CN218058210U - A hoisting device for prefabricated I-beams in house construction - Google Patents

A hoisting device for prefabricated I-beams in house construction Download PDF

Info

Publication number
CN218058210U
CN218058210U CN202221238096.1U CN202221238096U CN218058210U CN 218058210 U CN218058210 U CN 218058210U CN 202221238096 U CN202221238096 U CN 202221238096U CN 218058210 U CN218058210 U CN 218058210U
Authority
CN
China
Prior art keywords
hoisting
shaped
dragging
shaped steel
winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221238096.1U
Other languages
Chinese (zh)
Inventor
王玉峰
于洋
康飞
周梦浩
刘红霞
黄永
谢艳强
岳朝兴
王帅帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202221238096.1U priority Critical patent/CN218058210U/en
Application granted granted Critical
Publication of CN218058210U publication Critical patent/CN218058210U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a housing construction assembled I-beam hoisting equipment, the housing construction assembled I-beam hoisting equipment comprises an overhanging I-beam, a hoisting I-beam, hoisting components and a pulling component, the overhanging I-beam is provided with at least two beams at intervals side by side, and the overhanging I-beam can be assembled at the top of the housing construction in a detachable way; the hoisting I-shaped steel beams are connected to the overhanging ends of the overhanging I-shaped steel beams; the hoisting assembly comprises two fixed blocks and a hoisting winch, the two fixed blocks are arranged on the hoisting I-shaped steel beam at intervals along the length direction of the hoisting I-shaped steel beam, hoisting steel wire ropes are wound on the hoisting winch, the end parts of the hoisting steel wire ropes are connected with hoisting rings, the hoisting rings are connected with lifting hooks, the lifting hooks are U-shaped hooks, and the lifting hooks are U-shaped limiting grooves matched with the sections of the I-shaped steel beams; the dragging component comprises a dragging winch, a dragging steel wire rope is wound on the dragging winch, and one end of the dragging steel wire rope is connected with a hanging ring. The utility model discloses can guarantee I-beam and constructor's safety.

Description

一种房屋建筑装配式工字梁吊装设备A hoisting device for prefabricated I-beams in house construction

技术领域technical field

本实用新型涉及建筑施工技术领域,尤其涉及一种房屋建筑装配式工字梁吊装设备。The utility model relates to the technical field of building construction, in particular to an assembly-type I-beam hoisting device for house construction.

背景技术Background technique

工字钢是截面为工字形状的长条钢材,具有竖直的工字钢腹板和与工字钢腹板垂直的工字钢翼板,工字钢被广泛的应用在各个行业,例如工字钢作为梁结构,两根工字钢连接形成梁节点,工字钢梁节点的连接对于装配式钢结构整体性能具有举足轻重的作用。The I-beam is a long strip of steel with an I-shaped cross section. It has a vertical I-steel web and an I-steel wing perpendicular to the I-steel web. I-beams are widely used in various industries, such as The I-beam is used as a beam structure, and two I-beams are connected to form a beam node. The connection of the I-beam node plays a decisive role in the overall performance of the fabricated steel structure.

在建筑场地施工时,需要将工字钢梁吊装至对应的楼层,常用的吊装方式是采用吊车将用钢丝绳绑扎的工字钢竖直吊装至对应楼层,然后施工人员拉动吊车上的吊钩将工字钢拉直楼层内。由于吊车上通常只有一个吊钩,在吊装过程中,工字钢容易发生倾斜,进而可能发生坠落的风险,另外,施工人员拉动吊钩时通常需要站在楼层边缘,容易发生踩空坠落的风险。During construction on the building site, it is necessary to hoist the I-beams to the corresponding floors. The common hoisting method is to use a crane to vertically hoist the I-beams bound with steel wire ropes to the corresponding floors, and then the construction personnel pull the hook on the crane to lift them to the corresponding floors. I-beams straighten the floors inside. Since there is usually only one hook on the crane, the I-beam is prone to tilt during the hoisting process, which may cause the risk of falling. In addition, the construction personnel usually need to stand on the edge of the floor when pulling the hook, which is prone to the risk of stepping on the air and falling .

实用新型内容Utility model content

鉴于此,本实用新型的目的在于提供一种房屋建筑装配式工字梁吊装设备,以解决现有技术中在吊装工字钢梁时有较大安全风险的技术问题。In view of this, the purpose of the present utility model is to provide a housing construction assembly type I-beam hoisting equipment to solve the technical problem in the prior art that there is a relatively large safety risk when hoisting the I-beam.

为实现上述目的,本实用新型所采用的技术方案是:In order to achieve the above object, the technical solution adopted in the utility model is:

房屋建筑装配式工字梁吊装设备,包括:Prefabricated I-beam hoisting equipment for house construction, including:

悬挑工字钢梁,用于可拆固定在房屋建筑顶部并且一端悬伸在房屋建筑外,悬挑工字钢梁并排间隔设置有至少两个;The cantilevered I-beams are used to be detachably fixed on the top of the building and one end cantilever outside the building, and at least two cantilevered I-beams are arranged side by side at intervals;

吊装工字钢梁,沿各悬挑工字钢梁的布置方向延伸,吊装工字钢梁的顶部连接在各个悬挑工字钢梁的悬伸端下;The hoisting I-beam extends along the arrangement direction of each cantilevered I-beam, and the top of the hoisted I-beam is connected under the overhanging end of each cantilevered I-beam;

吊装组件,包括安装在吊装工字钢梁上的固定块和安装在固定块底部的吊装卷扬机,固定块沿吊装工字钢梁的长度方向间隔设置有两个,吊装卷扬机上缠绕有吊装钢丝绳,吊装钢丝绳的端部连接有吊环,吊环上固定连接有吊钩,吊钩为U形钩,具有与待吊装工字梁的截面适配的U形限位槽;The hoisting assembly includes a fixing block installed on the hoisting I-beam and a hoisting winch installed at the bottom of the fixing block. There are two fixing blocks at intervals along the length direction of the hoisting I-beam, and a hoisting wire rope is wound on the hoisting hoist. The end of the hoisting wire rope is connected with a hoisting ring, and the hoisting ring is fixedly connected with a hook. The hook is a U-shaped hook with a U-shaped limiting groove adapted to the section of the I-beam to be hoisted;

拉扯组件,包括用于安装在对应楼层的拉扯卷扬机,拉扯卷扬机与吊装卷扬机一一对应,拉扯卷扬机上缠绕有拉扯钢丝绳,拉扯钢丝绳的一端与所述吊环连接。The pulling assembly includes a pulling hoist for installation on a corresponding floor, the pulling hoist corresponds to the hoisting hoist one by one, a pulling wire rope is wound on the pulling hoist, and one end of the pulling wire rope is connected to the suspension ring.

上述技术方案的有益效果是:本实用新型的房屋建筑装配式工字梁吊装设备具有两个吊钩,两个吊钩形成两个吊装支撑点,使工字梁在提升过程中更稳定,并且吊钩为U形钩,能够使工字梁卡在吊钩的U形限位槽内,进一步避免工字梁的晃动,保证工字梁的吊装安全;工字梁在吊装卷扬机的作用下吊装至对应楼层时,无需施工人员站在楼层边缘拉扯,开启拉扯卷扬机即可拉动吊钩使其朝向楼层内移动,这样的话施工人员能够站在安全的地方将工字梁卸下,保证施工人员的安全。The beneficial effects of the above-mentioned technical solution are: the hoisting equipment of the house construction assembly type I-beam of the utility model has two hooks, and the two hooks form two hoisting support points, so that the I-beam is more stable during the lifting process, and The hook is a U-shaped hook, which can make the I-beam stuck in the U-shaped limit groove of the hook, further avoiding the shaking of the I-beam and ensuring the safety of the I-beam hoisting; the I-beam is hoisted under the action of the hoisting hoist When reaching the corresponding floor, there is no need for construction personnel to stand on the edge of the floor to pull. Turn on the pulling hoist to pull the hook to move toward the floor. In this way, the construction personnel can stand in a safe place to unload the I-beam, ensuring the safety of the construction personnel. Safety.

进一步的,悬挑工字钢梁的下翼板上设有间隔布置的安装孔,房屋建筑顶部预埋有与安装孔一一对应的螺纹套管。Further, the lower flange of the cantilevered I-beam is provided with installation holes arranged at intervals, and threaded sleeves corresponding to the installation holes are pre-embedded on the top of the building.

有益效果:便于悬挑工字钢梁的安装和拆卸。Beneficial effect: it is convenient to install and disassemble the cantilevered I-beam.

进一步的,所述吊装工字钢梁的顶部与各个悬挑工字钢梁铰接连接。Further, the top of the hoisted I-beam is hingedly connected to each cantilevered I-beam.

有益效果:在房屋建筑的楼顶具有一定坡度时,仍然能够实现工字梁的安全吊装。Beneficial effect: when the roof of a building has a certain slope, the safe hoisting of the I-beam can still be realized.

进一步的,各固定块均移动装配在吊装工字钢梁上,拉扯卷扬机移动装配在对应的楼层板上。Further, each fixed block is moved and assembled on the hoisting I-beam, and the pulling hoist is moved and assembled on the corresponding floor board.

有益效果:可以调节两个吊钩之间的距离,进而可对不同长度尺寸的工字梁进行吊装作业,提高整个吊装设备的适用范围。Beneficial effects: the distance between the two hooks can be adjusted, so that I-beams of different lengths and sizes can be hoisted, and the application range of the entire hoisting device can be improved.

进一步的,吊装工字钢梁的下翼板上位于吊装工字钢梁的腹板两侧的部分均设有沿吊装工字钢梁的长度方向延伸的齿条板,固定块呈U形,吊装工字钢梁位于固定块的U形槽内,固定块的两个相对平行的块壁上转动装配有两根并排间隔布置的传动轴,传动轴穿过吊装工字钢梁的腹板,并且每根传动轴上均固定连接有与对应侧的齿条板啮合传动的传动齿轮,固定块的顶部连接有驱动电机,驱动电机的输出轴上固定连接有驱动齿轮,其中一根传动轴上固定连接有与驱动齿轮啮合的中间齿轮;拉扯卷扬机的底部安装有底座,底座上滑动装配有沿吊装工字钢梁的长度方向延伸的导轨,导轨用于固定在对应的楼层板上。Further, the parts on both sides of the web of the hoisted I-steel beam on the lower wing plate of the hoisted I-steel beam are provided with rack plates extending along the length direction of the hoisted I-steel beam, and the fixing block is U-shaped. The hoisting I-beam is located in the U-shaped groove of the fixed block, and the two relatively parallel block walls of the fixed block are rotatably equipped with two drive shafts arranged side by side at intervals, and the drive shaft passes through the web of the hoisting I-beam. And each drive shaft is fixedly connected with a drive gear that meshes with the rack plate on the corresponding side, the top of the fixed block is connected with a drive motor, and the output shaft of the drive motor is fixedly connected with a drive gear. The intermediate gear meshing with the driving gear is fixedly connected; the bottom of the pulling hoist is equipped with a base, and a guide rail extending along the length direction of the hoisting I-beam is slidably installed on the base, and the guide rail is used to be fixed on the corresponding floor board.

有益效果:便于实现固定块的位置调整,并且调整时,更精确。Beneficial effect: it is convenient to realize the position adjustment of the fixed block, and the adjustment is more precise.

优选的,还包括多个沿吊装工字钢梁长度方向并排间隔布置的导向滑轮,导向滑轮用于设置在对应楼层板的边缘处,导向滑轮上设有钢丝绳槽,用于在吊钩向下释放时使拉扯钢丝绳绕过导向滑轮。Preferably, it also includes a plurality of guide pulleys arranged side by side along the length direction of the hoisting I-beam at intervals, the guide pulleys are used to be arranged at the edge of the corresponding floor plate, and the guide pulleys are provided with wire rope grooves, which are used for lifting the hook downwards. When released, the pulling wire rope goes around the guide pulley.

有益效果:拉扯钢丝绳可绕过导向滑轮,从而减少拉扯钢丝绳与建筑墙体之间的摩擦,提高拉扯钢丝绳的使用寿命。Beneficial effect: the pulling wire rope can bypass the guide pulley, thereby reducing the friction between the pulling wire rope and the building wall, and improving the service life of the pulling wire rope.

进一步的,吊装工字钢梁上位于齿条板两端的位置均固定连接有限位板。Further, the positions at both ends of the rack plate on the hoisting I-beam are fixedly connected with the limiting plate.

有益效果:避免固定块从吊装工字钢料上脱出。Beneficial effect: the fixing block is prevented from falling out from the hoisting I-beam material.

附图说明Description of drawings

图1是本实用新型的房屋建筑装配式工字梁吊装设备的主视图;Fig. 1 is the front view of the housing construction assembly type I-beam hoisting equipment of the present utility model;

图2是本实用新型的房屋建筑装配式工字梁吊装设备的侧视图;Fig. 2 is a side view of the housing construction assembly type I-beam hoisting device of the present invention;

图3是本实用新型的房屋建筑装配式工字梁吊装设备中显示吊装工字钢梁与吊装组件之间的装配关系示意图。Fig. 3 is a schematic diagram showing the assembly relationship between the hoisting I-beam and the hoisting components in the house construction assembly type I-beam hoisting device of the present invention.

附图标记说明:1-悬挑工字钢梁,2-吊装工字钢梁,3-固定块,4-吊装卷扬机,5-吊装钢丝绳,6-吊环,7-吊钩,8-拉扯钢丝绳,9-钢丝绳卡扣,10-螺纹套管,11-紧固螺栓,12-楼层板,13-房屋建筑,14-底座,15-导轨,16-驱动齿轮,17-中间齿轮,18-传动齿轮,19-传动轴,20-导向滑轮,21-限位板,22-连接块,23-连接耳,24-齿条板,25-驱动电机,26-拉扯卷扬机。Explanation of reference signs: 1-cantilevered I-beam, 2-hoisting I-beam, 3-fixing block, 4-hoisting hoist, 5-hoisting wire rope, 6-hanging ring, 7-hook, 8-pull wire rope , 9-wire rope buckle, 10-thread casing, 11-fastening bolt, 12-floor plate, 13-building, 14-base, 15-guide rail, 16-driving gear, 17-intermediate gear, 18-transmission Gear, 19-transmission shaft, 20-guide pulley, 21-limiting plate, 22-connecting block, 23-connecting ear, 24-rack plate, 25-driving motor, 26-pull hoist.

具体实施方式detailed description

下面结合附图及具体实施方式对本实用新型作进一步详细描述。The utility model will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

本实用新型的房屋建筑装配式工字梁吊装设备的具体实施例:Specific embodiments of the house building assembly type I-beam hoisting equipment of the present invention:

如图1、图2和图3所示,房屋建筑装配式工字梁吊装设备包括悬挑工字钢梁1、吊装工字钢梁2、吊装组件和拉扯组件。As shown in Fig. 1, Fig. 2 and Fig. 3, the prefabricated I-beam hoisting equipment for building construction includes a cantilevered I-beam 1, a hoisting I-beam 2, a hoisting component and a pulling component.

具体的,如图2所示,悬挑工字钢梁1的下翼板上于悬挑工字钢梁1的腹板两侧的部分均设有沿悬挑工字钢梁1的长度方向间隔布置的安装孔,房屋建筑13的顶部则预埋有与安装孔一一对应的螺纹套管10,安装时,悬挑工字钢梁上的安装孔与螺纹套管10对应,从安装孔处安装紧固螺栓11,紧固螺栓11与螺纹套管10螺纹连接,从而将悬挑工字钢梁1固定在房屋建筑13的顶部。悬挑工字钢梁1的一端悬伸在房屋建筑13外,形成悬伸端。本实施例中,悬挑工字钢梁1并排间隔设置有三个,相邻两个悬挑工字钢梁1之间的间距相等。每根悬挑工字钢梁1的底部均焊接固定有两个连接耳23。Specifically, as shown in Figure 2, the parts on both sides of the web of the cantilevered I-steel beam 1 on the lower wing plate of the cantilevered I-steel beam 1 are provided with The installation holes arranged at intervals, the top of the building 13 is pre-buried with threaded sleeves 10 corresponding to the installation holes one by one. During installation, the installation holes on the cantilevered I-beam correspond to the threaded sleeves 10, A fastening bolt 11 is installed at the place, and the fastening bolt 11 is threadedly connected with the threaded casing 10, thereby the cantilevered I-beam 1 is fixed on the top of the building 13. One end of the cantilevered I-beam 1 hangs outside the building 13 to form a cantilevered end. In this embodiment, three cantilevered I-shaped steel beams 1 are arranged side by side at intervals, and the distance between two adjacent cantilevered I-shaped steel beams 1 is equal. The bottom of each cantilevered I-beam 1 is welded and fixed with two connecting ears 23 .

吊装工字钢梁2沿各悬挑工字钢梁1的布置方向延伸,即吊装工字钢梁2与悬挑工字钢梁1垂直布置。吊装工字钢梁2的顶部对应各个悬挑工字钢梁1的位置均设置有连接块22,连接块22位于对应的两个连接耳23之间,并与连接耳23铰接连接,从而实现吊装工字钢梁2与各悬挑工字钢梁1悬伸端之间的铰接连接。这样一来,即使房屋建筑13顶部为坡面,本实用新型的吊装设备也能正常使用。The hoisting I-beam 2 extends along the arrangement direction of each cantilevered I-beam 1 , that is, the hoisting I-beam 2 is vertically arranged with the cantilevered I-beam 1 . The top of the hoisted I-beam 2 is provided with a connecting block 22 corresponding to the position of each cantilevered I-beam 1. The connecting block 22 is located between the corresponding two connecting ears 23 and is hingedly connected with the connecting ears 23, thereby realizing The hinged connection between hoisting I-beams 2 and the overhanging ends of each cantilevered I-beams 1 . In this way, even if the top of the building 13 is a slope, the hoisting device of the present utility model can be used normally.

如图1、图2和图3所示,吊装组件包括安装在吊装工字钢梁2上的两个固定块3和安装在各固定块3底部的吊装卷扬机4。其中,两个固定块3间隔设置,固定块3呈U形,吊装工字钢梁2位于固定块的U形槽内,固定块3托着吊装工字钢梁2。吊装工字钢梁2的下翼板上位于吊装工字钢梁2的腹板两侧的部分均设有沿吊装工字钢梁2的长度方向延伸的齿条板24,齿条板24上具有齿条。固定块3的两个相对平行的块壁上转动装配有两根并排间隔布置的传动轴19,传动轴19穿过吊装工字钢梁2的腹板,并且每根传动轴19上均固定连接有与对应侧的齿条板24啮合传动的传动齿轮18。固定块3的顶部连接有驱动电机25,驱动电机25的输出轴上固定连接有驱动齿轮16,其中一根传动轴19上固定连接有与驱动齿轮16啮合的中间齿轮17。驱动电机25开启时,通过驱动齿轮16驱动中间齿轮17转动,中间齿轮17带动其所在的传动轴19转动,进而使该传动轴19上的传动齿轮18与齿条板啮合传动,进而驱使固定块3在吊装工字钢梁2上移动做位置调整。为了避免固定块3从齿条板24上脱落,在 齿条板24的两侧固定连接有限位板21。As shown in FIG. 1 , FIG. 2 and FIG. 3 , the hoisting assembly includes two fixing blocks 3 installed on the hoisting I-beam 2 and a hoisting hoist 4 installed at the bottom of each fixing block 3 . Wherein, two fixed blocks 3 are arranged at intervals, and the fixed blocks 3 are U-shaped, and the hoisting I-shaped steel beam 2 is located in the U-shaped groove of the fixed block, and the fixed block 3 supports the hoisting I-shaped steel beam 2 . The parts on both sides of the web of the hoisting I-beam 2 on the lower wing plate of the hoisting I-beam 2 are provided with a rack plate 24 extending along the length direction of the hoisting I-beam 2 . Has a rack. The two relatively parallel block walls of the fixed block 3 are rotatably equipped with two transmission shafts 19 arranged side by side at intervals. The transmission shafts 19 pass through the web of the hoisting I-beam 2, and each transmission shaft 19 is fixedly connected There is a transmission gear 18 for meshing transmission with the rack plate 24 on the corresponding side. The top of the fixed block 3 is connected with a drive motor 25 , the output shaft of the drive motor 25 is fixedly connected with a drive gear 16 , and one of the drive shafts 19 is fixedly connected with an intermediate gear 17 meshing with the drive gear 16 . When the driving motor 25 is turned on, the driving gear 16 drives the intermediate gear 17 to rotate, and the intermediate gear 17 drives the transmission shaft 19 where it is located to rotate, and then the transmission gear 18 on the transmission shaft 19 is engaged with the rack plate for transmission, and then drives the fixed block. 3 Move on the hoisting I-beam 2 for position adjustment. In order to avoid that the fixed block 3 comes off from the rack plate 24, the both sides of the rack plate 24 are fixedly connected with the limiting plate 21.

吊装卷扬机4上缠绕有吊装钢丝绳5,吊装钢丝绳5的端部连接有吊环6,吊环6上固定连接有吊钩7,吊钩7为U形钩,具有与待吊装工字梁的截面适配的U形限位槽。The hoisting winch 4 is wound with a hoisting wire rope 5, the end of the hoisting wire rope 5 is connected with a hoisting ring 6, and a hoisting hook 7 is fixedly connected to the hoisting hoist 6, and the hoisting hook 7 is a U-shaped hook, which is adapted to the section of the I-beam to be hoisted. The U-shaped limit slot.

拉扯组件包括拉扯卷扬机26、导轨15和底座14。其中,拉扯卷扬机26固定在底座14上,底座14与导轨15滑动装配,从而可调整拉扯卷扬机26的位置,导轨15则固定在对应的楼层板12上。拉扯卷扬机26设置有两个,与吊装卷扬机4一一对应。拉扯卷扬机26上缠绕有拉扯钢丝绳8,拉扯钢丝绳8的一端与吊环6连接,连接时,拉扯钢丝绳8绕过吊环6,绕过的部分与原拉扯钢丝绳之间通过多个钢丝绳卡扣9连接。The pulling assembly includes a pulling hoist 26 , a guide rail 15 and a base 14 . Wherein, the pulling hoist 26 is fixed on the base 14 , the base 14 is slidably assembled with the guide rail 15 , so that the position of the pulling hoist 26 can be adjusted, and the guide rail 15 is fixed on the corresponding floor plate 12 . There are two pulling winches 26, corresponding to the hoisting winches 4 one by one. The pulling hoist 26 is wound with a pulling wire rope 8, and one end of the pulling wire rope 8 is connected with the suspension ring 6. When connecting, the pulling wire rope 8 bypasses the suspension ring 6, and the bypassed part is connected with the original pulling wire rope by a plurality of wire rope buckles 9.

楼层板12上还设有多个沿吊装工字钢梁2长度方向并排间隔布置的导向滑轮20,导向滑轮20位于楼层板12的边缘处,导向滑轮20上设有钢丝绳槽。在吊钩7下放至处于楼层板12以下时,拉扯钢丝绳8刚好能够绕在导向滑轮20上,从而减少拉扯钢丝绳8与建筑墙壁之间的摩擦,提高拉扯钢丝绳8的使用寿命。The floor plate 12 is also provided with a plurality of guide pulleys 20 arranged side by side along the length direction of the hoisting I-beam 2 at intervals. The guide pulleys 20 are located at the edge of the floor plate 12, and the guide pulleys 20 are provided with wire rope grooves. When suspension hook 7 is lowered to be below floor plate 12, pulling wire rope 8 just can be wound on guide pulley 20, thereby reduces the friction between pulling wire rope 8 and building wall, improves the service life of pulling wire rope 8.

本实用新型的房屋建筑装配式工字梁吊装设备具有两个吊钩,两个吊钩形成两个吊装支撑点,使工字梁在提升过程中更稳定,并且吊钩为U形钩,能够使工字梁卡在吊钩的U形限位槽内,进一步避免工字梁的晃动,保证工字梁的吊装安全;工字梁在吊装卷扬机的作用下吊装至对应楼层时,无需施工人员站在楼层边缘拉扯,开启拉扯卷扬机即可拉动吊钩使其朝向楼层内移动,这样的话施工人员能够站在安全的地方将工字梁卸下,保证施工人员的安全。The hoisting equipment of the housing construction assembly type I-beam of the utility model has two hooks, and the two hooks form two hoisting support points, so that the I-beam is more stable during the lifting process, and the hook is a U-shaped hook, which can Make the I-beam stuck in the U-shaped limit groove of the hook, further avoid the shaking of the I-beam, and ensure the safety of the hoisting of the I-beam; when the I-beam is hoisted to the corresponding floor under the action of the hoisting winch, no construction personnel are required Stand on the edge of the floor and pull, turn on the pulling hoist to pull the hook to move toward the floor, so that the construction personnel can stand in a safe place to unload the I-beam, ensuring the safety of the construction personnel.

在其他实施例中,在所应用的房屋建筑顶部均为平顶时,吊装工字钢梁可以与悬挑工字钢梁固定连接。In other embodiments, when the tops of the applied buildings are all flat roofs, the hoisting I-beams can be fixedly connected with the cantilevered I-beams.

在其他实施例中,若吊装的工字梁尺寸统一时,固定块可以焊接在吊装工字钢梁上。In other embodiments, if the hoisted I-beams are uniform in size, the fixing block can be welded on the hoisted I-beams.

以上所述的本实用新型的实施方式,并不构成对本实用新型保护范围的限定。任何在本实用新型的精神和原则之内所作的修改、等同替换和改进等,均应包括在本实用新型的权利要求保护范围之内。The embodiments of the utility model described above do not constitute a limitation to the protection scope of the utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model shall be included in the protection scope of the claims of the present utility model.

Claims (7)

1. House building assembled I-beam lifting device, its characterized in that includes:
the cantilever I-shaped steel beams are detachably fixed at the top of the house building, one ends of the cantilever I-shaped steel beams are cantilevered outside the house building, and at least two cantilever I-shaped steel beams are arranged side by side at intervals;
hoisting the I-shaped steel beams, extending along the arrangement direction of each overhanging I-shaped steel beam, and connecting the top of each hoisting I-shaped steel beam below the overhanging end of each overhanging I-shaped steel beam;
the hoisting assembly comprises two fixed blocks and a hoisting winch, wherein the two fixed blocks are arranged on the hoisting I-shaped steel beam at intervals along the length direction of the hoisting I-shaped steel beam, the hoisting winch is wound with a hoisting steel wire rope, the end part of the hoisting steel wire rope is connected with a hoisting ring, the hoisting ring is fixedly connected with a lifting hook, and the lifting hook is a U-shaped hook and is provided with a U-shaped limiting groove matched with the cross section of the I-shaped beam to be hoisted;
the dragging component comprises a dragging winch which is used for being installed on a corresponding floor, the dragging winch is in one-to-one correspondence with the hoisting winch, a dragging steel wire rope is wound on the dragging winch, and one end of the dragging steel wire rope is connected with the hanging ring.
2. The building construction assembling type I-beam hoisting equipment according to claim 1, wherein mounting holes are arranged at intervals on the lower wing plate of the cantilever I-beam, and threaded sleeves corresponding to the mounting holes one to one are pre-embedded in the top of the building construction.
3. The housing construction fabricated i-beam hoisting device of claim 1, wherein the top of the hoisting i-beam is hinged to each overhanging i-beam.
4. The building construction fabricated i-beam hoisting device of any one of claims 1 to 3, wherein each fixing block is movably assembled on the hoisting i-beam, and the pulling winch is movably assembled on the corresponding floor slab.
5. The housing construction fabricated I-beam hoisting device according to claim 4, wherein rack plates extending along the length direction of the hoisting I-beam are arranged on the lower wing plate of the hoisting I-beam at the two sides of the web plate of the hoisting I-beam, the fixing block is U-shaped, the hoisting I-beam is positioned in a U-shaped groove of the fixing block, two transmission shafts which are arranged side by side at intervals are rotatably assembled on two relatively parallel block walls of the fixing block, the transmission shafts penetrate through the web plate of the hoisting I-beam, each transmission shaft is fixedly connected with a transmission gear which is meshed with the rack plate at the corresponding side for transmission, the top of the fixing block is connected with a driving motor, an output shaft of the driving motor is fixedly connected with a driving gear, and one transmission shaft is fixedly connected with an intermediate gear meshed with the driving gear; the base is installed to the bottom of dragging the hoist engine, and the sliding assembly has the guide rail that extends along the length direction of hoist and mount I-steel roof beam on the base, and the guide rail is used for fixing on the floor board that corresponds.
6. The building construction fabricated i-beam hoisting device of claim 5, further comprising a plurality of guide pulleys arranged side by side at intervals along the length direction of the hoisted i-beam, the guide pulleys being adapted to be disposed at edges of corresponding floor panels, the guide pulleys being provided with wire rope grooves for allowing the pulling wire ropes to bypass the guide pulleys when the hooks are released downward.
7. The housing construction fabricated i-beam hoisting device of claim 5, wherein limiting plates are fixedly connected to the hoisting i-beam at both ends of the rack plate.
CN202221238096.1U 2022-05-23 2022-05-23 A hoisting device for prefabricated I-beams in house construction Active CN218058210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221238096.1U CN218058210U (en) 2022-05-23 2022-05-23 A hoisting device for prefabricated I-beams in house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221238096.1U CN218058210U (en) 2022-05-23 2022-05-23 A hoisting device for prefabricated I-beams in house construction

Publications (1)

Publication Number Publication Date
CN218058210U true CN218058210U (en) 2022-12-16

Family

ID=84432280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221238096.1U Active CN218058210U (en) 2022-05-23 2022-05-23 A hoisting device for prefabricated I-beams in house construction

Country Status (1)

Country Link
CN (1) CN218058210U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116730175A (en) * 2023-06-16 2023-09-12 四川省建筑设计研究院有限公司 Main beam assembly device and method for fiber composite house
CN116771075A (en) * 2023-06-01 2023-09-19 中国建筑第八工程局有限公司 A sliding rail system for ceiling installation of special-shaped GRG panels
CN117822911A (en) * 2023-12-26 2024-04-05 中交建筑集团有限公司 A circular steel track for installing super high-rise curtain walls

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116771075A (en) * 2023-06-01 2023-09-19 中国建筑第八工程局有限公司 A sliding rail system for ceiling installation of special-shaped GRG panels
CN116730175A (en) * 2023-06-16 2023-09-12 四川省建筑设计研究院有限公司 Main beam assembly device and method for fiber composite house
CN117822911A (en) * 2023-12-26 2024-04-05 中交建筑集团有限公司 A circular steel track for installing super high-rise curtain walls

Similar Documents

Publication Publication Date Title
CN218058210U (en) A hoisting device for prefabricated I-beams in house construction
CN205387439U (en) Mast hoisting accessory
CN110761193B (en) Cable tower construction equipment
JP2006233486A (en) Traversing work device and work method thereby
CN217461396U (en) Hanging basket suspension device
CN214570037U (en) Install socket joint formula steel construction side fascia hoist device fast
CN209816674U (en) A prestressed tension jack installation tool in the cast-in-place box girder box
CN217268962U (en) Panel Wall Mounter
CN214733983U (en) A simple lifting device passing through the beam body
CN109941900B (en) Simple installation equipment for sound barrier plugboard
CN223239553U (en) A windproof and anti-falling limited hoisting guide rope mechanism
JP2006299559A (en) Self climbing scaffold and self climbing method by use of it
CN210594968U (en) Sliding device for truss hoisting
JP2989969B2 (en) Exterior scaffolding and exterior construction method
CN210029781U (en) Anti-shaking device for hoisting
CN216687192U (en) Curtain wall hoisting device
CN118742504A (en) Lift construction device and method
CN221587805U (en) Wallboard lifting machine
KR101976724B1 (en) Method for installing elevator guide rails without a machine room
CN219217505U (en) Portable apron hoist device
CN214828524U (en) Portable assembled building board hoist device
CN223813263U (en) A steel curtain combined hoisting device
CN219885608U (en) Hoisting platform in elevator well
JPH021066B2 (en)
CN218626631U (en) Fast-assembling structure of fast-assembling type grid lamp group

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant