CN220849553U - Steel pipe pole climbing subassembly - Google Patents
Steel pipe pole climbing subassembly Download PDFInfo
- Publication number
- CN220849553U CN220849553U CN202322031807.9U CN202322031807U CN220849553U CN 220849553 U CN220849553 U CN 220849553U CN 202322031807 U CN202322031807 U CN 202322031807U CN 220849553 U CN220849553 U CN 220849553U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- square ring
- mounting
- pedal
- pipe pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 24
- 239000010959 steel Substances 0.000 title claims abstract description 24
- 230000009194 climbing Effects 0.000 title claims abstract description 18
- 229910000838 Al alloy Inorganic materials 0.000 claims description 4
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 229910001339 C alloy Inorganic materials 0.000 claims description 2
- QMQXDJATSGGYDR-UHFFFAOYSA-N methylidyneiron Chemical compound [C].[Fe] QMQXDJATSGGYDR-UHFFFAOYSA-N 0.000 claims description 2
- 230000005484 gravity Effects 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 239000004020 conductor Substances 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a steel pipe pole climbing assembly which can effectively solve the problem of unstable gravity center caused by the reason of pedal spacing when people with different heights climb; the device comprises a tower body, wherein the tower body in the device is a steel pipe body; the front end of the tower body is fixedly provided with a mounting bar, and two sides of the mounting bar are provided with foot pedals; armrests are arranged at two ends of the foot pedal; wherein, the handrail includes the mounting panel, sets up the erection column in the mounting panel upper end, is provided with square ring on the erection column. The beneficial effects are that: the handrail in the device adopts a square ring shape; compared with the prior art, the hand-held area is more, the four corners of the square ring are provided with the round corners, and the round corners can provide various arm angles when the staff holds the hand-held area; the comfortable grabbing position of staff adjustment is convenient. The novel square ring is arranged at the lower end of the pedal, four fillets can be newly added for the selection of staff to increase; so that the utility model is suitable for people with arm exhibition of various heights.
Description
Technical Field
The utility model relates to a steel pipe pole climbing assembly, and belongs to the field of climbing equipment.
Background
The steel pipe tower has the advantages of small occupied area, high strength and the like, so the steel pipe tower is widely used by the erection of circuits in urban areas, the main components of the steel pipe tower are steel pipes, other components are lattice towers formed by steel pipes or section steel and the like, and the lattice towers are supporting structures for supporting wires and lightning conductors by overhead transmission lines, so that the wires meet the distance limiting requirements on the ground and ground objects, can bear the loads and external loads of the wires, the lightning conductors and the lightning conductors, and when the steel pipe tower is required to be maintained and overhauled, workers need to climb to operate.
The Chinese patent application No. CN202221376131.6, a steel pipe tower convenient to climb, describes climbing stairs composed of long plates and foot pedals, and can be climbed by staff; in the patent, one end of the pedal is provided with the handrail, the pedal position is separated from the hand grasping position, and soil sundries on the soles of staff are prevented from adhering to the handrail, so that the hand grasping is prevented from being influenced.
However, the handrail is a cylinder, so that the handrail is not easy to exert force when being held by hands to climb upwards, and is easy to slip; although the handrail is additionally provided with anti-skidding patterns, if the handrail encounters rain and snow weather, the handrail can climb by holding the vertical cylinder under the force, and the situation of skidding can be caused.
The hands and feet of the staff cannot be used together comfortably due to the reason that the height of the staff is unfolded and the reason that the pedals are arranged at intervals; for example, the total height of the steel pipe tower is 12m, one pedal is arranged at 0.5m, and the standing height of a worker with the height of 1.8m is between 2.2 and 2.4 m; the foot pedal below the foot is used as the first ladder, the number of the foot pedal is four upwards, the fifth ladder can be easily held, and the foot pedal can be used for climbing with a strong force; but the height of the staff with the height of 1.65m is 2.0-2.2 when standing and touching; the staff needs to take the pedal below the foot as the first ladder, the fifth ladder is barely enough, the fourth ladder is too low, the staff is inconvenient to exert force, and the gravity center of the staff during climbing can be influenced, so that potential safety hazards are formed.
Disclosure of utility model
The utility model aims to provide a steel pipe pole climbing assembly which can effectively solve the problem that the gravity center is unstable due to the interval of foot pedals when people with different heights climb.
In order to solve the technical problems, the utility model is realized by the following technical scheme:
The tower comprises a tower body, wherein a mounting bar is fixed at the front end of the tower body, and foot pedals are arranged on two sides of the mounting bar; armrests are arranged at two ends of the foot pedal; the handrail comprises a mounting plate, a mounting column arranged at the upper end of the mounting plate, and a square ring arranged on the mounting column.
Further: the mounting plate lower extreme also is provided with the erection column.
Further: the mounting post is rotatably arranged on the mounting plate.
Further: a rope is connected between two adjacent square rings.
Further: the anti-slip layer is arranged outside the square ring, and the anti-slip layer is sprayed on the square ring or is adhered with the rubber layer.
Further: the middle of the pedal plate is uniformly provided with penetrating strip-shaped grooves.
Further: the pedal plate is made of aluminum alloy or iron-carbon alloy.
The beneficial effects are as follows:
The handrail in the device adopts a square ring shape; compared with the prior art, the hand-held area is more, the four corners of the square ring are provided with the round corners, and the round corners can provide various arm angles when the staff holds the hand-held area; the comfortable grabbing position of staff adjustment is convenient.
The novel square ring is arranged at the lower end of the pedal, four fillets can be newly added for the selection of staff to increase; so that the utility model is suitable for people with arm exhibition of various heights.
Drawings
For ease of illustration, the utility model is described in detail by the following detailed description and the accompanying drawings.
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is an enlarged view of FIG. 1 at A;
Fig. 3 is a cross-sectional view of a square ring of the present utility model.
Reference numerals illustrate:
1. A tower body; 2. a mounting bar; 3. a foot pedal; 4. an armrest; 5. a mounting plate; 6. a mounting column; 7. a square ring; 8. a rope; 9. a bar-shaped groove; 10. an anti-slip layer.
Detailed Description
Reference will now be made in detail to embodiments of the present utility model, examples of which are illustrated in the accompanying drawings. The embodiments described below by referring to the drawings are illustrative and intended to explain the present utility model and should not be construed as limiting the utility model.
Referring to figures 1-3 of the drawings there is shown an embodiment of a steel pole climbing assembly in accordance with the present utility model,
The device comprises a tower body 1, wherein the tower body 1 in the device is a steel pipe body; the front end of the tower body 1 is fixed with a mounting bar 2, and the two sides of the mounting bar 2 are provided with foot pedals 3; armrests 4 are arranged at two ends of the foot rest 3; wherein, handrail 4 includes mounting panel 5, sets up the erection column 6 in mounting panel 5 upper end, is provided with square ring 7 on the erection column 6.
The installation strip 2 in the device has the functions of being fixed on the tower body 1 and installing the pedal 3, so that a worker can conveniently climb on the tower body 1 by stepping on the stable pedal 3;
The armrest 4 is convenient for staff to hold the armrest 4 by two hands during climbing to stabilize the gravity center of the staff;
Mounting plates 5 are arranged on two sides of the foot pedal 3, mounting columns 6 are arranged at the upper ends of the mounting plates 5, and the mounting plates 5 and the mounting columns 6 are convenient for mounting the armrests 4; the structure of the handrail 4 is improved in the device, and the handrail 4 in the device adopts the shape of a square ring 7; compared with the prior art, the area that can hold is more to square ring 7's four corners position all sets up to the fillet, and the fillet position can provide the selection of various arm angles when staff holds.
The lower end of the mounting plate 5 is also provided with a mounting post 6. The arrangement is equivalent to that the square rings 7 are arranged at the upper end and the lower end of the same pedal plate 3, and the aim of the arrangement is to increase the length of the square rings 7, so that people with various heights and arm exhibition can conveniently hold the square rings 7; instead of extending the square ring 7 on the pedal plate 3, the purpose of arranging the same square ring 7 on the pedal plate 3 is as follows: if the original length of the square ring 7 is extended, the round angle of one square ring 7 can only be four, the number of points convenient for force application is unchanged, and the length of the vertical rod of the square ring 7 is changed, so that the actual patent is not greatly different; and a new square ring 7 is arranged at the lower end of the pedal plate 3, and four fillets can be newly added for the selection of staff to increase.
The mounting post 6 is rotatably disposed on the mounting plate 5.
The mounting column 6 in the device can rotate, which means that the square ring 7 can also rotate, and the square ring 7 is equivalent to a cuboid from a plane when rotating, and becomes a solid cylinder; the implementation is to expand the choice space of the staff.
A rope 8 is connected between two adjacent square rings 7.
The purpose of the rope 8 is to link the space between two adjacent square rings 7, whereby the square rings 7 of the rope 8 are connected end to form a continuous hand device suitable for all staff with height and arm extension points.
An anti-slip layer 10 is arranged outside the square ring 7, and the anti-slip layer 10 is sprayed on the square ring 7. In order to prevent slipping, the paint spraying mode is convenient.
The middle of the foot pedal 3 is uniformly provided with a penetrating strip-shaped groove 9. The arrangement of the strip-shaped groove 9 is equivalent to the arrangement of anti-skid patterns on the pedal plate 3, and the pedal plate 3 is hollowed out, so that dust and impurities are prevented from being accumulated on the pedal plate 3, and the normal use of staff is affected.
The pedal 3 is made of aluminum alloy; aluminum alloys are not prone to rust.
The above embodiments are merely illustrative embodiments of the present utility model, but the technical features of the present utility model are not limited thereto, and any changes or modifications made by those skilled in the art within the scope of the present utility model are included in the scope of the present utility model.
Claims (7)
1. The utility model provides a steel pipe pole climbing subassembly, includes tower body (1), its characterized in that: the front end of the tower body (1) is fixedly provided with a mounting strip (2), and pedals (3) are arranged on two sides of the mounting strip (2); armrests (4) are arranged at two ends of the foot pedal (3); the handrail (4) comprises a mounting plate (5), a mounting column (6) arranged at the upper end of the mounting plate (5), and a square ring (7) arranged on the mounting column (6).
2. The steel pipe pole climbing assembly according to claim 1, wherein: the lower end of the mounting plate (5) is also provided with a mounting column (6).
3. The steel pipe pole climbing assembly according to claim 2, wherein: the mounting column (6) is rotatably arranged on the mounting plate (5).
4. A steel pipe pole climbing assembly according to claim 3, wherein: a rope (8) is connected between two adjacent square rings (7).
5. The steel pipe pole climbing assembly according to claim 4, wherein: an anti-slip layer (10) is arranged outside the square ring (7), and the anti-slip layer (10) is sprayed on the square ring (7) or a rubber layer is adhered on the square ring (7).
6. The steel pipe pole climbing assembly according to claim 1, wherein: the middle of the foot pedal (3) is uniformly provided with penetrating strip-shaped grooves (9).
7. The steel pipe pole climbing assembly according to claim 1, wherein: the pedal plate (3) is made of aluminum alloy or iron-carbon alloy.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322031807.9U CN220849553U (en) | 2023-07-31 | 2023-07-31 | Steel pipe pole climbing subassembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322031807.9U CN220849553U (en) | 2023-07-31 | 2023-07-31 | Steel pipe pole climbing subassembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220849553U true CN220849553U (en) | 2024-04-26 |
Family
ID=90782673
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322031807.9U Active CN220849553U (en) | 2023-07-31 | 2023-07-31 | Steel pipe pole climbing subassembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220849553U (en) |
-
2023
- 2023-07-31 CN CN202322031807.9U patent/CN220849553U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205532221U (en) | Electric power transformer overhauls with insulating ladder | |
CN220849553U (en) | Steel pipe pole climbing subassembly | |
CN207003981U (en) | A kind of movable altitude operation protective frame with safety supports | |
CN209339555U (en) | A kind of construction scaffold | |
CN208486815U (en) | A kind of extra-high voltage Poling Construction climbing device | |
CN214034710U (en) | Spring layer support | |
CN211629711U (en) | Fishing rod type aerial work maintenance platform | |
CN105089487B (en) | Special portable power transmission line routing inspection rope ladder capable of being operated by single person | |
CN114408817A (en) | Protective device for circuit maintenance | |
CN220978623U (en) | Steel construction stair | |
CN207377209U (en) | A kind of indirect cool tower lifts broadening platform stent | |
CN206903179U (en) | A kind of adhesion type climbing frame of laemodipodiform skyscraper | |
CN210508625U (en) | Novel cement electric pole | |
CN214255443U (en) | Overhead transmission line engineering stringing construction tackle for power transmission line | |
CN211974555U (en) | Steel pipe pole with climbing device | |
CN218991476U (en) | Vertical ladder with rest plate | |
CN214886772U (en) | Novel safe type high-rise building climbs frame for building | |
CN220395336U (en) | Cement pole with prevent structure that collapses obliquely | |
CN215717108U (en) | Anti-falling safety platform for high-altitude building construction | |
CN217631607U (en) | High-voltage wire pole convenient to overhaul | |
CN221073402U (en) | Building construction scaffold with safety protection function | |
CN202625606U (en) | Basket device for installation and construction of ship lift guide rail | |
CN213869090U (en) | Electric power construction safety climbing device | |
CN220667144U (en) | Guardrail hot galvanizing communication power tube tower | |
CN214935137U (en) | Guide rail based on intelligence is carried thing and is climbed stair robot and use |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |