CN221422607U - Workbench for electric power pipe gallery construction - Google Patents
Workbench for electric power pipe gallery construction Download PDFInfo
- Publication number
- CN221422607U CN221422607U CN202323244297.XU CN202323244297U CN221422607U CN 221422607 U CN221422607 U CN 221422607U CN 202323244297 U CN202323244297 U CN 202323244297U CN 221422607 U CN221422607 U CN 221422607U
- Authority
- CN
- China
- Prior art keywords
- base
- workbench
- plates
- electric power
- power pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 230000006978 adaptation Effects 0.000 claims description 2
- 238000012423 maintenance Methods 0.000 abstract description 4
- 238000005299 abrasion Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Landscapes
- Forklifts And Lifting Vehicles (AREA)
Abstract
The utility model relates to the technical field of electric power pipe galleries, and discloses a workbench for electric power pipe gallery construction. According to the utility model, the motor is started, the second rotating shaft drives the first bevel gear to rotate, the two second bevel gears drive the first rotating shaft to rotate, the second moving plate moves along the first rotating shaft under the action of the second spiral groove, the two first baffles are respectively moved and unfolded towards two sides, the plurality of second baffles are respectively moved and unfolded towards two sides under the action of the first connecting rod to protect the periphery of the workbench, the workbench is prevented from shaking due to collision of the base when workers work, the stability is improved, the motor is reversed after the work is finished, the first baffles and the second baffles are retracted, and when the workbench is moved, the workbench is prevented from collision and abrasion, and the maintenance cost is reduced.
Description
Technical Field
The utility model belongs to the technical field of electric power pipe galleries, and particularly relates to a workbench for electric power pipe gallery construction.
Background
The utility tunnel is a special passageway that sets up for laying and maintaining of electric power circuit, usually an underground or overhead channel structure for hold electric power circuit, cable, telecommunication equipment etc. and provide the facility of maintaining and managing these equipment, in urban construction, the utility tunnel usually can cooperate with other types of pipe galleries, constitutes a part of urban infrastructure jointly, through rational planning and overall arrangement, the utility tunnel helps improving urban utility equipment's security and reliability, promotes urban utility power supply system's health development, and the utility tunnel construction sometimes needs in higher position, can make things convenient for workman's operation through the workstation.
Through retrieving CN 217325484U, a workbench for electric power pipe gallery construction is disclosed, and through the integral structure of equipment, the contact area with the ground is improved, the stability is improved, and collapse is prevented.
But the present inventors have found that this technical solution still has at least the following drawbacks:
When working personnel work on the workstation, lack the protective component around current workstation, the workstation directly bumps and can produce to rock, has certain potential safety hazard, and at the in-process that removes, the workstation bumps, probably can cause wearing and tearing, increases the maintenance cost of workstation.
The present utility model has been made in view of this.
Disclosure of utility model
Therefore, the utility model aims to provide a workbench for electric power pipe gallery construction, which solves the problems that when working staff works on the workbench, the periphery of the existing workbench lacks a protection component, the workbench directly collides to generate shaking, a certain potential safety hazard exists, and the workbench collides in the moving process, so that abrasion is possibly caused, and the maintenance cost of the workbench is increased.
Based on the above objects, the present utility model provides a workbench for electric power piping lane construction.
The utility model provides a workbench is used in electric power piping lane construction, includes base, workstation, two equal fixedly connected with hydraulic push rods in base upper portion both ends, a plurality of hydraulic push rod output all install on the workstation, install the motor on the base, the second pivot is installed to the motor output, and the base internal rotation is connected with two first pivots, and sliding connection has two second movable plates in the base, two first pivot one end runs through the second movable plate that corresponds respectively, has all seted up the second helicla flute in two first pivots, two the second helicla flute respectively with the second movable plate looks adaptation that corresponds, two first pivot one end all fixed cover is equipped with the second bevel gear, and second pivot one end fixed cover is equipped with first bevel gear, two second bevel gear all meshes with first bevel gear, and the base both sides all are equipped with first baffle, and two second movable plate one side both ends all are fixedly connected with first slide bar, a plurality of first slide bar other end respectively fixed connection is on corresponding first baffle, and base both sides all are equipped with the second baffle.
As a preferred embodiment of the utility model, two ends of one side of each first baffle are fixedly connected with a fixed plate, one side of each second baffle is rotatably connected with a first connecting rod, the other ends of the first connecting rods are respectively rotatably connected with the corresponding fixed plates, one side of each second baffle is fixedly connected with two second sliding rods, and the second sliding rods slide in the base.
As a preferable implementation mode of the utility model, two second sliding grooves are formed in the base, and the two second moving plates slide in the corresponding second sliding grooves respectively.
As a preferred implementation mode of the utility model, two first movable plates are connected in the base in a sliding manner, one ends of the two first rotating shafts penetrate through the corresponding first movable plates respectively, first spiral grooves are formed in the two first rotating shafts, the two first spiral grooves are respectively matched with the corresponding first movable plates, lifting plates are arranged at two ends of one side of the base, second connecting rods are connected at two ends of the two first movable plates in a rotating manner, the other ends of the plurality of second connecting rods are connected to the corresponding lifting plates in a rotating manner respectively, and supporting seats are arranged at two ends of one side of the two lifting plates.
As a preferred embodiment of the utility model, two third sliding grooves are formed in two ends of one side of the base, guide rods are fixedly connected to two ends of one side of the two lifting plates, and a plurality of guide rods slide in the corresponding third sliding grooves respectively.
As a preferred embodiment of the utility model, two first sliding grooves are formed in the base, the two first moving plates slide in the corresponding first sliding grooves respectively, side grooves are formed in the inner walls of the two sides of the two first sliding grooves, sliding blocks are connected to the two ends of the two first moving plates in a rotating mode, and a plurality of sliding blocks slide in the corresponding side grooves respectively.
As a preferable implementation mode of the utility model, the lower part of the base is provided with a plurality of universal wheels, both sides of the base are provided with the staircase, and the workbench is provided with the guardrail.
Compared with the prior art, the utility model has the following beneficial effects:
According to the utility model, the motor is started, the second rotating shaft drives the first bevel gear to rotate, the two second bevel gears drive the first rotating shaft to rotate, the second moving plate moves along the first rotating shaft under the action of the second spiral groove, the two first baffles are respectively moved and unfolded towards two sides, the plurality of second baffles are respectively moved and unfolded towards two sides under the action of the first connecting rod to protect the periphery of the workbench, the workbench is prevented from shaking due to collision of the base when workers work, the stability is improved, the motor is reversed after the work is finished, the first baffles and the second baffles are retracted, and when the workbench is moved, the workbench is prevented from collision and abrasion, and the maintenance cost is reduced.
The following describes the embodiments of the present utility model in further detail with reference to the accompanying drawings.
Drawings
In the drawings:
fig. 1 is a schematic perspective view of a workbench for electric power pipe gallery construction according to the present utility model;
Fig. 2 is a schematic perspective view of a fixing plate of a workbench for electric power pipe gallery construction;
Fig. 3 is a schematic perspective view of a universal wheel of a workbench for electric power pipe gallery construction;
Fig. 4 is a schematic diagram of a cross-sectional structure of a base of a workbench for electric power piping lane construction according to the present utility model;
Fig. 5 is a schematic diagram of a second baffle plate of the electric power pipe gallery construction workbench according to the present utility model;
fig. 6 is a schematic perspective view of a first moving plate of a workbench for electric power pipe gallery construction according to the present utility model;
Fig. 7 is a schematic view of a first rotating shaft of a workbench for electric power piping lane construction according to the present utility model
Fig. 8 is a schematic view of a lifting plate for a workbench for electric power piping lane construction according to the present utility model
Fig. 9 is a schematic perspective view of a first baffle of a workbench for electric power pipe gallery construction.
In the figure: 1. a base; 2. a work table; 3. a hydraulic push rod; 4. guard bars; 5. an escalator; 6. a first baffle; 7. a second baffle; 8. a motor; 9. a fixing plate; 10. a universal wheel; 11. a support base; 12. a first chute; 13. a second chute; 14. a side groove; 15. a third chute; 16. a first link; 17. a first rotating shaft; 18. a guide rod; 19. a lifting plate; 20. a first moving plate; 21. a second moving plate; 22. a second link; 23. a second rotating shaft; 24. a first bevel gear; 25. a second bevel gear; 26. a first helical groove; 27. a second helical groove; 28. a slide block; 29. a first slide bar; 30. and a second slide bar.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more apparent, the technical solutions in the embodiments will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and the following embodiments are used to illustrate the present utility model.
As shown in fig. 1 to 9, a workbench for electric power pipe gallery construction comprises a base 1 and a workbench 2, wherein two hydraulic push rods 3 are fixedly connected to two ends of the upper part of the base 1, the output ends of a plurality of hydraulic push rods 3 are respectively arranged on the workbench 2, a motor 8 is arranged on the base 1, a second rotating shaft 23 is arranged at the output end of the motor 8, two first rotating shafts 17 are rotationally connected in the base 1, two second moving plates 21 are slidingly connected in the base 1, one ends of the two first rotating shafts 17 respectively penetrate through the corresponding second moving plates 21, second spiral grooves 27 are respectively formed in the two first rotating shafts 17, the two second spiral grooves 27 are respectively matched with the corresponding second moving plates 21, one ends of the two first rotating shafts 17 are respectively fixedly sleeved with a second bevel gear 25, one end of the second rotating shaft 23 is fixedly sleeved with a first bevel gear 24, the two second bevel gears 25 are respectively meshed with the first bevel gear 24, the second rotating shaft 23 drives the first bevel gear 24 to rotate, the two second bevel gears 25 drive the first rotating shaft 17 to rotate, the second moving plates 21 move along the first rotating shaft 17 under the action of the second spiral grooves 27, the first baffle plates 6 are respectively arranged at two sides of the base 1, the first slide bars 29 are fixedly connected with two ends of one side of the two second moving plates 21, the other ends of the plurality of first slide bars 29 are respectively and fixedly connected with the corresponding first baffle plates 6, the two second moving plates 21 respectively drive the first baffle plates 6 to spread, the second baffle plates 7 are respectively arranged at two ends of the two sides of the base 1, the fixed plates 9 are respectively and fixedly connected with one side of the two first baffle plates 6, the first connecting rods 16 are respectively and rotatably connected with one side of the plurality of second baffle plates 7, the other ends of the plurality of first connecting rods 16 are respectively and rotatably connected with the corresponding fixed plates 9, the plurality of second baffle plates 7 are respectively spread under the action of the first connecting rods 16, to the protection around the workstation 2, a plurality of second baffle 7 one side all fixedly connected with two second slide bars 30, a plurality of second slide bars 30 all slide in base 1, have seted up two second spouts 13 in the base 1, and two second movable plates 21 slide respectively in corresponding second spout 13, and staircase 5 is all installed to base 1 both sides, installs guardrail 4 on the workstation 2.
The base 1 is internally and slidably connected with two first movable plates 20, one ends of the two first rotating shafts 17 respectively penetrate through the corresponding first movable plates 20, the two first rotating shafts 17 are respectively provided with first spiral grooves 26, the two first spiral grooves 26 are respectively matched with the corresponding first movable plates 20, two ends of one side of the base 1 are respectively provided with lifting plates 19, two ends of the two first movable plates 20 are respectively and rotatably connected with second connecting rods 22, the other ends of the plurality of second connecting rods 22 are respectively and rotatably connected with the corresponding lifting plates 19, two ends of one side of the two lifting plates 19 are respectively provided with supporting seats 11, two ends of one side of the base 1 are respectively provided with two third sliding grooves 15, two ends of one side of the two lifting plates 19 are respectively and fixedly connected with guide rods 18, the guide rods 18 slide in the corresponding third sliding grooves 15 respectively, two first sliding grooves 12 are formed in the base 1, the two first moving plates 20 slide in the corresponding first sliding grooves 12 respectively, side grooves 14 are formed in the inner walls of the two sides of the two first sliding grooves 12 respectively, the sliding blocks 28 are connected to the two ends of the two first moving plates 20 in a rotating mode, the sliding blocks 28 slide in the corresponding side grooves 14 respectively, the universal wheels 10 are mounted on the lower portion of the base 1, the first moving plates 20 move along the first rotating shafts 17 under the action of the first spiral grooves 26, and the lifting plates 19 move downwards along the supporting seats 11 under the action of the second connecting rods 22 to support the base 1, so that the universal wheels 10 are separated from the ground, and the stability of the base 1 can be improved.
The implementation principle of the workbench for electric power pipe gallery construction in this embodiment is as follows:
When the workbench is used, the motor 8 is started, the second rotating shaft 23 drives the first bevel gear 24 to rotate, the two second bevel gears 25 drive the first rotating shaft 17 to rotate, the two first moving plates 20 move along the corresponding first rotating shafts 17 respectively under the action of the first spiral grooves 26, the lifting plate 19 drives the supporting seat 11 to move downwards under the action of the second connecting rod 22, the base 1 is supported, the universal wheels 10 are separated from the ground, the stability of the base 1 is improved, the two second moving plates 21 move along the corresponding first rotating shafts 17 respectively under the action of the second spiral grooves 27, the two first baffle plates 6 are pushed to move and spread towards two sides, the plurality of second baffle plates 7 move and spread under the action of the first connecting rod 16, the periphery of the workbench 2 is protected by the first baffle plates 6 and the second baffle plates 7, and the hydraulic push rod 3 is started, so that the workbench 2 can be moved to a required height for operation.
Claims (7)
1. The utility model provides a workbench for electric power pipe gallery construction, including base (1), workstation (2), its characterized in that, two hydraulic push rods (3) are all fixedly connected with in base (1) upper portion both ends, a plurality of hydraulic push rods (3) output are all installed on workstation (2), install motor (8) on base (1), second pivot (23) are installed to motor (8) output, base (1) swivelling joint has two first pivots (17), sliding connection has two second movable plates (21) in base (1), two first pivots (17) one end runs through corresponding second movable plate (21) respectively, second helical groove (27) have all been seted up on two first pivots (17), two second helical groove (27) respectively with corresponding second movable plate (21) looks adaptation, two first pivots (17) one end all fixed cover is equipped with second bevel gear (25), second pivot (23) one end fixed cover is equipped with first bevel gear (24), two first bevel gear (25) are equipped with in first bevel gear (24) in sliding connection in base (1), two first bevel gear (25) one end fixed cover, two first bevel gear (25) and two both ends are equipped with two second bevel gears (29) respectively on the first slide bar (6) both sides are connected with one side respectively, two ends of two sides of the base (1) are provided with second baffle plates (7).
2. The workbench for electric power pipe gallery construction according to claim 1, wherein two fixing plates (9) are fixedly connected to two ends of one side of each first baffle plate (6), a plurality of second baffle plates (7) are rotatably connected to first connecting rods (16) on one side, the other ends of the plurality of first connecting rods (16) are rotatably connected to corresponding fixing plates (9) respectively, two second sliding rods (30) are fixedly connected to one side of each second baffle plate (7), and the plurality of second sliding rods (30) slide in the base (1).
3. The workbench for electric power pipe gallery construction according to claim 2, wherein two second sliding grooves (13) are formed in the base (1), and the two second moving plates (21) slide in the corresponding second sliding grooves (13) respectively.
4. The workbench for electric power pipe gallery construction according to claim 3, wherein two first moving plates (20) are connected in a sliding manner in the base (1), one ends of the two first rotating shafts (17) penetrate through the corresponding first moving plates (20) respectively, first spiral grooves (26) are formed in the two first rotating shafts (17), the two first spiral grooves (26) are matched with the corresponding first moving plates (20) respectively, lifting plates (19) are arranged at two ends of one side of the base (1), second connecting rods (22) are connected at two ends of the two first moving plates (20) in a rotating manner, the other ends of the plurality of second connecting rods (22) are connected to the corresponding lifting plates (19) in a rotating manner respectively, and supporting seats (11) are arranged at two ends of one side of the two lifting plates (19).
5. The workbench for electric power pipe gallery construction according to claim 4, wherein two third sliding grooves (15) are formed in two ends of one side of the base (1), guide rods (18) are fixedly connected to two ends of one side of the two lifting plates (19), and the guide rods (18) slide in the corresponding third sliding grooves (15) respectively.
6. The workbench for electric power pipe gallery construction according to claim 5, wherein two first sliding grooves (12) are formed in the base (1), the two first moving plates (20) slide in the corresponding first sliding grooves (12) respectively, side grooves (14) are formed in inner walls of two sides of the two first sliding grooves (12), sliding blocks (28) are connected to two ends of the two first moving plates (20) in a rotating mode, and a plurality of sliding blocks (28) slide in the corresponding side grooves (14) respectively.
7. The workbench for electric power pipe gallery construction according to claim 6, wherein a plurality of universal wheels (10) are installed at the lower part of the base (1), the escalator (5) is installed at two sides of the base (1), and the guardrail (4) is installed on the workbench (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323244297.XU CN221422607U (en) | 2023-11-30 | 2023-11-30 | Workbench for electric power pipe gallery construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323244297.XU CN221422607U (en) | 2023-11-30 | 2023-11-30 | Workbench for electric power pipe gallery construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221422607U true CN221422607U (en) | 2024-07-26 |
Family
ID=92015617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202323244297.XU Active CN221422607U (en) | 2023-11-30 | 2023-11-30 | Workbench for electric power pipe gallery construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221422607U (en) |
-
2023
- 2023-11-30 CN CN202323244297.XU patent/CN221422607U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205472513U (en) | A lift platform for power plant equipment overhauls | |
CN107161818A (en) | A kind of automatically controlled lowering or hoisting gear of construction | |
CN115448227A (en) | Extension type live working platform | |
CN221422607U (en) | Workbench for electric power pipe gallery construction | |
CN204877464U (en) | All -in -one is strutted to coal mine tunnel tunnelling | |
CN108442442B (en) | Pit digging, vertical rod and lifting integrated machine | |
CN217299719U (en) | Hydraulic engineering construction is with removing movable support | |
CN203321338U (en) | Lifting working platform for vehicle-mounted deep well drilling machine | |
CN112499364B (en) | Pay-off is used in construction of power transmission and distribution power consumption electric engineering | |
CN210712584U (en) | Movable supporting bracket for road and bridge construction | |
CN221856725U (en) | Tunnel engineering excavation construction table | |
CN216076180U (en) | Scaffold for house repair | |
CN217871671U (en) | Low-position safe building construction platform | |
CN113107522B (en) | Movable rack vehicle for tunnel excavation supporting | |
CN221191409U (en) | Communication pipeline construction device | |
CN221420628U (en) | Substation operation and maintenance supporting equipment | |
CN221000645U (en) | Highway engineering safety construction platform | |
CN220353348U (en) | Civil engineering construction support | |
CN221779455U (en) | Tunnel engineering construction safety management device | |
CN217499954U (en) | Operation platform for bridge construction | |
CN221346984U (en) | Mine channel supporting device for coal mining | |
CN217783509U (en) | Subway shield tunnel section of jurisdiction hand hole shutoff operation platform | |
CN219079028U (en) | Electric power overhauls work rack | |
CN217025246U (en) | Ascending device for maintaining power equipment | |
CN220234056U (en) | Cable protection frame for power engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |