used for connecting the top support (8), the middle connecting hole is used for connecting the middle horizontal rod (5), and the lower connecting hole is used for connecting the upright post supporting seat (13).
6. The floating type movable operation platform capable of being disassembled on water as claimed in claim 1, wherein the top support (8) is composed of a top support plate (81) and a top support sleeve (82), the top of the periphery of the top support plate (81) is provided with connecting holes, the top support sleeve (82) is provided with connecting holes, one end of the operation layer horizontal rod (6) close to the top support plate (81) is located above the top support plate (81) and connected with the top support plate through the bolt, the other end of the operation layer horizontal rod (6) is connected with a third connecting plate (61), and the third connecting plate (61) is connected with the edge upright column (3) through the bolt.
7. The floating mobile work platform capable of being disassembled on water as claimed in claim 1, wherein the two ends of the middle layer horizontal rod (5) are fixedly connected with first connecting end plates (51), the upper and lower parts of the first connecting end plates (51) are provided with connecting holes, and each first connecting end plate (51) is connected with the edge upright column (3) through the connecting hole.
8. The floating mobile work platform that can dismantle on water of claim 1, characterized in that, the guard rail (72) both ends fixedly connected with second connection end plate (721), second connection end plate (721) is gone up and is opened there is the connecting hole, second connection end plate (721) are connected with the edge post (3) through the connecting hole.
9. The floating type movable work platform capable of being disassembled on water as claimed in claim 1, wherein two ends of the cross brace (9) are bent and a connecting hole is arranged on the bent section, and two ends of the cross brace (9) are connected with the edge upright column (3) and the middle upright column (4) through bolts.
10. The floating mobile work platform of claim 1, characterized in that self-locking pins (74) are uniformly connected inside the scaffold board (73), the scaffold board (73) is located above the horizontal rod (6) of the work layer, and the scaffold board (73) is fixed with the horizontal rod (6) of the work layer through the self-locking pins (74).
CN202222537962.3U 2022-09-21 2022-09-21 Detachable floating type mobile operation platform on water Active CN218842883U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222537962.3U CN218842883U (en) 2022-09-21 2022-09-21 Detachable floating type mobile operation platform on water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222537962.3U CN218842883U (en) 2022-09-21 2022-09-21 Detachable floating type mobile operation platform on water

Publications (1)

Publication Number Publication Date
CN218842883U true CN218842883U (en) 2023-04-11

Family

ID=87284665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222537962.3U Active CN218842883U (en) 2022-09-21 2022-09-21 Detachable floating type mobile operation platform on water

Country Status (1)

Country Link
CN (1) CN218842883U (en)

Similar Documents

Publication Publication Date Title
CN103850445A (en) Reset reinforcing method for deformation of pavilion timer frame building
CN218842883U (en) Detachable floating type mobile operation platform on water
CN115680181B (en) Material-saving and wind-resistant cable-membrane structure building and construction method thereof
CN218467326U (en) Assembled tower footing tower crane safety barrier
CN215564746U (en) Assembled steel structure ladder cage
CN216713950U (en) Steel construction assembled supports bed-jig
CN216142502U (en) Anti-overturning high-voltage line power transmission iron tower
CN114086594B (en) Support welding tool for offshore wind power jacket
CN114182646B (en) Assembled ladder cage buttress with adjustable length
CN215593948U (en) Upper structure of offshore booster station
CN213563427U (en) Precast beam removes stretch-draw rack
CN115637644A (en) Detachable floating type mobile operation platform on water
CN205295943U (en) Detain tower system
CN111962907B (en) External swinging reinforcement device and method for controlling earthquake damage deformation of building structure
CN211369456U (en) Support is used in curtain construction near water
CN215290657U (en) Be used for building structure to assemble and use telescopic bracket
CN212478085U (en) Combined light steel beam column structure
CN220789783U (en) Novel foundation pit supporting equipment
CN220580041U (en) Open caisson formwork platform
CN218059930U (en) Steel pipe concrete arch bridge arch rib vertical splicing hydraulic jig frame
CN220620961U (en) Building construction has building construction frame of anti falling structure
RU132107U1 (en) SUPPORTS
CN214942134U (en) Special maintenance insulating platform for indoor transformer substation
CN210636445U (en) Building supporting structure
CN218813934U (en) Steel pipe micro pile underpins and consolidates deviation correcting device with basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant