CN219654392U - A prefabricated steel structure factory building structure - Google Patents

A prefabricated steel structure factory building structure Download PDF

Info

Publication number
CN219654392U
CN219654392U CN202320600306.5U CN202320600306U CN219654392U CN 219654392 U CN219654392 U CN 219654392U CN 202320600306 U CN202320600306 U CN 202320600306U CN 219654392 U CN219654392 U CN 219654392U
Authority
CN
China
Prior art keywords
block
groove
top cover
support
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320600306.5U
Other languages
Chinese (zh)
Inventor
刘柏学
曹昌星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Dongheng Steel Structure Co ltd
Original Assignee
Fujian Dongheng Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Dongheng Steel Structure Co ltd filed Critical Fujian Dongheng Steel Structure Co ltd
Priority to CN202320600306.5U priority Critical patent/CN219654392U/en
Application granted granted Critical
Publication of CN219654392U publication Critical patent/CN219654392U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model belongs to the technical field of steel structure plants, in particular to an assembled steel structure plant structure which comprises upright posts; through positioning mechanism's setting, keep away from the one end of top cap with the bracing piece and follow the gomphosis piece and insert recess and gomphosis inslot, at this in-process, the gomphosis piece is exerted pressure to the toper piece, then make the toper piece pressurized and part shrink into the spacing inslot, then the toper piece is exerted pressure to first spring through the sliding block, until the gomphosis piece is located between toper piece and the buffer block, the gomphosis piece is exerted pressure to the second spring through the buffer block, cooperate the supporting shoe to play the supporting role when being convenient for play the cushioning effect of certain degree to the top cap through the buffer block cooperation second spring, accomplish then with bracing piece erection joint between top cap and backup pad, the stability of top cap in the use has been guaranteed, dismantle and the installation all comparatively fast convenient, simplify assembly and the flow and the step of dismantling, and buffering supporting protection ability is better.

Description

一种装配式钢结构厂房结构A prefabricated steel structure factory building structure

技术领域Technical field

本实用新型涉及钢结构厂房技术领域,具体是一种装配式钢结构厂房结构。The utility model relates to the technical field of steel structure workshops, specifically an assembled steel structure workshop structure.

背景技术Background technique

随着社会的进步与发展,具有“绿色、环保、节能、工业化、可以循环使用”即“绿色建筑”特征的轻型钢结构框架体系,正在建筑布局中饰演越来越重要的角色,钢结构被广泛应用在工业厂房,体育馆等建筑。With the progress and development of society, the lightweight steel structure frame system with the characteristics of "green, environmentally friendly, energy-saving, industrialized, and recyclable", that is, "green building", is playing an increasingly important role in building layout. Steel structures are Widely used in industrial plants, stadiums and other buildings.

目前的钢结构厂房结构通常是由顶盖、支撑柱、顶板和支撑顶杆的固定柱等结构构成,即在顶盖底部的两侧均通过固定螺纹安装支撑柱,并在两个支撑柱之间通过固定螺纹安装顶板,并在顶板的顶部与顶盖的底部之间安装支撑顶杆用以避免顶盖因恶劣天气而出现塌陷。The current steel structure factory building structure is usually composed of a top cover, a support column, a top plate and a fixed column that supports the top rod. That is, the support columns are installed with fixed threads on both sides of the bottom of the top cover, and between the two support columns Install the top plate through fixed threads, and install support rods between the top of the top plate and the bottom of the top cover to prevent the top cover from collapsing due to bad weather.

现有的装配式钢结构厂房结构中的支撑顶杆通常是通过固定螺栓安装在顶板与顶盖之间,这就使得在厂房的安装和拆卸阶段,顶盖的支撑部分拆装效率较低,且支撑防护较差;因此,针对上述问题提出一种装配式钢结构厂房结构。The support ejector rods in existing prefabricated steel structure factory buildings are usually installed between the top plate and the top cover through fixing bolts, which makes the disassembly and assembly efficiency of the support part of the top cover low during the installation and disassembly stages of the factory building. And the support and protection are poor; therefore, a prefabricated steel structure factory building structure is proposed to solve the above problems.

实用新型内容Utility model content

为了弥补现有技术的不足,现有的装配式钢结构厂房结构中的支撑顶杆通常是通过固定螺纹安装在顶板与顶盖之间,这就使得在厂房的安装和拆卸阶段,顶盖的支撑部分拆装效率较低,且支撑防护较差的问题,本实用新型提出一种装配式钢结构厂房结构。In order to make up for the shortcomings of the existing technology, the support ejector rods in the existing prefabricated steel structure factory buildings are usually installed between the top plate and the top cover through fixed threads, which makes the top cover difficult to install during the installation and disassembly stages of the factory building. The utility model proposes a prefabricated steel structure factory building structure to solve the problems of low disassembly and assembly efficiency of the support part and poor support protection.

本实用新型解决其技术问题所采用的技术方案是:本实用新型所述的一种装配式钢结构厂房结构,包括立柱;所述立柱的顶端设置有顶盖,所述立柱的一侧面固定安装有支撑板,所述支撑板的顶部固定安装有支撑块,所述支撑块的顶部开设有凹槽,所述凹槽的内侧壁开设有嵌合槽,所述顶盖的底部固定安装有支撑杆,所述支撑杆的另一端插设至凹槽内,所述嵌合槽内设置有嵌合块,所述嵌合块的一端延伸出嵌合槽并与支撑杆位于凹槽内的一端固定连接;The technical solution adopted by the utility model to solve the technical problem is: a prefabricated steel structure factory structure described in the utility model, including a column; the top of the column is provided with a top cover, and one side of the column is fixedly installed There is a support plate, a support block is fixedly installed on the top of the support plate, a groove is provided on the top of the support block, a fitting groove is provided on the inner side wall of the groove, and a support is fixedly installed on the bottom of the top cover. Rod, the other end of the support rod is inserted into the groove, and a fitting block is provided in the fitting groove. One end of the fitting block extends out of the fitting groove and is connected to the end of the support rod located in the groove. Fixed connection;

所述支撑块上设置有定位机构,所述定位机构包括开设在支撑块内的限位槽,所述限位槽内安装有滑动连接的滑动块,所述滑动块的一端通过第一弹簧与限位槽的内侧壁弹性连接,所述滑动块的另一端安装有固定连接的锥形块,所述嵌合槽的内侧壁开设有与限位槽相连通的通槽,所述锥形块远离滑动块的一端穿过通槽并延伸至嵌合槽内,所述嵌合槽内安装有滑动连接的缓冲块,所述缓冲块的底端通过第二弹簧与嵌合槽的内底壁弹性连接。The support block is provided with a positioning mechanism. The positioning mechanism includes a limiting groove opened in the supporting block. A sliding block is installed in the limiting groove. One end of the sliding block is connected to the sliding block through a first spring. The inner wall of the limiting groove is elastically connected. The other end of the sliding block is installed with a fixedly connected tapered block. The inner wall of the fitting groove is provided with a through groove connected with the limiting groove. The tapered block One end away from the sliding block passes through the through groove and extends into the fitting groove. A slidingly connected buffer block is installed in the fitting groove. The bottom end of the buffer block passes through the second spring and the inner bottom wall of the fitting groove. Flexible connection.

优选的,所述顶盖底部的两侧均通过螺纹固定安装有围墙板,所述围墙板内设置有保温层。Preferably, wall panels are fixedly installed on both sides of the bottom of the top cover through threads, and a thermal insulation layer is provided inside the wall panels.

优选的,所述围墙板的侧壁开设有窗户,所述窗户内设置有透明钢化玻璃。Preferably, a window is provided on the side wall of the wall panel, and transparent tempered glass is provided inside the window.

优选的,所述顶盖通过固定螺纹与所述立柱的顶端固定连接,所述顶盖设置为弧形。Preferably, the top cover is fixedly connected to the top of the upright column through fixing threads, and the top cover is arranged in an arc shape.

优选的,所述立柱的底部固定安装有安装板,所述安装板上开设有定位孔。Preferably, a mounting plate is fixedly installed on the bottom of the upright column, and a positioning hole is provided on the mounting plate.

优选的,所述顶盖的两侧均固定安装有导水板,所述导水板的顶部开设有导水槽,所述导水槽在前后方向具有一定的坡度。Preferably, water guide plates are fixedly installed on both sides of the top cover, and a water guide groove is provided on the top of the water guide plate. The water guide groove has a certain slope in the front and rear directions.

本实用新型的有益之处在于:The benefits of this utility model are:

本实用新型通过定位机构的设置,将支撑杆远离顶盖的一端伴随嵌合块插入凹槽与嵌合槽内,在此过程中,嵌合块对锥形块施加压力,继而使得锥形块受压并部分缩入限位槽内,继而锥形块通过滑动块对第一弹簧施加压力,直至嵌合块位于锥形块与缓冲块之间,嵌合块通过缓冲块对第二弹簧施加压力,通过缓冲块配合第二弹簧便于对顶盖起到一定程度的缓冲作用的同时配合支撑块起到支撑作用,继而完成将支撑杆安装连接在顶盖与支撑板之间,保证了顶盖使用过程中的稳定性,拆卸与安装过程均较为快速便捷,简化装配与拆卸的流程与步骤,且缓冲支撑防护能力较好。Through the setting of the positioning mechanism, the utility model inserts the end of the support rod away from the top cover into the groove and the fitting groove along with the fitting block. During this process, the fitting block exerts pressure on the conical block, thereby causing the conical block to It is pressed and partially retracted into the limiting groove, and then the conical block exerts pressure on the first spring through the sliding block until the fitting block is between the conical block and the buffer block, and the fitting block exerts pressure on the second spring through the buffer block. Pressure, the buffer block cooperates with the second spring to provide a certain degree of buffering effect on the top cover, and at the same time cooperates with the support block to provide support, and then completes the installation and connection of the support rod between the top cover and the support plate, ensuring that the top cover The stability during use, the disassembly and installation processes are relatively fast and convenient, the processes and steps of assembly and disassembly are simplified, and the buffer support and protection capabilities are good.

附图说明Description of the drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description These are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting any creative effort.

图1为本实用新型的立体结构示意图;Figure 1 is a schematic diagram of the three-dimensional structure of the utility model;

图2为本实用新型的仰视结构示意图;Figure 2 is a schematic diagram of the structure of the utility model viewed from above;

图3为本实用新型支撑块的结构示意图;Figure 3 is a schematic structural diagram of the support block of the present utility model;

图4为本实用新型图3的部分剖面结构示意图;Figure 4 is a partial cross-sectional structural diagram of Figure 3 of the present utility model;

图5为本实用新型顶盖的结构示意图。Figure 5 is a schematic structural diagram of the top cover of the present utility model.

图中:1、立柱;2、顶盖;3、支撑板;4、支撑块;5、凹槽;6、支撑杆;7、嵌合槽;8、嵌合块;9、定位机构;91、限位槽;92、滑动块;93、第一弹簧;94、锥形块;95、缓冲块;96、第二弹簧;10、围墙板;11、安装板;12、导水板。In the picture: 1. Column; 2. Top cover; 3. Support plate; 4. Support block; 5. Groove; 6. Support rod; 7. Fitting groove; 8. Fitting block; 9. Positioning mechanism; 91 , limit groove; 92, sliding block; 93, first spring; 94, conical block; 95, buffer block; 96, second spring; 10, wall plate; 11, installation plate; 12, water guide plate.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.

请参阅图1-图5所示,一种装配式钢结构厂房结构,包括立柱1;所述立柱1的顶端设置有顶盖2,所述立柱1的一侧面固定安装有支撑板3,所述支撑板3的顶部固定安装有支撑块4,所述支撑块4的顶部开设有凹槽5,所述凹槽5的内侧壁开设有嵌合槽7,所述顶盖2的底部固定安装有支撑杆6,所述支撑杆6的另一端插设至凹槽5内,所述嵌合槽7内设置有嵌合块8,所述嵌合块8的一端延伸出嵌合槽7并与支撑杆6位于凹槽5内的一端固定连接;Referring to Figures 1 to 5, a prefabricated steel structure factory building structure includes a column 1; a top cover 2 is provided at the top of the column 1, and a support plate 3 is fixedly installed on one side of the column 1. A support block 4 is fixedly installed on the top of the support plate 3. A groove 5 is provided on the top of the support block 4. A fitting groove 7 is provided on the inner wall of the groove 5. The bottom of the top cover 2 is fixedly installed. There is a support rod 6, the other end of the support rod 6 is inserted into the groove 5, a fitting block 8 is provided in the fitting groove 7, one end of the fitting block 8 extends out of the fitting groove 7 and Fixedly connected to one end of the support rod 6 located in the groove 5;

所述支撑块4上设置有定位机构9,所述定位机构9包括开设在支撑块4内的限位槽91,所述限位槽91内安装有滑动连接的滑动块92,所述滑动块92的一端通过第一弹簧93与限位槽91的内侧壁弹性连接,所述滑动块92的另一端安装有固定连接的锥形块94,所述嵌合槽7的内侧壁开设有与限位槽91相连通的通槽,所述锥形块94远离滑动块92的一端穿过通槽并延伸至嵌合槽7内,所述嵌合槽7内安装有滑动连接的缓冲块95,所述缓冲块95的底端通过第二弹簧96与嵌合槽7的内底壁弹性连接;工作时,因现有的装配式钢结构厂房结构中的支撑顶杆通常是通过固定螺栓安装在顶板与顶盖2之间,这就使得在厂房的安装和拆卸阶段,顶盖2的支撑部分拆装效率较低,且支撑防护较差,故采用本厂房结构,具体为在装配顶盖2的支撑件时,即将支撑杆6安装在顶盖2与支撑板3之间,通过定位机构9的设置,将支撑杆6远离顶盖2的一端伴随嵌合块8插入凹槽5与嵌合槽7内,在此过程中,嵌合块8对锥形块94施加压力,继而使得锥形块94受压并部分缩入限位槽91内,继而锥形块94通过滑动块92对第一弹簧93施加压力,直至嵌合块8位于锥形块94与缓冲块95之间,嵌合块8通过缓冲块95对第二弹簧96施加压力,通过缓冲块95配合第二弹簧96便于对顶盖2起到一定程度的缓冲作用的同时配合支撑块4起到支撑作用,继而完成将支撑杆6安装连接在顶盖2与支撑板3之间,保证了顶盖2使用过程中的稳定性,而当要拆卸厂房时,当拆卸到支撑杆6时,先解除支撑板3与其两端的两个立柱1之间通过固定螺栓的连接,之后只需按压锥形块94使得缩入限位槽91,即可解除对嵌合块8的限位,即可解除对支撑杆6的限位,使得支撑杆6带动嵌合块8脱离支撑板3,完成该部分的拆卸,拆卸与安装过程均较为快速便捷,简化装配与拆卸的流程与步骤,且缓冲支撑防护能力较好,从而解决了现有的装配式钢结构厂房结构中的支撑顶杆通常是通过固定螺栓安装在顶板与顶盖2之间,这就使得在厂房的安装和拆卸阶段,顶盖2的支撑部分拆装效率较低,且支撑防护较差的问题。The support block 4 is provided with a positioning mechanism 9. The positioning mechanism 9 includes a limiting groove 91 opened in the supporting block 4. A sliding block 92 is installed in the limiting groove 91. The sliding block 92 is installed in the limiting groove 91. One end of 92 is elastically connected to the inner wall of the limiting groove 91 through the first spring 93. The other end of the sliding block 92 is installed with a fixedly connected tapered block 94. The inner wall of the fitting groove 7 is provided with a limiting groove. The slot 91 is connected to a through slot. One end of the tapered block 94 away from the sliding block 92 passes through the through slot and extends into the fitting groove 7. A slidingly connected buffer block 95 is installed in the fitting groove 7. The bottom end of the buffer block 95 is elastically connected to the inner bottom wall of the fitting groove 7 through the second spring 96; during operation, the support ejector rods in the existing prefabricated steel structure factory building structure are usually installed through fixing bolts. Between the top plate and the top cover 2, this makes the disassembly and assembly efficiency of the support part of the top cover 2 low during the installation and disassembly stages of the factory building, and the support protection is poor. Therefore, the structure of this factory building is adopted, specifically during the assembly of the top cover 2 When installing the support member, the support rod 6 is installed between the top cover 2 and the support plate 3. Through the setting of the positioning mechanism 9, the end of the support rod 6 away from the top cover 2 is inserted into the groove 5 and fitted with the fitting block 8. In the groove 7, during this process, the fitting block 8 exerts pressure on the conical block 94, which then causes the conical block 94 to be compressed and partially retracted into the limiting groove 91, and then the conical block 94 passes through the sliding block 92 to A spring 93 applies pressure until the fitting block 8 is located between the tapered block 94 and the buffer block 95. The fitting block 8 exerts pressure on the second spring 96 through the buffer block 95. The buffer block 95 cooperates with the second spring 96 to facilitate the adjustment. The top cover 2 not only plays a buffering role to a certain extent, but also cooperates with the support block 4 to play a supporting role, and then completes the installation and connection of the support rod 6 between the top cover 2 and the support plate 3, ensuring the stability of the top cover 2 during use. property, and when the factory building is to be dismantled, when the support rod 6 is disassembled, the connection between the support plate 3 and the two columns 1 at both ends through the fixing bolts is first released, and then only the conical block 94 is pressed to make the retraction limit The groove 91 can release the position limit of the fitting block 8, and can release the position limit of the support rod 6, so that the support rod 6 drives the fitting block 8 to separate from the support plate 3, completing the disassembly, disassembly and installation process of this part. They are relatively fast and convenient, simplifying the processes and steps of assembly and disassembly, and have good buffer support and protection capabilities, thus solving the problem that the support ejector rods in the existing prefabricated steel structure factory buildings are usually installed on the top plate and top cover through fixing bolts. 2, this leads to the problem that during the installation and disassembly stages of the factory building, the disassembly and assembly efficiency of the support part of the top cover 2 is low, and the support protection is poor.

所述顶盖2底部的两侧均通过螺纹固定安装有围墙板10,所述围墙板10内设置有保温层;工作时,通过围墙板10的设置配合立柱1装配构成厂房,围墙板10内设置有保温层提高围墙板10的保温性。Wall panels 10 are fixedly installed on both sides of the bottom of the top cover 2 through threads, and an insulation layer is provided inside the wall panel 10; during operation, the factory building is formed by setting the wall panels 10 and assembling the columns 1. A thermal insulation layer is provided to improve the thermal insulation of the wall panel 10 .

所述围墙板10的侧壁开设有窗户,所述窗户内设置有透明钢化玻璃;工作时,通过窗户的设置,配合其内的透明钢化玻璃为厂房内提供光照。A window is provided on the side wall of the wall panel 10, and a transparent tempered glass is provided inside the window; during operation, the window is provided in conjunction with the transparent tempered glass inside to provide light into the factory building.

所述顶盖2通过固定螺纹与所述立柱1的顶端固定连接,所述顶盖2设置为弧形;工作时,顶盖2通过固定螺纹与所述立柱1的顶端固定连接,便于拆装,顶盖2设置为弧形便于将落在顶盖2上的雨雪进行导引下顶盖2,降低顶盖2的压力。The top cover 2 is fixedly connected to the top of the column 1 through fixed threads, and the top cover 2 is set in an arc shape; during operation, the top cover 2 is fixedly connected to the top of the column 1 through fixed threads, which facilitates disassembly and assembly. , the top cover 2 is set in an arc shape to facilitate guiding the rain and snow falling on the top cover 2 to the top cover 2 and reduce the pressure of the top cover 2 .

所述立柱1的底部固定安装有安装板11,所述安装板11上开设有定位孔;工作时,通过安装板11的设置,便于配合定位螺栓和安装板11上的定位孔将立柱1安装在厂房安装地点。A mounting plate 11 is fixedly installed at the bottom of the column 1, and positioning holes are provided on the mounting plate 11; during operation, the setting of the mounting plate 11 facilitates the installation of the column 1 with the positioning bolts and the positioning holes on the mounting plate 11. At the factory installation location.

所述顶盖2的两侧均固定安装有导水板12,所述导水板12的顶部开设有导水槽,所述导水槽在前后方向具有一定的坡度;工作时,通过导水板12的设置,便于将顶盖2上流下的水排走,导水槽在前后方向具有一定的坡度,用于对导水槽内的水导走,防止在导水槽内挤压,增加顶盖2的负担,进一步保证了顶盖2的稳定性。Water guide plates 12 are fixedly installed on both sides of the top cover 2, and a water guide channel is provided on the top of the water guide plate 12. The water guide channel has a certain slope in the front and rear directions; during operation, the water guide plate 12 passes through the water guide plate 12. The arrangement is convenient for draining the water flowing down the top cover 2. The water guide channel has a certain slope in the front and rear directions, which is used to guide the water in the water guide channel to prevent it from being squeezed in the water guide channel and increasing the burden on the top cover 2. , further ensuring the stability of the top cover 2.

工作原理,在装配顶盖2的支撑件时,即将支撑杆6安装在顶盖2与支撑板3之间,通过定位机构9的设置,将支撑杆6远离顶盖2的一端伴随嵌合块8插入凹槽5与嵌合槽7内,在此过程中,嵌合块8对锥形块94施加压力,继而使得锥形块94受压并部分缩入限位槽91内,继而锥形块94通过滑动块92对第一弹簧93施加压力,直至嵌合块8位于锥形块94与缓冲块95之间,嵌合块8通过缓冲块95对第二弹簧96施加压力,通过缓冲块95配合第二弹簧96便于对顶盖2起到一定程度的缓冲作用的同时配合支撑块4起到支撑作用,继而完成将支撑杆6安装连接在顶盖2与支撑板3之间,保证了顶盖2使用过程中的稳定性,而当要拆卸厂房时,当拆卸到支撑杆6时,先解除支撑板3与其两端的两个立柱1之间通过固定螺栓的连接,之后只需按压锥形块94使得缩入限位槽91,即可解除对嵌合块8的限位,即可解除对支撑杆6的限位,使得支撑杆6带动嵌合块8脱离支撑板3,完成该部分的拆卸,拆卸与安装过程均较为快速便捷,简化装配与拆卸的流程与步骤,且缓冲支撑防护能力较好。The working principle is that when assembling the support of the top cover 2, the support rod 6 is installed between the top cover 2 and the support plate 3. Through the setting of the positioning mechanism 9, the end of the support rod 6 away from the top cover 2 is accompanied by the fitting block. 8 is inserted into the groove 5 and the fitting groove 7. During this process, the fitting block 8 exerts pressure on the conical block 94, which then presses the conical block 94 and partially retracts into the limiting groove 91, and then tapers The block 94 exerts pressure on the first spring 93 through the sliding block 92 until the fitting block 8 is located between the tapered block 94 and the buffer block 95. The fitting block 8 exerts pressure on the second spring 96 through the buffer block 95. 95 cooperates with the second spring 96 to provide a certain degree of buffering effect on the top cover 2 and at the same time cooperates with the support block 4 to provide support, and then completes the installation and connection of the support rod 6 between the top cover 2 and the support plate 3, ensuring that The stability of the top cover 2 during use. When the factory building is to be disassembled, when the support rod 6 is disassembled, the connection between the support plate 3 and the two columns 1 at both ends through the fixing bolts is first released, and then only the cone is pressed. The shape block 94 is retracted into the limit groove 91, and the limit on the fitting block 8 can be released, and the limit on the support rod 6 can be released, so that the support rod 6 can drive the fitting block 8 away from the support plate 3, thus completing the process. Partial disassembly, disassembly and installation processes are relatively fast and convenient, simplifying the assembly and disassembly processes and steps, and the buffer support and protection capabilities are good.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。The basic principles, main features and advantages of the present utility model are shown and described above. Those skilled in the industry should understand that the present utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principles of the present utility model. Without departing from the spirit and scope of the present utility model, the present utility model can be There will also be various changes and improvements in the new model, and these changes and improvements all fall within the scope of the claimed utility model.

Claims (6)

1.一种装配式钢结构厂房结构,包括立柱(1);所述立柱(1)的顶端设置有顶盖(2),所述立柱(1)的一侧面固定安装有支撑板(3),所述支撑板(3)的顶部固定安装有支撑块(4),所述支撑块(4)的顶部开设有凹槽(5),其特征在于:所述凹槽(5)的内侧壁开设有嵌合槽(7),所述顶盖(2)的底部固定安装有支撑杆(6),所述支撑杆(6)的另一端插设至凹槽(5)内,所述嵌合槽(7)内设置有嵌合块(8),所述嵌合块(8)的一端延伸出嵌合槽(7)并与支撑杆(6)位于凹槽(5)内的一端固定连接;1. A prefabricated steel structure factory building structure, including a column (1); a top cover (2) is provided at the top of the column (1), and a support plate (3) is fixedly installed on one side of the column (1) , a support block (4) is fixedly installed on the top of the support plate (3), and a groove (5) is provided on the top of the support block (4), which is characterized in that: the inner wall of the groove (5) A fitting groove (7) is provided, a support rod (6) is fixedly installed at the bottom of the top cover (2), and the other end of the support rod (6) is inserted into the groove (5). A fitting block (8) is provided in the fitting groove (7). One end of the fitting block (8) extends out of the fitting groove (7) and is fixed with the end of the support rod (6) located in the groove (5). connect; 所述支撑块(4)上设置有定位机构(9),所述定位机构(9)包括开设在支撑块(4)内的限位槽(91),所述限位槽(91)内安装有滑动连接的滑动块(92),所述滑动块(92)的一端通过第一弹簧(93)与限位槽(91)的内侧壁弹性连接,所述滑动块(92)的另一端安装有固定连接的锥形块(94),所述嵌合槽(7)的内侧壁开设有与限位槽(91)相连通的通槽,所述锥形块(94)远离滑动块(92)的一端穿过通槽并延伸至嵌合槽(7)内,所述嵌合槽(7)内安装有滑动连接的缓冲块(95),所述缓冲块(95)的底端通过第二弹簧(96)与嵌合槽(7)的内底壁弹性连接。The support block (4) is provided with a positioning mechanism (9). The positioning mechanism (9) includes a limiting groove (91) opened in the supporting block (4). The limiting groove (91) is installed in There is a sliding block (92) with sliding connection. One end of the sliding block (92) is elastically connected to the inner wall of the limiting groove (91) through the first spring (93). The other end of the sliding block (92) is installed There is a fixedly connected conical block (94). The inner wall of the fitting groove (7) is provided with a through groove connected with the limiting groove (91). The conical block (94) is away from the sliding block (92). ) passes through the through slot and extends into the fitting groove (7). A slidingly connected buffer block (95) is installed in the fitting slot (7). The bottom end of the buffer block (95) passes through the third The two springs (96) are elastically connected to the inner bottom wall of the fitting groove (7). 2.根据权利要求1所述的一种装配式钢结构厂房结构,其特征在于:所述顶盖(2)底部的两侧均通过螺纹固定安装有围墙板(10),所述围墙板(10)内设置有保温层。2. A prefabricated steel structure factory structure according to claim 1, characterized in that: both sides of the bottom of the top cover (2) are fixedly installed with wall panels (10) through threads, and the wall panels (10) are threaded. 10) There is an insulation layer inside. 3.根据权利要求2所述的一种装配式钢结构厂房结构,其特征在于:所述围墙板(10)的侧壁开设有窗户,所述窗户内设置有透明钢化玻璃。3. A prefabricated steel structure factory building structure according to claim 2, characterized in that: the side wall of the wall panel (10) is provided with windows, and transparent tempered glass is provided in the windows. 4.根据权利要求1所述的一种装配式钢结构厂房结构,其特征在于:所述顶盖(2)通过固定螺纹与所述立柱(1)的顶端固定连接,所述顶盖(2)设置为弧形。4. A prefabricated steel structure factory structure according to claim 1, characterized in that: the top cover (2) is fixedly connected to the top of the column (1) through fixed threads, and the top cover (2) ) is set to arc. 5.根据权利要求1所述的一种装配式钢结构厂房结构,其特征在于:所述立柱(1)的底部固定安装有安装板(11),所述安装板(11)上开设有定位孔。5. A prefabricated steel structure factory structure according to claim 1, characterized in that: a mounting plate (11) is fixedly installed at the bottom of the column (1), and a positioning plate (11) is provided on the mounting plate (11). hole. 6.根据权利要求1所述的一种装配式钢结构厂房结构,其特征在于:所述顶盖(2)的两侧均固定安装有导水板(12),所述导水板(12)的顶部开设有导水槽,所述导水槽在前后方向具有一定的坡度。6. A prefabricated steel structure workshop structure according to claim 1, characterized in that: water guide plates (12) are fixedly installed on both sides of the top cover (2), and the water guide plates (12) ) is provided with a water conduit at the top, and the water conduit has a certain slope in the front and rear directions.
CN202320600306.5U 2023-03-24 2023-03-24 A prefabricated steel structure factory building structure Expired - Fee Related CN219654392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320600306.5U CN219654392U (en) 2023-03-24 2023-03-24 A prefabricated steel structure factory building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320600306.5U CN219654392U (en) 2023-03-24 2023-03-24 A prefabricated steel structure factory building structure

Publications (1)

Publication Number Publication Date
CN219654392U true CN219654392U (en) 2023-09-08

Family

ID=87855061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320600306.5U Expired - Fee Related CN219654392U (en) 2023-03-24 2023-03-24 A prefabricated steel structure factory building structure

Country Status (1)

Country Link
CN (1) CN219654392U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117759079A (en) * 2023-12-28 2024-03-26 江苏非凡重工有限公司 A stable installation mechanism for prefabricated steel structure factory buildings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117759079A (en) * 2023-12-28 2024-03-26 江苏非凡重工有限公司 A stable installation mechanism for prefabricated steel structure factory buildings

Similar Documents

Publication Publication Date Title
CN203684468U (en) Curtain wall system with combination of exposed frame and hidden frame
CN219654392U (en) A prefabricated steel structure factory building structure
CN206448420U (en) A hidden frame glass curtain wall system
CN205777180U (en) Building structure and canopy with no fossil fragments glass canopy
CN211007203U (en) Large glass plate clamping plate hidden frame combined rib type curtain wall system
CN111851807A (en) A connection structure of prefabricated building curtain wall components
CN206844423U (en) Glass curtain wall attachment structure positioner optimizes structure
CN209891505U (en) Exposed frame curtain wall structure of simple installation type
CN204645345U (en) With the window curtain wall of splicing type aluminium sheet
CN210507963U (en) Detachable panel unit curtain wall
CN113982164A (en) High-rise environment-friendly toughened glass curtain wall
CN217811585U (en) Prefabricated steel construction assembled afforestation building element
CN210857654U (en) Detachable hidden frame unit curtain wall fixing device
CN222101612U (en) An assembled sun room with cleaning function
CN222252683U (en) A waterproof and heat-insulating structure of assembled glass curtain wall
CN219158104U (en) A semi-hidden frame curtain wall system that is easy to disassemble
CN220353123U (en) Connection structure is assembled to outer wall insulation board
CN219316121U (en) Top curtain glass connecting device in glass curtain wall system
CN221957021U (en) Glass curtain wall beam upright post mounting structure
CN219548085U (en) House building wall structure
CN222161593U (en) Building wood rafter mounting structure
CN204919906U (en) Novel glass curtain wall splices unit
CN221441835U (en) Stone unit curtain wall convenient to detach
CN222796808U (en) A unitized curtain wall assembly structure
CN221941646U (en) A decorative device for expansion joints of aluminum alloy structures in construction engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230908