CN221318999U CN202323295742.5U CN202323295742U CN221318999U CN 221318999 U CN221318999 U CN 221318999U CN 202323295742 U CN202323295742 U CN 202323295742U CN 221318999 U CN221318999 U CN 221318999U
Authority
CN
China
Prior art keywords
sling
hook
crane frame
lifting
balancing weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323295742.5U
Other languages
Chinese (zh)
Inventor
黄博
刘三元
涂永红
龚静怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Fangli Environmental Protection Building Materials Co ltd
Original Assignee
Jiangxi Fangli Environmental Protection Building Materials Co ltd
Filing date
Publication date
Application filed by Jiangxi Fangli Environmental Protection Building Materials Co ltd filed Critical Jiangxi Fangli Environmental Protection Building Materials Co ltd
Application granted granted Critical
Publication of CN221318999U publication Critical patent/CN221318999U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the technical field of partition plate installation and discloses a partition plate installation lifting device, which comprises a crane frame, wherein lifting equipment is installed on the crane frame, a first sling is fixed at the output end of the lifting equipment, a first hook is installed at one end of the first sling, which is far away from the lifting equipment, a second hook is arranged below the first hook, a second sling is installed on the second hook, and a tensioning assembly is arranged on the crane frame. According to the utility model, through the cooperation of the first hook and the second hook and the pulling of the first sling and the second sling, the device can keep the partition board stable in the lifting process, so that the partition board is prevented from shaking, and the safety of the lifting process is improved.

Description

Partition plate installation hoisting device
Technical Field
The utility model relates to the technical field of partition plate installation, in particular to a partition plate installation lifting device.
Background
Partition panel installation lifting devices are devices or apparatuses for lifting and installing partition panels that contain a series of mechanical, electrical or hydraulic systems to provide lifting and installation control of the partition panel.
When lifting partition boards, the partition boards are lifted by a crane generally, and in actual operation, the partition boards lack of limit in the lifting process, which causes the partition boards to shake easily in the lifting process, the lack of limit means that the partition boards may shake or be unstable in the lifting process, which may cause accidents, such as sudden inclination, swinging or separation of the partition boards from the lifting hooks, which cause damage or damage to workers, equipment or surrounding environment, and in addition, the shake or instability in the lifting process may cause uneven stress of the partition boards, may cause plate breakage, deformation or other quality problems, which may affect the final installation effect and the stability of the wall.
Therefore, it is necessary to design a partition plate installation lifting device to solve the above-mentioned problems.
Disclosure of utility model
The utility model aims to solve the defects in the prior art and provides a partition plate installation lifting device.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
The utility model provides a partition plate installs hoisting device, includes the crane frame, install lifting device on the crane frame, lifting device's output is fixed with first hoist cable, first couple is installed to the one end that lifting device was kept away from to first hoist cable, the below of first couple is provided with the second couple, install the second hoist cable on the second couple, be provided with tensioning assembly in the crane frame.
As a preferable technical scheme of the utility model, the tensioning assembly comprises two fixing plates, a guide rod and a balancing weight, wherein the two fixing plates are respectively fixed at the upper end and the lower end of the crane frame, the guide rod is fixed between the two fixing plates, the balancing weight is sleeved on the guide rod in a sliding way, and the balancing weight is connected with one end of the second sling, which is far away from the second hook.
As a preferable technical scheme of the utility model, the side face of the balancing weight is mutually attached to the crane frame.
As a preferable technical scheme of the utility model, two first pulleys are arranged on one side of the lifting frame, two second pulleys are arranged at the top end of the lifting frame, and the second sling bypasses the two first pulleys and the two second pulleys.
As a preferable technical scheme of the utility model, the first sling and the second sling adopt steel wire ropes.
The utility model has the following beneficial effects:
1. And (3) stabilizing the lifting process: through the cooperation of the first hook and the second hook and the pulling of the first sling and the second sling, the device can keep the partition board stable in the lifting process, so that the partition board is prevented from shaking, and the safety of the lifting process is improved;
2. Synergistic action of double slings: the first sling and the second sling realize the bidirectional pulling of the partition board through the linkage of the hooks and the balancing weights, and the cooperative effect enables the lifting force to be evenly distributed, so that uneven stress of the partition board in the lifting process is prevented, and the stability of the whole device is improved.
Drawings
Fig. 1 is a schematic structural view of a partition plate installation lifting device according to the present utility model;
Fig. 2 is an enlarged view of the structure at a in fig. 1.
In the figure: 1 crane frame, 2 lifting equipment, 3 first hoist rope, 4 first couple, 5 second couple, 6 second hoist rope, 7 first pulley, 8 second pulley, 9 fixed plate, 10 guide bar, 11 balancing weight.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1-2, a partition board installation lifting device comprises a crane frame 1, wherein lifting equipment 2 is installed on the crane frame 1, a first sling 3 is fixed at the output end of the lifting equipment 2, a first hook 4 is installed at one end, far away from the lifting equipment 2, of the first sling 3, a second hook 5 is arranged below the first hook 4, a second sling 6 is installed on the second hook 5, and a tensioning assembly is arranged on the crane frame 1.
Referring to fig. 1-2, the tensioning assembly comprises two fixing plates 9, a guide rod 10 and a balancing weight 11, wherein the two fixing plates 9 are respectively fixed at the upper end and the lower end of the crane frame 1, the guide rod 10 is fixed between the two fixing plates 9, the balancing weight 11 is slidably sleeved on the guide rod 10, the balancing weight 11 is connected with one end, far away from the second hanging hook 5, of the second hanging rope 6, the second hanging rope 6 can be pulled through the second hanging hook 5, the balancing weight 11 can be pulled when the second hanging rope 6 is stressed, the balancing weight 11 can move upwards, at the moment, the balancing weight 11 can provide a downward pulling force for the balancing weight through the second hanging rope 6 and the second hanging hook 5, the balancing weight can be tensioned under the cooperation of the pulling force of the first hanging hook 4 and the pulling force of the second hanging hook 5, so that the balancing weight can be prevented from shaking in the lifting process of the balancing weight, and the safety of the balancing weight in the lifting process is ensured.
Referring to fig. 1-2, the sides of the balancing weight 11 are mutually attached to the crane frame 1, so that stability of the balancing weight 11 in the moving process is ensured.
Referring to fig. 1-2, two first pulleys 7 are arranged on one side of the crane frame 1, two second pulleys 8 are arranged at the top end of the crane frame 1, the second sling 6 bypasses the two first pulleys 7 and the two second pulleys 8, and the two first pulleys 7 and the two second pulleys 8 play a role in regulating the trend of the second sling 6.
Referring to fig. 1-2, the first sling 3 and the second sling 6 use steel wire ropes to ensure that the first sling 3 and the second sling 6 have sufficient traction.
The specific working principle of the utility model is as follows:
When the partition board mounting and lifting device is used, a worker uses the first hook 4 to hook the top surface of the partition board, uses the second hook 6 to hook the bottom surface of the partition board, when the partition board is lifted, the lifting equipment 2 operates, the lifting equipment 2 can wind the first sling 3 when in operation, the first sling 3 pulls the partition board through the first hook 4, so that the partition board moves upwards, the partition board can pull the second sling 6 through the second hook 5 in the process, the second sling 6 can pull the balancing weight 11 when being stressed, the balancing weight 11 moves upwards, at the moment, the balancing weight 11 can provide a downward pulling force for the partition board through the second sling 6 and the second hook 5, and the partition board can be tensioned under the cooperation of the pulling force of the first hook 4 and the pulling force of the second hook 5, so that the partition board can be prevented from shaking in the lifting process of the partition board, and the safety of the partition board in the lifting process is ensured;
In the ascending process of the balancing weight 11, the guide rod 10 plays a limiting role on the movement of the balancing weight 11, so that the stability of the balancing weight 11 in the moving process is ensured.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (5)

1. The utility model provides a partition plate installs hoisting device, includes crane frame (1), install on crane frame (1) and lift by crane equipment (2), its characterized in that, the output of lifting by crane equipment (2) is fixed with first hoist cable (3), first couple (4) are installed to the one end that lifts by crane equipment (2) are kept away from to first hoist cable (3), the below of first couple (4) is provided with second couple (5), install second hoist cable (6) on second couple (5), be provided with taut subassembly on crane frame (1).
2. The partition plate mounting and lifting device according to claim 1, wherein the tensioning assembly comprises two fixing plates (9), a guide rod (10) and a balancing weight (11), the two fixing plates (9) are respectively fixed at the upper end and the lower end of the crane frame (1), the guide rod (10) is fixed between the two fixing plates (9), the balancing weight (11) is slidably sleeved on the guide rod (10), and the balancing weight (11) is connected with one end, far away from the second hook (5), of the second sling (6).
3. A partition wall mounting and lifting device according to claim 2, characterized in that the sides of the counterweight (11) are attached to the crane frame (1).
4. A partition wall panel installation lifting device according to claim 3, characterized in that one side of the crane frame (1) is provided with two first pulleys (7), the top end of the crane frame (1) is provided with two second pulleys (8), and the second slings (6) bypass the two first pulleys (7) and the two second pulleys (8).
5. A partition panel installation lifting device according to claim 1, wherein the first sling (3) and the second sling (6) are wire ropes.
CN202323295742.5U 2023-12-05 Partition plate installation hoisting device Active CN221318999U (en)

Publications (1)

Publication Number Publication Date
CN221318999U true CN221318999U (en) 2024-07-12

Family

ID=

Similar Documents

Publication Publication Date Title
CN116119517B (en) Automatic anti-torsion device for port crane lifting appliance
CN202273397U (en) Lifting device for reversal hanging lifting frame
JP6969686B2 (en) How to extend the lift of a construction elevator
CN214879790U (en) Movable arm tower crane
CN221318999U (en) Partition plate installation hoisting device
JPWO2018138831A1 (en) Elevator installation method
CN213923753U (en) Load-bearing device and bridge crane
CN2154250Y (en) Mini-tower hoist
CN110316647B (en) Synchronous unhooking lifting appliance based on four-bar mechanism
CN208684254U (en) A kind of steel reinforcement cage lowering equipment investing long spire stake machine fuselage
CN101672101A (en) One-drive multi-hoisting-point hoisting system
CN215326442U (en) Anti-falling protection mechanism for hoisting assembly type building PC component
KR20200004985A (en) Lifting device with balance weight
CN2038491U (en) Dual directional tightener
CN220393068U (en) Novel empty box lifting appliance
CN216687192U (en) Curtain wall hoisting device
CN210163040U (en) Movable hoisting frame for installing power distribution cabinet
CN217867826U (en) Hoisting equipment
CN213950273U (en) Elevator dragging equipment
CN217867758U (en) Four-point hanging beam for large-scale floating crane
CN218058210U (en) House building assembled I-beam lifting device
CN219217251U (en) Novel six-point hoisting sling
CN117819369B (en) Crane for building construction
CN221318885U (en) Self-balancing guiding lifting device