CN221143296U - Sealed double-layer daylighting panel - Google Patents

Sealed double-layer daylighting panel Download PDF

Info

Publication number
CN221143296U
CN221143296U CN202323231421.9U CN202323231421U CN221143296U CN 221143296 U CN221143296 U CN 221143296U CN 202323231421 U CN202323231421 U CN 202323231421U CN 221143296 U CN221143296 U CN 221143296U
Authority
CN
China
Prior art keywords
sub
daylighting panel
color steel
panel body
daylighting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323231421.9U
Other languages
Chinese (zh)
Inventor
沈奇松
沈奇宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Zhongqi Composite Materials Co ltd
Original Assignee
Foshan Zhongqi Composite Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Zhongqi Composite Materials Co ltd filed Critical Foshan Zhongqi Composite Materials Co ltd
Priority to CN202323231421.9U priority Critical patent/CN221143296U/en
Application granted granted Critical
Publication of CN221143296U publication Critical patent/CN221143296U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses a sealed double-layer daylighting panel which comprises a color steel plate, a daylighting panel body and purlines, wherein the color steel plate is arranged on the daylighting panel body; the color steel plates comprise a first sub-color steel plate and a second sub-color steel plate, the first sub-color steel plate is positioned at the top of the purline, and the second sub-color steel plate is positioned at the bottom of the purline; the lighting board body comprises a first sub lighting board body and a second sub lighting board body; a gasket is arranged at the top of the first sub-daylighting plate body and is connected with the first sub-daylighting plate body through bolts; the bottom of each of the two ends of the first sub-daylighting panel body is provided with an adhesive tape, and the two ends of the first sub-daylighting panel body are positioned at the top of the first sub-color steel plate based on the adhesive tape. The adhesive tapes are arranged at the bottoms of the two ends of the first sub-daylighting panel body, gaskets are arranged at the tops of the first sub-daylighting panel body, so that the waterproof performance of the sealed double-layer daylighting panel is enhanced, rainwater is not easy to permeate into a room in rainy weather, and the use experience of a user is improved.

Description

Sealed double-layer daylighting panel
Technical Field
The utility model relates to the technical field of daylighting panels, in particular to a sealed double-layer daylighting panel.
Background
The daylighting panel is the important component part on building roof, and the daylighting panel of prior art is generally single-layer structure, and the leakproofness is relatively poor, leads to its waterproof performance relatively poor, and rainy season weather makes the rainwater permeate into in the room easily, influences user's use experience sense.
Disclosure of utility model
The utility model aims to overcome the defects of the prior art, and provides a sealed double-layer daylighting panel.
The utility model provides a sealed double-layer daylighting panel, which comprises a color steel plate, a daylighting panel body and purlines, wherein the color steel plate is arranged on the daylighting panel body;
the color steel plates comprise a first sub-color steel plate and a second sub-color steel plate, the first sub-color steel plate is positioned at the top of the purline, and the second sub-color steel plate is positioned at the bottom of the purline;
The lighting board body comprises a first sub lighting board body and a second sub lighting board body, wherein both ends of the first sub lighting board body are positioned at the top of the first sub color steel board, and both ends of the second sub lighting board body are positioned at the bottom of the second sub color steel board;
A gasket is arranged at the top of the first sub-daylighting plate body and is connected with the first sub-daylighting plate body through bolts;
The bottom of each of the two ends of the first sub-daylighting panel body is provided with an adhesive tape, and the two ends of the first sub-daylighting panel body are positioned at the top of the first sub-color steel plate based on the adhesive tape.
Further, the first sub-daylighting panel body is located at the top of the purline, and the second sub-daylighting panel body is located at the bottom of the purline.
Further, the two ends of the first sub-daylighting panel body are respectively provided with a first fixing part, and the middle part of the first sub-daylighting panel body is provided with a second fixing part;
the first sub-colored steel plate is connected with the first sub-daylighting panel body based on the first fixing portion, and the middle portion of the first sub-daylighting panel body is connected with the purline based on the second fixing portion.
Further, the first fixing part comprises a first bracket, one end of the first bracket is positioned at the bottom of the adhesive tape, and one end top of the first sub-color steel plate is positioned at the bottom of one end of the first bracket;
the first sub lighting board body is connected with the adhesive tape based on bolts, one end of the first bracket is connected with the adhesive tape based on bolts, and one end of the first sub color steel board is connected with one end of the first bracket based on bolts;
the other end of the first bracket is connected with the purline through a bolt.
Further, the first sub-daylighting panel body is connected with the purline based on the other end of the first bracket, and the first sub-color steel plate is connected with the purline based on the other end of the first bracket.
Further, the second fixing part comprises a second bracket, and the second bracket is positioned at the bottom of the first sub-daylighting panel body;
One end of the second support is connected with the first sub-daylighting panel body through bolts, and the other end of the second support is connected with the purline through bolts.
Further, two ends of the second sub-daylighting panel body are connected with the second sub-color steel plates through bolts, and the second sub-color steel plates are connected with the purlines through bolts;
And two ends of the second sub lighting plate body are connected with the purlines by bolts based on the second sub color steel plates.
Further, the middle part of the second sub-daylighting panel body is connected with the purline through bolts.
The utility model provides a sealed double-layer daylighting panel, wherein adhesive tapes are arranged at the bottoms of two ends of a first sub-daylighting panel body, and gaskets are arranged at the top of the first sub-daylighting panel body, so that the waterproof performance of the sealed double-layer daylighting panel is enhanced, rainwater is not easy to permeate into a room in rainy weather, and the use experience of a user is improved.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings which are required in the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the description below are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic structural view of a sealed double-layer daylighting panel in the present utility model;
FIG. 2 is an enlarged view at A of FIG. 1;
FIG. 3 is an enlarged view at B of FIG. 1;
Fig. 4 is an enlarged view at C of fig. 1.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The sealed double-layer daylighting panel comprises a color steel plate 1, a daylighting panel body 2 and purlines 3; the color steel plates 1 comprise first sub-color steel plates 11 and second sub-color steel plates 12, the first sub-color steel plates 11 are positioned at the top of the purline 3, and the second sub-color steel plates 12 are positioned at the bottom of the purline 3; the daylighting panel body 2 comprises a first sub daylighting panel body 21 and a second sub daylighting panel body 22, wherein two ends of the first sub daylighting panel body 21 are positioned at the top of the first sub color steel plate 12, and two ends of the second sub daylighting panel body 22 are positioned at the bottom of the second sub color steel plate 12; a gasket 7 is arranged at the top of the first sub-daylighting panel body 21, and the gasket 7 is connected with the first sub-daylighting panel body 21 through bolts; the bottoms of the two ends of the first sub-daylighting plate body 21 are respectively provided with an adhesive tape 4, and the two ends of the first sub-daylighting plate body 21 are positioned at the top of the first sub-color steel plate 11 based on the adhesive tapes 4.
Specifically, be equipped with packing ring 7 between bolt and the both ends top of first sub-daylighting board body 21, be equipped with packing ring 7 between bolt and the both ends top of second sub-daylighting board body 22, packing ring 7 multiplicable bolt's area of force, and packing ring 7 has plugged up the clearance between bolt and the both ends at the top of first sub-daylighting board body 21, prevents that the rainwater from penetrating into sealed double-deck daylighting board inside through the clearance between bolt and the both ends at the top of first sub-daylighting board body 21.
Further, the first sub-daylighting panel body 21 is located at the top of the purline 3, and the second sub-daylighting panel body 22 is located at the bottom of the purline 3.
Specifically, the top of the purline 3 is provided with a first sub-daylighting panel body 21, and the bottom of the purline 3 is provided with a second sub-daylighting panel body 22, so that the thickness of the whole sealed double-layer daylighting panel is increased, and the effects of heat preservation and heat insulation are achieved; in winter, the sealed double-layer daylighting panel isolates external cold air and keeps warm indoor warm air; in summer, the sealed double-layer daylighting panel isolates external hot air, and keeps the indoor cold air warm, so that the use experience of a user is improved.
Further, the two ends of the first sub-daylighting panel body 21 are respectively provided with a first fixing part 5, and the middle part of the first sub-daylighting panel body 21 is provided with a second fixing part; the first sub-colored steel plate 11 is connected with the first sub-daylighting panel body 21 based on the first fixing portion 5, and the middle portion of the first sub-daylighting panel body 21 is connected with the purline 3 based on the second fixing portion 6.
Further, the first fixing portion 5 includes a first bracket 51, one end of the first bracket 51 is located at the bottom of the adhesive tape 4, and the top of one end of the first sub-color steel plate 11 is located at the bottom of one end of the first bracket 51; the first sub-daylighting panel body 21 is connected with the adhesive tape 4 based on bolts, one end of the first bracket 51 is connected with the adhesive tape 4 based on bolts, and one end of the first sub-color steel plate 11 is connected with one end of the first bracket 51 based on bolts; the other end of the first bracket 51 is connected with the purline 3 through bolts.
Specifically, first support 51 one end is the curved structure that turns over the formation of turning over, and first support 51 one end size and first sub color steel sheet 11 one end and first sub lighting panel body 21 both ends looks adaptation, first sub lighting panel body 21 is based on bolted connection with sticky tape 4, first support 51 one end is based on bolted connection with sticky tape 4, first sub color steel sheet 11 one end is based on bolted connection with first support 51 one end, make first sub lighting panel body 21 both ends, sticky tape 4, first support 51 one end, first sub color steel sheet 11 one end form integrated structure, first sub color steel sheet 11 one end, stable fixing is on first sub lighting panel body 21 both ends.
The sticky tape 4 is located first sub-daylighting board body 21 bottom, has increased the area of atress of bolt, and sticky tape 4 has the function of isolated rainwater, has avoided because of the rainy day, and the rainwater is through getting into the clearance between bolt and the first sub-daylighting board body 21, infiltration is in the room.
Further, the first sub-daylighting panel body 21 is connected to the purline 3 based on the other end of the first bracket 51, and the first sub-color steel panel 11 is connected to the purline 3 based on the other end of the first bracket 51.
Specifically, the other end of the first bracket 51 is formed by folding, and the other end of the first bracket 51 is connected with the purline 3, and the first sub-daylighting panel body 21 and the first sub-color steel plate 11 are stably connected with the purline 3 based on the other end of the first bracket 51.
Further, the second fixing portion 6 includes a second bracket 61, and the second bracket 61 is located at the bottom of the first sub-lighting panel body 21; one end of the second bracket 61 is in bolt connection with the first sub-daylighting panel body 21, and the other end of the second bracket 61 is in bolt connection with the purline 3.
Specifically, the other end of the second bracket 61 is provided with two support bars, and the two support bars are respectively in bolt connection with the purlines 3, so that the fixing effect of the second bracket 61 is increased, and the first sub-daylighting panel body 21 is stably and firmly connected with the purlines 3.
Further, two ends of the second sub-daylighting panel body 22 are in bolt connection with the second sub-color steel plate 12, and the second sub-color steel plate 12 is in bolt connection with the purline 3; and two ends of the second sub-daylighting panel body 22 are connected with the purlines 3 through bolts based on the second sub-color steel plates 12.
Specifically, the two ends of the second sub-daylighting panel body 22 and the second sub-color steel plate 12 form an integrated structure, so that the stability of the sealed double-layer daylighting panel is improved.
Further, the middle part of the second sub-daylighting panel body 22 is connected with the purline 3 through bolts.
Specifically, the middle part of the second sub-daylighting panel body 22 is stably fixed at the bottom of the purline 3.
The utility model provides a sealed double-layer daylighting panel, wherein a first sub-color steel plate 11 and a first sub-daylighting panel body 21 are arranged at the top of a purline 3, adhesive tapes 4 are arranged at the bottoms of two ends of the first sub-daylighting panel body 21, one end of the first sub-color steel plate 11, two ends of the first sub-daylighting panel body 21 and the adhesive tapes 4 are connected with the adhesive tapes 4 through bolts by a first fixing part 5, the adhesive tapes 4 are connected with one end of the first sub-color steel plate 11 through bolts, the two ends of the first sub-daylighting panel body 21 and the first sub-color steel plate 11 are fixed at the top of the purline 3 based on the first fixing part 5, and the first sub-daylighting panel body 21 is fixed at the top of the purline 3 based on a second fixing part 6.
The purlin 3 bottom is equipped with second sub-various steel sheet 12 and second sub-daylighting board body 22, second sub-various steel sheet 12 and second sub-daylighting board body 22 both ends bolted connection, second sub-various steel sheet 12 and purlin 3 bottom bolted connection, second sub-daylighting board body 22 mid portion and purlin 3 bolted connection.
In addition, the sealed double-layer daylighting panel provided by the embodiment of the present utility model is described in detail, and specific examples should be adopted to illustrate the principle and implementation of the present utility model, and the description of the above examples is only used to help understand the method and core idea of the present utility model; meanwhile, as those skilled in the art will have variations in the specific embodiments and application scope in accordance with the ideas of the present utility model, the present description should not be construed as limiting the present utility model in view of the above.

Claims (8)

1. The sealed double-layer daylighting panel is characterized by comprising a color steel plate, a daylighting panel body and purlines;
the color steel plates comprise a first sub-color steel plate and a second sub-color steel plate, the first sub-color steel plate is positioned at the top of the purline, and the second sub-color steel plate is positioned at the bottom of the purline;
The lighting board body comprises a first sub lighting board body and a second sub lighting board body, wherein both ends of the first sub lighting board body are positioned at the top of the first sub color steel board, and both ends of the second sub lighting board body are positioned at the bottom of the second sub color steel board;
A gasket is arranged at the top of the first sub-daylighting plate body and is connected with the first sub-daylighting plate body through bolts;
The bottom of each of the two ends of the first sub-daylighting panel body is provided with an adhesive tape, and the two ends of the first sub-daylighting panel body are positioned at the top of the first sub-color steel plate based on the adhesive tape.
2. The sealed double-layer daylighting panel of claim 1, wherein the first sub-daylighting panel body is positioned at the top of the purline and the second sub-daylighting panel body is positioned at the bottom of the purline.
3. The sealed double-layer daylighting panel according to claim 1, wherein the two ends of the first sub-daylighting panel body are respectively provided with a first fixing part, and the middle part of the first sub-daylighting panel body is provided with a second fixing part;
the first sub-colored steel plate is connected with the first sub-daylighting panel body based on the first fixing portion, and the middle portion of the first sub-daylighting panel body is connected with the purline based on the second fixing portion.
4. The sealed double-layer daylighting panel of claim 3, wherein the first fixing portion comprises a first bracket, one end of the first bracket is positioned at the bottom of the adhesive tape, and one end top of the first sub-color steel plate is positioned at the bottom of one end of the first bracket;
the first sub lighting board body is connected with the adhesive tape based on bolts, one end of the first bracket is connected with the adhesive tape based on bolts, and one end of the first sub color steel board is connected with one end of the first bracket based on bolts;
the other end of the first bracket is connected with the purline through a bolt.
5. The sealed double-layer daylighting panel of claim 4, wherein the first sub-daylighting panel body is connected with the purline based on the other end of the first bracket, and the first sub-colored steel panel is connected with the purline based on the other end of the first bracket.
6. A sealed double-layer daylighting panel according to claim 3, wherein the second fixing portion comprises a second bracket, and the second bracket is located at the bottom of the first sub-daylighting panel body;
One end of the second support is connected with the first sub-daylighting panel body through bolts, and the other end of the second support is connected with the purline through bolts.
7. The sealed double-layer daylighting panel according to claim 1, wherein two ends of the second sub-daylighting panel body are connected with the second sub-color steel plate through bolts, and the second sub-color steel plate is connected with the purline through bolts;
And two ends of the second sub lighting plate body are connected with the purlines by bolts based on the second sub color steel plates.
8. The sealed double-layer daylighting panel of claim 1, wherein the second sub-daylighting panel body middle portion is bolted to the purline.
CN202323231421.9U 2023-11-28 2023-11-28 Sealed double-layer daylighting panel Active CN221143296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323231421.9U CN221143296U (en) 2023-11-28 2023-11-28 Sealed double-layer daylighting panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323231421.9U CN221143296U (en) 2023-11-28 2023-11-28 Sealed double-layer daylighting panel

Publications (1)

Publication Number Publication Date
CN221143296U true CN221143296U (en) 2024-06-14

Family

ID=91390429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323231421.9U Active CN221143296U (en) 2023-11-28 2023-11-28 Sealed double-layer daylighting panel

Country Status (1)

Country Link
CN (1) CN221143296U (en)

Similar Documents

Publication Publication Date Title
CN2509255Y (en) Combined stone curtain wall
CN221143296U (en) Sealed double-layer daylighting panel
CN208088647U (en) A kind of overall assembled wall
CN209384558U (en) A kind of dedicated aeroge decorative panel of assembling type outer wall
CN207419869U (en) Double 360 ° of undercuts connect metal pressing plate Roof system
CN211775207U (en) Steel construction wall body and roof boarding water repellent node
CN216893053U (en) Vertical aluminum plate closing-in structure of assembled curtain wall
CN205445377U (en) Compromise exterior window of balcony, sunshade and photovoltaic power generation function
CN200968029Y (en) Timber structure villa fixed dormer windows
CN207538349U (en) A kind of rain insensitive device outside window for moveable house convenient for rain-proof
CN115434462A (en) Component type concave-convex curtain wall heat insulation system adopting equivalent energy-saving structure
CN206571018U (en) The water-proof roofing of light steel assembled integrated mother and baby's integrated house
CN210086662U (en) Novel wind-resistant metal roof system
CN210713562U (en) A mould for waterproof node of roofing skylight base
CN208251473U (en) Color steel plate connection structure
CN202202463U (en) Roofing system
CN218091651U (en) A thatch roofing structure for removing vacation room
CN221609267U (en) Hollow double-layer serging daylighting board
CN214497883U (en) Steel construction composite sheet wall body and roof boarding water repellent node
CN212053403U (en) Novel energy-saving roof truss of thermal-insulated multilayer steel construction
CN220377624U (en) Assembled dual waterproof double-slope ridge structure
CN1211548C (en) Composite heat-insulating steel plate roof and its production process
CN210636694U (en) Waterproof node structure of metal roofing parapet
CN209670143U (en) The mounting structure of open type aluminium plate curtain wall inner corner trim
CN2585920Y (en) Composite warm steel plate roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant