CN216238985U - Structure is built in interim room in quick detachable building site - Google Patents

Structure is built in interim room in quick detachable building site Download PDF

Info

Publication number
CN216238985U
CN216238985U CN202122138648.3U CN202122138648U CN216238985U CN 216238985 U CN216238985 U CN 216238985U CN 202122138648 U CN202122138648 U CN 202122138648U CN 216238985 U CN216238985 U CN 216238985U
Authority
CN
China
Prior art keywords
plate
room
bottom plate
fixedly connected
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122138648.3U
Other languages
Chinese (zh)
Inventor
戚菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Huichao Industry Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122138648.3U priority Critical patent/CN216238985U/en
Application granted granted Critical
Publication of CN216238985U publication Critical patent/CN216238985U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Special Wing (AREA)

Abstract

The utility model discloses a temporary building structure of an easily-detachable construction site, which relates to the technical field of building engineering and comprises a bottom plate and a first building plate connected with two second building plates, wherein top ends of the two first building plates are fixedly connected with a top plate, the inner wall of one side of the bottom plate, which is close to the first building plate, is symmetrically and fixedly connected with a first vertical plate, the inner wall of one side of the bottom plate, which is close to the second building plate, is symmetrically and fixedly connected with a second vertical plate, and positioning plates are fixedly arranged on the upper surfaces of the first vertical plates. According to the utility model, through the arrangement of the mounting grooves, the first room plate and the second room plate can be firstly clamped with the bottom plate, the clamping block is rotated along the hinge, the bottom parts of the first room plate and the second room plate are tightly attached to the bottom plate, the positioning plate is connected with the connecting rod through the matching of the arc-shaped grooves, the connecting stability of the device to the first room plate and the second room plate can be effectively improved, and the convenience in disassembly and assembly is better enhanced.

Description

Structure is built in interim room in quick detachable building site
Technical Field
The utility model relates to the technical field of building engineering, in particular to a temporary building structure for a construction site, which is easy to disassemble.
Background
On the building site, for the convenience of worker living, can generally build temporary housing construction around the construction place, current temporary housing construction, fix the mode of installing the face and need predetermine fixed stake in advance usually, then fix on the stake through the bolt and then install fixed temporary building, accomplish and set up, waste time and energy, the dismouting is troublesome.
In chinese utility model patent application no: CN201920711078.2 discloses a board house connection and fixation structure that is temporarily built, which includes two upper beams that are parallel to each other, a left channel beam and a right channel beam that are parallel to each other and have downward openings are fixed between two ends of the two upper beams, the two upper beams are square tube structures, through holes are formed on the lower surfaces of the two upper beams near two ends, a plastic tube is inserted between the two through holes, and electric wires are arranged in the plastic tube. This board house connection fixed knot who builds temporarily constructs, in the in-service use process, what adopt is that panel concatenation formula connection structure, and the structure is complicated, and the practicality is lower, and is low to the connection stability between the board, is not convenient for install and demolish the board, and the leakproofness of device is relatively poor, and the rainwater gets into indoorly through connection structure easily.
Therefore, it is necessary to provide a temporary housing structure for a construction site which is easily disassembled to solve the above problems.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model aims to: in order to solve the problems that a board splicing type connecting structure is adopted in the process of actual use, the temporarily built board house connecting and fixing structure is complex in structure and low in practicability, the connecting stability between boards is low, the boards are not convenient to install and remove, the sealing performance of the device is poor, and rainwater easily enters the room through the connecting structure, the utility model provides the easily detachable temporary house building structure in the construction site.
(II) technical scheme
The utility model specifically adopts the following technical scheme for realizing the purpose:
the utility model provides a structure is built in interim room in quick detachable building site, includes the bottom plate and is connected with the first room board of two second room boards, two the top fixedly connected with roof of first room board, the bottom plate is close to the first riser of one side inner wall symmetry fixedly connected with of first room board, the bottom plate is close to one side inner wall symmetry fixedly connected with second riser of second room board, and is a plurality of the last fixed surface of first riser installs the locating plate, and is a plurality of the outer wall of locating plate is provided with the arc wall that is used for installing the connecting rod, the mounting groove has been seted up to one side upper surface of bottom plate, one side upper surface of bottom plate is provided with the hinge that is used for installing the tight piece of clamp.
Furthermore, two the roof is close to one side lower surface symmetry of second riser and has seted up the locating hole, and is a plurality of the second riser is close to one side upper surface of locating hole and has seted up the through-hole.
Furthermore, the positioning holes are movably connected with positioning columns in the inner parts and penetrate through the through holes, and baffles are fixedly arranged on the lower surfaces of the positioning columns.
Furthermore, a plurality of connecting plates are fixedly mounted on the lower surface of one side, close to the baffle, of the second vertical plate, and connecting columns are inserted into the lower surfaces of the connecting plates and connected with the baffle.
Furthermore, the outer surfaces of the connecting columns are movably connected with springs, and pull rings are fixedly mounted on the lower surfaces of the connecting columns.
Furthermore, two the outer wall fixed mounting in one side of first room board has the aqueduct, two the last fixed surface of second room board installs the backup pad.
Furthermore, the upper surface of one side of each of the two top plates is fixedly connected with a rectangular plate, and the outer wall of each of the two top plates is fixedly provided with a water baffle.
Furthermore, the outer wall of one side of each of the two top plates is fixedly connected with a sealing plate, and the two sealing plates are fixedly connected with a connecting rod.
(III) advantageous effects
The utility model has the following beneficial effects:
1. according to the utility model, through the arrangement of the mounting grooves, the first room plate and the second room plate can be firstly clamped with the bottom plate, the clamping block is rotated along the hinge, the bottom parts of the first room plate and the second room plate are tightly attached to the bottom plate, the positioning plate is connected with the connecting rod through the matching of the arc-shaped grooves, the connecting stability of the device to the first room plate and the second room plate can be effectively improved, and the convenience in disassembly and assembly is better enhanced.
2. According to the utility model, the top plate is supported by the second vertical plate, the connecting column is matched with the baffle plate and drives the positioning column to move upwards and be attached to the positioning hole by the acting force of the spring, so that the position of the top plate is fixed, the connecting column is driven to move downwards by the pull ring, the positioning column is separated from the positioning hole, the top plate is unlocked, and the convenience degree in assembling and disassembling the top plate can be effectively improved.
3. According to the utility model, rain and snow can flow downwards along the surface of the top plate through the inclined arrangement of the top plate, and finally can be collected into the water guide pipe to be discharged downwards through the matching of the water baffle and the sealing plate, so that the device is prevented from being corroded by rain and snow accumulation, and the sealing plate is arranged in an L-shaped sleeved manner, so that the rain water on the upper surface of the top plate can be effectively prevented from flowing into the house.
Drawings
FIG. 1 is a perspective view of the structure of the present invention;
FIG. 2 is a schematic bottom perspective view of the structure of the present invention;
FIG. 3 is a schematic perspective cross-sectional view of the structure of the present invention;
FIG. 4 is a schematic perspective cross-sectional view of the top plate construction of the present invention;
FIG. 5 is an enlarged view of the structure of region A of FIG. 1 according to the present invention;
FIG. 6 is an enlarged view of the structure of FIG. 3 in accordance with the present invention;
FIG. 7 is an enlarged view of the structure of region C in FIG. 4 according to the present invention.
Reference numerals: 1. a base plate; 2. a first room panel; 3. a second house panel; 4. a top plate; 5. a first vertical plate; 6. a second vertical plate; 7. positioning a plate; 8. an arc-shaped slot; 9. a connecting rod; 10. mounting grooves; 11. a hinge; 12. a clamping block; 13. positioning holes; 14. a through hole; 15. a positioning column; 16. a baffle plate; 17. a connecting plate; 18. connecting columns; 19. a spring; 20. a pull ring; 21. a water conduit; 22. a support plate; 23. a rectangular plate; 24. a water baffle; 25. and (7) sealing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Please refer to fig. 1-7, a structure is built in interim room in quick detachable building site, including bottom plate 1 and the first room board 2 that is connected with two second room boards 3, the top fixedly connected with roof 4 of two first room boards 2, bottom plate 1 is close to one side inner wall symmetry fixedly connected with first riser 5 of first room board 2, bottom plate 1 is close to one side inner wall symmetry fixedly connected with second riser 6 of second room board 3, the last fixed surface of a plurality of first risers 5 installs locating plate 7, the outer wall of a plurality of locating plates 7 is provided with the arc wall 8 that is used for erection joint pole 9, mounting groove 10 has been seted up to one side upper surface of bottom plate 1, one side upper surface of bottom plate 1 is provided with the hinge 11 that is used for installing tight piece 12 of clamp.
In this embodiment, set up first riser 5 and second riser 6 through the inner wall at bottom plate 1, first riser 5 and second riser 6 play respectively and fix the connection of first room board 2 and second room board 3, at this in-process, setting through mounting groove 10, can rate earlier carry out the joint with first room board 2 and second room board 3 and bottom plate 1, and will press from both sides tight piece 12 and rotate along hinge 11, the realization is closely laminated the bottom of first room board 2 and second room board 3 and bottom plate 1, be connected locating plate 7 with connecting rod 9 through the cooperation of arc wall 8, realize being connected at first room board 2 and second room board 3 top, can effectively hoisting device to the stable degree of connection of first room board 2 and second room board 3, better reinforcing the convenient degree when the dismouting.
Example 2
Referring to fig. 1 to 7, the present embodiment is further optimized based on embodiment 1, specifically, positioning holes 13 are symmetrically formed on the lower surfaces of the two top plates 4 near the second vertical plate 6, through holes 14 are formed on the upper surfaces of the second vertical plates 6 near the positioning holes 13, and the positioning holes 13 correspond to the through holes 14.
Specifically, the positioning columns 15 are movably connected inside the positioning holes 13 and penetrate through the through holes 14, the positioning columns 15 are used for connecting the top plate 4 and the second vertical plate 6, and the baffle plates 16 are fixedly mounted on the lower surfaces of the positioning columns 15.
Specifically, a plurality of second risers 6 are close to one side lower surface fixed mounting of baffle 16 has connecting plate 17, and the lower surface of a plurality of connecting plates 17 is pegged graft and is had spliced pole 18 and be connected with baffle 16, and a plurality of connecting plates 17 are the sliding connection setting with spliced pole 18.
Specifically, the outer surface swing joint of a plurality of spliced poles 18 has spring 19, and the lower surface fixed mounting of a plurality of spliced poles 18 has pull ring 20, and pull ring 20's setting helps promoting the convenience when removing spliced pole 18.
In this embodiment, through setting up locating hole 13 at the lower surface of roof 4, when installing roof 4, support through second riser 6, in this process, spliced pole 18 passes through the cooperation of baffle 16, and the effort through spring 19, realize driving reference column 15 and upwards moving, and laminate mutually with locating hole 13, realize the rigidity to roof 4, through the pull ring 20 that moves down, can drive spliced pole 18 and move down, make reference column 15 and locating hole 13 separate, realize the unblock to roof 4, can effectively promote the convenient degree when dismouting roof 4.
Example 3
Referring to fig. 1 to 7, the present embodiment is optimized based on the embodiment 1 or 2, specifically, water conduits 21 are fixedly installed on the outer wall of one side of two first room boards 2, the number of the water conduits 21 is four, the four water conduits 21 are distributed in four corners of the device in a rectangular array, which is helpful for improving the flow guiding effect on rainwater, and supporting plates 22 are fixedly installed on the upper surfaces of two second room boards 3.
Specifically, one side upper surface fixed connection of two roof plates 4 has rectangular plate 23, and rectangular plate 23 is used for the fixed connection to roof plate 4, and the outer wall fixed mounting of two roof plates 4 has breakwater 24, makes the rainwater flow to four angles of device.
Specifically, the sealing plate 25 is fixedly connected to the outer wall of one side of each of the two top plates 4, and the two sealing plates 25 are fixedly connected to the connecting rod 9, so that the installation stability of the connecting rod 9 is improved.
In this embodiment, set up aqueduct 21 through the surface at first room board 2, in the in-service use process, when the device is located when sleet weather, slope form through roof 4 sets up, can make sleet flow along the surface of roof 4 downwards, through the cooperation of breakwater 24 and closing plate 25, finally, the inside discharge downwards of aqueduct 21 of converging, avoid sleet to accumulate to cause the corruption to the device, closing plate 25 adopts the setting of L type bell and spigot joint formula, can effectively avoid the rainwater of roof 4 upper surfaces to flow into inside the house.
In summary, the following steps: in the practical use process, firstly, the device is placed in a specific building area through the matching of the bottom plate 1, the first room plate 2 and the second room plate 3 which are matched with each other are fixedly connected with the bottom plate 1, the first vertical plate 5 and the second vertical plate 6 are respectively used for connecting and fixing the first room plate 2 and the second room plate 3, the bottoms of the first room plate 2 and the second room plate 3 are tightly attached to the bottom plate 1, the positioning plate 7 is connected with the connecting rod 9 through the matching of the arc-shaped groove 8, the top of the first room plate 2 and the top of the second room plate 3 are connected, the stable degree of the connection of the device to the first room plate 2 and the second room plate 3 can be effectively improved, the convenience degree in disassembly and assembly is better enhanced, the connecting column 18 drives the positioning column 15 to move upwards through the acting force of the spring 19 and is attached to the positioning hole 13, the position fixing of the top plate 4 is realized, spliced pole 18 moves down, make reference column 15 and locating hole 13 separate, the realization is to the unblock of roof 4, can effectively promote the convenient degree when dismouting roof 4, sleet is through the downward flow of surface along roof 4, finally converge the inside discharge downwards of aqueduct 21, avoid sleet to save and lead to the fact the corruption to the device, closing plate 25 adopts the L type to cup joint the formula setting, can effectively avoid inside the rainwater inflow house of roof 4 upper surface, be suitable for popularization.
The above description is only a preferred embodiment of the present invention, and not intended to limit the present invention, and the scope of the present invention is defined by the appended claims, and all structural changes that can be made by using the contents of the description and the drawings of the present invention are intended to be covered by the scope of the present invention.

Claims (8)

1. The utility model provides a structure is built in interim room in quick detachable building site, includes bottom plate (1) and first room board (2) that are connected with two second room boards (3), its characterized in that: two top fixedly connected with roof (4) of first room board (2), one side inner wall symmetry fixedly connected with riser (5) that bottom plate (1) is close to first room board (2), one side inner wall symmetry fixedly connected with second riser (6) that bottom plate (1) is close to second room board (3) is a plurality of last fixed surface of riser (5) installs locating plate (7), and is a plurality of the outer wall of locating plate (7) is provided with arc wall (8) that are used for erection joint pole (9), mounting groove (10) have been seted up to one side upper surface of bottom plate (1), one side upper surface of bottom plate (1) is provided with hinge (11) that are used for the installation to press from both sides tight piece (12).
2. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: two locating holes (13) have been seted up to roof (4) one side lower surface symmetry near second riser (6), and a plurality of through-hole (14) have been seted up to second riser (6) one side upper surface near locating hole (13).
3. The temporary housing structure of easy-to-disassemble construction site according to claim 2, wherein: the positioning holes (13) are movably connected with positioning columns (15) in the inner parts and penetrate through the through holes (14), and baffles (16) are fixedly arranged on the lower surfaces of the positioning columns (15).
4. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: a plurality of connecting plates (17) are fixedly installed on the lower surface of one side, close to the baffle (16), of the second vertical plate (6), and connecting columns (18) are inserted into the lower surfaces of the connecting plates (17) and connected with the baffle (16).
5. The temporary housing structure of easy-to-disassemble construction site according to claim 4, wherein: the outer surfaces of the connecting columns (18) are movably connected with springs (19), and pull rings (20) are fixedly mounted on the lower surfaces of the connecting columns (18).
6. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: two one side outer wall fixed mounting of first room board (2) has aqueduct (21), two the last fixed surface of second room board (3) installs backup pad (22).
7. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: the upper surface of one side of each of the two top plates (4) is fixedly connected with a rectangular plate (23), and the outer wall of each of the two top plates (4) is fixedly provided with a water baffle (24).
8. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: and the outer wall of one side of each of the two top plates (4) is fixedly connected with a sealing plate (25), and the two sealing plates (25) are fixedly connected with a connecting rod (9).
CN202122138648.3U 2021-09-06 2021-09-06 Structure is built in interim room in quick detachable building site Active CN216238985U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122138648.3U CN216238985U (en) 2021-09-06 2021-09-06 Structure is built in interim room in quick detachable building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122138648.3U CN216238985U (en) 2021-09-06 2021-09-06 Structure is built in interim room in quick detachable building site

Publications (1)

Publication Number Publication Date
CN216238985U true CN216238985U (en) 2022-04-08

Family

ID=80983499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122138648.3U Active CN216238985U (en) 2021-09-06 2021-09-06 Structure is built in interim room in quick detachable building site

Country Status (1)

Country Link
CN (1) CN216238985U (en)

Similar Documents

Publication Publication Date Title
CN213417861U (en) Ecological environmental protection pin-connected panel municipal administration side slope reinforced structure
CN216238985U (en) Structure is built in interim room in quick detachable building site
CN210597622U (en) Novel can dismantle simple and easy house structure
CN214884767U (en) Building roof steel structure
CN212358889U (en) Building top roof waterproof construction
CN219638105U (en) Movable house with combined foundation member
CN210597898U (en) Novel roof waterproof structure
CN217630431U (en) Frame structure of prefabricated house
CN220889077U (en) Large-span clamp type glass curtain wall system
CN215520146U (en) Modular design's assembled building
CN213390530U (en) Assembled reinforced concrete post and reinforced concrete roof beam connection structure
CN219060548U (en) Assembled roof node structure
CN220666460U (en) Assembled ditch
CN214145053U (en) Protector is kept apart with fast-assembling to municipal construction
CN217079880U (en) Assembled steel bar processing shed
CN220150727U (en) Assembled building stair
CN210288003U (en) Recyclable rapid assembled safety channel
CN219386927U (en) Large cantilever steel frame canopy for arc-shaped building
CN220565798U (en) Large-span photovoltaic waterproof shed support
CN214834146U (en) Gutter and downpipe connector
CN214940328U (en) Pile foundation of steel trestle
CN216767399U (en) Reinforced structure of tunnel ring pipe piece
CN215670529U (en) Prefabricated post of assembled convenient to installation
CN216641433U (en) SC structure inner formwork supports controlling means
CN217924330U (en) Light steel roof structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221017

Address after: 710300 Group 2, Taoguanzhai Village, Wuzhu Street, Heyi District, Xi'an City, Shaanxi Province

Patentee after: Shaanxi Huichao Industry Co.,Ltd.

Address before: 221000 Yangshan Road 21, Xuzhou Economic Development Zone, Jiangsu Province

Patentee before: Qi Fei