CN221034289U CN202322846462.2U CN202322846462U CN221034289U CN 221034289 U CN221034289 U CN 221034289U CN 202322846462 U CN202322846462 U CN 202322846462U CN 221034289 U CN221034289 U CN 221034289U
Authority
CN
China
Prior art keywords
frame
pipeline
clamping
water supply
adjusting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322846462.2U
Other languages
Chinese (zh)
Inventor
马雪坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Grad Group Co Ltd
Original Assignee
Shandong Grad Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Grad Group Co Ltd filed Critical Shandong Grad Group Co Ltd
Priority to CN202322846462.2U priority Critical patent/CN221034289U/en
Application granted granted Critical
Publication of CN221034289U publication Critical patent/CN221034289U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a water supply and drainage pipeline installation construction tool structure which comprises a hoisting assembly, wherein the hoisting assembly comprises a frame and a clamping assembly; the frame is of a C-shaped frame structure with a downward opening, and a hoisting piece is arranged at the top of the frame; the clamping assemblies are respectively arranged at two sides of the frame, a pipeline is fixed between the clamping assemblies, the middle part of the clamping assemblies is provided with an adjusting rod movably connected with the frame, the inner side end part of the adjusting rod is provided with a clamping plate connected with the adjusting rod, and the clamping plate is an arc-shaped panel matched with the surface of the pipeline; the pipeline clamping device is reasonable in structural design, the structure is installed by using the lifting mode of the existing pipeline, and the clamping assembly is moved horizontally in the clamping process, so that accurate positioning among pipelines is guaranteed, the clamping assembly can be smoothly removed after the pipelines are assembled in place, convenience and safety in the pipeline installation and construction process are improved, meanwhile, the operation by contacting a tool with the pipeline is not needed, and product damage is avoided.

Description

Water supply and drainage pipeline installation construction tool structure
Technical Field
The utility model relates to the technical field of pipeline construction, in particular to a water supply and drainage pipeline installation and construction tool structure.
Background
In water supply and drainage engineering of China, a large-diameter pipeline becomes a main carrier of underground water supply and drainage engineering, the diameter of the large-diameter pipeline can reach more than 1 meter, the laying distance is hundreds of meters or even thousands of meters, the large-diameter pipeline is generally formed by multiple sections, each section of pipeline is mutually assembled, however, in the construction process, because the pipeline is large in size and heavy in weight, the on-site is difficult to move, especially in the assembly process, workers need to operate the pipeline by means of tools such as crowbars, the operation can damage the protection structure of the equipment surface, even the main structure of the pipeline, and meanwhile, the labor intensity and the safety risk are high in the operation process.
Disclosure of utility model
In order to solve the defects in the prior art, the utility model aims to provide a water supply and drainage pipeline installation and construction tool structure which is used for improving convenience and safety in the pipeline installation and construction process.
The technical scheme adopted for solving the technical problems is as follows:
The utility model provides a water supply and drainage pipeline installation construction frock structure, includes hoisting assembly, its characterized in that: the hoisting assembly comprises a frame and a clamping assembly;
the frame is of a C-shaped frame structure with a downward opening, and a hoisting piece is arranged at the top of the frame;
The clamping components are respectively arranged on two sides of the frame, a pipeline is fixed between the clamping components, the middle part of the clamping components is an adjusting rod movably connected with the frame, the inner end part of the adjusting rod is provided with a clamping plate connected with the adjusting rod, and the clamping plate is an arc-shaped panel matched with the surface of the pipeline.
The outer side of the adjusting rod is provided with an operating piece connected with the adjusting rod, and the operating piece adopts a hand wheel structure.
The hoisting piece adopts a hoisting ring structure fixedly connected with the frame.
The inner side of the frame is also provided with a buffer plate, the buffer plate is an arc-shaped panel matched with the surface of the pipeline, and the upper part of the buffer plate is connected with the middle part of the frame through a buffer piece.
The buffer piece adopts the spring, and spring both ends are fixed with buffer board and frame connection respectively.
The side wall of the frame is provided with a through hole, an inner sleeve member is embedded in the through hole, the middle part of the inner sleeve member is provided with a through hole, and the inner wall of the through hole is provided with threads and is in threaded connection with the adjusting rod.
The support assembly is located at the bottom of the pipeline and comprises a base and at least two groups of carrier rollers arranged on the base, and the carrier rollers are propped against the surface of the pipeline.
The base comprises a bottom plate and supporting rods which are rotationally connected with the bottom plate, wherein every four supporting rods are arranged at two end positions of one group of carrier rollers in a symmetrical mode, and the end parts of the supporting rods are provided with U-shaped bayonets and are connected with the end parts of rotating shafts of the carrier rollers, so that the supporting rods are used for supporting the rotating shafts of the carrier rollers.
The beneficial effects of the utility model are as follows: structural design is reasonable, this structure utilizes the hoist and mount mode of current pipeline to install, can install hoist and mount subassembly near the tip of pipeline for pipeline installation can be through hoist and mount subassembly with the pipeline suspension in mid-air, utilizes clamping assembly to carry out horizontal direction's position movement in the centre gripping in-process, thereby ensures the accurate positioning between the pipeline, can smoothly demolish clamping assembly after the pipeline is assembled in place, improves convenience and the security in the pipeline installation work progress, no longer need operate through instrument and pipeline contact simultaneously, has also avoided the product damage.
This structure can support the pipeline in the bottom through setting up supporting component, after pipeline assembly position is in place, can rely on supporting component to rotate the pipeline in the circumferencial direction for guarantee sealing connection between the pipeline, supporting component adopts detachable construction simultaneously, after the pipeline connection, can utilize shallower geosyncline to demolish, convenient to use.
Drawings
The utility model will be further described with reference to the drawings and examples.
Fig. 1 is a schematic structural view of the present utility model.
Fig. 2 is a schematic structural view of the lifting assembly.
Fig. 3 is a schematic side view of a lifting assembly.
Fig. 4 is a schematic structural view of the support assembly.
In the figure: 100 hoisting components, 101 frames, 102 hoisting components, 103 operating components, 104 adjusting rods, 105 internal components, 106 clamping plates, 107 buffer plates, 108 buffer components, 200 supporting components, 201 bottom plates, 202 supporting rods, 203U-shaped bayonets, 204 carrier rollers, 205 rotating shafts and 300 pipelines.
Detailed Description
Further advantages and effects of the present utility model will become apparent to those skilled in the art from the disclosure of the present utility model, which is described by the following specific examples.
According to the figures 1 to 4: the embodiment provides a water supply and drainage pipeline installation construction tool structure, including hoisting component 100 and supporting component 200, hoisting component 100 cooperates with lifting device, hangs at the lifting device end to be used for fixed pipeline 300, supporting component 200 then is located subaerial, is used for the rotation operation after pipeline 300 falls to the ground, and each operation process in the pipeline 300 installation process has been considered to the two mutually supporting for easy on-the-spot personnel safety construction operation in the pipeline 300 construction process. Wherein the specific implementation of the lifting assembly 100 and the support assembly 200 is as follows.
The lifting assembly 100 comprises a frame 101, a clamping assembly and a buffer plate 107, wherein:
The frame 101 is of a C-shaped frame structure with a downward opening, the top of the frame 101 is provided with a lifting piece 102, the lifting piece 102 is of a lifting ring structure fixedly connected with the frame 101, and the frame 101 is used as a base of the lifting assembly 100, so that a clamping assembly can be arranged on the base of the lifting assembly, and connection with lifting equipment can be maintained;
The clamping assemblies are respectively arranged on two sides of the frame 101, a pipeline 300 is fixed between the clamping assemblies, the middle part of the clamping assemblies is provided with an adjusting rod 104 movably connected with the frame 101, the adjusting rod 104 adopts a screw rod structure and is in threaded connection with the frame 101, the adjusting rod 104 can move inwards or outwards through rotation, the inner end part of the adjusting rod 104 is provided with a clamping plate 106 in rotary connection with the clamping plate, the clamping plate 106 is an arc-shaped panel matched with the surface of the pipeline 300, the clamping plate 106 can keep unchanged in direction in the clamping process through the rotary connection effect with the adjusting rod 104 when the adjusting rod 104 rotates, the clamping and loosening actions can be realized by means of the adjusting rod 104 approaching or separating from the pipeline 300, the outer side of the adjusting rod 104 is provided with an operating piece 103 connected with the adjusting rod 103, the operating piece 103 adopts a hand wheel structure, and the hand rotation operation of a worker is easy;
Meanwhile, a through hole is formed in the side wall of the frame 101, an inner sleeve 105 is embedded in the through hole, a through hole is formed in the middle of the inner sleeve 105, threads are formed in the inner wall of the through hole and are connected with the adjusting rod 104 in a threaded manner, and therefore the stability of connection between the inner sleeve 105 and the adjusting rod 104 can be guaranteed by the axial length of the inner sleeve 105, and the inner sleeve is more stable in use;
The buffer plate 107 is also an arc-shaped panel matched with the surface of the pipeline 300, the upper part of the buffer plate 107 is connected with the middle part of the frame 101 through a buffer piece 108, the buffer piece 108 adopts springs, two ends of each spring are respectively connected and fixed with the buffer plate 107 and the frame 101, when the frame 101 descends to be close to the pipeline 300 in the assembly process of the frame 101 and the pipeline 300, the buffer plate 107 can be contacted with the pipeline 300, and the buffer piece 108 is utilized to play a role of buffer contact, so that the buffer plate is suitable for pipeline 300 products with different diameters, and the assembly process is safer and more reliable, and the damage to the surface of the pipeline 300 caused by collision is avoided; the contact effect also enables a predetermined position, keeping the clamping assembly in place on both sides of the pipe 300, facilitating the positioning of the clamping action.
The supporting component 200 is positioned at the bottom of the pipeline 300, the supporting component 200 comprises a base and two groups of carrier rollers 204 arranged on the base, the carrier rollers 204 are respectively positioned at two ends of the base and the carrier rollers 204 are propped against the surface of the pipeline 300, so that a better supporting effect is formed at the lower part, the pipeline 300 is kept to have a smaller gap with the ground, and the rotation of the pipeline 300 in the circumferential direction is realized by utilizing the rotation effect of the carrier rollers 204, so that the action requirement of assembly between the pipelines 300 is met;
The base comprises a bottom plate 201 and supporting rods 202 connected with the bottom plate 201, the supporting rods 202 are arranged in groups of four and symmetrically distributed at two ends of a group of supporting rollers 204, the supporting rods 202 at each end are respectively positioned at two sides of an end shaft of the supporting rollers 204, the bottom ends of the supporting rods 202 are rotatably connected with the bottom plate 201 through pin shafts, so that the supporting rods 202 can be close to or far away from the supporting rollers 204 through rotation, when the supporting rods 204 are far away from the supporting rollers, the supporting rods 202 can be horizontally placed on the bottom plate 201 through rotation effect, the whole height of the base is reduced, the end parts of the supporting rods 202 are provided with U-shaped bayonets 203 and are connected with the end parts of rotating shafts 205 of the supporting rollers 204, and thus, the two groups of supporting rods 202 at the same end can simultaneously clamp the same end shaft to fix the end shafts of the supporting rollers 204, and the supporting rollers 204 can be supported to a certain height by the supporting rods 202 to rotate freely;
in the construction of actual pipeline 300, the use of supporting component 200 needs prefabricating in the cell body below ground, under the prerequisite that satisfies supporting idler 204, after pipeline 300 assembly finishes, rotate bracing piece 202 and break away from idler 204, after shifting out idler 204, place bracing piece 202 horizontally this moment, through the cushion of removing the bottom plate 201 lower part for supporting component 200 can be in the height when being less than the use, can slide to arbitrary one side through the space of cell body at this moment completely and take out supporting component 200, make its use also more convenient.
The foregoing is only a preferred embodiment of the present utility model, and all that is required to achieve the object of the present utility model by substantially the same means is to fall within the scope of the present utility model.

Claims (8)

1. The utility model provides a water supply and drainage pipeline installation construction frock structure, includes hoisting assembly, its characterized in that: the hoisting assembly comprises a frame and a clamping assembly;
the frame is of a C-shaped frame structure with a downward opening, and a hoisting piece is arranged at the top of the frame;
The clamping components are respectively arranged on two sides of the frame, a pipeline is fixed between the clamping components, the middle part of the clamping components is an adjusting rod movably connected with the frame, the inner end part of the adjusting rod is provided with a clamping plate connected with the adjusting rod, and the clamping plate is an arc-shaped panel matched with the surface of the pipeline.
2. The water supply and drainage pipeline installation construction tool structure according to claim 1, wherein: the outer side of the adjusting rod is provided with an operating piece connected with the adjusting rod, and the operating piece adopts a hand wheel structure.
3. The water supply and drainage pipeline installation construction tool structure according to claim 1, wherein: the hoisting piece adopts a hoisting ring structure fixedly connected with the frame.
4. The water supply and drainage pipeline installation construction tool structure according to claim 1, wherein: the inner side of the frame is also provided with a buffer plate, the buffer plate is an arc-shaped panel matched with the surface of the pipeline, and the upper part of the buffer plate is connected with the middle part of the frame through a buffer piece.
5. The water supply and drainage pipeline installation construction tool structure according to claim 4, wherein: the buffer piece adopts the spring, and spring both ends are fixed with buffer board and frame connection respectively.
6. The water supply and drainage pipeline installation construction tool structure according to claim 1, wherein: the side wall of the frame is provided with a through hole, an inner sleeve member is embedded in the through hole, the middle part of the inner sleeve member is provided with a through hole, and the inner wall of the through hole is provided with threads and is in threaded connection with the adjusting rod.
7. The water supply and drainage pipeline installation construction tool structure according to claim 1, wherein: the support assembly is located at the bottom of the pipeline and comprises a base and at least two groups of carrier rollers arranged on the base, and the carrier rollers are propped against the surface of the pipeline.
8. The water supply and drainage pipeline installation construction tool structure according to claim 7, wherein: the base comprises a bottom plate and supporting rods which are rotationally connected with the bottom plate, wherein every four supporting rods are arranged at two end positions of one group of carrier rollers in a symmetrical mode, and the end parts of the supporting rods are provided with U-shaped bayonets and are connected with the end parts of rotating shafts of the carrier rollers, so that the supporting rods are used for supporting the rotating shafts of the carrier rollers.
CN202322846462.2U 2023-10-24 2023-10-24 Water supply and drainage pipeline installation construction tool structure Active CN221034289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322846462.2U CN221034289U (en) 2023-10-24 2023-10-24 Water supply and drainage pipeline installation construction tool structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322846462.2U CN221034289U (en) 2023-10-24 2023-10-24 Water supply and drainage pipeline installation construction tool structure

Publications (1)

Publication Number Publication Date
CN221034289U true CN221034289U (en) 2024-05-28

Family

ID=91168313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322846462.2U Active CN221034289U (en) 2023-10-24 2023-10-24 Water supply and drainage pipeline installation construction tool structure

Country Status (1)

Country Link
CN (1) CN221034289U (en)

Similar Documents

Publication Publication Date Title
CN105252549A (en) Suspension telescopic cylinder and mechanical arm fast installing and uninstalling system under nuclear radiation environment
CN221034289U (en) Water supply and drainage pipeline installation construction tool structure
CN204221435U (en) The super-huge water ring vacuum pump pump housing bores locating hole frock
CN107934781B (en) Three-point positioning buffer contact device
CN202114460U (en) Seabed hydraulic nut setting tool for rudderstock
CN219795176U (en) Roller centralizer for rotary well cementation
CN116237892A (en) Pressure vessel flange assembly fixture
KR20200002161U (en) Fast-replacing machine of bending roll cylinder of finishing rolling mill
CN207067024U (en) Tun detection ray detection system
CN201906976U (en) Movable tightening nut mounting device
CN205209985U (en) A auxiliary device for infiltration detection in batches
CN112520553A (en) Hydraulic pressure station motor is dismantled and is maintained lifting device
CN211447735U (en) Component device for overhanging scaffold
CN114069467A (en) Device is changed to suspension insulator above 220kV
CN204751880U (en) A device for rope sheave hoist and mount
CN103754785A (en) Device capable of eliminating steel wire rope stress
CN210855030U (en) Gantry hanging bracket
CN209021527U (en) Tooling platform for pump case built-up welding
CN204413668U (en) Water ring vacuum pump pump housing locating hole processing tool
CN207414719U (en) The rapid dismounting apparatus of railway large-scale maintenance machinery transmission shaft
CN211709230U (en) Pipeline rotation supporting device
CN208393959U (en) Coaming plate transport support is carried out to prefabricated storage tank drum plate
CN218145575U (en) Lifting combination tool for lifting seat on high-voltage side of 110kV main transformer
CN202377984U (en) Drilling tool installation equipment
CN205673849U (en) A kind of multifunction hydraulic attaching/detaching apparatus

Legal Events