CN208486815U - A kind of extra-high voltage Poling Construction climbing device - Google Patents
A kind of extra-high voltage Poling Construction climbing device Download PDFInfo
- Publication number
- CN208486815U CN208486815U CN201821166312.XU CN201821166312U CN208486815U CN 208486815 U CN208486815 U CN 208486815U CN 201821166312 U CN201821166312 U CN 201821166312U CN 208486815 U CN208486815 U CN 208486815U
- Authority
- CN
- China
- Prior art keywords
- pillar
- segment
- climbing device
- extra
- high voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 31
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 235000005121 Sorbus torminalis Nutrition 0.000 claims description 5
- 244000152100 Sorbus torminalis Species 0.000 claims description 5
- 230000007812 deficiency Effects 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract description 2
- 230000005540 biological transmission Effects 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000003447 ipsilateral effect Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 241000252254 Catostomidae Species 0.000 description 1
- 239000002519 antifouling agent Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002146 bilateral effect Effects 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000009671 shengli Substances 0.000 description 1
- 239000010117 shenhua Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model provides a kind of extra-high voltage Poling Construction climbing device, belongs to Poling Construction appliance technology, including several pillars, the fixed mechanism being arranged on pillar and the supporting mechanism that pillar lower part is arranged in;The pillar includes the first segment pillar with integral structure, second segment pillar and third section pillar;The first segment pillar is hollow structure, and the second segment pillar is equipped with pedal, and the outer diameter of the third section pillar is less than or equal to the internal diameter of the first segment pillar;Several support rods that the supporting mechanism includes the support column connecting with the pillar lower part, is connect with the support column.The utility model connects several pillars, it can be according to actual needs, connect different height, solve that previous climbing device is inconvenient to carry and height is fixed, problem inconvenient for use, pillar upper end and shaft tower support, and lower end is fixed by fixed mechanism and ground, sound construction overcomes previous climbing device lower part and is easy the deficiency loosened.
Description
Technical field
The utility model relates to Poling Construction appliance technologies, and in particular to a kind of extra-high voltage Poling Construction climbing dress
It sets.
Background technique
Inner Mongol Shengli Power Plant extra-high voltage transmission project line project, Inner Mongol north power plant extra-high voltage transmission project route
Engineering, Inner Mongol power plant of Shenhua extra-high voltage transmission project conveyance system stringing be by overhead line connection gold utensil and insulator chain
It is erected at the installation procedure organized on vertical shaft tower.Poling Construction is the completion stage of transmission line construction engineering, be make somebody a mere figurehead it is defeated
Master operation in electric line construction, its task is to be set up in by the stringing stress (arc sag) of design by conducting wire and lightning conducter
On the vertical shaft tower of group.Zha Lute-Qingzhou in Shandong province ± 800 kilovolt UHVDC Transmission Lines engineering (section of Inner Mongolia) construction in the Inner Mongol
In, line level crossing construction, unwrapping wire, suspension adjust coaster etc., generally require in construction personnel's climbing to shaft tower.First rank of shaft tower
The height distance ground of ladder is higher, causes big inconvenience to the climbing of construction personnel, needs by climbing tool.It is existing to climb
Tool is climbed, often volume is larger, and height is fixed, inconvenient to carry.
The patent of Publication No. CN205412108U discloses a kind of stringing tower auxiliary climbing device, solves the prior art
In auxiliary climb device and carry inconvenient deficiency.The stringing tower auxiliary that the utility model provides climbs device, on pedestal
It is equipped with wheel by connecting rod, and wheel can collapse, after wheel expansion, wheel supports pedestal from the ground, can be convenient at this time
Device is climbed using wheel is mobile in ground, and after wheel collapses, pedestal and ground face contact, climbing device can normal use;Snap lock
Tight block plays the role of locking connecting rod, avoids climbing device when moving, and connecting rod malfunction causes pedestal and ground face contact, optimization
Climb the service performance of device.But the height of the climbing device is fixed, and is not adjustable, it is inconvenient to carry.
Summary of the invention
In view of this, the present invention provides a kind of extra-high voltage Poling Construction climbing devices, several pillars are connected
It picks up and, different height can be connected according to actual needs, solve that previous climbing device is inconvenient to carry and height is fixed, make
With inconvenient problem.Pillar is connected when use, and is fixed with fixed mechanism, upper end and shaft tower support, and lower end passes through suction
Disk is fixed with ground, sound construction, is overcome previous climbing device lower part and is easy the deficiency loosened.
In order to solve the above technical problems, technical solution adopted in the utility model is:
A kind of extra-high voltage Poling Construction climbing device, including several pillars, the fixation machine being arranged on the pillar
Structure and the supporting mechanism that the pillar lower part is set;The pillar includes the first segment pillar with integral structure, second
Duan Zhizhu and third section pillar;The first segment pillar is hollow structure, and the second segment pillar is equipped with pedal, the third
The outer diameter of Duan Zhizhu is less than or equal to the internal diameter of the first segment pillar;The supporting mechanism includes connecting with the pillar lower part
Support column, several support rods for being connect with the support column.
Further, several link blocks are set on the support column, and sucker, the branch is arranged in one end of the support rod
The other end of strut is detachably connected with the link block.
Further, the fixed mechanism includes that several are arranged on the second segment lower rod end and first segment pillar
The lock at end.
Further, the pedal is symmetrical set to be arranged on the two sides of the second segment pillar, the pedal and prevent
Sliding line.
Further, groove is arranged in the top of second pillar.
The beneficial effects of the utility model are:
The utility model includes several pillars, the fixed mechanism being arranged on pillar and the support that pillar lower part is arranged in
Mechanism.Wherein, pillar includes the first segment pillar with integral structure, second segment pillar and third section pillar;First segment branch
Column is hollow structure, and second segment pillar is equipped with pedal, and the outer diameter of third section pillar is less than or equal to the internal diameter of first segment pillar.
In use, each pillar is connected, third section branch column sleeve is in the inside of the first segment pillar of another pillar, first segment branch
The internal diameter of column is slightly less than the outer diameter of third section pillar, and the equal length of three sections of pillars of length and ground of first segment pillar can make
The two connects.
In addition, supporting mechanism includes the support column connecting with pillar lower part, several support rods connecting with support column.Branch
Several link blocks are set on dagger, and sucker is arranged in one end of support rod, and the other end is detachably connected with link block.Supporting mechanism
It is used to support the pillar connected, support column contacts ground, and fixes on the ground by the sucker on support rod.Support rod
The other end is detachably connected with link block, it is ensured that pillar multi-angle oblique.Fixed mechanism includes that several are arranged second
The lock of section lower rod end and first segment pillar upper end, it is more stable for will be fixedly connected between upper and lower two pillars.It uses
When, the upper end of pillar is leaned against on shaft tower, the tilt angle of pillar and the position of bottom are regulated by support rod, it is solid with sucker
It is fixed, select suitable link block to connect with support rod.
In addition, pedal, which is symmetrical set on the two sides of second segment pillar, pedal, is arranged anti-skid chequer, when climbing, operation
The bipod of personnel is stepped on respectively on the pedal of the second pillar two sides, and balance is more preferable.Groove is arranged in the top of second pillar, will prop up
The top of column is stuck on shaft tower, and structure is more stable.
The utility model connects several pillars, can connect different height according to actual needs, solve with
It is fixed toward climbing device is inconvenient to carry with height, problem inconvenient for use.It mostly used ladder to climb in the past, and needed two support rods
With multiple cross bars, height is fixed, and volume is larger.Two support rods are reduced to a pillar by the utility model, and pillar can
Disassembly, not only adjustable height, flexible and convenient to use, and reduces volume, easy to carry.Pillar is connected when use
Come, and fixed with fixed mechanism, upper end and shaft tower support, and lower end is fixed by sucker and ground, sound construction, overcome previous
Climbing device lower part is easy the deficiency loosened.Using finishing, each pillar is dismantled, it is easy to carry.The utility model structure is steady
It is fixed, it climbs and easy to carry, brings great convenience for Poling Construction.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing.
Fig. 1 is the cross-sectional view of the pillar of the utility model embodiment 1.
Fig. 2 is the structural schematic diagram of the extra-high voltage Poling Construction climbing device of the utility model embodiment 1.
Fig. 3 is the top view of the support column of the utility model embodiment 1.
Fig. 4 is the structural schematic diagram of the extra-high voltage Poling Construction climbing device of the utility model embodiment 2.
Fig. 5 is the structural schematic diagram of the pillar of the utility model embodiment 2.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer
The attached drawing 1-5 of type embodiment, is clearly and completely described the technical solution of the utility model embodiment.Obviously, described
Embodiment be the utility model a part of the embodiment, instead of all the embodiments.Based on described the utility model
Embodiment, those of ordinary skill in the art's every other embodiment obtained fall within the protection scope of the utility model.
Embodiment 1
Refering to fig. 1-3, this embodiment offers a kind of extra-high voltage Poling Construction climbing device, including several pillars,
The fixed mechanism being arranged on the pillar and the supporting mechanism that the pillar lower part is set;The pillar includes having one
First segment pillar 1, second segment pillar 2 and the third section pillar 3 of formula structure;The first segment pillar 1 is hollow structure, described the
Two sections of pillars 2 are equipped with pedal 4, and the outer diameter of the third section pillar 3 is less than or equal to the internal diameter of the first segment pillar 1;Institute
Stating supporting mechanism includes the support column 6 connecting with the pillar lower part, several support rods 7 connecting with the support column.
Several link blocks 9 are set on the support column 6, and sucker 8, the support rod 7 is arranged in one end of the support rod 7
The other end be detachably connected with the link block 9.
The fixed mechanism includes the lock that 2 lower end of second segment pillar and 1 upper end of first segment pillar is arranged in several
Button 5.
Wherein, first segment pillar 1 is identical with the height of third section pillar 3, higher than the height of the second pillar 2, connects in this way
Get up more stable.The outer diameter of third section pillar 3 is slightly less than the internal diameter of first segment pillar 1.In the present embodiment, first segment pillar 1
Height with third section pillar 3 is 35 centimeters, and the height of second segment pillar 2 is 30 centimeters, and the diameter of second segment pillar 2 is 30 public
Point, the diameter of third section pillar 3 is 23.5-24 centimeters, and the outer diameter of first segment pillar 1 is 30 centimeters, and internal diameter is 24 centimeters, wall thickness
3 centimeters.The material of pillar is wooden.5 points of lock are fixed part and movable part, and fixed part is arranged in first end pillar 1
Upper end, the lower end of second segment pillar 2 is arranged in movable part, and upper and lower position corresponding matching latches 5 model XA-5, peace
Dress is convenient, it is of course also possible to be fixed with bolt.Pedal 4 is fixed on second segment pillar 2 with steel nail, and the upper surface of pedal 4 is flat
Face facilitates climbing.It can be set multiple pedals 4 on second segment pillar 2, in the present embodiment, pedal 4 is arranged in second segment pillar 2
Two sides, bilateral symmetry, be conducive to keep balance, number be two, the left and right sides of second segment pillar 2 is set.Certainly
It can be set to 4, left and right two, upper and lower two.
Cylinder shape groove is arranged in the center of support column 6, matches with the size of third section pillar 3, and depth is 10 centimeters, the
It after three sections of pillars 3 are put into the cylinder shape groove inside of support column 6, is fixed with bolt, the outer diameter of support column 6 is 40 centimeters, support
Column 6 is also wooden.Link block 9 is bolted to connection on support column 6, and the number of link block 9 can be multiple, this implementation
In example, 12 are set as, each 3 of four faces of support column 6.Support rod 7 can be designed as it is multiple, in the present embodiment be two,
One end is bolted with link block 9, other end fixing sucking disk 8, and sucker 8 is three-jaw sucker, and load-bearing is big, can also design certainly
For other suckers.Link block 9 and support rod 7 are metal material, are steel in the present embodiment, and link block 9 is L-type, are equipped with through-hole,
It is bolted on support column 6 on one side, another side is connect also by bolt with support rod 7, and support rod 7 is again provided with logical
Hole.Through-hole is arranged in the end of support rod 7, and pin shaft is arranged in through-hole, and sucker 8 is welded on pin shaft, and block is arranged in pin shaft both ends.
Embodiment 2
Refering to Figure 4 and 5, it to be the base in embodiment 1 that this embodiment offers a kind of extra-high voltage Poling Construction climbing devices
The improvement carried out on plinth: in the present embodiment, the ipsilateral of the second segment pillar 2 is arranged in the pedal 4, sets on the pedal 4
Set anti-skid chequer.Groove 10 is arranged in the top of second pillar 2.
Wherein, pedal 4 is setting up and down in the ipsilateral of second segment pillar 2, easy to carry, may be configured as multiple, the present embodiment
In be two, be separately positioned on the upper and lower ends of second segment pillar 2.Anti-skid chequer is set on pedal 4, increases coefficient of friction, more
Safety, anti-skid chequer can be band, vertical line or ripple glaze.Groove 10 is arranged in the top of second pillar 2, and the top of pillar is stuck in
On shaft tower, structure is more stable.Climbing device sprays protective paint, increases service life.
The above is preferred embodiments of the present invention, it is noted that for the ordinary skill of the art
For personnel, under the premise of not departing from principle described in the utility model, it can also make several improvements and retouch, these improvement
It also should be regarded as the protection scope of the utility model with retouching.
Claims (5)
1. a kind of extra-high voltage Poling Construction climbing device, it is characterised in that: including several pillars, be arranged on the pillar
Fixed mechanism and the supporting mechanism of the pillar lower part is set;The pillar includes the first segment branch with integral structure
Column, second segment pillar and third section pillar;The first segment pillar is hollow structure, and the second segment pillar is equipped with pedal,
The outer diameter of the third section pillar is less than or equal to the internal diameter of the first segment pillar;The supporting mechanism includes and the pillar
The support column of lower part connection, several support rods being connect with the support column.
2. a kind of extra-high voltage Poling Construction climbing device as described in claim 1, it is characterised in that: set on the support column
Several link blocks are set, sucker is arranged in one end of the support rod, and the other end of the support rod and the link block are detachable
Connection.
3. a kind of extra-high voltage Poling Construction climbing device as described in claim 1, it is characterised in that: the fixed mechanism packet
Include several locks that second segment lower rod end and first segment pillar upper end are set.
4. a kind of extra-high voltage Poling Construction climbing device as described in claim 1, it is characterised in that: described pedal or so pair
Claim the two sides that the second segment pillar is arranged in, anti-skid chequer to be arranged on the pedal.
5. a kind of extra-high voltage Poling Construction climbing device as described in claim 1, it is characterised in that: the second segment pillar
Top be arranged groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821166312.XU CN208486815U (en) | 2018-07-23 | 2018-07-23 | A kind of extra-high voltage Poling Construction climbing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821166312.XU CN208486815U (en) | 2018-07-23 | 2018-07-23 | A kind of extra-high voltage Poling Construction climbing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208486815U true CN208486815U (en) | 2019-02-12 |
Family
ID=65246533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821166312.XU Active CN208486815U (en) | 2018-07-23 | 2018-07-23 | A kind of extra-high voltage Poling Construction climbing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208486815U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110344745A (en) * | 2019-07-14 | 2019-10-18 | 苏州科斯曼照明工程有限公司 | A kind of multi-functional construction ladder in construction site |
-
2018
- 2018-07-23 CN CN201821166312.XU patent/CN208486815U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110344745A (en) * | 2019-07-14 | 2019-10-18 | 苏州科斯曼照明工程有限公司 | A kind of multi-functional construction ladder in construction site |
CN110344745B (en) * | 2019-07-14 | 2020-10-09 | 东阳市俊华电器销售有限公司 | Building site is with multi-functional construction ladder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105805112B (en) | A kind of universal joint assembly for the connection of rod piece space structure | |
CN208486815U (en) | A kind of extra-high voltage Poling Construction climbing device | |
CN207003981U (en) | A kind of movable altitude operation protective frame with safety supports | |
CN213477619U (en) | Climb outer facade fire prevention retractable safety net of frame | |
CN209761310U (en) | Portable cat ladder for overhaul of equipment | |
CN209429487U (en) | A kind of scaffold of architectural engineering | |
CN108756721B (en) | A kind of cement shaft tower Anti-drop ladder structure | |
CN207092504U (en) | A kind of scaffold for building | |
CN210976813U (en) | Energy-saving concrete pole | |
CN208122743U (en) | A kind of distribution line steel pipe pole climbing is removable to connect ladder | |
CN210685334U (en) | Assembly type building external hanging platform | |
CN211851626U (en) | Gardens are with novel multi-functional gardens ladder | |
CN112723094A (en) | Integrated wall-attached device based on synchronous climbing of light steel platform | |
CN206903246U (en) | A kind of structure with oblique member for building | |
CN211226087U (en) | Wall for miniature tower crane | |
CN205583535U (en) | Special tethers instrument of transmission line | |
CN210563765U (en) | Detachable iron railing | |
CN215631926U (en) | Supporting platform for mounting steel structure industrial factory building | |
CN110748140A (en) | Track beam hanging basket special for stepped curtain wall | |
CN213683907U (en) | Combined hoisting insulating holding pole ladder | |
CN216393564U (en) | Special orchard stool | |
CN216038519U (en) | Hydraulic engineering construction auxiliary device that ascends a height | |
CN212406019U (en) | Adjustable regularization safety operation platform construction equipment | |
CN212689526U (en) | Building external climbing type building construction operation platform | |
CN218206557U (en) | Climbing device with working platform for electrical maintenance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |