CN202625606U - Basket device for installation and construction of ship lift guide rail - Google Patents
Basket device for installation and construction of ship lift guide rail Download PDFInfo
- Publication number
- CN202625606U CN202625606U CN 201220225146 CN201220225146U CN202625606U CN 202625606 U CN202625606 U CN 202625606U CN 201220225146 CN201220225146 CN 201220225146 CN 201220225146 U CN201220225146 U CN 201220225146U CN 202625606 U CN202625606 U CN 202625606U
- Authority
- CN
- China
- Prior art keywords
- basket
- construction
- guide rail
- installation
- ship lift
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
A basket device for installation and construction of a ship lift guide rail. The basket device comprises a basket, multiple layers of working platforms are arranged in the basket, and each layer of working platform is provided with a climbing ladder and an opening. The basket is of a box body type, rails are arranged on the periphery of the basket, a plurality of walking wheels are installed on one side of the basket, a plurality of lifting lugs are symmetrically arranged at the top of the basket, and a steel wire rope penetrates through the lifting lugs to be connected with the basket. The working platforms are of steel wire rope structures, and the ladders are connected with the openings of two adjacent working platforms. The basket device for installation and construction of the ship lift guide rail can overcome multiple shortcomings in erection of the construction platforms by adopting a floor framed bent, meets the requirements for construction operation of people at the positions of different height, and saves large amount of materials. Construction efficiency is high, and consumption is low. The basket device for installation and construction of the ship lift guide rail is particularly suitable for working conditions of construction operation on a vertical wall face with large height, such as construction of ship lift engineering longitudinal guide metal structure embedded parts.
Description
Technical field
The utility model relates to a kind of nacelle device, and nacelle device is used in the installation of particularly a kind of ship lift guide rail.
Background technology
On the concrete wall in the tower column structure counterbalanced weight well of power station ship lift engineering; Designed a large amount of longitudinal rail metal construction built-in fittings; This gold knot built-in fitting is the overlength part that total length surpasses 100m, is that the single short lead rail aggregate erection by 6m left and right sides length forms.During the guide rail installation; Take from bottom to top single guide rail to be installed by joint back in place at the scene, therefore need many people coordinative construction operation simultaneously, just can guarantee to reach the design-calculated high-precision requirement in different elevation positions; Because construction location is higher apart from ground; Adopt conventional setting up to land framed bent erection construction flat-bed construction method, but this method not only will consume wide variety of materials, operating efficiency is low, construction speed is slow; And framed bent removes and also need take plenty of time and manual work, wastes time and energy.
Summary of the invention
The utility model technical matters to be solved provides the installation of a kind of ship lift guide rail and uses nacelle device, and it is simple in structure, and is reasonable in design, easy to use.
In order to solve the problems of the technologies described above, the technical scheme of the utility model is: nacelle device is used in the installation of a kind of ship lift guide rail, comprises hanging basket, is provided with the multiple benches platform in the hanging basket, and every layer of workplatform is provided with cat ladder and opening.
Hanging basket is a box-type, is provided with railing around it.
One side of hanging basket is equipped with a plurality of road wheels.
The top of hanging basket is symmetrically arranged with a plurality of hangers, and steel rope is connected with hanging basket through hanger.
Said workplatform is a steel mesh structure.
Said cat ladder connects the opening of adjacent two workplatformes.
Nacelle device is used in the ship lift guide rail installation that the utility model provides; Can overcome to adopt and land framed bent erection construction flat-bed number of drawbacks, can satisfy many people in different elevation positions the needs of coordinative construction operation simultaneously, not only practice thrift wide variety of materials; Operating efficiency is high, expends also low; Be specially adapted to the operating mode of construction operation on the highly bigger upright walls, for example ship lift engineering longitudinal rail metal construction built-in fitting construction.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further.
Fig. 1 is the front view of the utility model;
Fig. 2 is the lateral plan of the utility model;
Fig. 3 is that the A-A of Fig. 1 is to cutaway view.
The specific embodiment
Shown in Fig. 1-3, the utility model comprises hanging basket 1, is provided with multiple benches platform 2 in the hanging basket 1, and every layer of workplatform is provided with cat ladder 3 and opening 8.
Hanging basket 1 is a box-type, is provided with railing 4 around it.
One side of hanging basket 1 is equipped with a plurality of road wheels 5.
The top of hanging basket 1 is symmetrically arranged with a plurality of hangers 6, and steel rope 7 is connected with hanging basket 1 through hanger 6.
Said workplatform 2 is a steel mesh structure.
Said cat ladder 3 connects the opening 8 of adjacent two workplatformes.
Channel-section steel material (specification is greater than 20#) is adopted in the column of hanging basket 1 and stull, and diagonal brace adopts angle steel material (specification is greater than 16#), and railing and cat ladder adopt the tube material of 1 inch.
The top of hanging basket 1 is symmetrically arranged with 4 hangers 6, and steel rope 7 all is connected with each hanger, helps guaranteeing construction safety.
The multiple benches platform 2 that is provided with in the hanging basket 1 can satisfy the needs of many people in different elevation position while coordinative construction operations.
Claims (6)
1. nacelle device is used in ship lift guide rail installation, comprises hanging basket (1), it is characterized in that: be provided with multiple benches platform (2) in the hanging basket (1), every layer of workplatform is provided with cat ladder (3) and opening (8).
2. nacelle device is used in ship lift guide rail according to claim 1 installation, it is characterized in that: hanging basket (1) is a box-type, is provided with railing (4) around it.
3. nacelle device is used in ship lift guide rail according to claim 1 installation, it is characterized in that: a side of hanging basket (1) is equipped with a plurality of road wheels (5).
4. nacelle device is used in ship lift guide rail according to claim 1 installation, it is characterized in that: the top of hanging basket (1) is symmetrically arranged with a plurality of hangers (6), and steel rope (7) is connected with hanging basket (1) through hanger (6).
5. nacelle device is used in ship lift guide rail according to claim 1 installation, it is characterized in that: said workplatform (2) is a steel mesh structure.
6. nacelle device is used in ship lift guide rail according to claim 1 installation, it is characterized in that: said cat ladder (3) connects the opening (8) of adjacent two workplatformes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220225146 CN202625606U (en) | 2012-05-18 | 2012-05-18 | Basket device for installation and construction of ship lift guide rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220225146 CN202625606U (en) | 2012-05-18 | 2012-05-18 | Basket device for installation and construction of ship lift guide rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202625606U true CN202625606U (en) | 2012-12-26 |
Family
ID=47378826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220225146 Expired - Fee Related CN202625606U (en) | 2012-05-18 | 2012-05-18 | Basket device for installation and construction of ship lift guide rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202625606U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104724596A (en) * | 2013-12-23 | 2015-06-24 | 王圣君 | Hoisting and conveying device |
-
2012
- 2012-05-18 CN CN 201220225146 patent/CN202625606U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104724596A (en) * | 2013-12-23 | 2015-06-24 | 王圣君 | Hoisting and conveying device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203359842U (en) | Internal climbing crane with self-elevating jacking sleeve frame | |
CN202925866U (en) | Movable lifting work platform | |
CN107090968A (en) | Integrated form attached lifting scaffold and its elevating method | |
CN101435268B (en) | Stretching device of case beam in case | |
CN203097316U (en) | Foldable hydraulic lifting support secure channel for high altitude construction | |
CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
CN201428461Y (en) | Safety protection working bogie for cavern | |
CN107696005B (en) | lifting operation platform for building construction | |
CN203947758U (en) | Novel hydraulic automatic climbing discharging platform | |
CN202625606U (en) | Basket device for installation and construction of ship lift guide rail | |
CN203420223U (en) | Prestress concrete double-line T-shaped beam bridge deck construction trolley | |
CN203867198U (en) | Slip equipment for high-rise steel structure transfer layer truss | |
CN106533334A (en) | Novel single-layer parallel suspension cable photovoltaic support system | |
CN203715115U (en) | Supporting point structure for self-hoisting system of portal crane | |
CN202181898U (en) | Special hanging scaffold for sheathing and building inner-layer well wall in vertical shaft sinking construction | |
CN102287193A (en) | Special hanging scaffold for sleeve-building inner shaft wall in shaft sinking of vertical shaft | |
CN202718380U (en) | Hydraulic climbing frame for construction of high-rise building | |
CN101670994B (en) | Lifting working platform for construction | |
CN202055507U (en) | Desulfurizing tower examination and repair platform | |
CN201738563U (en) | Hydraulic climbing scaffold for building construction | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN202558576U (en) | Hydraulic mobile lift truck | |
CN204416844U (en) | A kind of auxiliary device of building hoist | |
CN203701552U (en) | Attached scaffold for lifted through worm, gear and screw rod | |
CN203499232U (en) | Attached lifting scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121226 Termination date: 20200518 |
|
CF01 | Termination of patent right due to non-payment of annual fee |