CN208486815U - A kind of extra-high voltage Poling Construction climbing device - Google Patents

A kind of extra-high voltage Poling Construction climbing device Download PDF

Info

Publication number
CN208486815U
CN208486815U CN201821166312.XU CN201821166312U CN208486815U CN 208486815 U CN208486815 U CN 208486815U CN 201821166312 U CN201821166312 U CN 201821166312U CN 208486815 U CN208486815 U CN 208486815U
Authority
CN
China
Prior art keywords
pillar
segment
climbing device
extra
high voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821166312.XU
Other languages
Chinese (zh)
Inventor
张国力
吴子镝
陈旭
林雨
王晓程
石强
罗宇亮
田秋松
林洋
蓝天驰
李平
康喜明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Inner Mongolia Eastern Power Co Ltd Construction Branch
State Grid Corp of China SGCC
Original Assignee
State Grid Inner Mongolia Eastern Power Co Ltd Construction Branch
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Inner Mongolia Eastern Power Co Ltd Construction Branch, State Grid Corp of China SGCC filed Critical State Grid Inner Mongolia Eastern Power Co Ltd Construction Branch
Priority to CN201821166312.XU priority Critical patent/CN208486815U/en
Application granted granted Critical
Publication of CN208486815U publication Critical patent/CN208486815U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model provides a kind of extra-high voltage Poling Construction climbing device, belongs to Poling Construction appliance technology, including several pillars, the fixed mechanism being arranged on pillar and the supporting mechanism that pillar lower part is arranged in;The pillar includes the first segment pillar with integral structure, second segment pillar and third section pillar;The first segment pillar is hollow structure, and the second segment pillar is equipped with pedal, and the outer diameter of the third section pillar is less than or equal to the internal diameter of the first segment pillar;Several support rods that the supporting mechanism includes the support column connecting with the pillar lower part, is connect with the support column.The utility model connects several pillars, it can be according to actual needs, connect different height, solve that previous climbing device is inconvenient to carry and height is fixed, problem inconvenient for use, pillar upper end and shaft tower support, and lower end is fixed by fixed mechanism and ground, sound construction overcomes previous climbing device lower part and is easy the deficiency loosened.

Description

A kind of extra-high voltage Poling Construction climbing device
Technical field
The utility model relates to Poling Construction appliance technologies, and in particular to a kind of extra-high voltage Poling Construction climbing dress It sets.
Background technique
Inner Mongol Shengli Power Plant extra-high voltage transmission project line project, Inner Mongol north power plant extra-high voltage transmission project route Engineering, Inner Mongol power plant of Shenhua extra-high voltage transmission project conveyance system stringing be by overhead line connection gold utensil and insulator chain It is erected at the installation procedure organized on vertical shaft tower.Poling Construction is the completion stage of transmission line construction engineering, be make somebody a mere figurehead it is defeated Master operation in electric line construction, its task is to be set up in by the stringing stress (arc sag) of design by conducting wire and lightning conducter On the vertical shaft tower of group.Zha Lute-Qingzhou in Shandong province ± 800 kilovolt UHVDC Transmission Lines engineering (section of Inner Mongolia) construction in the Inner Mongol In, line level crossing construction, unwrapping wire, suspension adjust coaster etc., generally require in construction personnel's climbing to shaft tower.First rank of shaft tower The height distance ground of ladder is higher, causes big inconvenience to the climbing of construction personnel, needs by climbing tool.It is existing to climb Tool is climbed, often volume is larger, and height is fixed, inconvenient to carry.
The patent of Publication No. CN205412108U discloses a kind of stringing tower auxiliary climbing device, solves the prior art In auxiliary climb device and carry inconvenient deficiency.The stringing tower auxiliary that the utility model provides climbs device, on pedestal It is equipped with wheel by connecting rod, and wheel can collapse, after wheel expansion, wheel supports pedestal from the ground, can be convenient at this time Device is climbed using wheel is mobile in ground, and after wheel collapses, pedestal and ground face contact, climbing device can normal use;Snap lock Tight block plays the role of locking connecting rod, avoids climbing device when moving, and connecting rod malfunction causes pedestal and ground face contact, optimization Climb the service performance of device.But the height of the climbing device is fixed, and is not adjustable, it is inconvenient to carry.
Summary of the invention
In view of this, the present invention provides a kind of extra-high voltage Poling Construction climbing devices, several pillars are connected It picks up and, different height can be connected according to actual needs, solve that previous climbing device is inconvenient to carry and height is fixed, make With inconvenient problem.Pillar is connected when use, and is fixed with fixed mechanism, upper end and shaft tower support, and lower end passes through suction Disk is fixed with ground, sound construction, is overcome previous climbing device lower part and is easy the deficiency loosened.
In order to solve the above technical problems, technical solution adopted in the utility model is:
A kind of extra-high voltage Poling Construction climbing device, including several pillars, the fixation machine being arranged on the pillar Structure and the supporting mechanism that the pillar lower part is set;The pillar includes the first segment pillar with integral structure, second Duan Zhizhu and third section pillar;The first segment pillar is hollow structure, and the second segment pillar is equipped with pedal, the third The outer diameter of Duan Zhizhu is less than or equal to the internal diameter of the first segment pillar;The supporting mechanism includes connecting with the pillar lower part Support column, several support rods for being connect with the support column.
Further, several link blocks are set on the support column, and sucker, the branch is arranged in one end of the support rod The other end of strut is detachably connected with the link block.
Further, the fixed mechanism includes that several are arranged on the second segment lower rod end and first segment pillar The lock at end.
Further, the pedal is symmetrical set to be arranged on the two sides of the second segment pillar, the pedal and prevent Sliding line.
Further, groove is arranged in the top of second pillar.
The beneficial effects of the utility model are:
The utility model includes several pillars, the fixed mechanism being arranged on pillar and the support that pillar lower part is arranged in Mechanism.Wherein, pillar includes the first segment pillar with integral structure, second segment pillar and third section pillar;First segment branch Column is hollow structure, and second segment pillar is equipped with pedal, and the outer diameter of third section pillar is less than or equal to the internal diameter of first segment pillar. In use, each pillar is connected, third section branch column sleeve is in the inside of the first segment pillar of another pillar, first segment branch The internal diameter of column is slightly less than the outer diameter of third section pillar, and the equal length of three sections of pillars of length and ground of first segment pillar can make The two connects.
In addition, supporting mechanism includes the support column connecting with pillar lower part, several support rods connecting with support column.Branch Several link blocks are set on dagger, and sucker is arranged in one end of support rod, and the other end is detachably connected with link block.Supporting mechanism It is used to support the pillar connected, support column contacts ground, and fixes on the ground by the sucker on support rod.Support rod The other end is detachably connected with link block, it is ensured that pillar multi-angle oblique.Fixed mechanism includes that several are arranged second The lock of section lower rod end and first segment pillar upper end, it is more stable for will be fixedly connected between upper and lower two pillars.It uses When, the upper end of pillar is leaned against on shaft tower, the tilt angle of pillar and the position of bottom are regulated by support rod, it is solid with sucker It is fixed, select suitable link block to connect with support rod.
In addition, pedal, which is symmetrical set on the two sides of second segment pillar, pedal, is arranged anti-skid chequer, when climbing, operation The bipod of personnel is stepped on respectively on the pedal of the second pillar two sides, and balance is more preferable.Groove is arranged in the top of second pillar, will prop up The top of column is stuck on shaft tower, and structure is more stable.
The utility model connects several pillars, can connect different height according to actual needs, solve with It is fixed toward climbing device is inconvenient to carry with height, problem inconvenient for use.It mostly used ladder to climb in the past, and needed two support rods With multiple cross bars, height is fixed, and volume is larger.Two support rods are reduced to a pillar by the utility model, and pillar can Disassembly, not only adjustable height, flexible and convenient to use, and reduces volume, easy to carry.Pillar is connected when use Come, and fixed with fixed mechanism, upper end and shaft tower support, and lower end is fixed by sucker and ground, sound construction, overcome previous Climbing device lower part is easy the deficiency loosened.Using finishing, each pillar is dismantled, it is easy to carry.The utility model structure is steady It is fixed, it climbs and easy to carry, brings great convenience for Poling Construction.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing.
Fig. 1 is the cross-sectional view of the pillar of the utility model embodiment 1.
Fig. 2 is the structural schematic diagram of the extra-high voltage Poling Construction climbing device of the utility model embodiment 1.
Fig. 3 is the top view of the support column of the utility model embodiment 1.
Fig. 4 is the structural schematic diagram of the extra-high voltage Poling Construction climbing device of the utility model embodiment 2.
Fig. 5 is the structural schematic diagram of the pillar of the utility model embodiment 2.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer The attached drawing 1-5 of type embodiment, is clearly and completely described the technical solution of the utility model embodiment.Obviously, described Embodiment be the utility model a part of the embodiment, instead of all the embodiments.Based on described the utility model Embodiment, those of ordinary skill in the art's every other embodiment obtained fall within the protection scope of the utility model.
Embodiment 1
Refering to fig. 1-3, this embodiment offers a kind of extra-high voltage Poling Construction climbing device, including several pillars, The fixed mechanism being arranged on the pillar and the supporting mechanism that the pillar lower part is set;The pillar includes having one First segment pillar 1, second segment pillar 2 and the third section pillar 3 of formula structure;The first segment pillar 1 is hollow structure, described the Two sections of pillars 2 are equipped with pedal 4, and the outer diameter of the third section pillar 3 is less than or equal to the internal diameter of the first segment pillar 1;Institute Stating supporting mechanism includes the support column 6 connecting with the pillar lower part, several support rods 7 connecting with the support column.
Several link blocks 9 are set on the support column 6, and sucker 8, the support rod 7 is arranged in one end of the support rod 7 The other end be detachably connected with the link block 9.
The fixed mechanism includes the lock that 2 lower end of second segment pillar and 1 upper end of first segment pillar is arranged in several Button 5.
Wherein, first segment pillar 1 is identical with the height of third section pillar 3, higher than the height of the second pillar 2, connects in this way Get up more stable.The outer diameter of third section pillar 3 is slightly less than the internal diameter of first segment pillar 1.In the present embodiment, first segment pillar 1 Height with third section pillar 3 is 35 centimeters, and the height of second segment pillar 2 is 30 centimeters, and the diameter of second segment pillar 2 is 30 public Point, the diameter of third section pillar 3 is 23.5-24 centimeters, and the outer diameter of first segment pillar 1 is 30 centimeters, and internal diameter is 24 centimeters, wall thickness 3 centimeters.The material of pillar is wooden.5 points of lock are fixed part and movable part, and fixed part is arranged in first end pillar 1 Upper end, the lower end of second segment pillar 2 is arranged in movable part, and upper and lower position corresponding matching latches 5 model XA-5, peace Dress is convenient, it is of course also possible to be fixed with bolt.Pedal 4 is fixed on second segment pillar 2 with steel nail, and the upper surface of pedal 4 is flat Face facilitates climbing.It can be set multiple pedals 4 on second segment pillar 2, in the present embodiment, pedal 4 is arranged in second segment pillar 2 Two sides, bilateral symmetry, be conducive to keep balance, number be two, the left and right sides of second segment pillar 2 is set.Certainly It can be set to 4, left and right two, upper and lower two.
Cylinder shape groove is arranged in the center of support column 6, matches with the size of third section pillar 3, and depth is 10 centimeters, the It after three sections of pillars 3 are put into the cylinder shape groove inside of support column 6, is fixed with bolt, the outer diameter of support column 6 is 40 centimeters, support Column 6 is also wooden.Link block 9 is bolted to connection on support column 6, and the number of link block 9 can be multiple, this implementation In example, 12 are set as, each 3 of four faces of support column 6.Support rod 7 can be designed as it is multiple, in the present embodiment be two, One end is bolted with link block 9, other end fixing sucking disk 8, and sucker 8 is three-jaw sucker, and load-bearing is big, can also design certainly For other suckers.Link block 9 and support rod 7 are metal material, are steel in the present embodiment, and link block 9 is L-type, are equipped with through-hole, It is bolted on support column 6 on one side, another side is connect also by bolt with support rod 7, and support rod 7 is again provided with logical Hole.Through-hole is arranged in the end of support rod 7, and pin shaft is arranged in through-hole, and sucker 8 is welded on pin shaft, and block is arranged in pin shaft both ends.
Embodiment 2
Refering to Figure 4 and 5, it to be the base in embodiment 1 that this embodiment offers a kind of extra-high voltage Poling Construction climbing devices The improvement carried out on plinth: in the present embodiment, the ipsilateral of the second segment pillar 2 is arranged in the pedal 4, sets on the pedal 4 Set anti-skid chequer.Groove 10 is arranged in the top of second pillar 2.
Wherein, pedal 4 is setting up and down in the ipsilateral of second segment pillar 2, easy to carry, may be configured as multiple, the present embodiment In be two, be separately positioned on the upper and lower ends of second segment pillar 2.Anti-skid chequer is set on pedal 4, increases coefficient of friction, more Safety, anti-skid chequer can be band, vertical line or ripple glaze.Groove 10 is arranged in the top of second pillar 2, and the top of pillar is stuck in On shaft tower, structure is more stable.Climbing device sprays protective paint, increases service life.
The above is preferred embodiments of the present invention, it is noted that for the ordinary skill of the art For personnel, under the premise of not departing from principle described in the utility model, it can also make several improvements and retouch, these improvement It also should be regarded as the protection scope of the utility model with retouching.

Claims (5)

1. a kind of extra-high voltage Poling Construction climbing device, it is characterised in that: including several pillars, be arranged on the pillar Fixed mechanism and the supporting mechanism of the pillar lower part is set;The pillar includes the first segment branch with integral structure Column, second segment pillar and third section pillar;The first segment pillar is hollow structure, and the second segment pillar is equipped with pedal, The outer diameter of the third section pillar is less than or equal to the internal diameter of the first segment pillar;The supporting mechanism includes and the pillar The support column of lower part connection, several support rods being connect with the support column.
2. a kind of extra-high voltage Poling Construction climbing device as described in claim 1, it is characterised in that: set on the support column Several link blocks are set, sucker is arranged in one end of the support rod, and the other end of the support rod and the link block are detachable Connection.
3. a kind of extra-high voltage Poling Construction climbing device as described in claim 1, it is characterised in that: the fixed mechanism packet Include several locks that second segment lower rod end and first segment pillar upper end are set.
4. a kind of extra-high voltage Poling Construction climbing device as described in claim 1, it is characterised in that: described pedal or so pair Claim the two sides that the second segment pillar is arranged in, anti-skid chequer to be arranged on the pedal.
5. a kind of extra-high voltage Poling Construction climbing device as described in claim 1, it is characterised in that: the second segment pillar Top be arranged groove.
CN201821166312.XU 2018-07-23 2018-07-23 A kind of extra-high voltage Poling Construction climbing device Active CN208486815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821166312.XU CN208486815U (en) 2018-07-23 2018-07-23 A kind of extra-high voltage Poling Construction climbing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821166312.XU CN208486815U (en) 2018-07-23 2018-07-23 A kind of extra-high voltage Poling Construction climbing device

Publications (1)

Publication Number Publication Date
CN208486815U true CN208486815U (en) 2019-02-12

Family

ID=65246533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821166312.XU Active CN208486815U (en) 2018-07-23 2018-07-23 A kind of extra-high voltage Poling Construction climbing device

Country Status (1)

Country Link
CN (1) CN208486815U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344745A (en) * 2019-07-14 2019-10-18 苏州科斯曼照明工程有限公司 A kind of multi-functional construction ladder in construction site

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344745A (en) * 2019-07-14 2019-10-18 苏州科斯曼照明工程有限公司 A kind of multi-functional construction ladder in construction site
CN110344745B (en) * 2019-07-14 2020-10-09 东阳市俊华电器销售有限公司 Building site is with multi-functional construction ladder

Similar Documents

Publication Publication Date Title
CN105805112B (en) A kind of universal joint assembly for the connection of rod piece space structure
CN208486815U (en) A kind of extra-high voltage Poling Construction climbing device
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN213477619U (en) Climb outer facade fire prevention retractable safety net of frame
CN209761310U (en) Portable cat ladder for overhaul of equipment
CN209429487U (en) A kind of scaffold of architectural engineering
CN108756721B (en) A kind of cement shaft tower Anti-drop ladder structure
CN207092504U (en) A kind of scaffold for building
CN210976813U (en) Energy-saving concrete pole
CN208122743U (en) A kind of distribution line steel pipe pole climbing is removable to connect ladder
CN210685334U (en) Assembly type building external hanging platform
CN211851626U (en) Gardens are with novel multi-functional gardens ladder
CN112723094A (en) Integrated wall-attached device based on synchronous climbing of light steel platform
CN206903246U (en) A kind of structure with oblique member for building
CN211226087U (en) Wall for miniature tower crane
CN205583535U (en) Special tethers instrument of transmission line
CN210563765U (en) Detachable iron railing
CN215631926U (en) Supporting platform for mounting steel structure industrial factory building
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN213683907U (en) Combined hoisting insulating holding pole ladder
CN216393564U (en) Special orchard stool
CN216038519U (en) Hydraulic engineering construction auxiliary device that ascends a height
CN212406019U (en) Adjustable regularization safety operation platform construction equipment
CN212689526U (en) Building external climbing type building construction operation platform