CN221320959U - Basement outer wall post-pouring strip shutoff construction structures - Google Patents

Basement outer wall post-pouring strip shutoff construction structures Download PDF

Info

Publication number
CN221320959U
CN221320959U CN202322994610.5U CN202322994610U CN221320959U CN 221320959 U CN221320959 U CN 221320959U CN 202322994610 U CN202322994610 U CN 202322994610U CN 221320959 U CN221320959 U CN 221320959U
Authority
CN
China
Prior art keywords
steel plate
plugging
basement
wall
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322994610.5U
Other languages
Chinese (zh)
Inventor
叶镕豪
唐斌
崔永旺
李勇
郭家红
邢超波
谭浩
张雷
陈咏
黄天平
肖汀
王翠平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau Central China Construction Co ltd
Original Assignee
China Construction Eighth Bureau Central China Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Bureau Central China Construction Co ltd filed Critical China Construction Eighth Bureau Central China Construction Co ltd
Priority to CN202322994610.5U priority Critical patent/CN221320959U/en
Application granted granted Critical
Publication of CN221320959U publication Critical patent/CN221320959U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a basement outer wall post-pouring strip plugging construction structure, which comprises a plurality of groups of basement outer wall templates, a plurality of plugging steel plates and a plurality of water stopping steel plates, wherein the basement outer wall templates comprise an inner template and an outer template; the outer side surfaces of the two ends of the plugging steel plate are attached to the inner side surfaces of the outer templates of the two groups of basement outer wall templates; one end of each water stop steel plate extends into a group of basement outer wall templates, and the other end extends to the inner side of the plugging steel plate and is fixedly connected with the plugging steel plate. The utility model has the beneficial effects that: the plugging steel plates are arranged on the outer side surface of the post-cast strip, the plugging steel plates are fixed in the pouring process of the outer wall of the basement, the post-cast strip is plugged, the waterproof construction and the backfill construction are convenient to insert in advance, the construction period can be effectively shortened, and the cost is saved; the plugging steel plate and the outer side surface of the basement outer wall are approximately located on the same plane, so that the outer wall waterproof coiled material is convenient to lay, construction is convenient, and the overall waterproof performance of the basement outer wall is improved.

Description

Basement outer wall post-pouring strip shutoff construction structures
Technical Field
The utility model relates to the technical field of basement exterior wall construction, in particular to a basement exterior wall post-pouring strip plugging construction structure.
Background
In the basement outer wall waterproof construction process, the basement outer wall post-cast strip cannot be sealed in advance, so that basement outer wall waterproof construction is caused, the basement fertilizer groove backfilling construction period is prolonged, and the basement outer wall waterproof construction is inserted in advance to solve the problem. If the outdoor wall of some buildings is constructed at present, a baffle is arranged at the position corresponding to the outer side of the post-cast strip, the post-cast strip of the outdoor wall of the basement is plugged by the baffle in advance, and then the waterproof construction of the outdoor wall of the basement is carried out, so that the backfilling work of a fertilizer tank of the basement is timely carried out. However, the baffle is not beneficial to the waterproof construction of the basement outer wall, and the water leakage problem is easy to occur in the gap between the baffle and the basement outer wall, so that the overall waterproof performance of the basement outer wall is affected.
Disclosure of utility model
In view of the above, in order to solve the problem of water leakage caused by early plugging of the post-cast strip in the waterproof construction process of the basement outer wall, the embodiment of the utility model provides a basement outer wall post-cast strip plugging construction structure.
The embodiment of the utility model provides a basement outer wall post-pouring strip plugging construction structure, which comprises the following steps:
The outdoor wall templates are arranged at intervals along the length direction of the outdoor wall, and each group of outdoor wall templates comprises an inner template and an outer template which are oppositely arranged;
The plurality of plugging steel plates are arranged between two adjacent groups of basement outer wall templates, and the outer side surfaces of the two ends of the plugging steel plates are attached to the inner side surfaces of the outer templates of the two groups of basement outer wall templates;
And each water stop steel plate is positioned on the inner side of one end of one plugging steel plate, one end of each water stop steel plate extends into one group of basement outer wall templates, and the other end of each water stop steel plate extends to the inner side of the plugging steel plate and is fixedly connected with the plugging steel plate.
Further, each water stop steel plate is connected with the plugging steel plate through a fixed steel plate.
Further, the fixed steel plates are respectively and vertically connected with the water stop steel plate and the plugging steel plate.
Further, the concrete pouring structure further comprises a plurality of groups of post-pouring strip steel bars, each group of post-pouring strip steel bars is arranged between two adjacent basement outer wall templates, and one end of the water stop steel plate extends into the post-pouring strip steel bars.
Further, the fixed steel plate passes through the post-cast steel bar.
Further, the device also comprises a plurality of opposite-pulling screws, and the inner templates and the outer templates of each group of the basement outer wall templates are locked by one opposite-pulling screw.
Further, a water stop ring is arranged in the middle of the opposite-pulling screw rod.
Further, two ends of the opposite-pull screw rod respectively penetrate through two steel pipes, and the two steel pipes respectively block the outer side surfaces of the inner die plate and the outer die plate.
Further, a plurality of battens are arranged between the steel pipe and the inner template and between the steel pipe and the outer template.
Further, the length of the plugging steel plate is not more than 1m, and the length of the joint part of each end of the plugging steel plate and the outer template is not less than 0.1m.
The technical scheme provided by the embodiment of the utility model has the beneficial effects that:
1. According to the basement outer wall post-pouring strip plugging construction structure, the plugging steel plates are arranged on the outer side face of the post-pouring strip and fixedly connected with the water stop steel plates in the basement outer wall templates, so that the fixing of the plugging steel plates is realized, the fixing of the plugging steel plates is completed in the basement outer wall pouring process, the post-pouring strip is plugged, the waterproof construction and the backfill construction are convenient to insert in advance, the construction period can be effectively shortened, and the cost is saved.
2. According to the basement outer wall post-pouring strip plugging construction structure, the plugging steel plate and the outer side face of the poured basement outer wall are approximately located on the same plane, so that the outer wall waterproof coiled materials are conveniently paved, the construction is convenient, the overall waterproof performance of the basement outer wall is improved, and the leakage risk of the basement outer wall in the later period is reduced.
Drawings
FIG. 1 is a schematic diagram of a basement exterior wall post-cast strip plugging construction structure of the present utility model.
In the figure: 1. an outer template; 2. an inner template; 3. plugging the steel plate; 4. a water-stopping steel plate; 5. fixing the steel plate; 6. a counter-pulling screw; 7. a water stop ring; 8. a steel pipe; 9. wood square; 10. post-pouring steel bars; 11. an external wall of a basement.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the present utility model more apparent, embodiments of the present utility model will be further described with reference to the accompanying drawings. The following presents a preferred one of a number of possible embodiments of the utility model in order to provide a basic understanding of the utility model, but is not intended to identify key or critical elements of the utility model or to delineate the scope of the utility model.
In all examples shown and discussed herein, any specific values should be construed as merely illustrative, and not a limitation. Thus, other examples of the exemplary embodiments may have different values.
Techniques, methods, and apparatus known to one of ordinary skill in the relevant art may not be discussed in detail, but are intended to be part of the specification where appropriate.
It should be noted that: like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further discussion thereof is necessary in subsequent figures. Meanwhile, it should be understood that the sizes of the respective parts shown in the drawings are not drawn in actual scale for convenience of description.
It is further noted that unless specifically stated or limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1, an embodiment of the present utility model provides a basement outer wall 11 post-cast strip plugging construction structure, which includes a plurality of groups of basement outer wall templates, a plurality of plugging steel plates 3 and a plurality of water stop steel plates 4.
As shown in fig. 1, the basement exterior wall templates are used for casting concrete to form basement exterior walls 11, and each group of basement exterior wall templates is arranged at intervals along the length direction of the pre-cast basement exterior walls 11. A plurality of post-cast strips may be present when a typical basement exterior wall 11 is cast, each post-cast strip being disposed between two adjacent basement exterior wall forms.
Each group of basement outer wall templates specifically comprises an inner template 2 and an outer template 1 which are oppositely arranged, wherein the inner template 2 and the outer template 1 are fixedly supported, and the space between the inner template 2 and the outer template 1 is the concrete pouring space of the basement outer wall 11.
Preferably, the plugging construction structure for the post-pouring strip of the basement outer wall 11 further comprises a plurality of opposite-pulling screws 6, wherein each group of the inner templates 2 and the outer templates 1 of the basement outer wall templates are locked through one opposite-pulling screw 6, and the basement outer wall templates are reinforced through the opposite-pulling screws 6. The middle part of the opposite-pull screw rod 6 is provided with a water stop ring 7, the water stop ring 7 and the opposite-pull screw rod 6 form the opposite-pull water stop screw rod, so that a template is fixed, the thickness of concrete pouring is controlled, and meanwhile, a certain water stop effect is achieved.
In order to ensure that the opposite-pulling screw 6 stably reinforces the inner die plate 2 and the outer die plate 1, two ends of the opposite-pulling screw 6 respectively penetrate through two steel pipes 8, the two steel pipes 8 respectively block the outer side surfaces of the inner die plate 2 and the outer die plate 1, and each steel pipe 8 is horizontally arranged in the middle of the outer side surface of the inner die plate 2 or the outer die plate 1. A plurality of battens 9 are arranged between the steel pipe 8 and the inner die plate 2 and between the steel pipe 8 and the outer die plate 1, the battens 9 are horizontally arranged, and the battens 9 and the steel pipe 8 are vertically crossed, so that the tension of the opposite-pulling screw 6 uniformly acts on the inner die plate 2 or the outer die plate 1.
The number of the plugging steel plates 3 is determined according to the number of post-cast strips to be arranged, and one plugging steel plate 3 is arranged at each post-cast strip. Each plugging steel plate 3 is arranged between two adjacent groups of basement exterior wall templates, and the outer side surfaces of the two ends of each plugging steel plate 3 are attached to the inner side surfaces of the outer templates 1 of the two groups of basement exterior wall templates.
The number of the water-stop steel plates 4 is determined according to the number of the plugging steel plates 3, and two ends of each plugging steel plate 3 are respectively connected with two water-stop steel plates 4. Specifically, each water-stop steel plate 4 is located inside one end of one plugging steel plate 3, one end of each water-stop steel plate 4 extends into one group of basement outer wall templates, and the other end extends to the inside of the plugging steel plate 3 and is fixedly connected with the plugging steel plate 3.
More specifically, each of the water stop steel plates 4 is connected to the sealing steel plate 3 by a fixed steel plate 5. The fixed steel plate 5 penetrates through the post-pouring steel bar 10, and the fixed steel plate 5 is respectively and vertically welded and connected with the water stop steel plate 4 and the plugging steel plate 3.
The length of the closure steel plate 3 is generally not more than 1m in consideration of the actual width of the post-cast strip. The length of the joint part of each end of the plugging steel plate 3 and the outer template 1 is not smaller than 0.1m, so that the plugging steel plate 3 is ensured to be in stable contact with the outer template 1. The width of the sealing steel plate 3 is about 0.1 m.
In addition, the basement outer wall 11 post-cast strip plugging construction structure further comprises a plurality of groups of post-cast strip steel bars 10, each group of post-cast strip steel bars 10 is arranged between two adjacent basement outer wall templates, and one end of the water stop steel plate 4 extends into the post-cast strip steel bars 10, namely the post-cast strip steel bars 10 required by the post-cast strip region are finished in advance before concrete of the basement outer wall 11 is poured.
As shown in fig. 1, the construction process of the basement outer wall 11 post-cast strip plugging construction structure applied to the basement outer wall 11 is as follows:
Arranging a plurality of groups of basement outer wall templates at the design position of the basement outer wall 11, and reinforcing each group of basement outer wall templates through the opposite-pulling screw rods 6;
Arranging a plugging steel plate 3 between two adjacent groups of basement outer wall templates, and enabling two ends of the plugging steel plate 3 to be respectively attached to the inner side surfaces of the outer templates 1 of the two groups of basement outer wall templates, wherein even if the plugging steel plate 3 and the inner side surfaces of the outer templates 1 are approximately located on the same plane;
Arranging a water-stopping steel plate 4 in each group of basement outer wall templates, and respectively welding and connecting the water-stopping steel plate 4 and the plugging steel plate 3 through a fixed steel plate 5 so as to fix the plugging steel plate 3;
And pouring concrete into the basement outer wall templates of each group, after the concrete pouring is finished, removing the templates, wherein the plugging steel plate 3 and the basement outer wall 11 are on the same plane, then performing waterproof reinforcement treatment on the plugging steel plate 3 and the basement outer wall 11, and integrally paving an outer wall waterproof coiled material, so that backfill construction is performed after construction of a later waterproof protective layer.
In this document, terms such as front, rear, upper, lower, etc. are defined with respect to the positions of the components in the drawings and with respect to each other, for clarity and convenience in expressing the technical solution. It should be understood that they are relative concepts and can be varied in many ways depending on the use and placement of the words, and that the use of the words should not limit the scope of the application as claimed.
The embodiments described above and features of the embodiments herein may be combined with each other without conflict. The foregoing description of the preferred embodiments of the utility model is not intended to limit the utility model to the precise form disclosed, and any such modifications, equivalents, and alternatives falling within the spirit and scope of the utility model are intended to be included within the scope of the utility model.

Claims (10)

1. Basement outer wall post-cast strip shutoff construction structures, characterized by, include:
The outdoor wall templates are arranged at intervals along the length direction of the outdoor wall, and each group of outdoor wall templates comprises an inner template and an outer template which are oppositely arranged;
The plurality of plugging steel plates are arranged between two adjacent groups of basement outer wall templates, and the outer side surfaces of the two ends of the plugging steel plates are attached to the inner side surfaces of the outer templates of the two groups of basement outer wall templates;
And each water stop steel plate is positioned on the inner side of one end of one plugging steel plate, one end of each water stop steel plate extends into one group of basement outer wall templates, and the other end of each water stop steel plate extends to the inner side of the plugging steel plate and is fixedly connected with the plugging steel plate.
2. The basement exterior wall post-cast strip plugging construction structure according to claim 1, wherein: each water stop steel plate is connected with the plugging steel plate through a fixed steel plate.
3. The basement exterior wall post-cast strip plugging construction structure according to claim 2, wherein: the fixed steel plate is respectively and vertically connected with the water stop steel plate and the plugging steel plate.
4. The basement exterior wall post-cast strip plugging construction structure according to claim 2, wherein: the water stop steel plate is characterized by further comprising a plurality of groups of post-cast strip steel bars, each group of post-cast strip steel bars is arranged between two adjacent basement outer wall templates, and one end of the water stop steel plate extends into the post-cast strip steel bars.
5. The basement exterior wall post-cast strip plugging construction structure according to claim 4, wherein: the fixed steel plate penetrates through the post-pouring steel bar.
6. The basement exterior wall post-cast strip plugging construction structure according to claim 1, wherein: the inner templates and the outer templates of the outer wall templates of the basement are locked by one pair of pull screws.
7. The basement exterior wall post-cast strip plugging construction structure according to claim 6, wherein: and a water stop ring is arranged in the middle of the opposite-pull screw rod.
8. The basement exterior wall post-cast strip plugging construction structure according to claim 6, wherein: two ends of the opposite-pull screw rod respectively penetrate through two steel pipes, and the two steel pipes respectively block the outer side surfaces of the inner die plate and the outer die plate.
9. The basement exterior wall post-cast strip plugging construction structure according to claim 8, wherein: and a plurality of battens are arranged between the steel pipe and the inner template and between the steel pipe and the outer template.
10. The basement exterior wall post-cast strip plugging construction structure according to claim 1, wherein: the length of the plugging steel plate is not more than 1m, and the length of the joint part of each end of the plugging steel plate and the outer template is not less than 0.1m.
CN202322994610.5U 2023-11-03 2023-11-03 Basement outer wall post-pouring strip shutoff construction structures Active CN221320959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322994610.5U CN221320959U (en) 2023-11-03 2023-11-03 Basement outer wall post-pouring strip shutoff construction structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322994610.5U CN221320959U (en) 2023-11-03 2023-11-03 Basement outer wall post-pouring strip shutoff construction structures

Publications (1)

Publication Number Publication Date
CN221320959U true CN221320959U (en) 2024-07-12

Family

ID=91793918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322994610.5U Active CN221320959U (en) 2023-11-03 2023-11-03 Basement outer wall post-pouring strip shutoff construction structures

Country Status (1)

Country Link
CN (1) CN221320959U (en)

Similar Documents

Publication Publication Date Title
CN102635118B (en) Square steel pipe concrete supporting structure for foundation pit support
CN213174793U (en) Mounting structure of pre-buried sleeve on floor
CN206053328U (en) A kind of middle buried water stop fixing device
CN221320959U (en) Basement outer wall post-pouring strip shutoff construction structures
CN207633547U (en) A kind of garage post-pouring belt of outer wall closed cover
CN211691431U (en) Detachable pipe group construction accurate positioning template combined system
CN209620278U (en) Concrete anti-bank template structure with can have enough to meet need reinforcing bar inside lining
CN216810024U (en) Basement outer wall post-cast strip concrete precast slab construction structures
CN215926411U (en) Narrow space post-cast strip formwork device in advance
CN208068520U (en) A kind of septic tank mold
CN207260636U (en) Pipe die reinforced column supporting member
CN212984630U (en) Template device is sealed in advance to vertical post-cast strip
CN203452101U (en) Sealing device for post-pouring belt of external wall of multi-storey basement
CN215562827U (en) Intercepting device is assembled to regularization post-cast strip
CN214696850U (en) Steel form for construction of constructional column at junction of longitudinal and transverse walls of house
CN210975900U (en) Basement side wall extra front and back pouring belt periphery protection structure
CN209228033U (en) Regularization template external corner reinforcing device
CN218263530U (en) Be used for box culvert entrance to a cave plugging device
CN221441580U (en) Advanced plugging structure for post-pouring strip steel plate of deep foundation pit outer wall
CN207211208U (en) Basic post-cast strip side shaping tool
CN220620510U (en) Settlement post-pouring belt sealing structure
CN214658885U (en) Free type device for preventing concrete with different marks from being poured in mixed mode
CN217517649U (en) Calandria pouring die
CN214615439U (en) Large and medium-sized water tank deformation joint post-cast side wall single-side formwork system
CN218508617U (en) Template in cast-in-place escape canal in tunnel