CN221346392U - Safety device for steel structure building construction - Google Patents

Safety device for steel structure building construction Download PDF

Info

Publication number
CN221346392U
CN221346392U CN202323146928.4U CN202323146928U CN221346392U CN 221346392 U CN221346392 U CN 221346392U CN 202323146928 U CN202323146928 U CN 202323146928U CN 221346392 U CN221346392 U CN 221346392U
Authority
CN
China
Prior art keywords
wall
safety
building construction
steel
connecting rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323146928.4U
Other languages
Chinese (zh)
Inventor
孙煌威
陈帅
郑华辉
付昕宇
王亮
周志强
谢绪琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Group South China Co Ltd
Original Assignee
China Construction Third Bureau Group South China Co Ltd
Filing date
Publication date
Application filed by China Construction Third Bureau Group South China Co Ltd filed Critical China Construction Third Bureau Group South China Co Ltd
Application granted granted Critical
Publication of CN221346392U publication Critical patent/CN221346392U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a safety protection device for steel structure building construction, which comprises four steel columns, a collecting box, safety belts, a same cross beam and a plurality of safety belts, wherein the cross beams are equidistantly distributed on the inner walls of the four steel columns, and the safety protection device comprises the following components: and a moving mechanism: for moving the collection box; be equipped with the protection network on the bottom outer wall of crossbeam, be equipped with first connecting rope and reset spring on the bottom outer wall of collecting box, first connecting rope with reset spring's top all is connected with fixed ball, be connected with the second on the inner wall of fixed ball and connect the rope, cup jointed fixed lantern ring on the outer wall of one side of safety belt, the second connect the rope with fixed lantern ring is connected. The safety protection device for the steel structure building construction has the technical effects of collecting and storing small objects or small particle dust leaked from the leakage holes of the protection net, avoiding affecting the work of workers, realizing double protection and being higher in safety.

Description

Safety device for steel structure building construction
Technical Field
The utility model relates to the technical field of steel structure building construction, in particular to a safety protection device for steel structure building construction.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, and in recent years, steel structure buildings are rapidly developed, and compared with traditional concrete buildings, the steel structure buildings are higher in structural strength and better in shock resistance.
The patent document of application number 202020612176.3 discloses a safety device for steel construction, including the chassis, connect the base, the guard bar, be equipped with the attenuator between the bottom of guard bar and the connection base, the connecting block of attenuator bottom and the last fixed surface who connects the base are connected, the connecting block fixedly connected with pivot at attenuator top, the bottom fixedly connected with bearing of guard bar, bearing and pivot swing joint, the top of guard bar is equipped with the roof, the top fixedly connected with blotter of roof, the material of roof is the chrome, its inside packing has glass fiber.
However, when the traditional safety protection device for steel structure building construction is used, a protection net is connected between the cross beams to connect and put objects falling above, but small objects or small particle dust generated during construction can fall from the protection net, potential safety hazards exist, and the work of workers can be influenced; for example: the protection network is the network structure, in the high altitude effect of steel construction, can have the condition that the part dropped, can be lived by the protection string bag generally, but little article or granule dust can leak by the mesh, drops in the eminence and can cause the injury to the staff, and granule dust drops and can make the staff sight fuzzy, and then causes the influence to the work.
Disclosure of utility model
The utility model discloses a safety protection device for steel structure building construction, which aims to solve the technical problems that when the traditional safety protection device for steel structure building construction is used, a protection net is connected between cross beams to connect and put objects falling above, but small objects or small particle dust generated during construction can fall from the protection net, potential safety hazards exist and the work of staff can be influenced.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
The utility model provides a steel construction safety device for construction, includes four steel columns, collecting box, safety belt and equidistance distribute four same crossbeam on the steel column inner wall still includes:
and a moving mechanism: for moving the collection box;
Be equipped with the protection network on the bottom outer wall of crossbeam, be equipped with first connecting rope and reset spring on the bottom outer wall of collecting box, first connecting rope with reset spring's top all is connected with fixed ball, be connected with the second on the inner wall of fixed ball and connect the rope, cup jointed fixed lantern ring on the outer wall of one side of safety belt, the second connect the rope with fixed lantern ring is connected.
In this scheme, the bottom of every crossbeam all is equipped with the protection network, the protection network of top is lived the article pocket that drops to the eminence and is deposited, the protection network of bottom protects the staff who walks on the crossbeam, the staff wears the safety belt and walks on the crossbeam, cooperation moving mechanism, reset spring plays elastic buffer's effect, it can be simply spacing to make first connecting rope pull in reset spring, make the second connecting rope because the effect of safety belt will collect the case and stimulate, the pulling range of collection case can not be too big, make the removal case remove the top position to the staff, make the little article or the little granule dust that the protection network leaks collect through the collection case, after the certain cycle, can clear up and change the collection case, the course of working is safer.
Optionally, the first connecting rope is located inside the return spring.
By adopting the technical scheme, when the collecting box is pulled, the reset spring can be pulled, so that the pulling range of the first connecting rope inside is positioned in the reset spring, the limiting is performed, the first connecting rope can be protected, the pulling amplitude is not too large, and the movement is more stable.
In a preferred scheme, the moving mechanism comprises mounting blocks arranged on the outer walls of one side of the four steel columns, one slide rail is arranged on the outer wall of the opposite side of each mounting block, a sleeve hook is sleeved on the outer wall of each slide rail, sleeve rings are arranged on two sides of the outer wall of the top of the collecting box, and the sleeve rings are connected with the sleeve hooks.
By adopting the technical scheme, the collecting box is sleeved on the sleeve hooks, when the safety belt pulls the collecting box to move, the sleeve hooks on two sides move on the sliding rail, meanwhile, the collecting box is driven to move to the matched position, the moving process is smoother, and the matching effect is good.
From the above, a safety device for steel construction includes four steel columns, collecting box, safety belt and equidistance distribute four same crossbeam on the steel column inner wall still includes:
and a moving mechanism: for moving the collection box;
Be equipped with the protection network on the bottom outer wall of crossbeam, be equipped with first connecting rope and reset spring on the bottom outer wall of collecting box, first connecting rope with reset spring's top all is connected with fixed ball, be connected with the second on the inner wall of fixed ball and connect the rope, cup jointed fixed lantern ring on the outer wall of one side of safety belt, the second connect the rope with fixed lantern ring is connected. The safety protection device for the steel structure building construction has the technical effects of collecting and storing small objects or small particle dust leaked from the leakage holes of the protection net, avoiding affecting the work of workers, realizing double protection and being higher in safety.
Drawings
Fig. 1 is a schematic diagram of the overall structure of a safety protection device for steel structure building construction.
Fig. 2 is an enlarged view of a first connecting rope of a safety device for steel structure building construction according to the present utility model.
Fig. 3 is a schematic diagram of a safety belt structure of a safety device for steel structure building construction according to the present utility model.
In the accompanying drawings: 1. a steel column; 2. a cross beam; 3. a protective rod; 4. a mounting block; 5. a slide rail; 6. a sleeve hook; 7. a collection box; 8. a cross bar; 9. a first connecting rope; 10. a return spring; 11. a fixed ball; 12. a second connecting rope; 13. a safety belt; 14. a fixed collar; 15. a movable collar; 16. a protective net; 17. a buffer cord.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. The components of the embodiments of the present application generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the application, as presented in the figures, is not intended to limit the scope of the application, as claimed, but is merely representative of selected embodiments of the application. All other embodiments, which can be made by a person skilled in the art without making any inventive effort, are intended to be within the scope of the present application.
When the safety protection device for the steel structure building construction is mainly applied to the traditional safety protection device for the steel structure building construction, the protection net is connected between the cross beams to receive and place objects falling from the upper side, but small objects or small particle dust generated during construction can fall from the protection net, potential safety hazards exist, and the working scene of workers can be influenced.
Referring to fig. 1 and 2, a safety device for steel construction, including four steel columns 1, a collection box 7, a safety belt 13 and the same beam 2 equidistantly distributed on the inner wall of the four steel columns 1, further including:
and a moving mechanism: for moving the collection box 7;
The bottom outer wall of the cross beam 2 is provided with a protective net 16, the bottom outer wall of the collecting box 7 is fixedly connected with a first connecting rope 9 and a reset spring 10, the top ends of the first connecting rope 9 and the reset spring 10 are fixedly connected with a fixed ball 11, the inner wall of the fixed ball 11 is fixedly connected with a second connecting rope 12, one side outer wall of the safety belt 13 is fixedly sleeved with a fixed lantern ring 14, and the second connecting rope 12 is connected with the fixed lantern ring 14.
In a specific working process, when working on the cross beam 2, a worker walks on the cross beam 2, the protective net 16 arranged at the bottom of the cross beam 2 can pocket and store articles falling from a high place, the worker also protects the walking worker, when wearing the safety belt 13 to walk on the cross beam 2, the worker is matched with the moving mechanism to move the collecting box 7 to the upper part of the worker, in the process, the reset spring 10 plays a role in elastic buffering, the first connecting rope 9 cannot be excessively pulled in the reset spring 10, the second connecting rope 12 pulls and moves the collecting box 7 to a required position under the movement of the safety belt 13, and after a certain period, the collecting box 7 can be cleaned and replaced.
Further, referring to fig. 2, in some examples, the first connecting rope 9 is located inside the return spring 10, so when the collecting box 7 is pulled, the return spring 10 will be pulled, so that the pulling range of the first connecting rope 9 inside is located inside the return spring 10, limiting is performed, the first connecting rope 9 can be protected, the pulling amplitude is not too large, and the moving process is smoother.
The safety belt 13 is matched with the collecting box 7, when a worker wears the safety belt 13 and moves, the collecting box 7 can be pulled to be located above the worker, so that falling objects can be collected, and the work cannot be influenced.
Referring to fig. 1 and 2, in a preferred embodiment, the moving mechanism includes mounting blocks 4 provided on outer walls of one side of four steel columns 1, the same slide rail 5 is provided on outer walls of opposite sides of the two mounting blocks 4, a sleeve hook 6 is sleeved on an outer wall of the slide rail 5, sleeve rings are fixedly installed on two sides of an outer wall of a top of the collecting box 7, and the sleeve rings are connected with the sleeve hook 6.
Specifically, the sleeve ring on the collecting box 7 is sleeved on the sleeve hook 6, when a worker wears the safety belt 13 to move, the collecting box 7 is pulled, and at the moment, the sleeve hooks 6 on the two sides move on the sliding rail 5, so that the collecting box 7 is driven to move to the matched position.
Referring to fig. 1 and 3, in a preferred embodiment, supporting pads distributed equidistantly are fixedly installed on two sides of the outer wall of the top of the cross beam 2, a protection rod 3 is fixedly installed on the outer wall of the top of the supporting pad, placing rings distributed equidistantly are arranged on two sides of the outer wall of the circumference of the protection rod 3, a cross rod 8 is arranged on the inner wall of the placing ring, a movable lantern ring 15 is sleeved on the outer wall of the safety belt 13, a buffer rope 17 is connected on one side outer wall of the movable lantern ring 15, a hanging structure is connected on the top end of the buffer rope 17, and a hook is matched with the cross rod 8 for use.
Specifically, the horizontal pole 8 that the protection pole 3 on the crossbeam 2 is connected can carry out dual protection to the staff, and the couple lock joint through on the safety belt 13 is on horizontal pole 8, guarantees staff's safety, and the personnel of different altitudes can lock safety belt 13 to one between two horizontal poles 8 of adaptation, at the in-process that removes, also can hold up horizontal pole 8 and remove.
It should be noted that, the steel column 1 is provided with a plurality of beams 2, the scheme is only described for one layer of beams 2, and in the actual working environment, corresponding adjustment can be performed through the number of workers and the places needing protection.
Working principle: when the safety protection device is used, a worker wears the safety belt 13 when working on the cross beam 2, the hook connected with the movable lantern ring 15 is hung on the adaptive cross rod 8, the fixed lantern ring 14 is connected with the collecting box 7, the collecting box 7 is sleeved on the sleeve hook 6, when the worker walks, the collecting box 7 is pulled to enable the sleeve hook 6 to move on the sliding rail 5, the reset spring 10 plays a role of elastic buffering, the first connecting rope 9 is pulled and limited in the reset spring 10, the second connecting rope 12 is enabled to pull the collecting box 7, the collecting box 7 is moved to the upper position of the worker, then small objects or small particle dust falling from the protective net 16 can be collected through the collecting box 7, the set protective net 16 can be used for carrying and storing the objects falling at high, the worker walking on the cross beam 2 can be protected, and the cross rod 8 connected on the set protective rod 3 can also be used for protecting the worker.
The above description is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto. The substitutions may be partial structures, devices, or method steps, or may be a complete solution. The technical proposal and the utility model concept are equivalent to or changed in accordance with the utility model, and the utility model is covered in the protection scope of the utility model.

Claims (7)

1. The utility model provides a safety device for steel construction, includes four steel column (1), collection box (7), safety belt (13) and equidistance are distributed on four same crossbeam (2) on steel column (1) inner wall, its characterized in that still includes:
and a moving mechanism: for moving the collection box (7);
Be equipped with protection network (16) on the bottom outer wall of crossbeam (2), be equipped with first connecting rope (9) and reset spring (10) on the bottom outer wall of collection box (7), first connecting rope (9) with the top of reset spring (10) all is connected with fixed ball (11), be connected with second connecting rope (12) on the inner wall of fixed ball (11), fixed lantern ring (14) have been cup jointed on the outer wall of one side of safety belt (13), second connecting rope (12) with fixed lantern ring (14) are connected.
2. Safety device for steel construction building construction according to claim 1, characterized in that the first connecting rope (9) is located inside the return spring (10).
3. Safety device for steel construction building construction according to claim 2, characterized in that the safety belt (13) is used in cooperation with the collecting box (7).
4. The safety protection device for steel structure building construction according to claim 1, wherein the moving mechanism comprises mounting blocks (4) arranged on the outer walls of one side of the four steel columns (1), the same sliding rail (5) is arranged on the outer walls of the opposite sides of the two mounting blocks (4), and a sleeve hook (6) is sleeved on the outer walls of the sliding rails (5).
5. The safety protection device for steel structure building construction according to claim 4, wherein sleeve rings are arranged on two sides of the outer wall of the top of the collecting box (7), and the sleeve rings are connected with the sleeve hooks (6).
6. The safety protection device for the steel structure building construction according to claim 1, wherein supporting pads distributed at equal distances are arranged on two sides of the outer wall of the top of the cross beam (2), a protection rod (3) is arranged on the outer wall of the top of the supporting pad, placing rings distributed at equal distances are arranged on two sides of the outer wall of the circumference of the protection rod (3), and transverse rods (8) are arranged on the inner wall of the placing rings.
7. The safety protection device for steel structure building construction according to claim 6, wherein a movable sleeve ring (15) is sleeved on the outer wall of the safety belt (13), a buffer rope (17) is connected to the outer wall of one side of the movable sleeve ring (15), a hook is connected to the top end of the buffer rope (17), and the hook is matched with the cross rod (8).
CN202323146928.4U 2023-11-22 Safety device for steel structure building construction Active CN221346392U (en)

Publications (1)

Publication Number Publication Date
CN221346392U true CN221346392U (en) 2024-07-16

Family

ID=

Similar Documents

Publication Publication Date Title
CN211645989U (en) Water conservancy construction safety device
CN210396204U (en) Horizontal safety protection net of overhanging outer frame for engineering site
CN112392247B (en) Building outer wall construction operation platform
CN221346392U (en) Safety device for steel structure building construction
CN211229466U (en) Municipal construction is with hanging basket with protector
CN212507309U (en) High hanging flower basket for construction of security
CN214834555U (en) Supporting platform with protection function for municipal engineering construction
CN114875802B (en) Folding and unfolding type bridge hanging basket construction device with windproof shaking structure
CN110975186A (en) Utensil falling prevention device for portable high-altitude operation
CN212025911U (en) Bridge protective fence
CN207048357U (en) A kind of civil engineering building guardrail
CN215760354U (en) Construction hanging basket with protection function
CN207484936U (en) A kind of nacelle device of Landscape Lighting installation
CN212127384U (en) Material lifting device for building construction
CN210583549U (en) Manual lifting type damping basketball stand
CN209924411U (en) Hanging flower basket for construction
CN216377259U (en) Tower crane for constructional engineering construction
CN215670939U (en) Frame protective structure is climbed in building engineering construction
CN219451448U (en) Collision buffer protection mechanism for constructional engineering
CN207892211U (en) A kind of architectural engineering installment inside and outside room holder
CN207612673U (en) Portable fruit picker
CN214885749U (en) Multifunctional safety protection device for high-rise building construction
CN110805250A (en) Outdoor scaffold with rest platform
CN216017862U (en) Fruit device is got in forestry
CN220621153U (en) Security protection device for construction

Legal Events

Date Code Title Description
GR01 Patent grant