CN112392247B CN202011328109.XA CN202011328109A CN112392247B CN 112392247 B CN112392247 B CN 112392247B CN 202011328109 A CN202011328109 A CN 202011328109A CN 112392247 B CN112392247 B CN 112392247B
Authority
CN
China
Prior art keywords
platform
sliding
building
seat
base platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011328109.XA
Other languages
Chinese (zh)
Other versions
CN112392247A (en
Inventor
刘勇
王孟林
李钦
洪玉龙
马睿
刘彩云
廖伟
李文
朱小立
郭芳
李建
周骁玲
廖海军
张代源
段凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Jinqi Construction Engineering Co ltd
Original Assignee
Hunan Jinqi Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Jinqi Construction Engineering Co ltd filed Critical Hunan Jinqi Construction Engineering Co ltd
Priority to CN202011328109.XA priority Critical patent/CN112392247B/en
Publication of CN112392247A publication Critical patent/CN112392247A/en
Application granted granted Critical
Publication of CN112392247B publication Critical patent/CN112392247B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The invention discloses a building outer wall construction operation platform, which comprises a base platform and a lifting mechanism connected and arranged above the base platform, wherein guard rails are arranged on four sides of the base platform; a slide rail is arranged on the upper part of the base platform along the length direction, and a following mechanism is arranged in the slide rail; a sliding chute is arranged below the sliding rail, and a balance mechanism connected with the following mechanism is arranged in the sliding chute; the following mechanism comprises a sliding seat which is arranged in the sliding rail and matched with the sliding rail, and an upright post is vertically arranged above the sliding seat; the upper part of the upright post is provided with a buckle, the buckle is internally provided with a safety lock catch capable of being unlocked, and the safety lock catch is connected with a safety belt used for being tied on the body of a worker through a safety rope; the invention can balance the weight in time when the center of the platform deviates due to the work of personnel on the operation platform, and can carry out safety protection along with the personnel at any time.

Description

Building outer wall construction operation platform
Technical Field
The invention belongs to the technical field of building construction equipment, and particularly relates to a building outer wall construction operation platform.
Background
The construction operation platform for the building outer wall is a construction facility which is erected on a building or a structure through a cantilever mechanism, is driven by a lifting mechanism to suspend the platform, runs up and down along the vertical surface of the building or the structure through a steel wire rope, and is also an operation platform for operators. It generally acts on the curtain installation, and outer wall cleaning is one kind and can replaces traditional scaffold frame, can alleviate intensity of labour, improves work efficiency to can used repeatedly's novel aerial working equipment. The use of the construction hanging basket has gradually become a trend, and the construction hanging basket is widely accepted in high-altitude operations such as outer wall construction, curtain wall installation, heat preservation construction, maintenance and outer wall cleaning of high-rise and multi-storey buildings, and can be used for the operation of large-scale tank bodies, bridges, dams and other projects. The product can avoid scaffold. The construction cost is reduced, the construction cost is 28 percent of that of the traditional scaffold, and the working efficiency is greatly improved. The hanging basket is flexible to operate, easy to shift, convenient, practical, safe and reliable.
But as the work platform who often is applied to high altitude construction, the safety protection function is all the heaviest at all times, because work needs, the staff can make a round trip to walk on the platform, can often stretch out the health and operate the guardrail outside, these works all can lead to the platform to take place to squint as a holistic structure focus with the human body, when the skew range is too big or the skew process is comparatively violent, light then can lead to the mechanism's that suspends in midair pressure bearing change that the platform both sides acutely leads to wearing and tearing, heavy then the platform unbalance leads to personnel to fall down or even fall aloft.
Disclosure of Invention
The invention aims to solve the problems and provides a building outer wall construction operating platform which can balance weight in time when the center of the platform deviates due to the work of personnel on the operating platform and can perform safety protection along with the personnel at any time.
In order to realize the purpose, the invention adopts the technical scheme that: a building outer wall construction operation platform comprises a base platform and a lifting mechanism which is connected with and arranged above the base platform, wherein guard rails are arranged on four sides of the base platform; a sliding rail is arranged on the upper part of the base platform along the length direction, and a following mechanism is arranged in the sliding rail; a sliding groove is arranged below the sliding rail, and a balance mechanism connected with the following mechanism is arranged in the sliding groove; the following mechanism comprises a sliding seat which is arranged in the sliding rail and matched with the sliding rail, and an upright post is vertically arranged above the sliding seat; the upper part of the upright post is provided with a ring buckle, and the ring buckle is connected with a safety belt tied on the body of a worker through a safety rope.
Furthermore, the balance mechanism comprises a balance weight sliding block which is arranged in the sliding chute and can slide back and forth, and a reset mechanism is arranged between the balance weight sliding block and one end of the sliding chute; the balance weight slider is characterized in that a roller is arranged between the same ends of the sliding rail and the sliding groove, a traction rope is arranged at the other end of the balance weight slider, and the traction rope is connected with the sliding seat by bypassing the roller.
Further, the bottom of the sliding groove is evenly provided with rollers at intervals below the balance weight sliding block.
Furthermore, the reset mechanism is an elastic telescopic rope or a tension spring.
Furthermore, seats are arranged on two sides of the upright post.
Further, an articulated seat is arranged between the seat and the upright post, and the seat can be unfolded and retracted through the articulated seat.
Further, the two sides of the upright post are provided with tool racks for containing construction operation tools.
Furthermore, the upper part of the upright post is sleeved with a rotatable rotary drum, and the ring buckles are uniformly arranged on the outer wall of the rotary drum at intervals on the circumference; the safety lock catch capable of being unlocked is arranged in the ring buckle and connected with the safety rope.
Further, a foot pad for buffering protection is arranged at the bottom of the base platform.
Furthermore, the lifting mechanism consists of a steel wire rope connected with two sides of the base platform and a hoist connected with the steel wire rope.
The invention has the beneficial effects that:
1. the device can perform follow-up protection on workers who are under construction on the base platform, so that the safety of the workers is guaranteed, the situation that in the prior art, once an unbalanced falling accident occurs, the workers can be subjected to follow-up rescue only when safety ropes with fixed lengths fall to be completely unfolded is avoided, the working range of the safety workers can be matched with the rectangular range of the platform through the follow-up device, and the workers are completely prevented from falling.
2. The device is provided with the balance mechanism, so that the balance weight sliding block can be driven to slide to the other end in time in the process of platform gravity center deviation caused by movement of workers, the platform gravity center deviation degree is corrected, and the platform stability is improved.
3. According to the device, the following mechanism is provided with the seat, the tool rack and other structures, so that the device can provide convenient rest and work assistance for workers while following protection is achieved.
Drawings
Fig. 1 is a schematic perspective view of the device of the present invention.
Fig. 2 is an enlarged schematic structural view of a part a in fig. 1.
FIG. 3 is a schematic top view of the apparatus of the present invention.
Fig. 4 is a schematic cross-sectional view of a-a in fig. 3.
Fig. 5 is an enlarged structural view of a portion B in fig. 4.
Fig. 6 is a schematic cross-sectional view of B-B in fig. 3.
Fig. 7 is an enlarged structural view of a portion C in fig. 6.
Fig. 8 is an enlarged schematic view of a portion D in fig. 6.
Fig. 9 is a schematic perspective view of the balancing mechanism 4 and the following mechanism 5 in the device of the present invention.
In the figure: 1. a lifting mechanism; 2. a base platform; 3. protecting the fence; 4. a balancing mechanism; 5. a following mechanism; 101. a wire rope; 102. a hoist; 201. a slide rail; 202. a chute; 203. a drum; 204. a foot pad; 401. a balance weight slider; 402. a reset structure; 403. a hauling rope; 404. a roller; 501. a slide base; 502. a column; 503. a hinged seat; 504. a seat; 505. a tool holder; 506. a rotating drum; 507. looping; 508. safe lock catch; 509. a safety cord; 510. a safety belt.
Detailed Description
The following detailed description of the present invention is given for the purpose of better understanding technical solutions of the present invention by those skilled in the art, and the present description is only exemplary and explanatory and should not be construed as limiting the scope of the present invention in any way.
As shown in fig. 1 to 9, the specific structure of the present invention is: an operating platform for building exterior wall construction comprises a base platform 2 and a lifting mechanism 1 which is connected with and arranged above the base platform 2, wherein guard rails 3 are arranged on four sides of the base platform 2; a slide rail 201 is arranged on the upper part of the base platform 2 along the length direction, and a following mechanism 5 is arranged in the slide rail 201; a sliding groove 202 is arranged below the sliding rail 201, and a balance mechanism 4 connected with a following mechanism 5 is arranged in the sliding groove 202; the following mechanism 5 comprises a sliding seat 501 which is arranged in the sliding rail 201 and matched with the sliding rail, and an upright column 502 is vertically arranged above the sliding seat 501; the upper part of the upright post 502 is provided with a buckle 507, and the buckle 507 is connected with a safety belt 510 for tying on the body of a worker through a safety rope 509.
In order to further realize that when a worker moves on the base platform 2, the inner parts of the two ends of the device automatically carry out counterweight balance, the balance mechanism 4 comprises a counterweight sliding block 401 which is arranged in the sliding groove 202 and can slide back and forth, and a reset mechanism 402 is arranged between the counterweight sliding block 401 and one end of the sliding groove 202; a roller 404 is arranged between the same ends of the sliding rail 201 and the sliding groove 202, a traction rope 403 is arranged at the other end of the balance weight sliding block 401, and the traction rope 403 bypasses the roller 404 and is connected with the sliding base 501.
In order to further improve the working sensitivity of the balance mechanism 4, rollers 203 are uniformly distributed at intervals below the balance weight sliding block 401 at the bottom of the sliding chute 404.
Preferably, the reset mechanism 403 is an elastic retractable rope or a tension spring.
In order to facilitate the rest of the staff on the base platform 2 at any time, seats 504 are arranged on both sides of the upright 502.
Preferably, an articulated seat 503 is disposed between the seat 504 and the upright 502, and the seat 504 can be unfolded and retracted through the articulated seat 503.
In order to facilitate the staff to take the required working tools at any time, two sides of the upright column 502 are provided with tool racks 505 for accommodating the construction operation tools.
In order to facilitate the workers to walk on the base platform 2 at will without knotting or winding the safety rope 509, the upper part of the upright column 502 is sleeved with a rotatable rotary drum 506, and the ring fasteners 507 are circumferentially and uniformly arranged on the outer wall of the rotary drum 506 at intervals; an unlockable safety lock 508 is arranged in the buckle 507, and the safety lock 508 is connected with a safety rope 509.
Preferably, the bottom of the base platform 2 is provided with a foot pad 204 for buffering protection.
Preferably, the lifting mechanism 1 is composed of a steel wire rope 101 connected to two sides of the base platform and a lifter 102 connected to the steel wire rope 101.
Device during operation, the staff is at the construction platform during operation, the safety belt of binding on one's body passes through the safety rope and connects on the stand, when the personnel walk about, the slide that the safety rope can drive the stand bottom removes in the slide rail, the haulage rope of slide one side also can drive the inside balanced counter weight slider of platform at once and slide in the spout, realize that platform both sides have weight similar's object all the time to balance, the staff can also expand the seat through the stand both sides of follow-up and have a rest simultaneously, take storage tool through the tool rest also more convenient and fast more
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The principles and embodiments of the present invention are explained herein using specific examples, which are presented only to assist in understanding the method and its core concepts of the present invention. The foregoing is only a preferred embodiment of the present invention, and it should be noted that there are objectively infinite specific structures due to the limited character expressions, and it will be apparent to those skilled in the art that a plurality of modifications, decorations or changes may be made without departing from the principle of the present invention, and the technical features described above may be combined in a suitable manner; such modifications, variations, combinations, or adaptations of the invention using its spirit and scope, as defined by the claims, may be directed to other uses and embodiments.

Claims (9)

1. An operating platform for building exterior wall construction comprises a base platform (2) and a lifting mechanism (1) which is connected with and arranged above the base platform (2), wherein guard rails (3) are arranged on four sides of the base platform (2); the device is characterized in that a sliding rail (201) is arranged on the upper part of the base platform (2) along the length direction, and a following mechanism (5) is arranged in the sliding rail (201); a sliding groove (202) is arranged below the sliding rail (201), and a balance mechanism (4) connected with a following mechanism (5) is arranged in the sliding groove (202); the following mechanism (5) comprises a sliding seat (501) which is arranged in the sliding rail (201) and matched with the sliding seat, and an upright post (502) is vertically arranged above the sliding seat (501); a buckle (507) is arranged at the upper part of the upright post (502), and the buckle (507) is connected with a safety belt (510) used for being tied on the body of a worker through a safety rope (509); the balance mechanism (4) comprises a balance weight sliding block (401) which is arranged in the sliding groove (202) and can slide back and forth, and a reset mechanism (402) is arranged between the balance weight sliding block (401) and one end of the sliding groove (202); and a roller (404) is arranged between the same end of the sliding rail (201) and the same end of the sliding groove (202), a traction rope (403) is arranged at the other end of the balance weight sliding block (401), and the traction rope (403) bypasses the roller (404) to be connected with the sliding seat (501).
2. The construction operation platform for the external wall of the building as claimed in claim 1, wherein the bottom of the chute (202) is provided with rollers (203) at uniform intervals below the balance weight slider (401).
3. The operating platform for construction of exterior walls of buildings according to claim 1, characterized in that the restoring mechanism (402) is an elastic extension rope or tension spring.
4. The construction operation platform for the external wall of the building as claimed in claim 1, wherein the vertical column (502) is provided with seats (504) at both sides.
5. The building exterior wall construction operation platform as claimed in claim 4, wherein a hinged seat (503) is arranged between the seat (504) and the upright column (502), and the seat (504) can be unfolded and retracted through the hinged seat (503).
6. The construction operation platform for the external wall of the building as claimed in claim 1, wherein tool racks (505) for receiving construction operation tools are arranged at both sides of the upright column (502).
7. The construction operation platform for the external wall of the building as claimed in claim 1, wherein the upper part of the upright column (502) is sleeved with a rotatable drum (506), and the ring fasteners (507) are circumferentially and uniformly arranged on the outer wall of the drum (506) at intervals; a safety lock catch (508) capable of being unlocked is arranged in the buckle (507), and the safety lock catch (508) is connected with a safety rope (509).
8. The construction operation platform for the outer wall of the building as claimed in claim 1, wherein a foot pad (204) for buffering protection is arranged at the bottom of the base platform (2).
9. The operating platform for the construction of the external wall of the building as claimed in claim 1, wherein the lifting mechanism (1) is composed of a steel wire rope (101) connected with two sides of the base platform and a lifter (102) connected with the steel wire rope (101).
CN202011328109.XA 2020-11-24 2020-11-24 Building outer wall construction operation platform Active CN112392247B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011328109.XA CN112392247B (en) 2020-11-24 2020-11-24 Building outer wall construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011328109.XA CN112392247B (en) 2020-11-24 2020-11-24 Building outer wall construction operation platform

Publications (2)

Publication Number Publication Date
CN112392247A CN112392247A (en) 2021-02-23
CN112392247B true CN112392247B (en) 2022-04-05

Family

ID=74607735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011328109.XA Active CN112392247B (en) 2020-11-24 2020-11-24 Building outer wall construction operation platform

Country Status (1)

Country Link
CN (1) CN112392247B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550558A (en) * 2021-06-17 2021-10-26 李欢欢 Building outer wall construction platform
CN113958197A (en) * 2021-11-04 2022-01-21 金狮堂(江苏)建筑设计研究院有限公司 Rail guard is used in building engineering construction
CN114678804B (en) * 2022-04-22 2023-08-18 国网江苏省电力有限公司南通供电分公司 Live working platform of ascending a height of distribution network
CN115303992A (en) * 2022-08-04 2022-11-08 河南省发达起重机有限公司 Maintenance tool for gantry crane and maintenance method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207827801U (en) * 2018-01-26 2018-09-07 中国建筑第二工程局有限公司 A kind of safety hanging cradle
CN109184175A (en) * 2018-10-08 2019-01-11 渠衍飞 A kind of construction suspension platform and suspention auxiliary device
CN109537862A (en) * 2018-11-29 2019-03-29 李小英 A kind of apparatus for building of safe construction
CN211647422U (en) * 2020-01-19 2020-10-09 张景程 Building construction safety device
CN111410150B (en) * 2020-04-16 2021-09-21 合肥慧问机械设计有限公司 Lifting platform for maintaining glass curtain wall
CN111573482A (en) * 2020-05-26 2020-08-25 田志群 Prevent to rock high building protection device for construction that stability is high

Also Published As

Publication number Publication date
CN112392247A (en) 2021-02-23

Similar Documents

Publication Publication Date Title
CN112392247B (en) Building outer wall construction operation platform
US5065838A (en) Movable support for window washers and the like
EP2522616A1 (en) Elevator apparatus
EP3003504B1 (en) Improvements in rope access equipment
CN108756266A (en) A kind of foundation construction of high-rise buildings anti-drop device
CN106139430A (en) High-rise life saving, disaster relief system
CN214942247U (en) External hanging basket for building installation and construction
CN110734014A (en) safe lifting device for underground rescue
CN207445385U (en) One kind steps on bar falling proof device
CN207406013U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device
CN211007572U (en) Deep foundation pit personnel climbing equipment
JPH1045381A (en) Method and device capable of giving secure access particularly to high cab of tower type crane
CN216360648U (en) Hanging basket for bridge construction
CN111732024A (en) Supplementary lift erection equipment of interior decoration heavy object
CN218538895U (en) Safety device for manned lifting hanging basket of building tower crane
CN217119154U (en) Folding escape frame for escape window
CN218714852U (en) Scaffold for multi-use architecture
CN217230152U (en) Lifting machine for building
CN220845190U (en) Crane with protection function
CN218759820U (en) Vertical shaft wellhead maintenance platform
CN214611211U (en) Double-beam crane with protection mechanism
CN215407322U (en) Anti-falling guide mechanism of climbing frame
CN216766727U (en) Climbing frame protection device
CN214785853U (en) Safety protection device for integrated lifting platform of outer vertical surface of assembled building
CN209277524U (en) Scaffold ladder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant