CN220951000U - Steel wire rope winding and unwinding device - Google Patents
Steel wire rope winding and unwinding device Download PDFInfo
- Publication number
- CN220951000U CN220951000U CN202323186386.3U CN202323186386U CN220951000U CN 220951000 U CN220951000 U CN 220951000U CN 202323186386 U CN202323186386 U CN 202323186386U CN 220951000 U CN220951000 U CN 220951000U
- Authority
- CN
- China
- Prior art keywords
- reel
- wire rope
- rope
- motor
- pulleys
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jib Cranes (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及机械设备领域,特别涉及一种钢丝绳收放器。The utility model relates to the field of mechanical equipment, in particular to a wire rope retractor.
背景技术Background technique
冶金吊行车属于特种设备,使用安全尤为重要,钢丝绳作为起吊的关键工具需要根据使用周期和情况,定期更换钢丝绳。在更换钢丝绳时,通常需要5个人和2台叉车(或铲车)通过拖拽的方式,将新钢丝绳从绳盘上放出。仅仅靠人工释放新钢丝绳,需要比较大的场地(300米钢丝绳需要用到300米长的场地)。由于用到场地较大,如遇路上有进出货车时,会存在一定的安全隐患,由于场地的限制导致钢丝绳测量误差较大。作业时间严重过长,工作需要8小时以上。由于钢丝绳较重,需要人工较多,工作效率低下。Metallurgical cranes are special equipment, and safety in use is particularly important. Wire ropes, as the key tool for lifting, need to be replaced regularly according to the use cycle and situation. When replacing the wire rope, it usually takes 5 people and 2 forklifts (or shovel trucks) to release the new wire rope from the rope drum by dragging. Releasing the new wire rope manually alone requires a relatively large site (300 meters of wire rope requires a 300-meter-long site). Due to the large site, there will be certain safety hazards when there are trucks entering and leaving the road. Due to the limitation of the site, the measurement error of the wire rope is large. The operation time is seriously too long, and the work takes more than 8 hours. Because the wire rope is heavy, more manpower is required, and the work efficiency is low.
鉴于上述原因,需要一种钢丝绳收放器,减少释放钢丝绳的工作时间和场地。In view of the above reasons, a wire rope retractor is needed to reduce the working time and space for releasing the wire rope.
实用新型内容Utility Model Content
本实用新型的目的在于提供一种钢丝绳收放器,该收放器用电机提供动力,解决需要人工和车辆拖拽问题,两个滑轮定点滑动,解决场地过大问题,工作效率高,使用场地小,降低了安全隐患。The utility model aims to provide a wire rope retractor, which uses a motor to provide power, solves the problem of requiring manual and vehicle towing, and has two pulleys that slide at fixed points to solve the problem of too large a site. It has high work efficiency, uses a small site, and reduces safety hazards.
为了实现上述目的,本实用新型提供如下技术方案:In order to achieve the above purpose, the utility model provides the following technical solutions:
一种钢丝绳收放器,包括电机、第一卷盘、第二卷盘、起吊设备、牵引绳和滑轮,所述电机和所述第二卷盘同轴连接,钢丝绳卷绕在所述第一卷盘上,所述第一卷盘吊装在所述起吊设备上,所述牵引绳的一端卷绕在所述第二卷盘上,所述牵引绳的另一端绕过所述滑轮后与由所述第一卷盘引出的所述钢丝绳连接,所述电机驱动所述第二卷盘旋转,所述第二卷盘的旋转能够对所述牵引绳进行回收,在所述牵引绳的牵引下,由所述第一卷盘释放的所述钢丝绳能够缠绕在所述滑轮上。A wire rope retractor comprises a motor, a first reel, a second reel, a lifting device, a traction rope and a pulley, wherein the motor and the second reel are coaxially connected, the wire rope is wound around the first reel, the first reel is hoisted on the lifting device, one end of the traction rope is wound around the second reel, and the other end of the traction rope is connected to the wire rope led out from the first reel after passing around the pulley, the motor drives the second reel to rotate, the rotation of the second reel can recover the traction rope, and under the traction of the traction rope, the wire rope released from the first reel can be wound around the pulley.
进一步地,在上述的钢丝绳收放器中,还包括第三卷盘,所述第三卷盘设置在所述电机和所述第二卷盘之间,所述第三卷盘、所述电机和所述第二卷盘之间均为同轴连接,缠绕在所述滑轮上的所述钢丝绳的一端能够固定在所述第三卷盘上,所述电机能够驱动所述第三卷盘逆向旋转,所述第三卷盘的旋转能够使缠绕在所述滑轮上的所述钢丝绳卷绕至所述第三卷盘上。Furthermore, in the above-mentioned wire rope retractor, a third reel is also included, and the third reel is arranged between the motor and the second reel. The third reel, the motor and the second reel are all coaxially connected. One end of the wire rope wound on the pulley can be fixed on the third reel, and the motor can drive the third reel to rotate in reverse. The rotation of the third reel can make the wire rope wound on the pulley be wound onto the third reel.
进一步地,在上述的钢丝绳收放器中,还包括减速机,所述减速机设置在所述电机和所述第三卷盘之间,所述减速机、所述电机和所述第三卷盘之间均为同轴连接。Furthermore, in the above-mentioned wire rope retractor, a reducer is also included, and the reducer is arranged between the motor and the third reel, and the reducer, the motor and the third reel are all coaxially connected.
进一步地,在上述的钢丝绳收放器中,所述第一卷盘和所述滑轮分别位于所述第三卷盘的两侧,所述滑轮设置有两个,两个所述滑轮的轴线与所述电机的轴线平行,所述牵引绳的一圈绕过两个所述滑轮。Furthermore, in the above-mentioned wire rope retractor, the first reel and the pulley are respectively located on both sides of the third reel, two pulleys are provided, the axes of the two pulleys are parallel to the axis of the motor, and one circle of the traction rope passes around the two pulleys.
进一步地,在上述的钢丝绳收放器中,所述滑轮上设置有多个轮槽,所述轮槽沿所述滑轮的周向设置,多个所述轮槽沿所述滑轮的轴向均匀设置,所述牵引绳位于所述轮槽内,所述牵引绳通过所述轮槽在两个所述滑轮上缠绕多圈。Furthermore, in the above-mentioned wire rope retractor, a plurality of wheel grooves are arranged on the pulley, the wheel grooves are arranged along the circumference of the pulley, and the plurality of wheel grooves are evenly arranged along the axial direction of the pulley. The traction rope is located in the wheel grooves, and the traction rope is wound around the two pulleys multiple times through the wheel grooves.
进一步地,在上述的钢丝绳收放器中,所述滑轮上设置有五个轮槽。Furthermore, in the above-mentioned wire rope retractor, five wheel grooves are arranged on the pulley.
进一步地,在上述的钢丝绳收放器中,两个所述滑轮的轴线相互平行,缠绕在两个所述滑轮的一圈的所述牵引绳的长度为20m~60m。Furthermore, in the above-mentioned wire rope retractor, the axes of the two pulleys are parallel to each other, and the length of the traction rope wound around the two pulleys is 20m to 60m.
进一步地,在上述的钢丝绳收放器中,所述第一卷盘引出的所述钢丝绳的绳头处焊接有螺母,所述牵引绳能够通过所述螺母与所述钢丝绳连接。Furthermore, in the above-mentioned wire rope retractor, a nut is welded at the rope end of the wire rope led out from the first reel, and the traction rope can be connected to the wire rope through the nut.
进一步地,在上述的钢丝绳收放器中,两个所述滑轮错开设置。Furthermore, in the above-mentioned wire rope retractor, the two pulleys are staggered.
分析可知,本实用新型公开一种钢丝绳收放器,该收放器利用电机提供动力不需要人工和车辆拖拽。该收放器解决了钢丝绳释放过程中需要场地过大的问题,利用两个滑轮定点滑动,大大减少了场地的使用空间,降低了安全隐患。该钢丝绳收放器还能够释放钢丝绳的应力,使得更换行车钢丝绳的过程更加顺畅,提高了工作效率,减少了安全隐患。释放的钢丝绳误差大大减少,提高了材料的使用率。It can be seen from the analysis that the utility model discloses a wire rope retractor, which uses a motor to provide power and does not require manual or vehicle towing. The retractor solves the problem of requiring too much space during the wire rope release process. It uses two pulleys for fixed-point sliding, which greatly reduces the use space of the site and reduces safety hazards. The wire rope retractor can also release the stress of the wire rope, making the process of replacing the driving wire rope smoother, improving work efficiency and reducing safety hazards. The error of the released wire rope is greatly reduced, which improves the utilization rate of materials.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
构成本申请的一部分的说明书附图用来提供对本实用新型的进一步理解,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。其中:The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. Among them:
图1为本实用新型一实施例的结构示意图。FIG1 is a schematic structural diagram of an embodiment of the utility model.
图2为本实用新型一实施例的第三卷盘和滑轮配合进行回收钢丝绳的结构示意图。FIG2 is a schematic structural diagram of a third reel and a pulley cooperating to recover a steel wire rope in one embodiment of the utility model.
附图标记说明:1电机;2减速机;3第一卷盘;4第二卷盘;5第三卷盘;6牵引绳;7滑轮;8轮槽;9钢丝绳;10螺母;11起吊设备。Explanation of reference numerals: 1 motor; 2 reducer; 3 first reel; 4 second reel; 5 third reel; 6 traction rope; 7 pulley; 8 wheel groove; 9 wire rope; 10 nut; 11 lifting equipment.
具体实施方式Detailed ways
下面将参考附图并结合实施例来详细说明本实用新型。各个示例通过本实用新型的解释的方式提供而非限制本实用新型。实际上,本领域的技术人员将清楚,在不脱离本实用新型的范围或精神的情况下,可在本实用新型中进行修改和变型。例如,示为或描述为一个实施例的一部分的特征可用于另一个实施例,以产生又一个实施例。因此,所期望的是,本实用新型包含归入所附权利要求及其等同物的范围内的此类修改和变型。The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments. Each example is provided by way of explanation of the present invention and does not limit the present invention. In fact, it will be clear to those skilled in the art that modifications and variations may be made in the present invention without departing from the scope or spirit of the present invention. For example, a feature shown or described as a part of one embodiment may be used in another embodiment to produce yet another embodiment. Therefore, it is desired that the present invention includes such modifications and variations within the scope of the appended claims and their equivalents.
在本实用新型的描述中,术语“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型而不是要求本实用新型必须以特定的方位构造和操作,因此不能理解为对本实用新型的限制。本实用新型中使用的术语“相连”、“连接”、“设置”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接;可以是直接相连,也可以通过中间部件间接相连;可以是有线电连接、无线电连接,也可以是无线通信信号连接,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语的具体含义。In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention. The terms "connected", "connected" and "set" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components; they can be wired electrical connections, radio connections, or wireless communication signal connections. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
所附附图中示出了本实用新型的一个或多个示例。详细描述使用了数字和字母标记来指代附图中的特征。附图和描述中的相似或类似标记的已经用于指代本实用新型的相似或类似的部分。如本文所用的那样,用语“第一”、“第二”和“第三”等可互换地使用,以将一个构件与另一个区分开,且不旨在表示单独构件的位置或重要性。One or more examples of the utility model are shown in the attached drawings. The detailed description uses numbers and letters to refer to the features in the drawings. Similar or similar marks in the drawings and descriptions have been used to refer to similar or similar parts of the utility model. As used herein, the terms "first", "second", and "third" etc. are used interchangeably to distinguish one component from another, and are not intended to indicate the position or importance of individual components.
如图1至图2所示,根据本实用新型的实施例,提供了一种钢丝绳收放器,包括电机1、第一卷盘3、第二卷盘4、起吊设备11、牵引绳6和滑轮7,电机1和第二卷盘4同轴连接,钢丝绳9卷绕在第一卷盘3上,第一卷盘3吊装在起吊设备11上,牵引绳6的一端卷绕在第二卷盘4上,牵引绳6的另一端绕过滑轮7后与由第一卷盘3引出的钢丝绳9连接,电机1驱动第二卷盘4正向旋转,第二卷盘4的旋转能够对牵引绳6进行回收,在牵引绳6的牵引下,由第一卷盘3释放的钢丝绳9能够缠绕在滑轮7上,实现对钢丝绳9的释放。该收放器利用电机1提供动力不需要人工和车辆拖拽。As shown in Figures 1 and 2, according to an embodiment of the utility model, a wire rope retractor is provided, comprising a motor 1, a first reel 3, a second reel 4, a hoisting device 11, a traction rope 6 and a pulley 7, the motor 1 and the second reel 4 are coaxially connected, the wire rope 9 is wound on the first reel 3, the first reel 3 is hoisted on the hoisting device 11, one end of the traction rope 6 is wound on the second reel 4, the other end of the traction rope 6 is connected to the wire rope 9 drawn from the first reel 3 after passing around the pulley 7, the motor 1 drives the second reel 4 to rotate forward, the rotation of the second reel 4 can recycle the traction rope 6, under the traction of the traction rope 6, the wire rope 9 released by the first reel 3 can be wound on the pulley 7, so as to release the wire rope 9. The retractor uses the motor 1 to provide power and does not require manual and vehicle towing.
进一步地,该收放器还包括第三卷盘5,第三卷盘5设置在电机1和第二卷盘4之间,第三卷盘5、电机1和第二卷盘4之间均为同轴连接,缠绕在滑轮7上的钢丝绳9的一端能够固定在第三卷盘5上,电机1能够驱动第三卷盘5逆向旋转,第三卷盘5的旋转能够使缠绕在滑轮7上的钢丝绳9卷绕至第三卷盘5上,实现钢丝绳9的回收。该收放器在收放钢丝绳9的过程中,能够释放钢丝绳9的应力,使得对行车的钢丝绳的更换更加顺畅,提高了工作效率。Furthermore, the retractor further includes a third reel 5, which is arranged between the motor 1 and the second reel 4. The third reel 5, the motor 1 and the second reel 4 are all coaxially connected. One end of the wire rope 9 wound on the pulley 7 can be fixed on the third reel 5. The motor 1 can drive the third reel 5 to rotate in reverse. The rotation of the third reel 5 can make the wire rope 9 wound on the pulley 7 be wound on the third reel 5, so as to realize the recovery of the wire rope 9. The retractor can release the stress of the wire rope 9 during the process of retracting and releasing the wire rope 9, so that the replacement of the wire rope of the vehicle is smoother and the work efficiency is improved.
进一步地,还包括减速机2,减速机2设置在电机1和第三卷盘5之间,减速机2、电机1和第三卷盘5之间均为同轴连接。电机1通过减速机2的传动能够使第二卷盘4和第三卷盘5以适当的速度旋转。利用电机1进行驱动,减少了所需的人工的数量,提高了工作效率。Furthermore, a reducer 2 is included, and the reducer 2 is arranged between the motor 1 and the third reel 5. The reducer 2, the motor 1 and the third reel 5 are all coaxially connected. The motor 1 can rotate the second reel 4 and the third reel 5 at an appropriate speed through the transmission of the reducer 2. The use of the motor 1 for driving reduces the number of manual labor required and improves work efficiency.
进一步地,第一卷盘3和滑轮7分别位于第三卷盘5的两侧,由第一卷盘3引出的钢丝绳9由第三卷盘5的下方穿过后与牵引绳6连接,滑轮7设置有两个,两个滑轮7的轴线与电机1的轴线平行,牵引绳6的一圈绕过两个滑轮7。滑轮7上设置有多个轮槽8,轮槽8沿滑轮7的周向设置,多个轮槽8沿滑轮7的轴向均匀设置,牵引绳6位于轮槽8内,牵引绳6通过轮槽8在两个滑轮7上缠绕多圈。两个滑轮7的轴线相互平行,缠绕在两个滑轮7的一圈的牵引绳6的长度为20m~60m,根据钢丝绳9的使用长度设计两个滑轮7之间的距离。利用该收放器将第一卷盘3所释放的钢丝绳9缠绕在两个滑轮7上,然后再将缠绕在两个滑轮7上的钢丝绳9卷绕至第三卷盘5上,利用两个滑轮7定点滑动,能够大大减少了场地的使用空间,降低了安全隐患。释放的钢丝绳9的误差也大大减少,提高了材料的使用率。Furthermore, the first reel 3 and the pulley 7 are respectively located on both sides of the third reel 5, and the wire rope 9 drawn from the first reel 3 passes through the bottom of the third reel 5 and is connected to the traction rope 6. Two pulleys 7 are provided, and the axes of the two pulleys 7 are parallel to the axis of the motor 1. One turn of the traction rope 6 passes around the two pulleys 7. A plurality of wheel grooves 8 are provided on the pulley 7, and the wheel grooves 8 are arranged along the circumference of the pulley 7. The plurality of wheel grooves 8 are evenly arranged along the axial direction of the pulley 7. The traction rope 6 is located in the wheel grooves 8, and the traction rope 6 is wound around the two pulleys 7 for multiple turns through the wheel grooves 8. The axes of the two pulleys 7 are parallel to each other, and the length of the traction rope 6 wound around the two pulleys 7 is 20m to 60m. The distance between the two pulleys 7 is designed according to the use length of the wire rope 9. The retractor is used to wind the steel wire rope 9 released from the first reel 3 onto the two pulleys 7, and then the steel wire rope 9 wound onto the two pulleys 7 is wound onto the third reel 5. The two pulleys 7 are used for fixed-point sliding, which can greatly reduce the use space of the site and reduce safety hazards. The error of the released steel wire rope 9 is also greatly reduced, which improves the utilization rate of materials.
进一步地,第一卷盘3引出的钢丝绳9的绳头处焊接有螺母10,牵引绳6能够通过螺母10与钢丝绳9连接。如此设置方便地对钢丝绳9和牵引绳6之间进行连接。Further, a nut 10 is welded at the rope end of the steel wire rope 9 led out of the first reel 3, and the traction rope 6 can be connected to the steel wire rope 9 through the nut 10. Such an arrangement facilitates the connection between the steel wire rope 9 and the traction rope 6.
进一步地,两个滑轮7错开设置,两个滑轮7的端部错开一个轮槽8的宽度,如图1所示,距离第三卷盘5相对远的一个滑轮7比另一个滑轮7向左移动一个轮槽8的宽度,如此设置能够方便将牵引绳6缠绕在两个滑轮7上。Furthermore, the two pulleys 7 are staggered, and the ends of the two pulleys 7 are staggered by the width of a wheel groove 8. As shown in FIG. 1 , a pulley 7 that is relatively far from the third reel 5 is moved to the left by the width of a wheel groove 8 than the other pulley 7. Such an arrangement makes it convenient to wind the traction rope 6 around the two pulleys 7.
在本实用新型的一实施例中,行车需要更换的钢丝绳9为300米,滑轮7上设置有五个轮槽8,缠绕在两个滑轮7的一圈牵引绳6的长度为60米(两个滑轮7的轴线之间的距离小于30米),第一卷盘3所释放的钢丝绳9在两个滑轮7上缠绕五圈后即能够得到所需长度的钢丝绳9。In one embodiment of the utility model, the wire rope 9 that needs to be replaced for driving is 300 meters, five wheel grooves 8 are provided on the pulley 7, and the length of a circle of traction rope 6 wound around two pulleys 7 is 60 meters (the distance between the axes of the two pulleys 7 is less than 30 meters). The wire rope 9 released by the first reel 3 can be obtained after being wound around the two pulleys 7 for five circles to obtain the required length of the wire rope 9.
在对行车进行更换钢丝绳时,该收放器的工作过程包括如下步骤:When replacing the wire rope of the crane, the working process of the retractor includes the following steps:
步骤1,组装收放器:如图1所示,首先将第一卷盘3吊装在起吊设备11上,将电机1、减速机2、第三卷盘5和第二卷盘4依次同轴连接,在第二卷盘4上引出牵引绳6,牵引绳6在两个滑轮7上缠绕五圈后与第一卷盘3引出的钢丝绳9连接。Step 1, assemble the retractor: As shown in Figure 1, first hoist the first reel 3 on the lifting device 11, coaxially connect the motor 1, the reducer 2, the third reel 5 and the second reel 4 in sequence, lead out the traction rope 6 on the second reel 4, and the traction rope 6 is connected to the wire rope 9 led out from the first reel 3 after being wound five times on the two pulleys 7.
步骤2,释放钢丝绳9:启动电机1,电机1驱动第二卷盘4正向旋转对牵引绳6进行回收,在牵引绳6的牵引下,第一卷盘3通过旋转释放钢丝绳9,第一牵引绳6牵引钢丝绳9在两个滑轮7上缠绕五圈,完成钢丝绳9的释放。Step 2, releasing the wire rope 9: starting the motor 1, the motor 1 drives the second reel 4 to rotate forward to recover the traction rope 6. Under the traction of the traction rope 6, the first reel 3 releases the wire rope 9 by rotation. The first traction rope 6 pulls the wire rope 9 to wrap five circles around the two pulleys 7, completing the release of the wire rope 9.
步骤3,回收钢丝绳9:如图2所示,当缠绕在两个滑轮7上的钢丝绳9达到指定长度后,剪断钢丝绳9,将缠绕在滑轮7上的钢丝绳9与第三卷盘5连接,启动电机1,电机1驱动第三卷盘5逆向旋转,第三卷盘5的旋转使钢丝绳9卷绕在第三卷盘5上,同时第二卷盘4上的牵引绳6重新缠绕在两个滑轮7上,完成钢丝绳9的回收,钢丝绳9回收完成后,依次断开第二卷盘4、第三卷盘5和减速机2之间的连接,利用第三卷盘5上的钢丝绳9对行车进行钢丝绳9的更换。Step 3, recovering the wire rope 9: as shown in Figure 2, when the wire rope 9 wound on the two pulleys 7 reaches the specified length, cut the wire rope 9, connect the wire rope 9 wound on the pulley 7 to the third reel 5, start the motor 1, and drive the third reel 5 to rotate in the opposite direction. The rotation of the third reel 5 causes the wire rope 9 to be wound on the third reel 5, and at the same time, the traction rope 6 on the second reel 4 is rewound on the two pulleys 7 to complete the recovery of the wire rope 9. After the recovery of the wire rope 9 is completed, disconnect the second reel 4, the third reel 5 and the reducer 2 in turn, and use the wire rope 9 on the third reel 5 to replace the wire rope 9 for the driving.
从以上的描述中,可以看出,本实用新型上述的实施例实现了如下技术效果:From the above description, it can be seen that the above embodiments of the utility model achieve the following technical effects:
一种钢丝绳收放器,该收放器利用电机1提供动力不需要人工和车辆拖拽。A wire rope retractor is provided, which utilizes a motor 1 to provide power and does not require manual labor or vehicle towing.
该收放器解决了钢丝绳9释放过程中需要场地过大的问题,利用两个滑轮7定点滑动,大大减少了场地的使用空间,降低了安全隐患。The retractor solves the problem that a large space is required during the release of the wire rope 9, and utilizes two pulleys 7 for fixed-point sliding, thereby greatly reducing the use space of the site and reducing potential safety hazards.
该钢丝绳9收放器还能够释放钢丝绳9的应力,使得更换行车钢丝绳9的过程更加顺畅,提高了工作效率,减少了安全隐患。The wire rope 9 retractor can also release the stress of the wire rope 9, making the process of replacing the driving wire rope 9 smoother, improving work efficiency and reducing safety hazards.
释放的钢丝绳9误差大大减少,提高了材料的使用率。The error of the released steel wire rope 9 is greatly reduced, thus improving the utilization rate of materials.
以上所述仅为本实用新型的优选实施例,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. For those skilled in the art, the utility model may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323186386.3U CN220951000U (en) | 2023-11-23 | 2023-11-23 | Steel wire rope winding and unwinding device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323186386.3U CN220951000U (en) | 2023-11-23 | 2023-11-23 | Steel wire rope winding and unwinding device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220951000U true CN220951000U (en) | 2024-05-14 |
Family
ID=91006218
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323186386.3U Active CN220951000U (en) | 2023-11-23 | 2023-11-23 | Steel wire rope winding and unwinding device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220951000U (en) |
-
2023
- 2023-11-23 CN CN202323186386.3U patent/CN220951000U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103626058B (en) | Auxiliary luffing device, hoisting crane and auxiliary luffing method | |
| CN105800490A (en) | Method for replacing crane main hook steel wire rope | |
| CN104716602B (en) | A kind of portable rural power grids line-sag adjusting apparatus | |
| CN102009917B (en) | Method for replacing steel wire rope and gantry hook of large-scale bridge crane simultaneously | |
| CN220951000U (en) | Steel wire rope winding and unwinding device | |
| CN210457261U (en) | Variable-amplitude pull rope structure of movable-arm crane | |
| CN103072513A (en) | Multifunctional construction vehicle for high-tension line construction | |
| CN117585600A (en) | A wire rope retracting and retracting device and a method for retracting and retracting a steel wire rope | |
| CN205294769U (en) | Draw gear is used in production of engineering machine tool | |
| CN204243611U (en) | A kind of portable manual take-up line concentrator | |
| CN203728455U (en) | Two-ratio amplitude changing device of trolley amplitude-changing type tower crane | |
| CN214359810U (en) | A walking trolley for a lifting device | |
| CN207046684U (en) | A kind of vertical track infall boom hoisting | |
| CN212555711U (en) | Vehicle traction device applied to drawer type coating production line | |
| CN210326718U (en) | Highway unwrapping wire structure is striden to distribution network | |
| CN202657878U (en) | Weight traction mechanism | |
| CN201545647U (en) | Rope guiding device | |
| CN213326029U (en) | Multifunctional cable pay-off cart | |
| CN210944633U (en) | Steel rope blanking and winding device of crane | |
| CN218931492U (en) | Auxiliary cable quick replacement harbour crane well insertion's operation instrument dolly | |
| CN223240556U (en) | Traction device for steel strand blanking | |
| CN207738327U (en) | A kind of automobile-used boom hoisting in day | |
| CN223213681U (en) | Multi-lifting-point portal crane | |
| CN220317146U (en) | Hoisting device of prefabricated inverted arch assembly trolley | |
| CN106684760B (en) | The dragger that a kind of aerial work uses |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250519 Address after: 536000 the Guangxi Zhuang Autonomous Region Beihai Tieshan Port Road No. four and No. seven interchange Patentee after: Guangxi Beigang New Material Co.,Ltd. Country or region after: China Patentee after: Guangxi Beigang Jinya Steel Co.,Ltd. Patentee after: Guangxi Beigang Stainless Steel Co.,Ltd. Patentee after: Guangxi Beihai Zonghong Technology Development Co.,Ltd. Patentee after: Beihai Zongwei Environmental Protection Technology Co.,Ltd. Address before: 536000 the Guangxi Zhuang Autonomous Region Beihai Tieshan Port Road No. four and No. seven interchange Patentee before: Guangxi Beigang New Material Co.,Ltd. Country or region before: China |