CN221062130U - Dust fall equipment for construction site - Google Patents

Dust fall equipment for construction site Download PDF

Info

Publication number
CN221062130U
CN221062130U CN202322798714.9U CN202322798714U CN221062130U CN 221062130 U CN221062130 U CN 221062130U CN 202322798714 U CN202322798714 U CN 202322798714U CN 221062130 U CN221062130 U CN 221062130U
Authority
CN
China
Prior art keywords
water
arc
air outlet
construction site
fixedly provided
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322798714.9U
Other languages
Chinese (zh)
Inventor
刁彦林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Shengcheng Construction Engineering Group Co ltd
Original Assignee
Hebei Shengcheng Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Shengcheng Construction Engineering Group Co ltd filed Critical Hebei Shengcheng Construction Engineering Group Co ltd
Priority to CN202322798714.9U priority Critical patent/CN221062130U/en
Application granted granted Critical
Publication of CN221062130U publication Critical patent/CN221062130U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

The utility model provides a dust fall device for a building construction site, which belongs to the technical field of dust fall devices, and is characterized in that arc air outlet pipes are arranged on the left side and the right side of the upper surface of the outer box body, the input ends of the two arc air outlet pipes are positioned in the outer box body, the inner bottom walls of the two arc air outlet pipes are fixedly connected with guide plates, one side of each guide plate is fixedly provided with an exhaust fan, and the inner top walls of the two arc air outlet pipes are fixedly provided with water pipes. The second water pump is led into the water pipe with the clear water in the water tank, and is sprayed in the arc play tuber pipe by a plurality of high pressure atomizer on the water pipe in the atomizing form, then in being arranged outside air by the exhaust fan again, the water smoke contacts with the dust in the air like this, can make the dust subside fast, has reached the dust removal effect, makes the device have efficient automatic dust removal function, both can promote dust removal efficiency, also need not to occupy the workman resource, provides availability factor.

Description

Dust fall equipment for construction site
Technical Field
The utility model belongs to the technical field of dust fall equipment, and particularly relates to dust fall equipment for a building construction site.
Background
The building construction refers to the construction process of various buildings, namely the process of changing various lines on a design drawing into real objects at a designated place. The method comprises foundation engineering construction, main body structure construction, roof engineering construction, decoration engineering construction and the like. In the process of building construction, more dust can be generated, especially in the early foundation construction stage, so that dust fall on a construction site is necessary, the human health of workers can be protected, and the environmental pollution can be reduced. However, the existing dust falling mode of general building construction is that workers spray water to carry out dust falling, and the efficiency of the dust falling mode is not high, and certain worker resources are required to be occupied. In order to overcome the defects, the utility model provides dust settling equipment for a building construction site.
Disclosure of utility model
The utility model aims to provide dust settling equipment for a building construction site, and aims to solve the problem of low dust settling efficiency in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction scene dust fall equipment, includes the outer box, the left and right sides of outer box upper surface all is provided with the arc and goes out the tuber pipe, two the input that the arc goes out the tuber pipe all is located the inside of outer box, two the equal fixedly connected with guide plate of interior diapire of arc play tuber pipe, one side fixed mounting of guide plate has the exhaust fan, two the equal fixed mounting of interior roof of arc play tuber pipe has the water pipe, the inside wall fixed mounting of outer box has the funnel, two the output of guide plate all is located the inside of funnel, the interior bottom wall fixed mounting of outer box has the filtration jar, the input of filtration jar is linked together through pipeline and the output of funnel, the inner wall of filtration jar is provided with cotton fiber filter layer, one side fixed mounting of filtration jar has the water tank.
Further, the inner walls of the two arc-shaped air outlet pipes are fixedly provided with wind direction control plates.
Further, at least two high-pressure atomizing spray heads are arranged on the outer surfaces of the two water running pipes.
Further, ventilation nets are arranged on two side surfaces of the two arc-shaped air outlet pipes.
Further, an activated carbon adsorption layer is arranged on the inner wall of the filter tank, and a ceramic filter layer is arranged on one side of the activated carbon adsorption layer.
Further, the upper surface of the water tank is fixedly provided with a first water pump, the input end of the first water pump is communicated with the output end of the filter tank through a pipeline, and the output end of the first water pump is communicated with the input end of the water tank through a pipeline.
Further, the upper surface of the water tank is fixedly provided with a second water pump, the input end of the second water pump is communicated with the output end of the water tank through a pipeline, and the output end of the second water pump is communicated with the input end of the water pipe through a pipeline.
Further, a water inlet pipe is arranged on one side of the upper surface of the water tank, and the input end of the water inlet pipe is positioned outside the outer tank body.
Compared with the prior art, the utility model has the beneficial effects that:
1. This building construction scene dust fall equipment, the second water pump is leading-in the water tank in the water pipe of walking, and by a plurality of high pressure atomizer on the water pipe being atomizing and spraying in the arc play tuber pipe, then in being discharged outside air by the exhaust fan, the water smoke contacts with the dust in the air like this, can make the dust subside fast, dust removal effect has been reached, and can carry out the row water smoke to two different directions simultaneously through two arc play tuber pipes, can further promote the dust removal effect of the device, make the device have efficient automatic dust removal function, both can promote dust removal efficiency, also need not occupy the workman resource, provide availability factor.
2. The arc-shaped air outlet pipe always has a plurality of water mist which cannot be discharged and is collected into large water drops to drop on the guide plate, at the moment, the water drops on the guide plate automatically flow into the funnel and then flow into the filtering tank, the dust is removed, the impurities are removed, the bacteria are removed, the toxin is removed and the filtering is carried out in the filtering tank, the filtered water is pumped into the water tank through the first water pump, so that the water can be collected and reused, the device has the function of recycling water, the use efficiency of the water can be improved, and certain water resources can be saved.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic elevational view of the present utility model;
FIG. 2 is a schematic rear view of the present utility model;
FIG. 3 is a schematic view of the present utility model in elevation and partial cross-section;
FIG. 4 is a schematic view of the right-side view partially in cross-section structure of the present utility model;
fig. 5 is an enlarged schematic view of the structure of fig. 4 a according to the present utility model.
In the figure: 1. an outer case; 2. an arc air outlet pipe; 3. a deflector; 4. an exhaust fan; 5. a water pipe; 6. a funnel; 7. a filter tank; 8. a cotton fiber filter layer; 9. a water tank; 10. a wind direction control board; 11. a high pressure atomizer; 12. a ventilation screen; 13. an activated carbon adsorption layer; 14. a ceramic filter layer; 15. a first water pump; 16. a second water pump; 17. a water inlet pipe.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples
Referring to fig. 1-5, the present utility model provides the following technical solutions: the utility model provides a construction scene dust fall equipment, including outer box 1, the left and right sides of outer box 1 upper surface all is provided with arc tuber pipe 2, the input of two arc tuber pipes 2 all is located the inside of outer box 1, the equal fixedly connected with guide plate 3 of interior diapire of two arc tuber pipes 2, one side fixed mounting of guide plate 3 has exhaust fan 4, the equal fixed mounting of interior roof of two arc tuber pipes 2 has the water pipe 5 of walking, the inside wall fixed mounting of outer box 1 has funnel 6, the output of two guide plates 3 all is located the inside of funnel 6, the interior bottom wall fixed mounting of outer box 1 has filter tank 7, the input of filter tank 7 is linked together with the output of funnel 6 through the pipeline, the inner wall of filter tank 7 is provided with cotton fiber filter layer 8, one side fixed mounting of filter tank 7 has water tank 9.
In the specific embodiment of the utility model, the second water pump 16 guides the clean water in the water tank 9 into the water travelling pipe 5, a plurality of high-pressure atomizing spray heads 11 on the water travelling pipe 5 are atomized and sprayed into the arc-shaped air outlet pipe 2, and then the arc-shaped air outlet pipe is discharged into the outside air by the exhaust fan 4, so that the water mist contacts with dust in the air, the dust can be quickly settled down, the dust removing effect is achieved, some water mist in the arc-shaped air outlet pipe 2 can not be discharged and collected into large water drops to drop on the guide plate 3, at the moment, the water drops on the guide plate 3 automatically flow into the funnel 6 and then flow into the filter tank 7, the filtered water is sucked into the water tank 9 through the first water pump 15, and the water can be collected and reused.
Specifically, the inner walls of the two arc-shaped air outlet pipes 2 are fixedly provided with a wind direction control plate 10.
In this embodiment: the air outlet direction of the arc-shaped air outlet pipe 2 can be adjusted by rotating the air direction control board 10.
Specifically, at least two high-pressure atomizing spray heads 11 are arranged on the outer surfaces of the two water running pipes 5.
In this embodiment: the clean water in the water running pipe 5 can be sprayed out in an atomized form through the high-pressure atomization spray head 11.
Specifically, the two sides of the two arc-shaped air outlet pipes 2 are provided with ventilation nets 12.
In this embodiment: the ventilation net 12 can facilitate the exhaust of the exhaust fan 4 and prevent external organisms from entering the arc-shaped air outlet pipe 2.
Specifically, the inner wall of the filter tank 7 is provided with an activated carbon adsorption layer 13, and one side of the activated carbon adsorption layer 13 is provided with a ceramic filter layer 14.
In this embodiment: the activated carbon adsorption layer 13 can remove bacteria and peculiar smell, and the ceramic filter layer 14 can remove toxin and microorganism.
Specifically, the upper surface of the water tank 9 is fixedly provided with a first water pump 15, the input end of the first water pump 15 is communicated with the output end of the filter tank 7 through a pipeline, and the output end of the first water pump 15 is communicated with the input end of the water tank 9 through a pipeline.
In this embodiment: the water in the filter tank 7 can be pumped into the water tank 9 by the first water pump 15, so that the water is convenient to collect and use for the second time.
Specifically, the upper surface of the water tank 9 is fixedly provided with a second water pump 16, the input end of the second water pump 16 is communicated with the output end of the water tank 9 through a pipeline, and the output end of the second water pump 16 is communicated with the input end of the water running pipe 5 through a pipeline.
In this embodiment: the water in the water tank 9 can be led into the water feed pipe 5 by means of the second water pump 16.
Specifically, a water inlet pipe 17 is arranged on one side of the upper surface of the water tank 9, and the input end of the water inlet pipe 17 is positioned outside the outer tank body 1.
In this embodiment: fresh water can be added to the water tank 9 through the water inlet pipe 17.
The electrical components are all connected with an external main controller and 220V mains supply, and the main controller can be conventional known equipment for controlling a computer and the like.
The working principle and the using flow of the utility model are as follows: when the dust settling equipment for the construction site is used, firstly, proper amount of clean water is introduced into the water tank 9 through the water inlet pipe 17, then the second water pump 16 and the exhaust fan 4 are started, the second water pump 16 can introduce the clean water in the water tank 9 into the two water passing pipes 5, then the plurality of high-pressure atomization spray heads 11 on the two water passing pipes 5 can spray the clean water in an atomized manner into the two arc air outlet pipes 2, and the exhaust fan 4 in the two arc air outlet pipes 2 can exhaust air outwards rapidly in the process, so that water mist in the two arc air outlet pipes 2 can be discharged into the outside air, and then the dust can be quickly settled down by contacting with dust in the outside air through the water mist, and the dust removal effect is achieved. In the process that the exhaust fan 4 discharges the water mist in the arc-shaped air outlet pipe 2 to the outside air, a certain amount of water mist can not be discharged in time and is collected into big water drops to drop on the guide plates 3, at this time, the water drops on the two guide plates 3 can automatically flow into the funnel 6, then the water in the funnel 6 can automatically flow into the filter tank 7 under the gravity, and the water in the filter tank 7 needs to be sequentially subjected to dust removal and impurity removal filtration of the cotton fiber filter layer 8, sterilization and odor removal filtration of the activated carbon adsorption layer 13 and toxin removal and microorganism filtration of the ceramic filter layer 14, and finally the filtered water is pumped into the water tank 9 through the first water pump 15, so that the water collection and secondary utilization effects can be formed. The air outlet direction of the arc-shaped air outlet pipe 2 can be adjusted by rotating the air direction control board 10. The ventilation net 12 can facilitate the exhaust of the exhaust fan 4 and prevent external organisms from entering the arc-shaped air outlet pipe 2.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (8)

1. The utility model provides a construction site dust fall equipment, includes outer box (1), its characterized in that: the novel filter tank is characterized in that arc-shaped air outlet pipes (2) are arranged on the left side and the right side of the upper surface of the outer tank body (1), the two input ends of the arc-shaped air outlet pipes (2) are located in the outer tank body (1), the two inner bottom walls of the arc-shaped air outlet pipes (2) are fixedly connected with guide plates (3), one side of each guide plate (3) is fixedly provided with an exhaust fan (4), the two inner top walls of the arc-shaped air outlet pipes (2) are fixedly provided with water pipes (5), the inner side walls of the outer tank body (1) are fixedly provided with funnels (6), the two output ends of the guide plates (3) are located in the funnels (6), the input ends of the outer tank body (1) are fixedly provided with filter tanks (7), and the input ends of the filter tanks (7) are connected with the output ends of the funnels (6) through pipelines, and the inner walls of the filter tanks (7) are provided with cotton fiber filter layers (8), and one side of each filter tank (7) is fixedly provided with a water tank (9).
2. A construction site dust settling device as claimed in claim 1, wherein: the inner walls of the two arc-shaped air outlet pipes (2) are fixedly provided with wind direction control plates (10).
3. A construction site dust settling device as claimed in claim 1, wherein: at least two high-pressure atomizing spray heads (11) are arranged on the outer surfaces of the two water travelling pipes (5).
4. A construction site dust settling device as claimed in claim 1, wherein: the two side surfaces of the two arc-shaped air outlet pipes (2) are respectively provided with a ventilation net (12).
5. A construction site dust settling device as claimed in claim 1, wherein: an activated carbon adsorption layer (13) is arranged on the inner wall of the filter tank (7), and a ceramic filter layer (14) is arranged on one side of the activated carbon adsorption layer (13).
6. A construction site dust settling device as claimed in claim 1, wherein: the upper surface of the water tank (9) is fixedly provided with a first water pump (15), the input end of the first water pump (15) is communicated with the output end of the filter tank (7) through a pipeline, and the output end of the first water pump (15) is communicated with the input end of the water tank (9) through a pipeline.
7. A construction site dust settling device as claimed in claim 1, wherein: the upper surface of the water tank (9) is fixedly provided with a second water pump (16), the input end of the second water pump (16) is communicated with the output end of the water tank (9) through a pipeline, and the output end of the second water pump (16) is communicated with the input end of the water feeding pipe (5) through a pipeline.
8. A construction site dust settling device as claimed in claim 1, wherein: one side of the upper surface of the water tank (9) is provided with a water inlet pipe (17), and the input end of the water inlet pipe (17) is positioned outside the outer tank body (1).
CN202322798714.9U 2023-10-18 2023-10-18 Dust fall equipment for construction site Active CN221062130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322798714.9U CN221062130U (en) 2023-10-18 2023-10-18 Dust fall equipment for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322798714.9U CN221062130U (en) 2023-10-18 2023-10-18 Dust fall equipment for construction site

Publications (1)

Publication Number Publication Date
CN221062130U true CN221062130U (en) 2024-06-04

Family

ID=91267791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322798714.9U Active CN221062130U (en) 2023-10-18 2023-10-18 Dust fall equipment for construction site

Country Status (1)

Country Link
CN (1) CN221062130U (en)

Similar Documents

Publication Publication Date Title
CN105689183B (en) A kind of Water Rotation Painting Booth
CN221062130U (en) Dust fall equipment for construction site
CN204656246U (en) Integration Turbulent Flow Type wet-scrubbing equipment
CN204448403U (en) A kind of paint line device for purifying and treating tail gas
CN206343039U (en) A kind of paint line tail gas, exhaust gas purification and treatment device
CN204637871U (en) Weld fumes cleaning system
CN205269366U (en) Low -temperature plasma waste gas purification apparatus
CN212141892U (en) Environmental protection dust collecting equipment of building engineering construction
CN212142034U (en) Workshop dust and gas treatment equipment
CN211245969U (en) Novel energy-concerving and environment-protective desulfurization is removed dust device
CN210645625U (en) Spraying dust filtering device
CN203577541U (en) High-efficiency paint-blocking spraying room system
CN207694528U (en) Industrial tail gas flue dust and formaldehyde comprehensive treatment system
CN208275196U (en) A kind of novel environment friendly smoke dust-removing equipment
CN207520819U (en) A kind of industrial automation dust-extraction unit
CN220071122U (en) Wet desulfurization dust remover
CN221385787U (en) Dust collecting equipment is used in on-the-spot construction of building engineering
CN212856347U (en) Energy-concerving and environment-protective spray booth
CN221412631U (en) Dust collector for building site
CN219518267U (en) Stone material processing water spray dust collecting equipment
CN220656875U (en) Spraying dust collecting equipment for cement production
CN217979080U (en) Fresh air dehumidifier for ventilation
CN213349474U (en) Automatic water lifting paint spray booth paint mist treatment system
CN213375727U (en) A spray dust remover for environmental engineering
CN215391479U (en) Unorganized dust collection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant