CN221042148U - Novel electric power wire casing installation is supplementary device - Google Patents

Novel electric power wire casing installation is supplementary device Download PDF

Info

Publication number
CN221042148U
CN221042148U CN202323000849.2U CN202323000849U CN221042148U CN 221042148 U CN221042148 U CN 221042148U CN 202323000849 U CN202323000849 U CN 202323000849U CN 221042148 U CN221042148 U CN 221042148U
Authority
CN
China
Prior art keywords
supporting platform
angle steel
slide rail
fixedly connected
telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323000849.2U
Other languages
Chinese (zh)
Inventor
张强
李朝阳
张运茂
楼添
王朝旭
郇志刚
赵琴
缪志军
盛小辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Installation Engineering Co Ltd filed Critical China Construction Fourth Bureau Installation Engineering Co Ltd
Priority to CN202323000849.2U priority Critical patent/CN221042148U/en
Application granted granted Critical
Publication of CN221042148U publication Critical patent/CN221042148U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

The utility model discloses a novel auxiliary device for installing a power line slot, which relates to the technical field of construction processes and comprises the following components: the novel steel angle comprises a first angle steel slide rail and a second angle steel slide rail, wherein rubber wheels are arranged on the inner sides of the first angle steel slide rail and the second angle steel slide rail in a sliding manner, a first supporting platform and a second supporting platform are arranged above the rubber wheels, the lower end of the first supporting platform is fixedly connected with first telescopic angle steel, a first connecting groove is formed in the lower end of the first telescopic angle steel, a second telescopic angle steel is fixedly connected with the lower end of the second supporting platform, a second connecting groove is formed in the lower end of the second telescopic angle steel, and a screw is arranged between the second connecting groove and the first connecting groove: the problem of traditional construction process need with the furred ceiling and other part of influence installation pipeline all demolishs, then carry out the crane span structure and promote the installation, can lead to engineering time extension like this, the work progress loaded down with trivial details and waste time and energy is solved.

Description

Novel electric power wire casing installation is supplementary device
Technical Field
The utility model relates to the technical field of construction processes, in particular to a novel auxiliary device for installing a power line slot.
Background
The novel auxiliary device for installing the power line slot is auxiliary equipment for installing the power line slot. The electric power line slot installation device can help constructors to install the electric power line slot more conveniently and efficiently.
As the electromechanical systems of the buildings age, the electromechanical systems of schools, hospitals, office buildings and other projects need to be updated and modified. Traditional construction process need be with the furred ceiling and other part that influence the installation pipeline totally demolishs, then carries out the crane span structure and promotes the installation, can lead to engineering time extension like this, and the work progress is loaded down with trivial details and wastes time and energy.
Disclosure of utility model
The present utility model aims to solve at least one of the technical problems existing in the prior art. Therefore, the utility model provides a novel power line slot installation auxiliary device, which solves the problems that the traditional construction process needs to remove all parts of a suspended ceiling and other influence installation pipelines, and then the bridge is lifted and installed, so that the engineering time is prolonged, and the construction process is tedious and time-consuming and labor-consuming.
In order to achieve the above object, the present utility model provides a novel power line slot installation auxiliary device, comprising: the first angle steel slide rail, the second angle steel slide rail, the inboard of first angle steel slide rail and second angle steel slide rail all slides and is provided with the rubber wheel, the rubber wheel top is provided with first supporting platform, second supporting platform, first flexible angle steel of lower extreme fixedly connected with of first supporting platform, first spread groove has been seted up to the lower extreme of first flexible angle steel, the flexible angle steel of second supporting platform's lower extreme fixedly connected with second, the second spread groove has been seted up to the lower extreme of the flexible angle steel of second, be provided with the screw rod between second spread groove and the first spread groove.
As a further scheme of the utility model: the first angle steel slide rail and the second angle steel slide rail are positioned on the same plane.
As a further scheme of the utility model: the inside fixedly connected with fixed axle of rubber wheel, the both ends of fixed axle all rotate and are connected with spacing piece, fixedly connected with fixed block between two spacing pieces.
As a further scheme of the utility model: the upper end of one of the fixed blocks is fixedly connected with the first supporting platform, and the upper end of the other fixed block is fixedly connected with the second supporting platform.
As a further scheme of the utility model: one end of the first telescopic angle steel extends to the outer side of the first supporting platform, and one end of the second telescopic angle steel extends to the outer side of the second supporting platform.
As a further scheme of the utility model: the screw rod passes through the second connecting groove and the first connecting groove and is in threaded connection with a nut.
As a further scheme of the utility model: the top ends of the first supporting platform and the second supporting platform are fixedly connected with anti-skid rubber.
As a further scheme of the utility model: articles are placed at the upper end of the anti-skid rubber.
Compared with the prior art, the utility model has the beneficial effects that:
1. The position between the first telescopic angle steel and the second telescopic angle steel is adjusted, so that the distance between the first supporting platform and the second supporting platform is changed, and the electric power bridge wire slot is suitable for various model sizes.
2. One of the rubber wheels is arranged on the inner side of the first angle steel slide rail, the other rubber wheel is arranged on the inner side of the second angle steel slide rail, the screw rod penetrates through the second connecting groove and the first connecting groove to adapt to the current power bridge wire groove, the nut is rotated, the screw rod is fixed, and finally the object is placed on the upper end of the anti-skid rubber. Only need operate in the access hole at horizontal crane span structure both ends can, need not to carry out large tracts of land furred ceiling and demolish.
3. The utility model is safe and convenient to use, the constituent materials are conventional materials of conventional electromechanical installation engineering, the materials are convenient to obtain, and the assembly is quick.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a bottom block diagram of the present utility model;
FIG. 3 is an exploded view of the present utility model;
fig. 4 is a top view of the present utility model.
In the figure: 1. a first angle steel slide rail; 2. the second angle steel slide rail; 3. an article; 4. a rubber wheel; 5. a fixed shaft; 6. a limiting piece; 7. a fixed block; 8. the first telescopic angle steel; 81. a first connection groove; 9. the second telescopic angle steel; 91. a second connecting groove; 10. a first support platform; 11. a second support platform; 12. an anti-slip rubber; 13. and (3) a screw.
Detailed Description
The technical solutions of the present utility model will be clearly and completely described in connection with the embodiments, and it is obvious that the described embodiments are only some embodiments of the present utility model, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
As shown in fig. 1-4, a novel power line slot installation auxiliary device includes: the first angle steel slide rail 1 and the second angle steel slide rail 2 are positioned on the same plane, and the first angle steel slide rail 1 and the second angle steel slide rail 2 are positioned on the same plane.
The inboard of first angle steel slide rail 1 and second angle steel slide rail 2 all slides and is provided with rubber wheel 4, and first angle steel slide rail 1 adopts 40 angle steel with second angle steel slide rail 2, need not to carry out secondary treatment, and it is convenient to draw materials, plays spacing and horizontal guiding effect to rubber wheel 4.
The inside fixedly connected with fixed axle 5 of rubber wheel 4, the both ends of fixed axle 5 all rotate and are connected with spacing piece 6, fixedly connected with fixed block 7 between two spacing pieces 6, and rubber wheel 4 and spacing piece 6 fixer are four sets altogether, and rubber wheel 4 is 45 degrees contained angles of inclining inwards and arranges.
The upper end of one of the fixed blocks 7 is fixedly connected with a first supporting platform 10, and the upper end of the other fixed block 7 is fixedly connected with a second supporting platform 11.
The lower extreme fixedly connected with first flexible angle steel 8 of first supporting platform 10, the one end of first flexible angle steel 8 extends to the outside of first supporting platform 10, and first spread groove 81 has been seted up to the lower extreme of first flexible angle steel 8, the lower extreme fixedly connected with second flexible angle steel 9 of second supporting platform 11, the one end of second flexible angle steel 9 extends to the outside of second supporting platform 11, and the second spread groove 91 has been seted up to the lower extreme of second flexible angle steel 9.
Be provided with screw rod 13 between second spread groove 91 and the first spread groove 81, screw rod 13 passes second spread groove 91 and first spread groove 81 and threaded connection has the nut, through rotating the nut in the different positions of second spread groove 91 and first spread groove 81, fix screw rod 13, can adjust the position between first flexible angle steel 8 and the flexible angle steel 9 of second to change the distance between first supporting platform 10 and the second supporting platform 11, be applicable to the electric power crane span structure wire casing of multiple model size.
The top ends of the first supporting platform 10 and the second supporting platform 11 are fixedly connected with anti-slip rubber 12 for increasing friction force in the using process.
The upper end of the anti-slip rubber 12 is provided with an article 3.
Working principle:
One of the rubber wheels 4 is mounted on the inner side of the first angle steel slide rail 1, the other rubber wheel 4 is mounted on the inner side of the second angle steel slide rail 2, the screw 13 passes through the second connecting groove 91 and the first connecting groove 81 to adapt to the current power bridge wire slot, the nut is rotated, the screw 13 is fixed, and finally the article 3 is placed on the upper end of the anti-skid rubber 12.
The above embodiments are only for illustrating the technical method of the present utility model and not for limiting the same, and it should be understood by those skilled in the art that the technical method of the present utility model may be modified or substituted without departing from the spirit and scope of the technical method of the present utility model.

Claims (8)

1. Novel electric power wire casing installation is supplementary device, its characterized in that includes: the novel steel angle comprises a first steel angle slide rail (1), a second steel angle slide rail (2), rubber wheels (4) are slidably arranged on the inner sides of the first steel angle slide rail (1) and the second steel angle slide rail (2), a first supporting platform (10) and a second supporting platform (11) are arranged above the rubber wheels (4), a first telescopic steel angle (8) is fixedly connected to the lower end of the first supporting platform (10), a first connecting groove (81) is formed in the lower end of the first telescopic steel angle (8), a second telescopic steel angle (9) is fixedly connected to the lower end of the second supporting platform (11), a second connecting groove (91) is formed in the lower end of the second telescopic steel angle (9), and a screw rod (13) is arranged between the second connecting groove (91) and the first connecting groove (81).
2. The novel power line slot installation auxiliary device according to claim 1, wherein the first angle steel sliding rail (1) and the second angle steel sliding rail (2) are positioned on the same plane.
3. The novel power line slot installation auxiliary device according to claim 1, wherein a fixed shaft (5) is fixedly connected to the inside of the rubber wheel (4), limiting pieces (6) are rotatably connected to two ends of the fixed shaft (5), and a fixed block (7) is fixedly connected between the two limiting pieces (6).
4. A novel power line slot installation auxiliary device according to claim 3, characterized in that the upper end of one of the fixing blocks (7) is fixedly connected with the first supporting platform (10), and the upper end of the other fixing block (7) is fixedly connected with the second supporting platform (11).
5. The novel power line slot installation auxiliary device according to claim 1, wherein one end of the first telescopic angle steel (8) extends to the outer side of the first supporting platform (10), and one end of the second telescopic angle steel (9) extends to the outer side of the second supporting platform (11).
6. A novel power line slot installation aid according to claim 1, characterized in that the screw (13) passes through the second connecting slot (91) and the first connecting slot (81) and is screwed with a nut.
7. The novel power line slot installation auxiliary device according to claim 1, wherein the top ends of the first supporting platform (10) and the second supporting platform (11) are fixedly connected with anti-slip rubber (12).
8. A novel power line slot installation auxiliary device according to claim 7, characterized in that the upper end of the anti-slip rubber (12) is provided with an article (3).
CN202323000849.2U 2023-11-07 2023-11-07 Novel electric power wire casing installation is supplementary device Active CN221042148U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323000849.2U CN221042148U (en) 2023-11-07 2023-11-07 Novel electric power wire casing installation is supplementary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323000849.2U CN221042148U (en) 2023-11-07 2023-11-07 Novel electric power wire casing installation is supplementary device

Publications (1)

Publication Number Publication Date
CN221042148U true CN221042148U (en) 2024-05-28

Family

ID=91139547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323000849.2U Active CN221042148U (en) 2023-11-07 2023-11-07 Novel electric power wire casing installation is supplementary device

Country Status (1)

Country Link
CN (1) CN221042148U (en)

Similar Documents

Publication Publication Date Title
CN112110300A (en) Electric power communication construction pay off rack
CN221042148U (en) Novel electric power wire casing installation is supplementary device
CN114920148A (en) Positioning and adjusting auxiliary mounting device for mounting electromechanical equipment
CN112222468A (en) High-stability multifunctional steel plate drilling equipment
CN216382841U (en) Pipeline strutting arrangement for construction
CN116197151A (en) Cable buries and puts piping shaft sludge treatment equipment
CN215484469U (en) Wallboard installation device for construction
CN217010220U (en) Bridge cable device for machine room
CN212802716U (en) Civil engineering construction supporting structure
CN213387515U (en) Small-size adjustable portal crane
CN203570330U (en) Vertical type vertical column demounting and mounting machine
CN204858905U (en) Portable electric motor rotor rule device
CN219746163U (en) Portable transformer construction overhauls processing platform
CN214091074U (en) Quick positioner of steel construction installation
CN214442114U (en) Automatic pipe bending machine
CN112079108A (en) Municipal works construction is with pressing from both sides formula pipeline handling device
CN219078717U (en) Electric power construction draw gear
CN210430818U (en) Power transmission and transformation engineering cable fixing support
CN220152388U (en) Water level detection device for hydraulic engineering construction
CN213982291U (en) Hydrogen pipeline structure convenient to installation
CN204912384U (en) Flat bender of two -way simple and easy generating line with adjustable
CN220989761U (en) Movable multistage sedimentation tank
CN219263404U (en) Adjustable pipeline supporting structure
CN216649168U (en) Auxiliary mounting structure for bus duct
CN207407304U (en) Rotatable lamp hanger

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant