CN220889077U - Large-span clamp type glass curtain wall system - Google Patents

Large-span clamp type glass curtain wall system Download PDF

Info

Publication number
CN220889077U
CN220889077U CN202322143475.3U CN202322143475U CN220889077U CN 220889077 U CN220889077 U CN 220889077U CN 202322143475 U CN202322143475 U CN 202322143475U CN 220889077 U CN220889077 U CN 220889077U
Authority
CN
China
Prior art keywords
curtain wall
glass
steel
wall part
rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322143475.3U
Other languages
Chinese (zh)
Inventor
张成军
俞伟达
纪云
张果
孙伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Suzhou Green Architectural Development Co ltd
Zhongyifeng Construction Group Co Ltd
Original Assignee
Zhongyifeng Suzhou Green Architectural Development Co ltd
Zhongyifeng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyifeng Suzhou Green Architectural Development Co ltd, Zhongyifeng Construction Group Co Ltd filed Critical Zhongyifeng Suzhou Green Architectural Development Co ltd
Priority to CN202322143475.3U priority Critical patent/CN220889077U/en
Application granted granted Critical
Publication of CN220889077U publication Critical patent/CN220889077U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a large-span clamp type glass curtain wall system, which comprises a curtain wall part, wherein glass ribs are vertically arranged on the inner side of the curtain wall part, the glass ribs are utilized to strengthen and support the curtain wall part, slot assemblies are reserved at the bottom of the curtain wall part, clamp assemblies are arranged at the top of the curtain wall part, the top and the bottom of the glass ribs are respectively connected with the clamp assemblies and the slot assemblies, and a large-span glass curtain wall is formed by the slot assemblies, the clamp assemblies, the curtain wall part and the glass ribs. According to the utility model, the bottom of the curtain wall part can be rapidly limited and fixed through the slot assembly, the top of the curtain wall part is clamped through the clamp assembly, so that the assembly of workers is facilitated, time and labor are saved, the inner side of the curtain wall part is supported in the vertical direction through the glass ribs, the strength of the curtain wall part is improved, the installation and the use of a large span can be realized, and the glass ribs are connected through the slot assembly and the clamp assembly, so that the installation difficulty of the workers is reduced.

Description

Large-span clamp type glass curtain wall system
Technical Field
The utility model relates to the technical field of curtain walls, in particular to a large-span clamp type glass curtain wall system.
Background
In the conventional frame curtain wall system, main keels (upright posts and cross beams) are basically arranged on main beams and are mutually connected to form a sash system. Along with the diversification of the appearance of the building, different building shapes are wider and wider, so when meeting public areas such as airports, stations, venues, large-scale malls, apartment hotels and the like, large-span public spaces such as hall positions and the like, people often hope to have larger indoor space effects, obtain better outdoor visual extension, and therefore, the requirements of the facade are concise, and the atmosphere and permeability are satisfied;
Traditional frame curtain wall can not adapt to new building development form, can all cause more or less hindrance to the sight, leads to the effect of curtain not good, can't provide penetrating, succinct curtain wall to the actual installation of traditional curtain wall has certain degree of difficulty, and installation cost is high, and installation period is long, has increased staff's installation degree of difficulty.
Disclosure of utility model
The utility model aims to provide a large-span clamp type glass curtain wall system for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a large-span anchor clamps formula glass curtain wall system, includes the curtain wall part, the curtain wall part inboard is vertical to be provided with the glass rib, utilizes the glass rib to carry out reinforcing support to the curtain wall part, has reserved the slot subassembly in curtain wall part bottom, installs anchor clamps subassembly at curtain wall part top, and glass rib top, bottom are connected with anchor clamps subassembly, slot subassembly respectively, constitute a large-span glass curtain wall through slot subassembly, anchor clamps subassembly, curtain wall part, glass rib.
As a further preferable mode of the technical scheme, the curtain wall part is formed by splicing a plurality of glass panels up and down, and the glass panels are connected through silicone structural adhesive.
As the further preferred of this technical scheme, the slot subassembly is including reserving the steel pipe on the installation region, has at steel pipe surface welding with curtain wall part, glass rib complex angle steel, reserves the cushion in the angle steel bottom, and cushion and curtain wall part, glass rib bottom contact, it has galvanized steel sheet to increase on the angle steel, carries out the shutoff to angle steel one side through galvanized steel sheet.
As a further preferable mode of the technical scheme, the angle steel and the galvanized steel sheet are enclosed together to form a cuboid structure with an open top, and the cushion block is specifically a hard rubber cushion block.
As a further preferable mode of the technical scheme, the clamp assembly specifically comprises a first clamp part and a second clamp part, the first clamp part is preassembled on the installation area to clamp and fix the curtain wall part, the second clamp part is preassembled on the installation area to clamp and fix the glass rib, and the stable clamping and fixing of the glass curtain wall and the glass rib are realized through the cooperation of the first clamp part and the second clamp part.
As the further preferred of this technical scheme, a fixture portion is including the board-like built-in fitting of a pre-installation on the installation region, a board-like built-in fitting one side welding has a channel-section steel, no. two channel-section steel is increased to a channel-section steel bottom one side, evenly distributed installs a plurality of turnbuckle on No. two channel-section steels, stainless steel anchor clamps are installed to turnbuckle bottom, and stainless steel anchor clamps block is at the top of curtain wall part, stainless steel injecting glue bolt is installed to stainless steel anchor clamps and curtain wall part junction.
As a further preferred of this technical scheme, no. two anchor clamps portions are including preassembling the board formula built-in fitting No. two on the installation region, and board formula built-in fitting No. two installs in board formula built-in fitting below No. two, no. two board formula built-in fitting one side welding has No. three channel-sections, no. three channel-sections top is installed the stiffening rib, no. three channel-sections bottom is installed the steel sheet connecting piece, installs a rib splint in steel sheet connecting piece bottom, through a high strength bolt fastening connection between rib splint and the steel sheet connecting piece, no. two rib splint are installed to rib splint bottom, and No. two rib splint pass through the bolt and are connected with the glass rib, and pass through No. two high strength bolt fastening connection between rib splint and the No. two rib splint.
The utility model provides a large-span clamp type glass curtain wall system, which has the following beneficial effects:
(1) According to the utility model, the slot assembly is arranged, the curtain wall part formed by splicing the plurality of glass panels is clamped in the angle steel, the glass ribs are spliced into the corresponding angle steel, the cushion blocks corresponding to the curtain wall part and the glass ribs are reserved in the angle steel, the curtain wall part and the glass ribs can be protected, after the bottom splicing and installation are completed, the galvanized steel plate is installed, and the curtain wall part and the glass ribs are stably clamped and fixed, so that the falling problem is avoided.
(2) According to the utility model, the clamp assembly is arranged, the stainless steel clamp is driven to clamp and fix the top of the curtain wall part under the cooperation of the first clamp part, so that the top of the curtain wall part can be clamped and fixed, the second rib clamping plate is clamped and connected with the glass rib under the assistance of the second clamp part, and the third channel steel is provided with the reinforcing rib at the top, so that the integral strength of the third channel steel is improved, stable supporting force can be provided for the glass rib, and the integral stability of the curtain wall system is improved.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a first clamp part structure of the present utility model;
FIG. 3 is a schematic diagram of a socket assembly according to the present utility model;
FIG. 4 is a schematic view of the installation of the spacer block of the present utility model in angle steel;
fig. 5 is a schematic structural view of a clamp assembly according to the present utility model.
In the figure: 1. curtain wall parts; 101. a glass panel; 102. silicone structural adhesive; 2. glass ribs; 3. a steel pipe; 4. angle steel; 5. a cushion block; 6. zinc-plated steel sheet; 7. a first plate type embedded part; 8. channel steel I; 9. channel steel II; 10. a turnbuckle; 11. a stainless steel clamp; 12. stainless steel glue injection bolts; 13. a second plate-type embedded part; 14. channel steel III; 15. reinforcing ribs; 16. a steel plate connecting piece; 17. rib clamping plates I; 18. a first high-strength bolt; 19. rib clamping plates II; 20. and a second high-strength bolt.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model.
The utility model provides the technical scheme that: as shown in fig. 1 and 2, in this embodiment, a large-span fixture type glass curtain wall system includes a curtain wall part 1, a glass rib 2 is vertically disposed on the inner side of the curtain wall part 1, the curtain wall part 1 is reinforced and supported by the glass rib 2, a slot component is reserved at the bottom of the curtain wall part 1, a fixture component is mounted at the top of the curtain wall part 1, the top and the bottom of the glass rib 2 are respectively connected with the fixture component and the slot component, a large-span glass curtain wall is formed by splicing a plurality of glass panels 101 up and down through the slot component, the fixture component, the curtain wall part 1 and the glass rib 2, and a plurality of glass panels 101 are connected through silicone structural adhesive 102.
As shown in fig. 3 and 4, the slot assembly comprises a steel pipe 3 reserved on an installation area, angle steel 4 matched with a curtain wall part 1 and a glass rib 2 is welded on the surface of the steel pipe 3, a cushion block 5 is reserved at the bottom of the angle steel 4, the cushion block 5 is contacted with the bottoms of the curtain wall part 1 and the glass rib 2, a galvanized steel plate 6 is added on the angle steel 4, one side of the angle steel 4 is plugged through the galvanized steel plate 6, the angle steel 4 and the galvanized steel plate 6 are jointly enclosed to form a cuboid structure with an open top, and the cushion block 5 is specifically a hard rubber cushion block 5;
Wherein, when fixing curtain wall part 1, glass rib 2 bottom: through being equipped with the slot subassembly, will by the curtain wall part 1 block of a plurality of glass panels 101 concatenation formation in angle steel 4 at first, simultaneously glass rib 2 peg graft equally to in the angle steel 4 that corresponds, reserve in angle steel 4 have with curtain wall part 1, the cushion 5 that glass rib 2 corresponds, can protect it, install galvanized steel sheet 6 after the bottom grafting installation is accomplished, carry out stable clamping to curtain wall part 1, glass rib 2 fixedly, avoid appearing the problem that drops, easy to assemble.
As shown in fig. 2 and 5, the fixture assembly specifically comprises a first fixture portion and a second fixture portion, the first fixture portion is preassembled on the installation area to clamp and fix the curtain wall component 1, the second fixture portion is preassembled on the installation area to clamp and fix the glass rib 2, and the first fixture portion and the second fixture portion are matched to realize stable clamping and fixing of the glass curtain wall and the glass rib 2;
Wherein, when carrying out top clamping to curtain wall part 1, glass rib 2: through the clamp assembly, under the cooperation of the first clamp part, the turnbuckle screws 10 are correspondingly operated to drive the stainless steel clamps 11 on the turnbuckle screws to move up and down for fine adjustment, the stainless steel clamps 11 are driven to clamp and fix the top of the curtain wall part 1, then the stainless steel glue injection bolts 12 are used for reinforcing and connecting the stainless steel clamps, so that the top of the curtain wall part 1 can be clamped and fixed, the second rib clamping plate 19 is clamped and connected with the glass rib 2 with the aid of the second clamp part, and the second high-strength bolts 20 at the joint of the first rib clamping plate 17 and the second rib clamping plate 19 are fastened, so that the stability of the glass rib 2 is ensured, the reinforcing ribs 15 are arranged at the top of the third channel steel 14, the integral strength of the third channel steel 14 is improved, the stable supporting force can be provided for the glass rib 2, and the integral stability of the curtain wall system is improved;
In some disclosures: the first fixture part comprises a first plate-type embedded part 7 preassembled on an installation area, a first channel steel 8 is welded on one side of the first plate-type embedded part 7, a second channel steel 9 is additionally arranged on one side of the bottom of the first channel steel 8, a plurality of turnbuckle screws 10 are uniformly distributed on the second channel steel 9, a stainless steel fixture 11 is installed at the bottom of the turnbuckle screws 10, the stainless steel fixture 11 is clamped at the top of the curtain wall part 1, and a stainless steel glue injection bolt 12 is installed at the joint of the stainless steel fixture 11 and the curtain wall part 1.
In some disclosures: the second clamp part comprises a second plate-type embedded part 13 which is preloaded on the installation area, the second plate-type embedded part 13 is installed below the first plate-type embedded part 7, a third channel steel 14 is welded on one side of the second plate-type embedded part 13, a reinforcing rib 15 is installed at the top of the third channel steel 14, a steel plate connecting piece 16 is installed at the bottom of the third channel steel 14, a first rib clamping plate 17 is installed at the bottom of the steel plate connecting piece 16, the first rib clamping plate 17 is fixedly connected with the steel plate connecting piece 16 through a first high-strength bolt 18, a second rib clamping plate 19 is installed at the bottom of the first rib clamping plate 17, the second rib clamping plate 19 is connected with the glass rib 2 through a bolt, and the first rib clamping plate 17 is fixedly connected with the second rib clamping plate 19 through a second high-strength bolt 20.
The utility model provides a large-span clamp type glass curtain wall system, which has the following specific working principle: during installation, the installation area preassembled slot assembly and the clamp assembly of the glass curtain wall can be used for rapidly limiting and fixing the bottom of the curtain wall part 1 through the slot assembly, so that the follow-up stability of the curtain wall part 1 is guaranteed, the top of the curtain wall part 1 is clamped through the clamp assembly, the rapid installation of the curtain wall part 1 is realized, the assembly of workers is facilitated, time and labor are saved, the glass rib 2 is additionally arranged on the inner side of the curtain wall part 1, the inner side of the curtain wall part 1 is supported in the vertical direction through the glass rib 2, the strength of the curtain wall part 1 is improved, the installation and the use of a large span can be realized, the glass rib 2 is also connected through the slot assembly and the clamp assembly, and the installation difficulty of the workers is reduced.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a large-span anchor clamps formula glass curtain wall system, includes curtain wall part (1), its characterized in that: the glass curtain wall is characterized in that glass ribs (2) are vertically arranged on the inner side of the curtain wall part (1), the glass ribs (2) are utilized to strengthen and support the curtain wall part (1), slot assemblies are reserved at the bottom of the curtain wall part (1), clamp assemblies are arranged at the top of the curtain wall part (1), the top and the bottom of the glass ribs (2) are respectively connected with the clamp assemblies and the slot assemblies, and a large-span glass curtain wall is formed by the slot assemblies, the clamp assemblies, the curtain wall part (1) and the glass ribs (2).
2. The large span clamp type glass curtain wall system of claim 1, wherein: the curtain wall part (1) is formed by splicing a plurality of glass panels (101) up and down, and the glass panels (101) are connected through silicone structural adhesive (102).
3. The large span clamp type glass curtain wall system of claim 1, wherein: the slot assembly comprises a steel pipe (3) reserved on an installation area, angle steel (4) matched with a curtain wall part (1) and a glass rib (2) is welded on the surface of the steel pipe (3), a cushion block (5) is reserved at the bottom of the angle steel (4), the cushion block (5) is contacted with the bottom of the curtain wall part (1) and the bottom of the glass rib (2), a galvanized steel plate (6) is added on the angle steel (4), and one side of the angle steel (4) is plugged through the galvanized steel plate (6).
4. A large span clip-on glass curtain wall system as defined in claim 3, wherein: the angle steel (4) and the galvanized steel sheet (6) are enclosed together to form a cuboid structure with an open top, and the cushion block (5) is specifically a hard rubber cushion block (5).
5. The large span clamp type glass curtain wall system of claim 1, wherein: the fixture assembly specifically comprises a first fixture part and a second fixture part, the first fixture part is preassembled on the installation area to clamp and fix the curtain wall part (1), the second fixture part is preassembled on the installation area to clamp and fix the glass rib (2), and the stable clamping and fixing of the glass curtain wall and the glass rib (2) are realized through the cooperation of the first fixture part and the second fixture part.
6. The large span clamp type glass curtain wall system of claim 5, wherein: the fixture part comprises a plate-type embedded part (7) which is preassembled on an installation area, a channel steel (8) is welded on one side of the plate-type embedded part (7), a second channel steel (9) is additionally arranged on one side of the bottom of the first channel steel (8), a plurality of turnbuckle screws (10) are uniformly distributed on the second channel steel (9), a stainless steel fixture (11) is installed on the bottom of the turnbuckle screws (10), the stainless steel fixture (11) is clamped at the top of the curtain wall part (1), and a stainless steel glue injection bolt (12) is installed at the joint of the stainless steel fixture (11) and the curtain wall part (1).
7. The large span clamp type glass curtain wall system of claim 5, wherein: the second clamp part comprises a second plate-type embedded part (13) which is preloaded on an installation area, the second plate-type embedded part (13) is installed below a first plate-type embedded part (7), a third channel steel (14) is welded on one side of the second plate-type embedded part (13), a reinforcing rib (15) is installed at the top of the third channel steel (14), a steel plate connecting part (16) is installed at the bottom of the third channel steel (14), a first rib clamping plate (17) is installed at the bottom of the steel plate connecting part (16), the first rib clamping plate (17) is fixedly connected with the steel plate connecting part (16) through a first high-strength bolt (18), a second rib clamping plate (19) is installed at the bottom of the first rib clamping plate (17), the second rib clamping plate (19) is connected with a glass rib (2) through a bolt, and the first rib clamping plate (17) is fixedly connected with the second rib clamping plate (19) through a second high-strength bolt (20).
CN202322143475.3U 2023-08-10 2023-08-10 Large-span clamp type glass curtain wall system Active CN220889077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322143475.3U CN220889077U (en) 2023-08-10 2023-08-10 Large-span clamp type glass curtain wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322143475.3U CN220889077U (en) 2023-08-10 2023-08-10 Large-span clamp type glass curtain wall system

Publications (1)

Publication Number Publication Date
CN220889077U true CN220889077U (en) 2024-05-03

Family

ID=90868097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322143475.3U Active CN220889077U (en) 2023-08-10 2023-08-10 Large-span clamp type glass curtain wall system

Country Status (1)

Country Link
CN (1) CN220889077U (en)

Similar Documents

Publication Publication Date Title
CN109779015B (en) Assembly type steel structure integrated green building and design and installation process thereof
WO2020238707A1 (en) Modular assembled house and construction method therefor
CN111456222B (en) Assembly type steel structure integrated green building and design and installation process thereof
CN220889077U (en) Large-span clamp type glass curtain wall system
CN211081534U (en) Flat-pushing window of exposed frame glass curtain wall
CN111945936A (en) Mounting structure and mounting method for steel-structure canopy through hidden-frame glass curtain wall
CN210767418U (en) Glass curtain wall convenient for indoor installation
CN209780318U (en) prefabricated component installation bearing structure
CN114352034B (en) Unit glass curtain wall system installation method capable of being installed indoors
CN116025073A (en) Waterproof device for building separation structure seam of high-speed rail station building bridge and construction method
CN108331217B (en) Composite unit type curtain wall system
CN219753521U (en) Be applied to quick mounting structure of girder on sunshine room
CN219387345U (en) Novel sunshine room
CN217027491U (en) Plane daylighting roofing tip and concrete member binding off connection structure
CN210238789U (en) Steel house convenient to installation and dismantlement
CN216810517U (en) Curtain wall splicing type small unit window installation node
CN211313897U (en) Steel construction elevator is with dress escutcheon that can trade glass fast
CN216664640U (en) Non-rib full glass curtain wall upright post combined structure
CN220100809U (en) Integrated portable room of stand container formula
CN215978970U (en) Window frame connecting structure of combined window
CN117027279B (en) Wallboard unit and wall body
CN216810520U (en) Glass curtain wall of slide rail installation formula
CN216238985U (en) Structure is built in interim room in quick detachable building site
CN220978429U (en) Composite material full mortise and tenon structural type box house
CN218970386U (en) Precast column and precast floor slab connection grouting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant