CN221052957U CN202322422393.2U CN202322422393U CN221052957U CN 221052957 U CN221052957 U CN 221052957U CN 202322422393 U CN202322422393 U CN 202322422393U CN 221052957 U CN221052957 U CN 221052957U
Authority
CN
China
Prior art keywords
type
plate
curtain
fixedly connected
fixed frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322422393.2U
Other languages
Chinese (zh)
Inventor
葛兴宇
杨平
王楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Gangyuan Curtain Wall Co ltd
Jangho Group Co Ltd
Original Assignee
Beijing Gangyuan Curtain Wall Co ltd
Jangho Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Gangyuan Curtain Wall Co ltd, Jangho Group Co Ltd filed Critical Beijing Gangyuan Curtain Wall Co ltd
Priority to CN202322422393.2U priority Critical patent/CN221052957U/en
Application granted granted Critical
Publication of CN221052957U publication Critical patent/CN221052957U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to the technical field of building curtain walls, in particular to a universal fixing structure for curtain wall plates. Including the rectangle steel pipe, one side fixedly connected with of rectangle steel pipe a plurality of parallel arrangement's L type crossbeams, the equal fixedly connected with fixed plate of upper surface of every L type crossbeam is provided with U type fixed frame on the terminal surface that rectangle steel pipe one side was kept away from to the fixed plate, the inside spacing chucking subassembly that is used for carrying out chucking to the curtain board that is provided with of U type fixed frame, the both sides of fixed plate are fixedly connected with respectively and are used for bearing curtain wallboard's U type layer board, U type layer board is kept away from the terminal surface that rectangle steel pipe one side and is surpassed the terminal surface that rectangle steel pipe one side was kept away from to the fixed frame of U type, install curtain wallboard between the U type layer board on two adjacent L type crossbeams from top to bottom. According to the utility model, the U-shaped supporting plate is arranged to support the curtain wall plate, and the limiting clamping assembly is arranged to fix the curtain wall plate, so that the installation process can be effectively simplified, the installation is more convenient, the time and the labor are saved, and the construction progress is effectively accelerated.

Description

General fixed knot of curtain board constructs
Technical Field
The utility model relates to the technical field of building curtain walls, in particular to a universal fixing structure for curtain wall plates.
Background
The stone curtain wall plate is required to be used for protecting the wall body in daily building construction operation, and has the functions of light weight, wind pressure resistance, rain resistance and the like.
The stone curtain wall is a building enclosure structure which does not bear the load of the main structure, and a fixing structure is needed to be used for fixing the stone curtain wall plate when the stone curtain wall plate is installed.
Because prior art is at the fixed in-process to stone material curtain board, need set up the mounting groove at stone material curtain board upper and lower both ends earlier, then at mounting groove inside fixed mounting layer board or other joint spare, and then be connected with the connecting piece on the L type crossbeam through layer board or other joint spare, the degree of depth of mounting groove has directly influenced the position of layer board or joint spare, the overall installation precision requirement is higher, can not effectively guarantee the effective alignment of two adjacent stone material curtain boards, and the overall installation step is comparatively loaded down with trivial details, it is time-consuming and laborious, increase staff's intensity of labour, consequently, need provide a general fixed knot of curtain board to solve above-mentioned problem.
Disclosure of utility model
Aiming at the problems in the prior art, the utility model discloses a general fixing structure of a curtain wall plate, and particularly discloses the following technical scheme:
The utility model provides a general fixed knot of curtain board constructs, includes the rectangle steel pipe, one side fixedly connected with of rectangle steel pipe a plurality of parallel arrangement's L type crossbeams, every the equal fixedly connected with fixed plate of upper surface of L type crossbeam, be provided with U type fixed frame on the terminal surface of rectangle steel pipe one side is kept away from to the fixed plate, the inside spacing chucking subassembly that is used for carrying out chucking to the curtain board that is provided with of U type fixed frame, the both sides of fixed plate are fixedly connected with U type layer board that is used for bearing curtain wallboard respectively, two U type layer board sets up about U type fixed frame symmetry, U type layer board is kept away from the terminal surface of rectangle steel pipe one side and is surpassed the terminal surface of U type fixed frame one side of rectangle steel pipe apart from U type layer board, installs curtain wallboard between the U type layer board on two upper and lower adjacent L type crossbeams.
Further, U type fixed frame internally mounted has spacing chucking subassembly and lower spacing chucking subassembly in the opposite direction, it is spacing that go up spacing chucking subassembly is used for carrying out the chucking to going up the curtain board among two upper and lower adjacent curtain boards, spacing chucking subassembly is used for going on the chucking spacing to going up the lower curtain board among two upper and lower adjacent curtain boards down.
Further, go up spacing chucking subassembly includes first movable mounting plate, first movable mounting plate slidable mounting is inside the fixed frame of U type, the first spacing post of upper surface fixedly connected with of first movable mounting plate, the roof of the fixed frame of U type is run through on the top of first spacing post and the roof sliding connection of the fixed frame of U type, first movable mounting plate is kept away from the first fixture block of one end top surface fixedly connected with of L type crossbeam, the position cover that is located between the roof of first movable mounting plate and the fixed frame of U type on the first spacing post is equipped with first reset spring, lower spacing chucking subassembly includes the second movable mounting plate, second movable mounting plate slidable mounting is inside the fixed frame of U type, the lower surface fixedly connected with second spacing post of second movable mounting plate, the bottom of second spacing post runs through the bottom plate of the fixed frame of U type and the bottom plate sliding connection of the fixed frame of U type, the second movable mounting plate is kept away from the one end bottom surface fixedly connected with second fixture block of L type crossbeam, be located the second movable mounting plate and be equipped with first reset spring between the roof and the fixed frame of U type roof, the second curtain wall is equipped with the second curtain groove and the second curtain groove is equipped with, the second curtain groove is located the second end face of the second curtain groove is equipped with, the second curtain groove is equipped with the second end face.
Further, the top of the first limiting column penetrates through the top plate of the U-shaped fixed frame and is fixedly connected with a first limiting disc, and the bottom of the second limiting column penetrates through the bottom plate of the U-shaped fixed frame and is fixedly connected with a second limiting disc.
Further, the top of first reset spring is fixedly connected with the top plate of the U-shaped fixed frame, the bottom of the first reset spring is fixedly connected with the first movable mounting plate, the bottom of the second reset spring is fixedly connected with the bottom plate of the U-shaped fixed frame, and the top of the second reset spring is fixedly connected with the second movable mounting plate.
Furthermore, the rectangular steel pipe is fixedly connected with the L-shaped cross beam through corner fittings and bolts at two sides of the rectangular steel pipe, and the fixing plate is fixedly connected with the L-shaped cross beam through bolts.
Further, a sealing rubber strip is arranged in a gap between the upper curtain wall plate and the lower curtain wall plate.
Compared with the prior art, the utility model has the beneficial effects that:
1. According to the utility model, the curtain wall plate is clamped and limited by arranging the limiting clamping assembly, the supporting plate or other clamping pieces are not required to be arranged on the curtain wall plate, when the curtain wall plate is clamped between the upper U-shaped supporting plate and the lower U-shaped supporting plate, the limiting column is loosened, the reset spring releases energy at the moment, the clamping block is driven to move and restore to the original position, and then the clamping block is clamped into the clamping groove, so that the effective fixing of the position of the curtain wall plate is realized, the operation is more convenient, the time and the labor are saved, and the construction progress can be effectively accelerated.
2. Through being provided with U type layer board, can effectively hold up curtain wallboard, the installation of being convenient for, and guarantee the effective alignment of two transversely adjacent curtain wallboards, later stage can effectively play the supporting role to the curtain board simultaneously, guarantees the stable in structure of curtain wallboard.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of the structure of the present utility model without installing a curtain wall board;
FIG. 3 is a second schematic view of the structure of the present utility model without installing a curtain wall board;
fig. 4 is an enlarged schematic view of the structure of fig. 2a according to the present utility model.
1-Rectangular steel pipes; a 2-L-shaped cross beam; 3-curtain wall boards; 301-a second clamping groove; 302-track grooves; 4-corner fitting; 5-a fixing plate; 501-U-shaped fixed frame; 502-U-shaped supporting plates; 6-upper limit clamping assembly; 601-a first movable mounting plate; 602-a first fixture block; 603-a first limit post; 604-a first return spring; 7-a lower limit clamping assembly; 701-a second movable mounting plate; 702-a second latch; 703-a second limit post; 704-a second return spring.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, a general fixed knot of curtain board constructs, including rectangle steel pipe 1, one side fixedly connected with of rectangle steel pipe 1 has a plurality of parallel arrangement's L type crossbeam 2 (only draw one in the drawing), every the equal fixedly connected with fixed plate 5 of upper surface of L type crossbeam 2, be provided with U type fixed frame 501 on the terminal surface of rectangle steel pipe 1 side is kept away from to fixed plate 5, U type fixed frame 501 inside is provided with the spacing chucking subassembly that is used for carrying out chucking to curtain board 3 fixedly, the both sides of fixed plate 5 are fixedly connected with respectively and are used for bearing curtain board's U type layer board 502, two U type layer board 502 is with U type fixed frame 501 symmetry setting, U type layer board 502 is kept away from the terminal surface of rectangle steel pipe 1 side and is surpassed the terminal surface of rectangle steel pipe 1 side of U type fixed frame 501 for U type layer board 502 can stretch into smoothly in the clearance of upper and lower adjacent two L type crossbeams 2, installs curtain board 3 between the U type layer board.
In this embodiment, U type fixed frame 501 internally mounted has spacing chucking subassembly 6 and lower spacing chucking subassembly 7 in opposite direction, it is spacing that go up spacing chucking subassembly 6 is used for carrying out the chucking to last curtain board among two upper and lower adjacent curtain boards 3, lower spacing chucking subassembly 7 is used for carrying out the chucking to lower curtain board 3 among two upper and lower adjacent curtain boards spacing, and last spacing chucking subassembly and lower spacing chucking subassembly on the adjacent L type crossbeam 2 can carry out the chucking spacing to the upper and lower both ends of same curtain board 3 respectively to guarantee the mounting stability of curtain board 3.
In this embodiment, go up spacing chucking subassembly 6 includes first movable mounting panel 601, first movable mounting panel 601 slidable mounting is inside U type fixed frame 501, the upper surface fixed connection of first movable mounting panel 601 has first spacing post 603, the roof and the roof sliding connection of U type fixed frame 501 are run through on the top of first spacing post 603, first movable mounting panel 601 keeps away from the first fixture block 602 of one end top surface fixedly connected with of L type crossbeam 2, the position cover that lies in between the roof of first movable mounting panel 601 and U type fixed frame 501 on the first spacing post 603 is equipped with first reset spring 604, spacing chucking subassembly 7 includes second movable mounting panel 701 down, second movable mounting panel 701 slidable mounting is inside U type fixed frame 501, the lower surface fixed connection of second movable mounting panel 701 has second spacing post 703, the bottom of second spacing post 703 run through the bottom plate of U type fixed frame 501 and with the bottom plate sliding connection of U type fixed frame 501, the second movable mounting panel is kept away from the bottom surface L type fixed frame 501 the second end of second curtain wall has the second fixture block groove 301 to be located the second end of second movable mounting panel 301, the second end has the second fixture block groove 301 to be provided with the second end face of the second movable mounting panel 301, the second end has the second fixture block groove 301 to be located on the second side of the second movable mounting panel 301, the second end has the second end groove 301 is located the second end of the second fixture block groove 301.
When the curtain wall plate 3 is installed, the first limiting column 603 on the L-shaped cross beam 2 below the curtain wall plate 3 is pushed to move downwards, the first clamping block 602 is driven to synchronously move downwards to flush with the upper end surface of the U-shaped supporting plate 502, the first reset spring 604 is in a stretching state at the moment, the second limiting column 703 on the L-shaped cross beam 2 above the curtain wall plate 3 is pushed to move upwards, the second clamping block 702 is driven to move upwards to flush with the lower end surface of the U-shaped supporting plate 502, and at the moment, the curtain wall plate 3 can be clamped between the upper U-shaped supporting plate 502 and the lower U-shaped supporting plate 502; when the curtain wall plate 3 is clamped between the upper U-shaped supporting plate 502 and the lower U-shaped supporting plate 502, the first limiting column 603 below and the second limiting column 703 above are loosened, and at the moment, the first reset spring 604 and the second reset spring 704 release energy to drive the first clamping block 602 and the second clamping block 702 to move and restore to the original positions, so that the curtain wall plate 3 is inserted into the first clamping groove and the second clamping groove 301 respectively, effective fixing of the position of the curtain wall plate 3 is achieved, operation is convenient, and time and labor are saved.
In this embodiment, the top end of the first limiting post 603 penetrates through the top plate of the U-shaped fixing frame 501 and is fixedly connected with a first limiting disc, the bottom end of the second limiting post 703 penetrates through the bottom plate of the U-shaped fixing frame 501 and is fixedly connected with a second limiting disc, and the first limiting disc and the second limiting disc can be arranged to avoid the first limiting post 603 and the second limiting post 703 from falling out of the through hole of the U-shaped fixing frame 501.
In this embodiment, the top end of the first return spring 604 is fixedly connected with the top plate of the U-shaped fixed frame 501, the bottom end of the first return spring 604 is fixedly connected with the first movable mounting plate 601, the bottom end of the second return spring 704 is fixedly connected with the bottom plate of the U-shaped fixed frame 501, and the top end of the second return spring 704 is fixedly connected with the second movable mounting plate 701, thereby improving the stability of the structure.
In this embodiment, the rectangular steel pipe 1 is fixedly connected with the L-shaped cross beam 2 through the corner fittings 4 and bolts on two sides of the rectangular steel pipe 1, and the fixing plate 5 is fixedly connected with the L-shaped cross beam 2 through bolts, so that the installation and the disassembly are convenient.
In this embodiment, be provided with joint strip in the gap between upper and lower adjacent two curtain boards 3, through being provided with joint strip, can effectively increase the stability between the curtain board 3, further improve the anti wind pressure of curtain board 3, the rain-proof scheduling function, effectively improve holistic aesthetic property simultaneously.
According to the utility model, the curtain wall plate 3 is clamped and limited by arranging the limiting clamping assembly, the supporting plate or other clamping pieces are not required to be arranged on the curtain wall plate 3, when the curtain wall plate 3 is clamped between the upper U-shaped supporting plate 502 and the lower U-shaped supporting plate 502, the limiting column is loosened, the reset spring releases energy at the moment, the clamping block is driven to move and restore to the original position, and then the clamping block is clamped into the clamping groove, so that the effective fixing of the position of the curtain wall plate 3 is realized, the operation is more convenient, the time and the labor are saved, and the construction progress can be effectively accelerated.
The U-shaped supporting plate 502 is arranged, so that the curtain wall plates 3 can be effectively supported, the installation is convenient, the effective alignment of two transversely adjacent curtain wall plates 3 is ensured, meanwhile, the later stage can effectively support the curtain wall plates 3, and the structural stability of the curtain wall plates 3 is ensured.
The foregoing description is only a preferred embodiment of the present utility model, and is not intended to limit the technical scope of the present utility model, so any minor modifications, equivalent changes and modifications made to the above embodiments according to the technical principles of the present utility model still fall within the scope of the technical solutions of the present utility model.

Claims (7)

1. The utility model provides a general fixed knot of curtain board constructs, its characterized in that, includes the rectangle steel pipe, one side fixedly connected with of rectangle steel pipe a plurality of parallel arrangement's L type crossbeams, every the equal fixedly connected with fixed plate of upper surface of L type crossbeam, be provided with U type fixed frame on the terminal surface of rectangle steel pipe one side is kept away from to the fixed plate, the inside spacing chucking subassembly that is used for carrying out chucking to the curtain board that is provided with of U type fixed frame, the both sides of fixed plate fixedly connected with respectively is used for bearing curtain wallboard's U type layer board, two U type layer board sets up about U type fixed frame symmetry, U type layer board is kept away from the terminal surface that rectangle steel pipe one side was kept away from to the fixed frame of U type surpassed, installs curtain wallboard between the U type layer board on two L type crossbeams that are adjacent from top to bottom.
2. The universal fixing structure of curtain wall plates according to claim 1, wherein an upper limit clamping assembly and a lower limit clamping assembly with opposite directions are installed in the U-shaped fixing frame, the upper limit clamping assembly is used for clamping and limiting an upper curtain wall plate among two upper and lower adjacent curtain wall plates, and the lower limit clamping assembly is used for clamping and limiting a lower curtain wall plate among the two upper and lower adjacent curtain wall plates.
3. The utility model provides a general fixed knot of curtain board constructs according to claim 2, a serial communication port, go up spacing chucking subassembly and include first movable mounting plate, first movable mounting plate slidable mounting is inside the fixed frame of U type, the first spacing post of upper surface fixedly connected with of first movable mounting plate, the top of first spacing post runs through the roof of the fixed frame of U type and with the roof sliding connection of the fixed frame of U type, first movable mounting plate is kept away from the first fixture block of one end top surface fixedly connected with of L type crossbeam, be located first movable mounting plate and the cover of the position between the roof of the fixed frame of U type on the first spacing post and be equipped with first reset spring, lower spacing chucking subassembly includes the second movable mounting plate, second movable mounting plate slidable mounting is inside the fixed frame of U type, the lower surface fixedly connected with second spacing post of second movable mounting plate, the bottom of second spacing post runs through the bottom of the fixed frame of U type and with the roof sliding connection of the fixed frame of U type, the second movable mounting plate is kept away from one end bottom surface fixedly connected with second fixture block of L type crossbeam, second movable mounting plate is located second curtain plate and is equipped with the second clamp groove and is located the second curtain plate, the second curtain plate has the second end groove and the top surface of the fixed groove is located on the second side of the second curtain plate, the second curtain plate has the second groove.
4. The universal fixing structure of the curtain wall plate according to claim 3, wherein the top end of the first limiting column penetrates through the top plate of the U-shaped fixing frame to be fixedly connected with a first limiting disc, and the bottom end of the second limiting column penetrates through the bottom plate of the U-shaped fixing frame to be fixedly connected with a second limiting disc.
5. The universal fixing structure of the curtain wall plate according to claim 3, wherein the top end of the first reset spring is fixedly connected with the top plate of the U-shaped fixing frame, the bottom end of the first reset spring is fixedly connected with the first movable mounting plate, the bottom end of the second reset spring is fixedly connected with the bottom plate of the U-shaped fixing frame, and the top end of the second reset spring is fixedly connected with the second movable mounting plate.
6. The universal fixing structure of the curtain wall plate according to claim 1, wherein the rectangular steel pipe is fixedly connected with the L-shaped cross beam through corner pieces and bolts on two sides of the rectangular steel pipe, and the fixing plate is fixedly connected with the L-shaped cross beam through bolts.
7. The universal fixing structure for curtain wall plates according to claim 1, wherein sealing rubber strips are arranged in gaps between two adjacent curtain wall plates.
CN202322422393.2U 2023-09-07 2023-09-07 General fixed knot of curtain board constructs Active CN221052957U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322422393.2U CN221052957U (en) 2023-09-07 2023-09-07 General fixed knot of curtain board constructs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322422393.2U CN221052957U (en) 2023-09-07 2023-09-07 General fixed knot of curtain board constructs

Publications (1)

Publication Number Publication Date
CN221052957U true CN221052957U (en) 2024-05-31

Family

ID=91203912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322422393.2U Active CN221052957U (en) 2023-09-07 2023-09-07 General fixed knot of curtain board constructs

Country Status (1)

Country Link
CN (1) CN221052957U (en)

Similar Documents

Publication Publication Date Title
CN221052957U (en) General fixed knot of curtain board constructs
CN111851807B (en) Assembly type building curtain wall component connecting structure
CN219654392U (en) Assembled steel construction factory building structure
CN213402903U (en) Photovoltaic power generation device for color steel tile roof
CN214574720U (en) Novel sunlight plate convenient to connect
CN209941985U (en) Detachable metal curtain wall sandwich panel system
CN210507963U (en) Detachable panel unit curtain wall
CN219304741U (en) Roofing does not have supporting formula photovoltaic energy storage board
CN215977965U (en) Energy-saving curtain wall for architectural decoration
CN220139454U (en) Photovoltaic module mounting structure
CN213014785U (en) Prefabricated wallboard combination formula assembly structure
CN215594667U (en) Photovoltaic board strutting arrangement convenient to installation
CN220964709U (en) Roof photovoltaic connection structure
CN112211320B (en) Photovoltaic building integrated section bar
CN218952565U (en) Metal grid furred ceiling structure
CN220814497U (en) Improved building decoration suspended ceiling based on BIM technology
CN219773358U (en) Assembled earth wallboard connecting device
CN220935053U (en) Photovoltaic panel connection fixing structure of photovoltaic module
CN219033687U (en) Fixed connection device for building curtain wall engineering
CN220848046U (en) Easily assembled movable board house
CN203320820U (en) Distance-adjustable energy-saving daylighting roof
CN220868564U (en) Section bar convenient to dismantle movable type furred ceiling aluminum plate
CN220210312U (en) Install in photovoltaic frame of various steel tile
CN216974003U (en) But decoration wallboard of fast-assembling that installation quality is good
CN216766627U (en) Mounting structure of decoration panel and fossil fragments