CN210944633U - Steel rope blanking and winding device of crane - Google Patents

Steel rope blanking and winding device of crane Download PDF

Info

Publication number
CN210944633U
CN210944633U CN201921897946.7U CN201921897946U CN210944633U CN 210944633 U CN210944633 U CN 210944633U CN 201921897946 U CN201921897946 U CN 201921897946U CN 210944633 U CN210944633 U CN 210944633U
Authority
CN
China
Prior art keywords
steel rope
speed reducer
drum
winding device
separable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921897946.7U
Other languages
Chinese (zh)
Inventor
谭雄
祁怀朝
刘志勇
曾涛
吴阳嗣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Valin Xiangtan Iron and Steel Co Ltd
Original Assignee
Hunan Valin Xiangtan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Valin Xiangtan Iron and Steel Co Ltd filed Critical Hunan Valin Xiangtan Iron and Steel Co Ltd
Priority to CN201921897946.7U priority Critical patent/CN210944633U/en
Application granted granted Critical
Publication of CN210944633U publication Critical patent/CN210944633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The crane steel rope blanking winding device comprises a winding device, a separable coupler and a roller, wherein the winding device consists of a motor, a brake wheel coupler, a brake, a speed reducer and a winding drum; the separable coupling consists of a screw, a separable coupling and a passive end. One end of the output end of a speed reducer in the hoisting device is connected with the winding drum, the other end of the output end of the speed reducer is connected with the driving end of the separable coupling, and two holes in the driving end are fixed by pins. The drum can be pushed directly onto the hoist mechanism, connected by a separable coupling and then positioned with a set screw, and then one end of the steel cable is fixed to the drum rope clip. The utility model provides a hoist can reduce intensity of labour at the inconsistent problem of steel cable spare part length that exists before changing the steel cable process, shortens maintenance duration, improves maintenance efficiency.

Description

Steel rope blanking and winding device of crane
Technical Field
The utility model belongs to hoisting equipment, which is a hoisting machine steel rope blanking and winding device for metallurgy.
Background
Cranes are one of the important pieces of equipment in the steel making process. Because the molten metal is hoisted, the requirement on the safety coefficient of the crane is high. The steel rope of metallurgical crane consists of four steel ropes, wherein the steel rope belongs to a piece which is changed periodically, the safety coefficient of the steel rope is required to be large, and the steel rope is selected. Because the hoisting height is high, the length of the steel rope is long, several steel ropes of the crane are required to be as long, otherwise, after the crane is replaced, the balance frame of the hoisting mechanism can cling to the balance frame seat, the steel rope needs to be adjusted, and the time for overhauling and replacing is seriously influenced. How to guarantee that four steel cable spare parts unloading length is unanimous is bothering the maintainer always, causes very big restriction for production, has also brought very big risk for overhauing.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a hoist steel cable unloading coiling mechanism solves the inconsistent problem of steel cable spare part length that the hoist exists before changing the steel cable process, shortens the repair time, improves maintenance efficiency.
The utility model provides a technical scheme that its technical problem adopted is:
a steel rope blanking winding device of a crane comprises a winding device, a separable coupler and a roller, wherein the winding device comprises a motor, a brake wheel coupler, a brake, a speed reducer and a winding drum, a driving end is in interference connection with an output shaft of the speed reducer, a pin penetrates through the driving end to be in transition connection, and a driven end is in interference connection with the roller.
One end of the output end of a speed reducer in the hoisting device is connected with the winding drum, the other end of the output end of the speed reducer is connected with the driving end of the separable coupling, and two holes in the driving end are fixed by pins. The steel rope blanking and winding device of the crane can be used as a normal winding device in daily life, and can be used as a steel rope when a spare steel rope is blanked.
The roller can be directly pushed onto a winch mechanism, is connected through a separable coupling 6 and then is positioned by a positioning screw 8; one end of the steel cable is then fixed to the drum 7 rope clip. The winding device drives the drum to wind the new steel rope onto the drum through the electric control system.
The using method comprises the following steps: the new steel rope is firstly transported to a steel rope blanking place by a forklift, and then the new steel rope is blanked to the required length. Because the steel ropes are not straight in the blanking process, the four steel ropes are generally different in length, one end of each steel rope is bound by a rope clamp at the position with the same length, the four steel ropes are connected by an equal-length traction steel rope and a forklift, the four steel ropes are dragged to be straight, and then the other three steel ropes are cut to be the same length by taking the shortest steel rope as a reference at the other end of each steel rope. This ensures that the four steel cords are the same length. Then put the cylinder on hoist mechanism, through the coupling joint hoist engine that can dismantle, fix steel cable one end to the cylinder again, through automatically controlled with the new steel cable of hoist engine automatic winding coil to the cylinder on, realize semi-automatization, make things convenient for transporting of steel cable spare part.
The utility model has the advantages that: reduce maintainer's working strength, reduced the operation risk of overhauing, improve work efficiency, the practicality is strong.
Drawings
Fig. 1 is a schematic view of a crane steel rope blanking and winding device.
Fig. 2 and 3 are front and left views of the driving end of the separable coupling, respectively.
Fig. 4 and 5 are front and left side views, respectively, of the driven end of the separable coupling.
Fig. 6 is a schematic view of a pin structure.
In the figure: the brake system comprises a motor 1, a brake wheel coupler 2, a brake 3, a speed reducer 4, a winding drum 5, a separable coupler 6, a roller 7 and a positioning screw 8.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
FIG. 1 shows: the steel rope blanking and winding device for crane consists of winding unit, separable coupler 6 and drum 5. The winding device consists of a motor 1, a brake wheel coupler 2, a brake 3, a speed reducer 4 and a winding drum 5; the separable coupling 6 is composed of three parts, namely a driving end connected with a speed reducer, a pin shaft and a driven end connected with a roller.
Fig. 2 and 3 show: one output end of a speed reducer 4 in the winding device is connected with a winding drum 5, the other output end of the speed reducer is connected with the driving end of a separable coupling 6, and two holes in the driving end of the separable coupling 6 are fixed through pins. The steel rope blanking and winding device of the crane can be used as a normal winding device in daily life, and the steel rope of the spare part can be used as a steel rope in the blanking process.
Fig. 4 and 5 show: the roller 7 can be directly pushed onto a winch mechanism, is connected through a separable coupling 6 and then is positioned by a positioning screw 8; then one end of the steel rope is fixed on a rope clamp of the roller 7, and the winding device drives the roller 7 to wind the new steel rope on the roller 7 through an electric control system.
FIG. 6 shows: schematic diagram of a separable coupling pin.

Claims (3)

1. Crane steel rope unloading coiling mechanism, its characterized in that: the device comprises a hoisting device, a separable coupler and a roller, wherein the hoisting device comprises a motor, a brake wheel coupler, a brake, a speed reducer and a winding drum; the separable coupler comprises a pin, a driving end and a driven end, the driving end is in interference connection with an output shaft of the speed reducer, the pin penetrates through the driving end to be in transition connection, and the driven end is in interference connection with the roller.
2. A crane steel rope blanking winder as claimed in claim 1, characterized in that: one end of the output end of a speed reducer in the hoisting device is connected with the winding drum, the other end of the output end of the speed reducer is connected with the driving end of the separable coupling, and two holes in the driving end are fixed by pins.
3. A crane steel rope blanking winder as claimed in claim 1, characterized in that: the drum can be directly pushed onto a winch mechanism, is connected through a separable coupler, is positioned by a positioning screw, and then one end of a steel rope is fixed onto a drum rope clamp.
CN201921897946.7U 2019-11-06 2019-11-06 Steel rope blanking and winding device of crane Active CN210944633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921897946.7U CN210944633U (en) 2019-11-06 2019-11-06 Steel rope blanking and winding device of crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921897946.7U CN210944633U (en) 2019-11-06 2019-11-06 Steel rope blanking and winding device of crane

Publications (1)

Publication Number Publication Date
CN210944633U true CN210944633U (en) 2020-07-07

Family

ID=71374512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921897946.7U Active CN210944633U (en) 2019-11-06 2019-11-06 Steel rope blanking and winding device of crane

Country Status (1)

Country Link
CN (1) CN210944633U (en)

Similar Documents

Publication Publication Date Title
CN101717038B (en) Multiplication-variable hook device
CN101239695A (en) Threading method for main steel wire rope of track crane
CN205294474U (en) Wire rope winding machine
CN101468766B (en) Movable rope withdrawing apparatus
CN210944633U (en) Steel rope blanking and winding device of crane
CN109019306B (en) A kind of method of quick-replaceable bridge crane single hook head
CN106698223A (en) Replacing method of travelling crane main hook steel wire rope
CN116477509A (en) Steel rope winch for explosion-proof crane and use method thereof
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN217376990U (en) Hoisting equipment for large steel structural part
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN207107907U (en) Automatic de-stacking palletizing apparatus
CN205346692U (en) Swing arm tower machine of supporting multiple mounting means becomes width of cloth pulley yoke
CN201746271U (en) Single hoisting point trolley and hoist employing same
CN202657880U (en) Lifting hook and grab bucket dual-purpose winch control device of crane
CN207061730U (en) Possesses the hoist engine of suspension hook supervising device
CN201560043U (en) Variable-magnification hook device
CN212558895U (en) Metallurgical blast furnace skip wire rope changes device
CN205973541U (en) Tower crane is with electronic introduction device that hangs, breaks off relations certainly
CN206188250U (en) And a work efficiency is increased
CN204342341U (en) A kind of hand-held design roller core towed equipment
CN201250057Y (en) Crown block sling
CN215557871U (en) Steel wire optical fiber pay-off device with lifting fork
CN2297432Y (en) Easy-to-dismount top rotating tower crane
CN220011874U (en) Outer wall protection device for hoisting building outer wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant