CN220848615U - Building renovation climbing equipment - Google Patents
Building renovation climbing equipment Download PDFInfo
- Publication number
- CN220848615U CN220848615U CN202322725518.9U CN202322725518U CN220848615U CN 220848615 U CN220848615 U CN 220848615U CN 202322725518 U CN202322725518 U CN 202322725518U CN 220848615 U CN220848615 U CN 220848615U
- Authority
- CN
- China
- Prior art keywords
- climbing
- frame
- climbing frame
- sides
- building renovation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 103
- 238000009418 renovation Methods 0.000 title claims abstract description 21
- 230000000694 effects Effects 0.000 claims description 4
- 230000002787 reinforcement Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 4
- 238000009966 trimming Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000037452 priming Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model relates to the field of building renovation, in particular to building renovation climbing equipment, which comprises two L-shaped frames and a climbing mechanism, wherein the climbing mechanism comprises a climbing frame and foot pedals, the climbing frame is movably arranged between the two L-shaped frames, a foot pedal array is hinged in the middle of the climbing frame in parallel, the lower end of the climbing frame is hinged with a first telescopic rod, the other end of the first telescopic rod is hinged on one of bottom plates, the two L-shaped frames are matched with the climbing mechanism, when the first telescopic rod in the climbing mechanism contracts, the climbing frame can be pulled to approach to the vertical section of the L-shaped frames, further, the climbing frame is gradually erected, the working height of a person can be remarkably increased when the person ascends by means of the foot pedals, the device is stable in structure, and when the person frequently ascends and descends by means of walls, compared with the traditional ladder, the potential safety hazards such as ladder slipping can be effectively avoided, and the person can conveniently ascend and descend at the same time.
Description
Technical Field
The utility model relates to the field of building renovation, in particular to building renovation climbing equipment.
Background
In building decoration construction, the wall is required to be trimmed, the wall trimming mainly comprises the working procedures of shoveling a wall skin, filling cracks, puttying, leveling, painting an interface agent, priming paint, finishing paint and the like, at the moment, personnel are required to approach the wall closely for construction, the height of the personnel is limited, when the whole wall is trimmed, the construction operation at a higher position is required by means of a climbing device, a ladder or a construction frame is usually arranged, the ladder is convenient for the personnel to go up and down, but the ladder is easy to slip and fall during construction, potential safety hazards exist, the construction frame is stable and safe, but is high, the personnel is inconvenient to take materials, and building trimming climbing equipment is provided for solving the existing problems.
Disclosure of utility model
The utility model aims to solve the defects that in the prior art, a wall trimming climbing device has potential safety hazards or personnel are inconvenient to take materials, and provides building trimming climbing equipment.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
The utility model provides a building renovation climbing equipment, includes two L type framves and climbing mechanism, two array fixed mounting has the bottom plate in the middle of the L type frame, climbing mechanism includes climbing frame, running-board, climbing frame activity sets up two in the middle of the L type frame, climbing frame upper end both sides and two L type frame vertical section sliding connection, climbing frame lower extreme both sides and two L type frame horizontal segment sliding connection, running-board array parallel hinge mounting is in the middle of the climbing frame, the hinge groove has been seted up to climbing frame lower extreme array, hinge groove internal fixation has the hinge rod, hinge mounting has first telescopic link on the hinge rod, first telescopic link other end hinge mounting is in one of them on the bottom plate.
Preferably, the sliding grooves are formed in two opposite sides of the vertical section and the horizontal section of the L-shaped frame, short pins are fixedly arranged on two sides of the upper end and two sides of the lower end of the climbing frame, and the short pins are inserted in the sliding grooves in a sliding manner.
Preferably, the outside of the pedal plate is fixedly wrapped with an anti-skid sleeve.
Preferably, the two outer sides of the L-shaped frames are fixedly provided with side reinforcing rods in an array mode.
Preferably, the lower ends of the bottom plates in the middle of the horizontal sections of the two L-shaped frames are correspondingly and fixedly provided with anti-slip strips.
Preferably, the two sides of the climbing frame are divided into sections, the two sides of the lower section of the climbing frame are fixedly provided with second telescopic rods, and the upper ends of the second telescopic rods are fixedly connected with the two sides of the upper section of the climbing frame.
Preferably, the jack has been seted up to climbing frame hypomere upper end, climbing frame hypomere lower extreme corresponds jack fixed mounting and has the inserted bar, the inserted bar slides and inserts establish in the jack.
The building renovation climbing equipment provided by the utility model has the beneficial effects that:
1. Through the cooperation of two L type framves and climbing mechanism, when the shrink of the first telescopic link in climbing mechanism, can stimulate the climbing frame and be close to the vertical section of L type frame, and then make the climbing frame erect gradually, when personnel relies on the running-board to ascend a height, can show the increase personnel's operation height to device stable in structure, when personnel frequently about, when relying on the wall to place through two L type framves, compare traditional ladder, can effectively avoid potential safety hazards such as ladder slip, also greatly be convenient for personnel about the while.
2. Through the setting of second telescopic link at climbing frame both sides face, can increase climbing frame inclination, further increase climbing frame upper segment and the height of the running-board of corresponding position for personnel's operation height also correspondingly increases, when repairing the operation to the building wall, need not personnel and remove the activity that can realize in the certain altitude range, the setting of inserted bar simultaneously can effectively strengthen climbing frame upper segment and the connection stability of hypomere, when guaranteeing that the second telescopic link stretches out, can still maintain in sharp state when climbing frame upper segment and hypomere separation promptly.
Drawings
Fig. 1 is a schematic diagram of a front view structure of a building renovation climbing device according to the present utility model.
Fig. 2 is a schematic diagram of a front view structure of a building renovation climbing device according to the present utility model.
Fig. 3 is a schematic cross-sectional view of a building renovation climbing device according to the present utility model.
Fig. 4 is a schematic view showing a lower view structure of a building renovation climbing device according to the present utility model.
Fig. 5 is a schematic structural view of a climbing mechanism of a building renovation climbing device according to the present utility model.
In the figure: l-shaped frame 1, chute 11, bottom plate 2, climbing mechanism 3, climbing frame 31, short pin 311, articulated rod 312, running-board 32, first telescopic link 33, second telescopic link 34, inserted link 35, side reinforcing rod 4, antislip strip 5.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Example 1
Referring to fig. 1-5, a building renovation climbing device comprises two L-shaped frames 1 and a climbing mechanism 3, wherein the L-shaped frames 1 are composed of vertical sections and horizontal sections, a bottom plate 2 is fixedly arranged in an array in the middle of the two L-shaped frames 1, the bottom plate 2 can increase the structural stability of the device, the climbing mechanism 3 comprises a climbing frame 31 and a pedal 32, the climbing frame 31 is movably arranged in the middle of the two L-shaped frames 1, sliding grooves 11 are respectively arranged on opposite sides of the vertical sections and the horizontal sections of the two L-shaped frames 1, short pins 311 are fixedly arranged on two sides of the upper end and two sides of the lower end of the climbing frame 31, the short pins 311 are slidably inserted in the sliding grooves 11 because the short pins 311 are fixedly arranged on two sides of the upper end and two sides of the lower end of the climbing frame 31, can restrict the activity of cat-height frame 31 while, also be favorable to the regulation of cat-height frame 31 angle, the vertical section sliding connection of cat-height frame 31 upper end both sides and two L type framves 1, the parallel articulated installation of running-board 32 array is in the middle of the cat-height frame 31, because the articulated setting of running-board 32, when the cat-height frame 31 inclination is not time, personnel trample running-board 32 from top to bottom and not influenced, still can guarantee the level of running-board 32 tread, the hinge groove has been seted up to cat-height frame 31 lower extreme array, hinge rod 312 is fixedly installed to the hinge inslot, hinge installation has first telescopic link 33 on the hinge rod 312, first telescopic link 33 other end articulated installation is on one of them bottom plate 2.
The fixed parcel in the running-board 32 outside has the antiskid cover, set up the antiskid cover, take place the slippage when avoiding personnel to trample running-board 32 and fall down the condition, the bottom plate 2 lower extreme in the middle of two L type frame 1 horizontal segments corresponds fixed mounting and has antislip strip 5, set up antislip strip 5, can show the frictional force that increases between bottom plate 2 and the ground, when personnel ascend a height or get off, avoid device equipment to remove, make equipment more stable, two equal array fixed mounting in two L type frame 1 both outsides have side reinforcing rod 4, set up side reinforcing rod 4, when climbing frame 31 moves in the middle of two L type frame 1, avoid the angle between two L type frame 1 horizontal segments and the vertical section to change.
Through the cooperation of two L type framves 1 and climbing mechanism 3, when the first telescopic link 33 shrink in climbing mechanism 3, can stimulate climbing frame 31 and be close to the vertical section of L type frame 1, and then make climbing frame 31 erect gradually, when personnel relies on running-board 32 to ascend a height, can show the increase personnel operation height, and device stable in structure, when personnel frequently about, when placing by the wall through two L type framves 1, compare traditional ladder, can effectively avoid the potential safety hazard such as ladder slip, also be convenient for personnel about the while greatly.
Example 2
According to embodiment 1, when the climbing frame 31 in embodiment 1 moves between the two L-shaped frames 1, when a person ascends by means of the foot pedal 32, the working height of the person can be remarkably increased, compared with a traditional ladder, potential safety hazards such as slipping of the ladder can be effectively avoided, meanwhile, the climbing frame 31 is greatly convenient for the person to ascend and descend, however, if the climbing frame 31 is of a certain length, the climbing height of the person can be limited, and referring to fig. 1-5, as another preferred embodiment of the utility model, on the basis of embodiment 1:
The two sides of the climbing frame 31 are divided, the two sides of the lower section of the climbing frame 31 are fixedly provided with the second telescopic rods 34, the upper ends of the second telescopic rods 34 are fixedly connected with the two sides of the upper section of the climbing frame 31, the upper ends of the lower sections of the climbing frame 31 are provided with inserting holes, the lower ends of the upper sections of the climbing frame 31 are fixedly provided with inserting rods 35 corresponding to the inserting holes, the inserting rods 35 are slidably inserted into the inserting holes, the inclination angle of the climbing frame 31 can be increased through the arrangement of the second telescopic rods 34 on the two sides of the climbing frame 31, the height of the upper section of the climbing frame 31 and the pedal 32 at the corresponding position is further increased, the working height of personnel is correspondingly increased, the movement in a certain height range can be achieved without personnel moving when the building wall is trimmed, meanwhile, the arrangement of the inserting rods 35 can effectively strengthen the connection stability of the upper section and the lower section of the climbing frame 31, and the second telescopic rods 34 are ensured to extend, namely the upper section and the lower section of the climbing frame 31 can still be maintained in a straight line state when being separated.
Working principle: firstly, place the vertical section laminating wall of two L type framves 1 in the device, personnel trample on the running-board 32 of climbing frame 31 below, at this moment, control first telescopic link 33 shrink, drive climbing frame 31 lower extreme and be close to the vertical section of L type frame 1, and then make climbing frame 31 erect gradually, personnel relies on running-board 32 to ascend a height, personnel can show the increase personnel operation height, personnel ascend a height through trampling running-board 32 upward this moment, repair the wall, at this moment, personnel can be about freely, like extracting mortar etc. that repair the wall was used, when needs to increase operation height, control second telescopic link 34 stretches out, personnel need trample on running-board 32 of climbing frame 31 upper segment this moment, can follow climbing frame 31 upper segment and rise.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.
Claims (7)
1. Building renovation climbing equipment, including two L type framves (1), two array fixed mounting has bottom plate (2) in the middle of L type frame (1), its characterized in that still includes:
The climbing mechanism (3), climbing mechanism (3) includes climbing frame (31), running-board (32), climbing frame (31) activity sets up two in the middle of L type frame (1), climbing frame (31) upper end both sides and two L type frame (1) vertical section sliding connection, climbing frame (31) lower extreme both sides and two L type frame (1) horizontal section sliding connection, running-board (32) array parallel hinge mounting is in the middle of climbing frame (31), the hinge groove has been seted up to climbing frame (31) lower extreme array, fixed mounting has hinge rod (312) in the hinge groove, hinge rod (312) are last to be articulated to install first telescopic link (33), first telescopic link (33) other end hinge mounting is in on one of them bottom plate (2).
2. The building renovation climbing device according to claim 1, wherein the two L-shaped frames (1) are provided with sliding grooves (11) on opposite sides of the vertical section and the horizontal section, short pins (311) are fixedly arranged on two sides of the upper end and two sides of the lower end of the climbing frame (31), and the short pins (311) are slidably inserted into the sliding grooves (11).
3. Building renovation climbing device according to claim 2, wherein the foot pedal (32) is fixedly wrapped with an anti-slip sleeve on the outside.
4. Building renovation climbing device according to claim 2, wherein the two L-shaped frames (1) are fixedly mounted with side reinforcement bars (4) on both outer sides in an array.
5. Building renovation climbing device according to claim 4, wherein the lower end of the base plate (2) in the middle of the horizontal section of the two L-shaped frames (1) is fixedly provided with an anti-slip strip (5) correspondingly.
6. The building renovation climbing device according to claim 2, wherein two sides of the climbing frame (31) are divided, second telescopic rods (34) are fixedly arranged at two sides of the lower section of the climbing frame (31), and the upper ends of the second telescopic rods (34) are fixedly connected with two sides of the upper section of the climbing frame (31).
7. The building renovation climbing device according to claim 6, wherein a jack is provided at an upper end of a lower section of the climbing frame (31), a plug rod (35) is fixedly installed at the lower end of the upper section of the climbing frame (31) corresponding to the jack, and the plug rod (35) is slidably inserted into the jack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322725518.9U CN220848615U (en) | 2023-10-11 | 2023-10-11 | Building renovation climbing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322725518.9U CN220848615U (en) | 2023-10-11 | 2023-10-11 | Building renovation climbing equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220848615U true CN220848615U (en) | 2024-04-26 |
Family
ID=90744368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322725518.9U Active CN220848615U (en) | 2023-10-11 | 2023-10-11 | Building renovation climbing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220848615U (en) |
-
2023
- 2023-10-11 CN CN202322725518.9U patent/CN220848615U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206737388U (en) | Lift-on/lift-off type elevator hoistway construction platform device | |
CN112938854A (en) | High altitude cable maintenance auxiliary assembly | |
CN115262934A (en) | Scaffold for building decoration | |
CN220848615U (en) | Building renovation climbing equipment | |
CN206645674U (en) | Two-sided chute type stair lift | |
CN216787790U (en) | Convenient and tower crane complex attached scaffold | |
CN205476384U (en) | Scaffold that can walk | |
CN211545861U (en) | Ascending device for electric power engineering | |
CN211850709U (en) | Simple scaffold for house construction | |
CN210127607U (en) | Novel liftable wall plastering machine | |
CN211851627U (en) | A cat ladder for safety engineering | |
CN112160514A (en) | Up-pushing type wood stair structure for attic | |
CN207048286U (en) | Movable expanding is encorbelmented operating platform | |
CN218881518U (en) | Construction integration frame | |
CN221321908U (en) | Building engineering is with climbing frame | |
CN215331325U (en) | Lifting type scaffold for plastering exterior wall of house | |
CN215593717U (en) | Personnel up-and-down system of bridge construction creeping formwork mechanism | |
CN215631462U (en) | Ascending device for building construction | |
CN216847720U (en) | Road environment monitoring system | |
CN210659178U (en) | Multifunctional scaffold for building construction | |
CN202131967U (en) | Antiskid folding ladder with telescopic link handrail and lighting lamps | |
CN217151139U (en) | Building structure consolidates reforms transform construction equipment | |
CN221627578U (en) | Multifunctional hydroelectric installation rack | |
CN218621907U (en) | Railway bridge lateral part and bottom protection maintenance are with removing frame | |
CN214117468U (en) | Effectual aluminum alloy of antiskid climbs frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |