CN220953239U - Anchor chain formula ground ox suitable for fixed steamship berths - Google Patents

Anchor chain formula ground ox suitable for fixed steamship berths Download PDF

Info

Publication number
CN220953239U
CN220953239U CN202322431549.3U CN202322431549U CN220953239U CN 220953239 U CN220953239 U CN 220953239U CN 202322431549 U CN202322431549 U CN 202322431549U CN 220953239 U CN220953239 U CN 220953239U
Authority
CN
China
Prior art keywords
crown
concrete cushion
ground
pile foundation
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322431549.3U
Other languages
Chinese (zh)
Inventor
马磊
刘贵富
杨诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN202322431549.3U priority Critical patent/CN220953239U/en
Application granted granted Critical
Publication of CN220953239U publication Critical patent/CN220953239U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an anchor chain type ground ox suitable for anchoring a ship, which comprises a plurality of pile foundations fixed on the ground, wherein crown beam concrete cushion layers are arranged on the side surfaces of the pile foundations, crown beams are arranged on the tops of the pile foundations and the tops of the crown beam concrete cushion layers, anchor chains are fixed in the crown beams and the pile foundations, the upper ends of the anchor chains extend out of the crown beams, adjacent crown beams are fixedly connected through connecting beams, the arrangement of the pile foundations is equivalent to the improvement of the strength of the anchor chain system foundation, the investigation and the treatment of the foundation on the shore are not needed, the arrangement of the crown beams increases the fixed length of the anchor chains, so that the crown beams and the pile foundations are simultaneously fixed with the anchor chains, and meanwhile, the arrangement of the connecting beams enables the adjacent crown beams to be an integral body, and a plurality of crown beams and the pile foundations are simultaneously used as the restriction of the anchor chains, so that the strength of the ground ox is increased.

Description

Anchor chain formula ground ox suitable for fixed steamship berths
Technical Field
The utility model relates to the technical field of building construction, in particular to an anchor chain type ground ox suitable for mooring a fixed ship.
Background
In large rivers, ships frequently come and go, and need to stop to land. In order to ensure the stability of the ship in water, the ship is usually tied to a hard foundation on the shore or to a firm marble by adopting an anchor chain in the prior art, but the method needs to check the condition of the shore, further needs to treat the foundation on the shore, or artificially construct a gravity type marble or foundation so as to be convenient for tying to the ship.
Disclosure of utility model
The utility model aims at overcoming the defects of the prior art, and provides an anchor chain type ground ox suitable for anchoring a ship, which comprises a plurality of pile foundations fixed on the ground, wherein crown beam concrete cushion layers are arranged on the side surfaces of the pile foundations, crown beams are arranged on the tops of the pile foundations and the tops of the crown beam concrete cushion layers, anchor chains are fixed in the crown beams and the pile foundations, the upper ends of the anchor chains extend out of the crown beams, and adjacent crown beams are fixedly connected through connecting beams.
Preferably, the pile foundation is drilled by a drilling machine and concrete is poured for forming, the diameter of the pile foundation is 1.0-1.5 m, the strength grade of the concrete is not lower than C30, and the diameter of a main reinforcement of the internally configured steel bar is not lower than 20mm.
Preferably, the thickness of the crown beam concrete cushion layer is 10cm, and the strength of the concrete is not lower than C15.
Preferably, brick bed-jig is built on each adjacent beam concrete cushion, connecting beam concrete cushions are built between the adjacent brick bed-jig, and the connecting beams are poured above the connecting beam concrete cushions.
Preferably, the top elevation of the brick bed-jig is equal to the top elevation of the beam concrete cushion, and the thickness of the brick bed-jig is 120mm.
Preferably, the anchor chain is fixed in the crown beam and the pile foundation in a pre-buried mode, and the anchor chain and the main reinforcement of the pile foundation are bound and connected to form a whole.
In summary, the utility model has the following beneficial effects: the setting of pile foundation is equivalent to improving the intensity of anchor chain tie point foundation, does not need to examine and process the foundation on the bank, and the setting of crown beam increases the fixed length of anchor chain, makes crown beam and pile foundation fixed anchor chain simultaneously, and simultaneously, the setting of tie beam makes adjacent crown beam become a whole, and a plurality of crown beams and pile foundation regard as the restriction of anchor chain simultaneously, makes the intensity of ground ox increase, therefore the utility model convenient to use, safety and effectiveness, simultaneously the human cost reduces, has practiced thrift the cost.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
Fig. 1 is a plan view of the construction of the present utility model.
In the figure: 1. a ground 1; 2. pile foundation 2; 3. a crown beam concrete cushion layer 3; 4. brick moulding bed 4; 5. a connecting beam concrete cushion layer 5; 6. a crown bar 6; 7. a connecting beam 7; 8. and an anchor chain 8.
Detailed Description
The technical scheme of the utility model is described in detail below through the drawings, but the protection scope of the utility model is not limited to the embodiments.
Referring to fig. 1, the anchor chain type ground ox suitable for anchoring a ship comprises a plurality of pile foundations 2 fixed on the ground 1, wherein a crown beam concrete cushion layer 3 is arranged on the side surface of each pile foundation 2, crown beams 6 are arranged on the top of each pile foundation 2 and the top of each crown beam concrete cushion layer 3, anchor chains 8 are fixed inside each crown beam 6 and each pile foundation 2, the upper ends of the anchor chains 8 extend out of the crown beams 6, adjacent crown beams 6 are fixedly connected through connecting beams 7, in the utility model, the arrangement of each pile foundation 2 is equivalent to the improvement of the strength of the foundation at which each anchor chain 8 is tied, the investigation and treatment of the foundation at the shore are not required, the arrangement of each crown beam 6 is increased in the fixed length of each anchor chain 8, the crown beams 6 and each pile foundation 2 are simultaneously fixed with each anchor chain 8, and the connecting beams 7 are simultaneously arranged to enable the adjacent crown beams 6 to be an integral body, and the plurality of crown beams 6 and each pile foundation 2 are simultaneously used as the limit of the anchor chains 8, so that the strength of the ground ox is increased.
According to the utility model, the pile foundation 2 is drilled and concrete is poured by a drilling machine for forming, the diameter of the pile foundation 2 is 1.0-1.5 m, the strength grade of the concrete is not lower than C30, the diameter of a main reinforcement of an internally configured steel bar is not lower than 20mm, the strength of the pile foundation 2 is ensured to be enough for the pull-out force of the anchor chain 8, the thickness of the crown beam concrete cushion layer 3 is 10cm, the strength of the concrete is not lower than C15, the strength of the bottom of the crown beam 6 is ensured, and the strength of the crown beam 6 is ensured to be enough for the pull-out force of the anchor chain 8.
In addition, brick bed-jig 4 is built on each beam concrete cushion layer adjacently, the brick bed-jig 4 is a low brick wall, the brick bed-jig is applicable as a template on the side face of the crown beam 6, the top elevation is equal to the top elevation of the beam concrete cushion layer, and the thickness of the brick bed-jig 4 is 120mm. A tie beam concrete cushion 5 is built between adjacent brick bed-jig 4, and the tie beam 7 is poured above the tie beam concrete cushion 5, and the tie beam concrete cushion 5 provides bottom support for the tie beam 7, so that the tie beam 7 has sufficient bottom strength to connect adjacent crown beams 6.
Finally, the anchor chain 8 is fixed in the crown beam 6 and the pile foundation 2 in a pre-buried mode, and the anchor chain 8 is connected with the main reinforcement of the steel bar of the pile foundation 2 to form a whole, so that later-stage whole stress is facilitated.
The construction method of the utility model comprises the following steps:
1. Leveling the field: the site of the construction area is leveled, and the foundation has certain strength, so that the upper construction machinery can walk conveniently.
2. Pile foundation 2 construction: and (3) drilling by adopting a special drilling machine, wherein the diameter of the general designed pile is 1.0-1.5 m, the strength grade of the concrete is not lower than C30, and the diameter of the internally configured main reinforcement is not lower than 20mm. After the construction of the pile foundation 2 is completed, foundation trenches are excavated in time, loose concrete at the top of the pile foundation 2 is chiseled out until fresh concrete stones are exposed, and the subsequent construction of the crown beam 6 is prepared.
3. And (3) constructing a crown beam concrete cushion layer: before the crown beam 6 is constructed, the crown beam concrete cushion layer 3 is constructed, the thickness of the crown beam concrete cushion layer 3 is 10cm, and the strength grade is not lower than C15.
4. Brick bed mould 4: after the construction of the crown beam concrete cushion layer 3 is completed, the connecting beam and the crown beam 6 are different in bottom mark height, and concrete needs to be integrally poured together, so that a low brick wall needs to be built as a template on the side face of the crown beam 6, and the crown beam concrete cushion layer is suitable for use. The thickness of the brick bed mould 4 is 120mm.
5. And (3) constructing a connecting beam concrete cushion layer 5: and in the same way, constructing a connecting beam concrete cushion layer 5, wherein the elevation of the connecting beam concrete cushion layer is flush with the top elevation of the brick bed-jig 4.
6. And (3) binding reinforcing steel bars of the crown beam 6 and the connecting beam 7: and binding steel bars of the crown beam 6 and connecting beam 7 structures on the crown beam concrete cushion layer 3 and the connecting beam concrete cushion layer 5, and after the steel bars are connected into a whole, starting the installation of the side templates to prepare concrete pouring.
7. And (3) installing an anchor chain 8: when the structural steel bars are bound, the special anchor chains 8 are embedded, the anchor chains 8 are reliably connected with the bound steel bars to form a whole, and later-stage whole stress is facilitated.
8. And (3) concrete pouring: rechecking the positions, specifications and dimensions of the steel bars, the anchor chains 8 and the templates, and integrally casting the concrete structure, wherein the strength grade of the concrete is not lower than C40.
While the utility model has been shown and described with reference to certain preferred embodiments thereof, it is not to be construed as limited to the utility model itself, but various changes in form and details may be made therein without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (6)

1. An anchor chain formula ground ox suitable for fixed steamship berths, its characterized in that: including fixing a plurality of pile foundations on ground, the side of pile foundation is provided with crown beam concrete cushion, the top of pile foundation and the top of crown beam concrete cushion are provided with the crown beam, the inside of crown beam and pile foundation is fixed with the anchor chain, the upper end of anchor chain stretches out outside the crown beam, through connecting beam fixed connection between the adjacent crown beam.
2. A chain ground ox suitable for use in stationary vessel berthing as claimed in claim 1, wherein: the pile foundation is drilled through a drilling machine and concrete is poured for forming, the diameter of the pile foundation is 1.0-1.5 m, the strength grade of the concrete is not lower than C30, and the diameter of a main reinforcement of an internally configured steel bar is not lower than 20mm.
3. A chain ground ox suitable for use in stationary vessel berthing as claimed in claim 2, wherein: the thickness of the crown beam concrete cushion layer is 10cm, and the strength of the concrete is not lower than C15.
4. A chain ground ox suitable for use in stationary vessel berthing as claimed in claim 3, wherein: brick bed-jig is built on each adjacent beam concrete cushion layer, connecting beam concrete cushion layers are built between the adjacent brick bed-jig, and the connecting beams are poured above the connecting beam concrete cushion layers.
5. A chain ground ox suitable for use in stationary vessel berthing as claimed in claim 4, wherein: the top elevation of the brick bed-jig is equal to the top elevation of the beam concrete cushion, and the thickness of the brick bed-jig is 120mm.
6. A chain ground ox suitable for use in stationary vessel berthing as claimed in claim 5, wherein: the anchor chain is fixed in the crown beam and the pile foundation in a pre-buried mode, and the anchor chain and the main reinforcement of the pile foundation are bound and connected to form a whole.
CN202322431549.3U 2023-09-07 2023-09-07 Anchor chain formula ground ox suitable for fixed steamship berths Active CN220953239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322431549.3U CN220953239U (en) 2023-09-07 2023-09-07 Anchor chain formula ground ox suitable for fixed steamship berths

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322431549.3U CN220953239U (en) 2023-09-07 2023-09-07 Anchor chain formula ground ox suitable for fixed steamship berths

Publications (1)

Publication Number Publication Date
CN220953239U true CN220953239U (en) 2024-05-14

Family

ID=91010498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322431549.3U Active CN220953239U (en) 2023-09-07 2023-09-07 Anchor chain formula ground ox suitable for fixed steamship berths

Country Status (1)

Country Link
CN (1) CN220953239U (en)

Similar Documents

Publication Publication Date Title
CN106758831B (en) Construction method of swivel continuous beam of cross-railway bridge
CN104018518B (en) The method of prefabricated diaphragm wall and construction outer wall of basement and floor
CN100371537C (en) Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
CN102828518A (en) Prestressed anchor cable anchoring structure of manual hole digging support pile and construction method thereof
CN103321241A (en) Deepwater open type wharf with combined foundation and method for constructing deepwater open type wharf
CN112575670B (en) T-shaped rigid frame bridge suitable for tunnel to pass through giant karst cave and construction technology thereof
CN110777569A (en) Expansive soil limited deformation anti-upwarp foundation structure and construction method of foundation structure
CN109403372A (en) Abrupt slope road structure and its construction method
CN108301440A (en) With waterproof, the underground pipe gallery construction method of drain function
CN109797759A (en) A kind of bionical precast-boxed cofferdam of sea scar and its construction method
CN204000925U (en) Prefabricated diaphragm wall
CN205296209U (en) Prestressed anchorage cable assembled stake siding wall protective structure
CN110359375B (en) Construction method for in-situ precast segmental beam precast field under bridge
CN210636443U (en) Tunnel top foundation pit reinforcing structure
CN220953239U (en) Anchor chain formula ground ox suitable for fixed steamship berths
CN111945657A (en) Wharf upgrading and reconstruction structure and wharf upgrading and reconstruction construction method
CN109024657B (en) Construction method of super high-rise core tube deep pit edge tower crane foundation under complex conditions
CN110258600A (en) A kind of vertical cofferdam construction engineering method suitable for deep water waters
CN109653223A (en) River anti-floating weighting board construction method
JP5562715B2 (en) Underwater foundation construction method and outer shell structure
CN106192880B (en) The box harbour of L-type and its method of construction
CN212405174U (en) Supporting structure and building of soft rock foundation pit at lower part of upper soil layer
CN211447000U (en) Foundation pit backfill area construction elevator foundation
CN209368866U (en) Abrupt slope road structure
CN207659988U (en) Crane beam on rock wall for underground power house present situation foundation reinforcing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant